This document contains details for a federal contract opportunity to renovate rooms in Building 1258 at the Naval Undersea Warfare Center Division in Newport, Rhode Island. The scope of work includes planning, execution, and implementation to reconfigure existing space in rooms 314 and 315 to provide a conference room and collaboration area, including improving lighting, HVAC, and power. The contractor will verify existing site conditions and provide hazardous materials surveys. Drawings and specifications provide additional requirements. The evaluation of bids will be based on lowest price. The contract is set aside for small businesses with a NAICS code of 236220 and size standard of $39.5 million. The project magnitude is between $250,000 to $500,000 and work must be completed within 180 calendar days of award. The Naval Facilities Engineering Command is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to NUWC Building 1258 Rapid Innovation Center, newest first.
File Type Posted
REVISED Drawing and Specification rev 2020.02.19.pdf PDF
Attachment 3 - Base Access - SECNAV Form 5512.pdf PDF
N40085-20-B-3307 Rapid Innovation Center (IFB).pdf PDF
Attachment 1 - Specifications & Drawings.pdf PDF
NUWC Building 1258 Pre Bid Site Visit.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Prepared by: Cam Ormiston

This amendment amends the solicitation as follow ed:

1. Provides revised Specifications & Draw ings (Omit original specifications & draw ings posted w ith solicitation on 14 January 2020. Revised Specifications & Draw ings are provided as attachments.

2. Request for Information (RFI) Responses for Building 1258 Rapid Innovation Center

See Continuation Page(s)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 20-Feb-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008520B3307

X 9B. DATED (SEE ITEM 11)

14-Jan-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Feb-2020

CODE

NAVFAC MID ATLANTIC

PWD NEWPORT

BLDG 1 SIMONPIETRI DRIVE

NAVAL STATION NEWPORT

NEWPORT RI 02841-1712

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008520B3307

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 01 10 - TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Specifications &

Drawings

Attachment 2 Submittal Register 3 Attachment 3 Base Access - SECNAV

Form 5512 to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Revised SOW &

Drawings

Attachment 2 Submittal Register 3 Attachment 3 Base Access - SECNAV

Form 5512

(End of Summary of Changes)

The following items are applicable to this modification:

RFI RESPONSES

PRE‐BID REQUESTS FOR INFORMATION (RFI's)

PROJECT Rapid Innovation Center

LOCATION Building 1258, NUWC Newport

DATE 2/19/2020

RFI No. QUESTION RESPONSE

1 Door “315‐3” shown on the Door Schedule is not located on the Plans. Are we required to supply this door? Or can you revise the Door Schedule?

You are not required to provide this door. Drawings have been revised.

2 On the Security Plan, Note #4 states” At locations indicating access panel, provide a 12 inch square surface mounted pull box at 60 inches above finished floor”. There are no access panels on the drawings, can you please revise this requirement?

Revised drawings have been provided.

3 Please confirm the purchases of materials and equipment that are to become permanently installed in the renovation are exempt from Rhode Island sales tax. The Solicitation includes FAR 52.229‐3 Federal, State and Local Taxes, which indicates the Government will provide evidence appropriate to establish the exemption where one exists, which we believe applies to this project.

Please include taxes in your bid. NAVFAC PWD Newport does not provide tax exempt documentation.

4 Is the Superintendent permitted to perform any direct work on the project, such as selective demolition or carpentry, or are his/her duties restricted to supervision/coordination/other non‐ trade tasks?

The Superintendent is permitted to perform direct work so long as he/she is qualified and that work does not interfere with their primary responsibility of managing and coordinating day‐to‐day production and schedule adherence. They must also be able to attend regular partnering and QC meetings.

5 Will the contractor have a dedicated area behind the building for a dumpster, or is live loading of debris required? If a dumpster is allowed, is a 30 cubic yard container ok, or will size be limited to a 15 or 20 cubic yard container?

The contractor will have a dedicated area behind the building for their dumpster. A 30 cubic yard container is okay.

6 Are there any time of day restrictions for carrying debris and/or materials down the corridor and in/out of the building?

No.

7 Will the systems furniture currently in the largest existing room be removed by the Government, or should it be carried by offerors as part of the demolition? If it is to be removed as part of demolition, can the Government provide a sketch so all offerors can see the extent of the work?

The Government will remove the furniture before construction begins.

8 Are temporary framed drywall partitions required, or is 6‐mil (or thicker) polyethylene sheeting ok if it is securely attached to walls/ceilings/floors to adequately contain dust? As a secondary question— are there any different requirements for working in the occupied rooms to the east and west of new room 314A?

Provide temporary framed drywall partitions to contain dust and to help mitigate the spread of noise to the adjacent office spaces. Other than being mindful of dust and noise, there are no special requirements. To reduce desturbance, work to minimize the amount of time the walls are open to those adjacent spaces.

9 Can the Government provide a detail for Note 3 on drawing 3 of 13 to indicate how beams should be infilled, including framing requirements?

The drawings have been revised.

10 The hatched area indicating the beam and column wrapping in the largest existing room stops at the column near the center of that room. But the beam is still exposed across this room the rest of the way to the corridor. Should this beam also be infilled?

No. The wall below the beam jogs so the beam will be above the suspended ceiling in room 315. We only need to wrap it where the wall comes up to meet the beam in order to maintain a continuous wall.

11 Are there any requirements for off‐hours or weekend work for infilling the beam on the existing room to the west of new room 314A? It appears to be occupied and there is a finish ceiling and carpeting in there. Are there any special requirements for working along the walls of the corridors or in room 316?

There are no special requirements for working in the corridor. Room 316 is a large meeting room. Periodically there are special events in there that we will need to work around but there are no special requirements. The drywall in the room to the west of room 314A is already continuous to the underside of the roof deck.

12 Does the elevation titled “Room 315 Interior Finish” on drawing 4 of 13 showing acoustical wall panels apply to all three of the walls in this room that do not get dry erase boards?

Yes.

13 Will a flow test be required on the existing water supply feeding the fire suppression system, or will the Government provide recent, reliable data for the fire suppression subcontractor to use?

Secondary question—are calculations and engineered shop drawings required for planned changes to the system, or can the fire suppression subcontractor merely perform relocations to protect the new layout in accordance with the product and execution requirements of the specifications?

The new sprinkler layout has been approved by the local Authority Having Jurisidiction. A flow test is not required.

Calculations are not required. The subcontractor may perfrom the relocations inaccordance with the product and execution requirements of the specifications.

14 Will the contractor be required to hire an elevator subcontractor to disable the elevator and lock the rear doors (south) in order to finish the inside of the type 3 partition being infilled within the door opening, and/or to program the elevator to disable that door permanently?

The inside of the partition must be finished. Yes, that will likely require the contractor to hire an elevator mechanic to lock the rear doors open. The Government will hire a contractor seperately to permanently disable that door.

15 Does the Navy require a specific dry erase board. Notes have been added to the drawing.

16 Can the QC Manager and Superintendent be the same person?

No. The specification has been revised.

17 Please provide a spec for non‐acoustical steel doors. A specification section has been added.

18 Can the sprinkler work be performed during normal working hours?

Yes but the system must be put back into service each night.

19 The existing VAV boxes have KMC controls. Is there a requirement for DDC controls on the new VAV's?

Yes. The base is working towards standardizing the DDC controls with the Johnson Controls System. A note has been added to the mechanical schedule. NUWC also has a follow on contract to retrofit this building with a new control system. These new units will need to be tested locally as the new system will not be installed prior to this work taking place. They will be connected to the new system, by others, at a later date.