N4008519Q4611_SOW.pdf
PDF 2 MB Posted
- Attached to
- Bldg. 1320 Rm 167 Acme Lab upgrade Federal contract opportunity
- Solicitation number
- N4008519Q4611
About this file
N4008519Q4611_SOW.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| _PRE_BID_SITE_VISIT_INFO.pdf | ||
| SOW.pdf | ||
| WD.pdf | ||
| Bldg_1320_Rm_167_Acme_Lab_Upgrade.pdf | ||
| N4008519Q4611_WD.pdf | ||
| N4008519Q4611_Bldg_1320_Rm_167_Acme_Lab_Upgrade.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
“Building 1320 ROOM 167”
NAVAL UNDERSEA WARFARE CENTER DIVISION NEWPORT
January 10, 2018
General
Background/Scope
The Naval Undersea Warfare Center, Division Newport (NUWCDIVNPT) has a requirement to modify the space room 167 in Building 1320 at the Naval Undersea Warfare Center, Newport, Rhode Island.
Applicable Documents
NUWCDIVNPT Drawings 17-020A (12 sheets) and this Statement of Work, depict the work required on this particular project.
Submittals The contractor shall provide 2 copies of submittals for approval purposes for all materials to be used on the project. Submittals shall be complete with manufacturer’s name, catalog number, specifications, and any other information necessary to approve the materials. SDS sheets shall be submitted along with the product data for any potentially hazardous materials such as adhesives, flux materials, etc. Use low VOC materials wherever possible.
Warranty
The contractor shall provide warranty services for all new items installed for one (1) year following acceptance by the Government. Warranty period begins at final system acceptance. If there is a failure of the system, the contractor shall respond within 48 hours of notification. See paragraph entitled “Closeout Procedures” for additional information regarding warranties.
Period of Performance
The Period of Performance is for 60 days after date of contract award.
Place of Performance:
Naval Undersea Warfare Center, Newport, Rhode Island
Radio Transmitter Restrictions
The contractor shall conform to the restrictions and procedures for the use of radio transmitting equipment as directed. The contractor shall not use transmitters without prior approval from the Explosive Safety Officer.
Pre-Construction Conference
The contractor will be responsible to attend a pre-construction conference at the Naval Undersea Warfare Center to discuss all aspects of the project, including phasing, scheduling, safety concerns, fire department concerns, submission of submittals and the approval process, security concerns, environmental issues, customer concerns, and any concerns that the contractor may have.
Safety
The contractor is responsible for the safety of his personnel and the safety of NUWC personnel during the course of this project. The contractor shall comply with the most recent Army Corps of Engineers COE-EM-385-1-1 Safety and Health Requirements Manual for all aspects of this project. The contractor will be responsible for the following:
With regards to any exterior work or to any work which involves the closing of a building’s entrance, the contractor shall be responsible for the provision of temporary chain link construction fencing set into moveable concrete blocks, meeting the requirements of COE-EM-385-1-1, around the complete work area to prevent NUWC personnel from entering the work zone and/or any unsafe areas. The fence shall be equipped with signage as required by COE-EM-385-1-1. Provide gates where necessary for access by emergency personnel or to allow personnel to escape during an emergency.
Sawhorses and/or construction tape is not sufficient for exterior closings or barriers.
Weather Protection
The contractor shall take necessary precautions to ensure any critical openings are monitored carefully. Take immediate actions required to seal off such openings when rain or other detrimental weather is imminent, and at the end of each workday. Ensure that the openings are completely sealed off to protect materials and equipment in the building from damage.
When a warning of gale force winds is issued, take precautions to minimize danger to persons, and protect the work and nearby Government property.
Precautions shall include, but are not limited to, closing openings; removing loose materials, tools and equipment from exposed locations; and removing or securing scaffolding and other temporary work. Close openings in the work when storms of lesser intensity pose a threat to the work or any nearby “Government property.
Environmental Protection
The contractor shall provide and maintain, during the life of the contract, environmental protective measures to control pollution that develops during normal construction practice. Plan for and provide environmental protective measures required to correct conditions that develop during the construction of permanent or temporary environmental features associated with the project.
Comply with Federal, state, and local regulations pertaining to the environment, including but not limited to, water, air, solid waste, hazardous waste and substances, oily substances, and noise pollution, reporting, and permitting requirements.
Closeout Procedures
Prior to receiving final payment, the contractor shall be responsible for the following at the completion of the project:
The provision of one full size set of marked up drawings to be used as “As Built” construction conditions.
The provision of an “As Built” Record of Materials, which will include a list of items, along with the Manufacturer’s name, Manufacturer’s model numbers, etc.
The provision of Warranty Information including the warranty duration, the actual date of warranty expiration, warranty contact information, and any items that have an extended warranty beyond the standard one year.
Existing Work
Contractor shall be responsible for the protection of all existing structures, equipment, finishes, etc. not to be removed as part of this project from damage during construction. Any items not included in the Scope of Work that are damaged or altered during construction shall be restored to their pre-construction condition at the contractor’s expense and verified as such by the Government.
Contractor Access and Use of Premises
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry.
Mark Contractor equipment for identification.
Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
Identification Badges and Installation Access
Application for and use of badges will be as directed. Obtain access to the installation by participating in the Navy Commercial Access Control System (NCACS), or by obtaining passes each day from the Base Pass and Identification Office. Costs for obtaining passes through the NCACS are the responsibility of the Contractor. One-day passes, issued through the Base Pass and Identification Office, will be furnished without charge. Furnish a completed EMPLOYEE ELIGIBILITY VERIFICATION (DHS FORM I-9) form for all personnel requesting badges. This form is available at http://www.uscis.gov/portal/site/uscis by searching or selecting Employment Verification (Form I-9). Immediately report instances of lost or stolen badges to the Contracting Officer.
NCACS Program: NCACS is a voluntary program in which Contractor personnel who enroll, and are approved, are subsequently granted access to the installation for a period up to one year, or the length of the contract, whichever is less, and are not required to obtain a new pass from the Base Pass and Identification Office for each visit. The Government performs http://www.uscis.gov/portal/site/uscis background screening and credentialing. Throughout the year the Contractor employee must continue to meet background screening standards. Periodic background screenings are conducted to verify continued NCACS participation and installation access privileges. Under the NCACS program, no commercial vehicle inspection is required, other than for Random Anti-Terrorism Measures (RAM) or in the case of an elevation of Force Protection Conditions (FPCON). Information on costs and requirements to participate and enroll in NCACS is available at http://www.rapidgate.com or by calling 1-877-727-4342.
Contractors should be aware that the costs incurred to obtain NCACS credentials, or costs related to any means of access to a Navy Installation, are not reimbursable. Any time invested, or price(s) paid, for obtaining NCACS credentials will not be compensated in any way or approved as a direct cost of any contract with the Department of the Navy.
Delivery companies submitting NCACS applications must only be granted access if the prime Contractor has included the company on a participant’s spreadsheet provided in advance to the Contracting Officer. This form must be provided to the Government upon request.
One-Day Passes: Participation in the NCACS is not mandatory, and if the Contractor chooses to not participate, the Contractor’s personnel will have to obtain daily passes, be subject to daily, mandatory vehicle inspection, and will have limited access to the installation. The Government will not be responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the
NCACS.
Facility Access Determinations (FAD): The NCACS program above allows contractors to work on the NUWC grounds outside of buildings. In order to perform work within existing buildings, a FAD must be submitted. The FAD is a process whereby commanding officers, in their responsibilities under the Internal Security Act of 1950 to protect persons and property under their command against the actions of untrustworthy persons, may request personnel scrutiny investigations and review the results to determine whether to allow the identified person(s) access to facilities under their control. The FAD program also complies with the requirements of Homeland Security Presidential Directive 12 (HSPD-12) to have a background investigation on all individuals who access federal facilities. FADs are required when:
Unescorted access to the installation is required for a non-classified contract A request for a photo ID is submitted. Photo ID’s are only given when the contractor will be on site for a minimum of 3 days per week for a period not less than 90 days.
When there is no other background investigation that meets the requirement of HSPD-12 such as a prior NAC, NACI, or TWIC.
The FAD Process consists of the following:
Company submits a complete visit request for the individual. Visit request forms are available from the Security Department or NUWC Website.
The NUWC POC submits a badge card for the individual after verifying that the individual needs access for a minimum of three days per week for a period of at least 90 days.
During the badge card review process, the individual does not have a background investigation that meets the requirements of HSPD-12.
http://www.rapidgate.com/
The individual, and the individual’s company, are provided the SF-85 form through the electronic Questionnaire for Investigation Processing (eQip) The eQip is reviewed and the individual is fingerprinted to verify citizenship through a valid birth certificate or US Passport.
OPM conducts the NAC or NACI. Only a determination of Favorable will result in the individual’s unescorted access to NUWCDIVNPT.
If derogatory information occurs after the badge is issued, the contractor will be advised that the issuance of a NUWC badge is the sole prerogative of the commanding officer. If the commanding officer determines, upon review of the facts, that allowing a person to perform certain duties or to access certain areas, would pose an unacceptable risk, that decision is final. No due process procedures are required.
No Smoking Policy
Smoking is prohibited within and immediately outside of all buildings on installations under the cognizance of NAVFAC, except in designated exterior smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines.
Working Hours
Regular working hours must consist of an 8 1/2 hour period between 7:00 a.m.
and 4:30 p.m., Monday through Friday, excluding Government holidays.
Work Outside Regular Hours
If required, work outside regular working hours requires government approval. Make application 15 calendar days prior to such work, giving the specific dates, hours, location, type of work to be performed, contract number and project title, to allow arrangements to be made by the Government. Based on the justification provided, the Government may approve work outside regular hours. During periods of darkness, the work must be lighted in a manner approved by the Government.
Occupied Existing Building
The Contractor will be working at an existing building. Make accommodations to limit the disturbance to the building occupants.
STEEL DOORS
Standard Steel Doors
SDI/DOOR A250.8, except as specified otherwise. Prepare doors to receive door hardware as specified below and on drawings. Undercut where indicated.
Exterior doors shall have top edge closed flush and sealed to prevent water intrusion. Doors shall be 1-3/4 inch thick, unless otherwise indicated.
Standard Steel Frames
SDI/DOOR A250.8 Form frames to sizes and shapes indicated, with welded corners. Provide steel frames for doors, mullions, cased openings, unless otherwise indicated.
Mullions and Transom Bars
Mullions and transom bars shall be closed or tubular construction and be a member with heads and jambs butt-welded thereto or knock-down for field assembly. Bottom of door mullions shall have adjustable floor anchors and spreader connections.
Anchors
Provide anchors to secure the frame to adjoining construction. Provide steel anchors, zinc-coated or painted with rust-inhibitive paint, not lighter than 18 gage.
Wall Anchors
Provide at least three anchors for each jamb. For frames which are more than 7.5 feet in height, provide one additional anchor for each jamb for each additional 2.5 feet or fraction thereof.
a. Masonry: Provide anchors of corrugated or perforated steel straps or 5 mm 3/16 inch diameter steel wire, adjustable or T-shaped;
b. Stud partitions: Weld or otherwise securely fasten anchors to backs of frames. Design anchors to be fastened to closed steel studs with sheet metal screws, and to open steel studs by wiring or welding.
c. Completed openings: Secure frames to previously placed concrete or masonry with expansion bolts in accordance with SDI/DOOR 111.
d. Solid plaster partitions: Secure anchors solidly to back offrames and tie into the lath. Provide adjustable top strut anchors on each side of frame for fastening to structural members or ceiling construction above. Size and type of strut anchors shall be as recommended by the frame manufacturer.
Floor Anchors
Provide floor anchors drilled for 3/8 inch anchor bolts at bottom of each jamb member.
Factory-Primed Finish
All surfaces of doors and frames shall be thoroughly cleaned, chemically treated and factory primed with a rust inhibiting coating as specified in SDI/DOOR A250.8. Where coating is removed by welding, apply touchup of factory primer.
DOOR HARDWARE
Hinges
Provide in accordance with ANSI/BHMA A156.1. Provide hinges that are 4-1/2 by 4-1/2 inch unless otherwise indicated. Construct loose pin hinges for interior doors and reverse-bevel exterior doors so that pins are non-removable when door is closed. Other anti-friction bearing hinges may be provided in lieu of ball bearing hinges.
Mortise Locks and Latches
Provide in accordance with ANSI/BHMA A156.13, Series 1000, Operational Grade 1, Security Grade 2. Provide mortise locks with escutcheons not less than 7 by 2-1/4 inch with a bushing at least 1/4 inch long. Cut escutcheons to fit cylinders and provide trim items with straight, beveled, or smoothly rounded sides, corners, and edges. Provide knobs and roses of mortise locks with screwless shanks and no exposed screws.
Cylinders and Cores
Provide cylinders and cores with seven pin tumblers. Provide cylinders from the products of one manufacturer, and provide cores from the products of one manufacturer. Rim cylinders, mortise cylinders, and knobs of bored locksets have interchangeable cores which are removable by special control keys. Stamp each interchangeable core with a key control symbol in a concealed place on the core.
Lever Handles
Provide lever handles [where indicated in the Hardware Schedule]. Provide in accordance with ANSI/BHMA A156.3 for mortise locks of lever handles for exit devices. Provide lever handle locks with a breakaway feature (such as a weakened spindle or a shear key) to prevent irreparable damage to the lock when force in excess of that specified in ANSI/BHMA A156.13 is applied to the lever handle. Provide lever handles return to within 1/2 inch of the door face.
Closers
Provide in accordance with ANSI/BHMA A156.4, Series C02000, Grade 1, with PT 4C. Provide with brackets, arms, mounting devices, fasteners, full size covers, except at storefront mounting, and other features necessary for the particular application. Size closers in accordance with manufacturer's printed recommendations, or provide multi-size closers, Sizes 1 through 6, and list sizes in the Hardware Schedule. Provide manufacturer's 10 year warranty.
GYPSUM BOARD
Type X (Special Fire-Resistant)
48 inch wide, 5/8 inch thick, tapered and featured edges.
Joint Treatment Materials
ASTM C475/C475M. Product must be low emitting VOC types with VOC limits not exceeding 50 g/L. Provide data identifying VOC content of joint compound. Use all purpose joint and texturing compound containing inert fillers and natural binders, including lime compound. Pre-mixed compounds must be free of antifreeze, vinyl adhesives, preservatives, biocides and other slow releasing compounds.
All-Purpose Compound
Specifically formulated and manufactured to serve as both a taping and a finishing compound and compatible with tape, substrate and fasteners.
Joint Tape
Use cross-laminated, tapered edge, reinforced paper, or fiber glass mesh tape recommended by the manufacturer.
Screws
ASTM C1002, Type "S" steel drill screws for fastening gypsum board to steel framing members less than 0.033 inch thick. ASTM C954 steel drill screws for fastening gypsum board to steel framing members 0.033 to 0.112 inch thick.
Provide cementitious backer unit screws with a polymer coating.
ACOUSTICAL CEILINGS
Exposed-Grid System
Type III (non-asbestos mineral fiber with painted finish)
Flame Spread
Class A, 25 or less
Pattern
Medium texture
Minimum NRC
0.75 in open office areas; in conference rooms, executive offices, teleconferencing rooms, and other rooms as designated; when tested on mounting Type E-400 of ASTM E795.
Minimum Light Reflectance Coefficient
LR-1, 0.90 or greater
Nominal Size
24 by 24 inch
Edge Detail
Square
Finish
Factory-applied standard finish
Minimum CAC
Suspension System
Provide 15/16” exposed flange suspension systems conforming to ASTM C635/C635M for intermediate-duty systems. Provide surfaces exposed to view of steel with a factory-applied white baked-enamel finish. Provide wall molding having a flange of not less than 15/16. Provide inside and outside corner caps.
Suspended ceiling framing system must have the capability to support the finished ceiling, air diffusers, and accessories, as shown. Provide a suspension system with a maximum deflection of 1/360 of the span length.
Hangers
Provide hangers and attachment capable of supporting a minimum 1330 N 300 pound ultimate vertical load without failure of supporting material or attachment in accordance with ASCE 7.
Wires
Conform wires to [ASTM A641/A641M, Class 1, 0.11 inch in diameter.
Eyebolts
Provide eyebolts of weldless, forged-carbon-steel, with a straight-shank in accordance with ASTM A489. Eyebolt size must be a minimum 1/4 inch, zinc coated.
PAINTING AND COATINGS
Surface Preparation
Remove dirt, splinters, loose particles, grease, oil, disintegrated coatings, and other foreign matter and substances deleterious to coating performance as specified for each substrate before application of paint or surface treatments. Oil and grease shall be removed prior to mechanical cleaning. Cleaning shall be programmed so that dust and other contaminants will not fall on wet, newly painted surfaces. Exposed ferrous metals such as nail heads on or in contact with surfaces to be painted with water-thinned paints, shall be spot-primed with a suitable corrosion-inhibitive primer capable of preventing flash rusting and compatible with the coating specified for the adjacent areas.
Non-Ferrous Metallic Surfaces
Aluminum and aluminum-alloy, lead, copper, and other nonferrous metal surfaces.
Surface Cleaning: Solvent clean in accordance with SSPC SP 1 and wash with mild non-alkaline detergent to remove dirt and water soluble contaminants.
Gypsum Board
a. Surface Cleaning: Gypsum board shall be dry. Remove loose dirt and dust by brushing with a soft brush, rubbing with a dry cloth, or vacuum-cleaning prior to application of the first coat material.
A damp cloth or sponge may be used if paint will be water-based.
b. Repair of Minor Defects: Prior to painting, repair joints, cracks, holes, surface irregularities, and other minor defects with patching plaster or spackling compound and sand smooth.
Allowable Moisture Content: Latex coatings may be applied to damp surfaces, but not surfaces with droplets of water.
Interior Metal, Ferrous And Non-Ferrous Paint Table Interior Steel / Ferrous Surfaces
A. Metal, Mechanical, Electrical, Fire extinguishing sprinkler systems including valves, conduit, hangers, supports, Surfaces adjacent to painted surfaces (Match surrounding finish), exposed copper piping, and miscellaneous metal items not otherwise specified except floors, hot metal surfaces, and new prefinished equipment:
1. High Performance Architectural Latex
MPI INT 5.1R-G3 (Eggshell) Primer: Intermediate: Topcoat:
MPI 79 MPI 139 MPI 139
System DFT: 5 mils
MPI INT 5.1R-G5 (Semigloss)
MPI 79 MPI 141 MPI 141
System DFT: 5 mils
Interior Plaster, Gypsum Board, Textured Surfaces Paint Table
A. New and Existing, previously painted Plaster and Wallboard not otherwise specified:
1. Latex
New; MPI INT 9.2A-G3 (Eggshell) / Existing; RIN 9.2A-G3 (Eggshell)
MPI 50 MPI 52 MPI 52
System DFT: 4 mils
2. High Performance Architectural Latex - High Traffic Areas
New; MPI INT 9.2B-G3 (Eggshell) / Existing; MPI RIN 9.2B-G3 (Eggshell)
MPI 50 MPI 139 MPI 139
3. Institutional Low Odor / Low VOC Latex
New; MPI INT 9.2M-G3 (Eggshell) / Existing; MPI RIN 9.2M-G3 (Eggshell)
MPI 50 MPI 145 MPI 145
WET PIPE SPRINKLER, FIRE PROTECTION
GENERAL
System Description
Modify existing automatic wet pipe fire extinguishing sprinkler systems for complete fire protection coverage. Install fire extinguishing sprinkler systems in accordance with the required and advisory provisions of NFPA 13 including all recommendations and advisory portions, which shall be considered mandatory; this includes advisory provisions listed in the appendices of such standard(s).
Location of Sprinklers
Sprinklers in relation to the ceiling and the spacing of sprinklers shall not exceed that permitted by NFPA 13.
PRODUCTS
Steel Pipe
Pipe shall be black steel. Steel piping shall be Schedule 40 for sizes less than 2 and schedule 10 for sizes 2 inches and greater. Fittings into which sprinklers, sprinkler riser nipples, or drop nipples are threaded shall be welded, threaded, or grooved-end type. Plain-end fittings with mechanical couplings, fittings that use steel gripping devices to bite into the pipe and segmented welded fittings shall not be permitted. Rubber gasketed grooved-end pipe and fittings with mechanical couplings shall be permitted in pipe sizes
1.5 inches and larger. Fittings, mechanical couplings, and rubber gaskets shall be supplied by the same manufacturer. Steel piping with wall thickness less than Schedule 30 shall not be threaded. Side outlet tees using rubber gasketed fittings shall be permitted and be full bodied and wrap completely around the pipe. Sprinkler pipe and fittings shall be metal. Roll grooving of galvanized pipe is prohibited
Sprinklers
Provide nominal 0.50 inch or 0.53 inch orifice sprinklers. Sprinklers with internal O-rings shall not be used. Sprinklers shall be used in accordance with their listed coverage limitations. Provide quick response sprinklers.
Sprinklers shall have a stainless steel finish. Temperature classification shall be as indicated. Sprinklers in high heat areas including attic spaces or in close proximity to unit heaters shall have temperature classification in accordance with NFPA 13. Extended coverage sprinklers shall not be used.
Provide corrosion-resistant sprinklers and sprinkler guards as required by NFPA 13. Deflector shall not be more than 3 inches below suspended ceilings.
Ceiling plates shall not be more than 0.5 inch deep. Ceiling cups shall not be permitted.
Pipe Supports
Provide Pipe hangers and supports and Seismic Bracing in accordance with NFPA 13.
INSTALLATION
Piping in Finished Areas
The methods of fabrication and installation of the aboveground piping shall fully comply with the requirements and recommended practices of NFPA 13 and this specification section.
In areas with suspended or dropped ceilings and in areas with concealed spaces above the ceiling, piping shall be concealed above ceilings. Piping shall be inspected, tested and approved before being concealed. Risers and similar vertical runs of piping in finished areas shall be concealed.
Pipe Painting And Color Code Marking
Paint and color code mark sprinkler piping with red alkyd gloss enamel.
Pendent Sprinklers
Where sprinklers are installed below suspended or dropped ceilings, drop nipples shall be cut such that sprinkler ceiling plates or escutcheons are of a uniform depth throughout the finished space. The outlet of the reducing coupling shall not extend more than 1 inch below the underside of the ceiling. Pendent sprinklers in suspended ceilings shall be a minimum of 6 inches from ceiling grids.
Pipe Joints
Pipe joints shall conform to NFPA 13, except as modified herein. Welded joints will be permitted, only if welding operations are performed as required by NFPA 13 at the Contractor's fabrication shop, not at the project construction site. Flanged joints shall be provided where indicated or required by NFPA 13. Grooved pipe and fittings shall be prepared in accordance with the manufacturer's latest published specification according to pipe material, wall thickness and size. Grooved couplings, fittings and grooving tools shall be products of the same manufacturer. The diameter of grooves made in the field shall be measured using the method specifically approved by the coupling manufacturer for the intended application. Groove width and dimension of groove from end of pipe shall be measured and recorded for each change in grooving tool setup to verify compliance with coupling manufacturer's tolerances. A representative of the grooved couplings and fittings manufacturer shall conduct at least one onsite inspection of the piping installation to ensure the method of installation is in accordance with the manufacturer's requirements and recommended practices.
Reducers
Reductions in pipe sizes shall be made with one-piece tapered reducing fittings. Bushings are prohibited.
PLUMBING AND SPECIALTIES
Pipe Joint Materials
Grooved pipe and hubless cast-iron soil pipe shall not be used underground.
Solder containing lead shall not be used with copper pipe. Cast iron soil pipe and fittings shall be marked with the collective trademark of the Cast Iron Soil Institute. Joints and gasket materials shall conform to the following:
a. Coupling for Cast-Iron Pipe: for hub and spigot type ASTM A74, AWWA
C606. For hubless type: CISPI 310
b. Coupling for Steel Pipe: AWWA C606.
c. Flange Gaskets: Gaskets shall be made of non-asbestos material in accordance with ASME B16.21. Gaskets shall be flat, 1/16 inch thick, and contain Aramid fibers bonded with Styrene Butadiene Rubber (SBR) or Nitro Butadiene Rubber (NBR). Gaskets shall be the full face or self centering flat ring type. Gaskets used for hydrocarbon service shall be bonded with NBR.
d. Brazing Material: Brazing material shall conform to AWS A5.8/A5.8M, BCuP-5.
e. Brazing Flux: Flux shall be in paste or liquid form appropriate for use with brazing material. Flux shall be as follows: lead-free; have a 100 percent flushable residue; contain slightly acidic reagents;
contain potassium borides; and contain fluorides.
f. Solder Material: Solder metal shall conform to ASTM B32.
g. Solder Flux: Flux shall be liquid form, non-corrosive, and conform to
ASTM B813, Standard Test 1.
h. PTFE Tape: PTFE Tape, for use with Threaded Metal or Plastic Pipe.
i. Rubber Gaskets for Cast-Iron Soil-Pipe and Fittings (hub and spigot type and hubless type): ASTM C564.
j. Flexible Elastomeric Seals: ASTM D3139, ASTM D3212 or ASTM F477.
k. Flanged fittings including flanges, bolts, nuts, bolt patterns, etc., shall be in accordance with ASME B16.5 class 150 and shall have the manufacturer's trademark affixed in accordance with MSS SP-25. Flange material shall conform to ASTM A105/A105M. Blind flange material shall conform to ASTM A516/A516M cold service and ASTM A515/A515M for hot service. Bolts shall be high strength or intermediate strength with material conforming to ASTM A193/A193M.
l. Copper tubing shall conform to ASTM B88, Type K,or L.
Miscellaneous Materials
Miscellaneous materials shall conform to the following:
a. Hose Clamps: SAE J1508.
b. Supports for Off-The-Floor Plumbing Fixtures: ASME A112.6.1M.
c. Metallic Cleanouts: ASME A112.36.2M.
d. Plumbing Fixture Setting Compound: A preformed flexible ring seal molded from hydrocarbon wax material. The seal material shall be nonvolatile nonasphaltic and contain germicide and provide watertight, gastight, odorproof and verminproof properties.
Valves
Valves shall be provided on supplies to equipment and fixtures. Valves 2-1/2 inches and smaller shall be bronze with threaded bodies for pipe and solder-type connections for tubing. Valves 3 inches and larger shall have flanged iron bodies and bronze trim. Pressure ratings shall be based upon the application. Grooved end valves may be provided if the manufacturer certifies that the valves meet the performance requirements of applicable MSS standard.
Thermostatic Mixing Valves
Provide thermostatic mixing valve for lavatory faucets. Mixing valves, thermostatic type, pressure-balanced or combination thermostatic and pressure-balanced shall be line size and shall be constructed with rough or finish bodies either with or without plating. Each valve shall be constructed to control the mixing of hot and cold water and to deliver water at a desired temperature regardless of pressure or input temperature changes.
The control element shall be of an approved type. The body shall be of heavy cast bronze, and interior parts shall be brass, bronze, corrosion-resisting steel or copper. The valve shall be equipped with necessary stops, check valves, unions, and sediment strainers on the inlets. Mixing valves shall maintain water temperature within 5 degrees F of any setting.
Fixtures
Fixtures shall be water conservation type, in accordance with ASHRAE 189.1 Section 6.3.2.1 Fixtures shall be equipped with appurtenances such as traps, faucets, stop valves, and drain fittings. Each fixture and piece of equipment requiring connections to the drainage system, shall be equipped with a trap. Brass expansion or toggle bolts capped with acorn nuts shall be provided for supports, and polished chromium-plated pipe, valves, and fittings shall be provided where exposed to view. Fixtures with the supply discharge below the rim shall be equipped with backflow preventers. Internal parts of faucetts, strainers of sink waste drains, shall be copper alloy with all visible surfaces chrome plated.
Hand Sinks
ASME A112.19.3/CSA B45.4, 20 gage stainless steel with integral mounting rim for flush installation, minimum dimensions of 25 inches wide by 22 inches front to rear, with undersides fully sound deadened, with supply openings for use with top mounted washerless sink faucets and with 3.5 inch drain outlet.
Provide aerator with faucet. Water flow rate shall not exceed 2.2 gpm when measured at a flowing water pressure of 60 psi. Provide stainless steel drain outlets and stainless steel cup strainers. Provide separate 1.5 inch P-trap and drain piping to vertical vent piping from compartment.
Emergency Shower, Eye and Face Wash
ANSI/ISEA Z358.1, floor supported free standing unit. Provide deluge shower head, stay-open ball valve operated by pull rod and ring or triangular handle. Provide eyewash and stay-open ball valve operated by foot treadle or push handle.
ISEA Z358.1, wall-mounted self-cleaning, nonclogging eye and face wash with quick opening, full-flow valves, stainless steel eye and face wash receptor. Unit shall deliver 3 gpm of aerated water at 30 psig flow pressure, with eye and face wash nozzles 33 to 45 inches above finished floor. Provide copper alloy control valves. Provide an air-gap with the lowest potable eye and face wash water outlet located above the overflow rim by not less than the International Plumbing Code minimum.
Traps
Unless otherwise specified, traps shall be copper-alloy adjustable tube type with slip joint inlet and swivel. Provide traps with removable access panels for easy clean-out at sinks. Tubes shall be copper alloy with walls not less than 0.032 inch thick within commercial tolerances, except on the outside of bends where the thickness may be reduced slightly in manufacture by usual commercial methods. Inlets shall have rubber washer and copper alloy nuts for slip joints above the discharge level. Swivel joints shall be below the discharge level and shall be of metal-to-metal or metal-to-plastic type as required for the application. Nuts shall have flats for wrench grip.
Outlets shall have internal pipe thread, except that when required for the application, the outlets shall have sockets for solder-joint connections.
The depth of the water seal shall be not less than 2 inches. The interior diameter shall be not more than 1/8 inch over or under the nominal size, and interior surfaces shall be reasonably smooth throughout. A copper alloy "P" trap assembly consisting of an adjustable "P" trap and threaded trap wall nipple with cast brass wall flange shall be provided for lavatories. The assembly shall be a standard manufactured unit and may have a rubber-gasketed swivel joint.
Escutcheon Plates
Provide one piece or split hinge metal plates for piping entering floors, walls, and ceilings in exposed spaces. Provide chromium-plated on copper alloy plates or polished stainless steel finish in finished spaces. Provide paint finish on plates in unfinished spaces.
Pipe Sleeves
Provide where piping passes entirely through walls, ceilings, roofs, and floors. Sleeves are not required where supply drain, waste, and vent (DWV) piping passes through concrete floor slabs located on grade, except where penetrating a membrane waterproof floor.
Sleeves in Masonry and Concrete
Provide steel pipe sleeves or schedule 40 PVC plastic pipe sleeves. Sleeves are not required where drain, waste, and vent (DWV) piping passes through concrete floor slabs located on grade. Core drilling of masonry and concrete may be provided in lieu of pipe sleeves when cavities in the core-drilled hole are completely grouted smooth.
Sleeves Not in Masonry and Concrete
Provide 26 gage galvanized steel sheet or PVC plastic pipe sleeves.
Pipe Hangers (Supports)
Provide MSS SP-58 and MSS SP-69, Type 1 with adjustable type steel support rods, except as specified or indicated otherwise. Attach to steel joists with Type 19 or 23 clamps and retaining straps. Attach to Steel W or S beams with Type 21, 28, 29, or 30 clamps. Attach to steel angles and vertical web steel channels with Type 20 clamp with beam clamp channel adapter. Attach to horizontal web steel channel and wood with drilled hole on centerline and double nut and washer. Attach to concrete with Type 18 insert or drilled expansion anchor. Provide Type 40 insulation protection shield for insulated piping.
Plumbing Pipe Insulation Material and Thickness
Pipe insulation materials must be as listed in Table 1 and must meet or exceed the requirements of ASHRAE 90.1 - IP.
TABLE 1
Insulation Material for Piping
Service
Material Specification Type Class VR/VB Req'd
Domestic Hot, Cold and Tepid Water Piping
Cellular Glass ASTM C552 II 2 Yes
Flexible Elastomeric Cellular
ASTM C534/C534M I Yes
Note: VR/VB = Vapor Retarder/Vapor Barrier
TABLE 2
Piping Insulation Thickness (inch)
Service
Material Tube And Pipe Size (inch)
<1 1-<1.5 1.5-<4 4-<8 > or = >8
Domestic Hot, Cold and Tepid Water Piping
Cellular Glass 1.5 2 2 2.5 3
Flexible Elastomeric Cellular 1 1 1 N/A N/A
Cutting and Repairing
The work shall be carefully laid out in advance, and unnecessary cutting of construction shall be avoided. Damage to building, piping, wiring, or equipment as a result of cutting shall be repaired by mechanics skilled in the trade involved.
Cast Iron Soil, Waste and Vent Pipe
Bell and spigot compression and hubless gasketed clamp joints for soil, waste and vent piping shall be installed per the manufacturer's recommendations.
Copper Tube and Pipe
Brazed. Brazed joints shall be made in conformance with AWS B2.2/B2.2M, ASME B16.50, and CDA A4015 with flux and are acceptable for all pipe sizes.
Copper to copper joints shall include the use of copper-phosphorus or copper-phosphorus-silver brazing metal without flux. Brazing of dissimilar metals (copper to bronze or brass) shall include the use of flux with either a copper-phosphorus, copper-phosphorus-silver or a silver brazing filler metal.
Soldered. Soldered joints shall be made with flux and are only acceptable for piping 2 inches and smaller. Soldered joints shall conform to ASME B31.5 and CDA A4015. Soldered joints shall not be used in compressed air piping between the air compressor and the receiver.
MECHANICAL PIPING AND SPECIALTIES
Standard Products
Provide materials and equipment which are the standard products of a manufacturer regularly engaged in the manufacture of such products and that essentially duplicate items that have been in satisfactory use for at least 2 years prior to bid opening. Equipment shall be supported by a service organization that is, in the opinion of the Contracting Officer, reasonably convenient to the site.
Nameplates
Place a plate on each major item of equipment having the manufacturer's name, address, type or style, model or serial number, and catalog number secured to the item of equipment.
Gaskets for Flanges
Composition gaskets shall conform to ASME B16.21. Gaskets shall be nonasbestos compressed material in accordance with ASME B16.21, 1/16 inch thickness, full face or self-centering flat ring type. Gaskets shall contain aramid fibers bonded with styrene butadiene rubber (SBR) or nitrile butadiene rubber (NBR).
NBR binder shall be used for hydrocarbon service. Gaskets shall be suitable for pressure and temperatures of piping system.
Pipe Hangers, Inserts, and Supports
Pipe hangers, inserts, and supports shall conform to MSS SP-58.
Drains
Install threaded drain connections with threaded cap or plug wherever required for thorough draining of the low temperature water system.
Install all work as indicated and in accordance with the manufacturer's diagrams and recommendations.
Piping
Unless otherwise specified, pipe and fittings installation shall conform to the requirements of ASME B31.1. Pipe shall be cut accurately to measurements established at the job site and worked into place without springing or forcing, completely clearing all windows, doors, and other openings. Cuttings or other weakening of the building structure to facilitate piping installation will not be permitted without written approval. Pipe or tubing shall be cut square, shall have burrs removed by reaming, and shall be so installed as to permit free expansion and contraction without causing damage to building structure, pipe, joints, or hangers. Changes in direction shall be made with factory made fittings, except that bending of pipe up to 4 inches will be permitted, provided a pipe bender is used and wide sweep bends are formed. The center line radius of bends shall not be less than six diameters of the pipe. Bent pipe showing kinks, wrinkles, flattening, or other malformations will not be accepted. Vent pipes shall be installed through the roof as indicated and shall be flashed as specified. Horizontal mains shall pitch up or down in the direction of flow as indicated. The grade shall be not less than 1 inch in 40 feet. Reducing fittings shall be used for changes in pipe sizes. Open ends of pipelines and equipment shall be capped or plugged during installation to keep dirt or other foreign materials out of the systems. Pipe not otherwise specified shall be uncoated. Unions and other components for copper pipe or tubing shall be brass or bronze. Connections between ferrous and copper piping shall be electrically isolated using dielectric unions.
Joints
Except as otherwise specified, joints used on steel pipe shall be threaded for fittings 1 inch and smaller; threaded or welded for 1-1/4 inches up through 2-1/2 inches; and flanged or welded for 3 inches and larger. Pipe and fittings 1-1/4 inches and larger installed in inaccessible conduits or trenches beneath concrete floor slabs shall be welded. Unless otherwise specified, connections to equipment shall be made with black malleable iron unions for pipe 2-1/2 inches or smaller in diameter, and with flanges for pipe 3 inches or larger in diameter.
Flanged Joints or Unions
Flanged joints or unions shall be provided in each line immediately preceding the connection to each piece of equipment or material requiring maintenance such as coils, pumps, control valves, and similar items. Flanged joints shall be faced true, provided with gaskets, and made square and tight. Full-faced gaskets shall be used with cast iron flanges.
Joints for Copper Tubing
Solder conforming to ASTM B32 alloy grade Sb5 or Sn96. Solder and flux shall be lead free (less than 0.2 percent of lead).
An extracted mechanical tee joint may be made in copper tube. Make joint with an appropriate tool by drilling a pilot hole and drawing out the tube surface to form a collar having a minimum height of three times the thickness of the tube wall. To prevent the branch tube from being inserted beyond the depth of the extracted joint, provide dimpled depth stops. Notch the branch tube for proper penetration into fitting to assure a free flow joint. Braze extracted joints using a copper phosphorous classification brazing filler metal.
Soldered joints shall not be permitted.
Press fittings for Copper Pipe and Tube are not allowed on Navy projects.
Pipe Insulation Material and Thickness
Pipe insulation materials must be as listed in Table 1 and must meet or exceed the requirements of ASHRAE 90.1 - IP.
TABLE 1
Insulation Material for Piping
Service
Material Specification Type Class VR/VB Req'd
Hot Water Supply & Return
Cellular Glass ASTM C552 II 2 Yes
Flexible Elastomeric Cellular
ASTM C534/C534M I Yes
Note: VR/VB = Vapor Retarder/Vapor Barrier
TABLE 2
Piping Insulation Thickness (inch)
Service
Material Tube And Pipe Size (inch)
<1 1-<1.5 1.5-<4 4-<8 > or = >8
Hot Water (Supply & Return, 40 Degrees F nominal)
Cellular Glass 1.5 2 2 2.5 3
Flexible Elastomeric Cellular 1 1 1 N/A N/A
Refrigerant and Condensate Drain Located Inside Building
Cellular Glass 1.5 1.5 1.5 1.5 1.5
Flexible Elastomeric Cellular 1 1 1 N/A N/A
Connections To Equipment
Supply and return connections shall be provided by the Contractor unless otherwise indicated. Valves shall be installed in accordance with the manufacturer's recommendations. Unless otherwise indicated, the size of the supply and return pipes to each piece of equipment shall be not smaller than the connections on the equipment. No bushed connections shall be permitted.
Change in sizes shall be made with reducers or increasers only.
Supports
Hangers used to support piping 2 inches and larger shall be fabricated to permit adequate adjustment after erection while supporting the load. Pipe guides and anchors shall be installed to keep pipes in accurate alignment, to direct the expansion movement, and to prevent buckling, swaying, and undue strain. All piping subjected to vertical movement when operating temperatures exceed ambient temperatures, shall be supported by variable spring hangers and supports or by constant support hangers. Where threaded rods are used for support, they shall not be formed or bent.
Pipe Hangers, Inserts, and Supports
Pipe hangers, inserts and supports shall conform to MSS SP-58.
Pipe Hanger Size
Pipe hangers on horizontal insulated pipe shall be the size of the outside diameter of the insulation.
Manufacturer's Services
Provide the services of a manufacturer's representative who is experienced in the installation, adjustment, and operation of the equipment specified. The representative shall supervise the installation, adjustment, and testing of the equipment.
Testing And Cleaning
Submit performance test reports in booklet form showing all field tests performed to adjust each component and all field tests performed to prove compliance with the specified performance criteria, upon completion and testing of the installed system. Indicate in each test report the final position of controls.
Pressure Testing Notify the Contracting Officer 2 days before the tests are to be conducted.
The tests shall be performed in the presence of the Contracting Officer.
Furnish all instruments and personnel required for the tests. All test results shall be accepted before thermal insulation is installed. The entire chilled/glycol system, including chiller and fittings, shall be hydrostatically tested and proved tight under a pressure of 45 psig for a period of four hours.
Cleaning
After the hydrostatic tests have been made and prior to the operating tests, the chiller and piping shall be thoroughly cleaned and the system thoroughly flushed out with fresh water. Equipment shall be wiped clean, with all traces of oil, dust, dirt, or paint spots removed. The Contractor will be responsible for maintaining the system in a clean condition until final acceptance. Bearings shall be lubricated with oil or grease as recommended by the manufacturer.
AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST
SYSTEMS
Identification Plates
In addition to standard manufacturer's identification plates, provide engraved laminated phenolic identification plates for each piece of mechanical equipment. Identification plates are to designate the function of the equipment. Submit designation with the shop drawings. Identification plates shall be three layers, black-white-black, engraved to show white letters on black background. Letters shall be upper case. Identification plates 1-1/2-inches high and smaller shall be 1/16-inch thick, with engraved lettering 1/8-inch high; identification plates larger than 1-1/2-inches high shall be 1/8-inch thick, with engraved lettering of suitable height.
Identification plates 1-1/2-inches high and larger shall have beveled edges.
Install identification plates using a compatible adhesive.
Metal Ductwork
Provide metal ductwork construction, including all fittings and components, that complies with SMACNA 1966, as supplemented and modified by this specification.
a. Ductwork shall be constructed meeting the requirements for the duct system static pressure.
b. Provide radius type elbows with a centerline radius of 1.5 times the width or diameter of the duct where space permits. Otherwise, elbows having a minimum radius equal to the width or diameter of the duct or square elbows with factory fabricated turning vanes are allowed.
c. Provide ductwork that meets the requirements of Seal Class A.
d. Provide sealants that conform to fire hazard classification specified and are suitable for the range of air distribution and ambient temperatures to which it is exposed. Do not use pressure sensitive tape as a sealant.
e. Make spiral lock seam duct, and flat oval with duct sealant and lock with not less than 3 equally spaced drive screws or other approved methods indicated in SMACNA 1966. Apply the sealant to the exposed male part of the fitting collar so that the sealer is on the inside of the joint and fully protected by the metal of the duct fitting. Apply one brush coat of the sealant over the outside of the joint to at least 2 inch band width covering all screw heads and joint gap. Dents in the male portion of the slip fitting collar are not acceptable. Fabricate outdoor air intake ducts and plenums with watertight soldered or brazed joints and seams.
Metallic Flexible Duct
a. Provide duct that conforms to UL 181 and NFPA 90A with factory-applied insulation, vapor barrier, and end connections. Provide duct assembly that does not exceed 25 for flame spread and 50 for smoke developed.
Provide ducts designed for working pressures of 2 inches water gauge positive and 1.5 inches water gauge negative. Provide flexible round duct length that does not exceed 5 feet. Secure connections by applying adhesive for 2 inches over rigid duct, apply flexible duct 2 inches over rigid duct, apply metal clamp, and provide minimum of three No. 8 sheet metal screws through clamp and rigid duct.
b. Inner duct core: Provide interlocking spiral core constructed of zinc-coated steel, aluminum, or stainless steel inner duct core.
c. Insulation: Provide inner duct core that is insulated with mineral fiber blanket type flexible insulation, minimum of 1 inch thick.
Provide insulation covered on exterior with manufacturer's standard fire retardant vapor barrier jacket for flexible round duct.
General Service Duct Connectors
Provide a flexible duct connector approximately 6 inches in width where sheet metal connections are made to fans or where ducts of dissimilar metals are…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.