_Drawings_2_of_2_.pdf

PDF 19 MB Posted

Attached to
Replace Potable Water Wells and Install Raw Water Main Federal contract opportunity
Solicitation number
N4008519B4002
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This pre-solicitation notice describes a forthcoming solicitation for replacement of potable water wells and installation of raw water main at Marine Corps Air Station Cherry Point in North Carolina. The contract will be awarded on a firm-fixed price basis to a small business for providing all labor, management, supervision, materials and equipment required to demolish four existing wells, construct three new wells, extend raw water mains and fiber optic lines to the new well sites, and perform related site preparation and incidental work. The total small business set-aside contract valued between $1-5 million utilizes NAICS code 237110 and will be solicited using sealed bidding procedures. The response deadline is 12 September 2019 with a pre-bid site visit scheduled for 19 August 2019. The wage determination, bid bond requirement, and other offeror registration and certification requirements are specified. The point of contact for questions is Jennifer L. Stewart of the Naval Facilities Engineering Command.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Potable Water Wells and Install Raw Water Main, newest first.
File Type Posted
N40085-19-B-4002-0001.pdf PDF
_SpecsAsOne.pdf PDF
_Drawings_1_of_2.pdf PDF
_N40085-19-B-4002.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ro N

D

C

? B" N n I n

I Q n o, � ro o, Q

I w

L

I

0, n c m a

'ii Q

:0

1 2

25.0

20.0

15.0

1 2

I

I

30.0 I

I fat-

AIR RELASE VALVE

ASSEMBLY (B1/C504)

STA. 20+69±

12" CAP, RJ. END 12" RJ PVC WATER MAIN

BLOW OFF ASSEMBLY. SEE DETAIL A2/C505.

� LIMITS OF CLEARING/

"""--�� DISTURB� \

24.

0, I i5/ '--l

I'��'"

\ - ) � -c.,/ zJ.9

\ zJ.9

/ 0,

• I? /( ;-, \ J

WELL NO. 42. SEE\ 1

\I

SHEET C103 FOR SrTE I I

I I,\:" AND PIPING PLAN. \/ � ;;�:t t'�\ ;\ \ ,,,--....... { ;,_ i ( 0 \ 1.:) ( \ (·z;.7 \

J 'c_/

'lf"1 �� I

' ,i; ";r' I t{_�-y \\" I / ('; I \

I t ("''-, a I -

WELL #42 RAW WATER MAIN PLAN

SCALE: 1" = 20'

L PROPOSED 12" PVC RJ C900

RAW WATER MAIN

-- --+ -- -- --- -- -----1

25.0

20.0

-1+------------+- -----

I 15.0

20+00 21+00

WELL #42 RAW WATER MAIN PROFILE

H0RZ. SCALE: 1" = 20' VERT. SCALE: 1" = 2'

3 4

);5,1

NOTES:

1. CONTRACTOR SHALL FIELD VERIFY TYPE /IND LOCATION OF

EXISTING UTILITIES IN VICINITY OF PROPOSED RAW WATER

MAIN. IF CONTRACTOR CANNOT MAINTAIN 5' HORIZONTAL

SEPARATION OR RELOCATE EXISTING UTILITIES, THEY

SHALL NOTIFY ENGINEER AND CONTRACTING OFFICER.

VERTICAL SCALE

HORIZONrnL SCALE

1 "=2' 2' 1'

20' 1 o' 1"=20'

2'

20'

GRAPHIC SCALES

4'

40' t1.\''"'""'''".1i �"'

y. CAR0

1� it�: 0ti:r.� � �·t� ... . . ... : : SEAi_ : ::

$7': 044627 : 85

D

:;?J . ! •L,J:t:

\0';•& .1 <d ,t .-:c1� �� • ��- ----§ C � ,t-•••••••• :.: ":( § �.ll · PARt.V"t1.� '"'""'"""'"'

Sb'I.L

AS'COM

AECOM TECHNICAL SERI/ICES, INC.

1600 PE RMI METER PARK DRIVE

SUITE 400

MORRISVILLE, NC 27560

(919) 461-1100 www.aecom.com

!f'PROV[D

ACTl�W

FINAL DRAWINGS

S�TISFACTORY TC DATE

A/E INFO

DES KKPT DPW KKPT CHK RAB

PK'l,IECT ND 60537017

½0. NJ 6584536

CP 110. CP18E01 M

CDNJR NJ. N62470-14-D-9016

C f- � � z:::, :,; :5 0 :,; 1S o Cl � 0 2 0 � z Cl: () • l:l <( � � LL i;l � > 'jw <( a.

I!] z � >= ::J I I [j w i:l: Cl� ;;l z �> <( "'�28 2� o-

CJ

z a:

w w z

CJz w

� [:3z f-w-:r

_J I- -

... () Ii:

0 <( - 'z LL �

UJ

_J

� � �a. <( �z2

SCAI E

<:z ....J io oz F<X:'. ,---..

�CJ)

z....1z z+ i----'.' ...J - <i:o zw<X:

::::!i'N

�s� 0::0

WI->- I-

82 a: a: <i:o wwW 5'0 :c 1- I- +

(_) <I: $CL()

<i:�

�s 0::

<i:

Of-ws <i: (/) O

...J <I: o::w co a: ....J w- <I: ...J Gu..

zO z l- ...J <i: 0:: o O <t: o::

0..

80..1- IO (/) w CJ) f-Z 0:: <i:

c::: OZ oz

� :5- z ::i 0..

�a.. (_) w w a:z

AS NOTED

UAII:_ JUNE 2018

CONSTR. cm I""/_ NO rsAVF'IC DRA\l\'lrJG NO

12757456

SHEET 19 OF

C312

B

A

C502

R E

P

LA

C E

P O

TA

B

LE

W

A

TE

R W

E

LL

S A

N D

IN

S

TA

LL

R A

W W

A

TE

R M

A

IN

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

N A

V

FA

C M

ID

LA

N T www.aecom.com(919) 461-1100

AECOM TECHNICAL SERVICES, INC.

1600 PERMIMETER PARK DRIVE

SUITE 400

MORRISVILLE, NC 27560

WELL PROFILE

PRELIMINARY WELL CONSTRUCTION DATA

PUMP PEDESTALA1

SECTION A-A

PLAN

WELL DISCHARGE HEAD/CASING INTERFACE

AutoCAD SHX Text

NON-SHRINK GROUT

AutoCAD SHX Text

12" SDR-17 PVC CASING

AutoCAD SHX Text

CONCRETE PEDESTAL

AutoCAD SHX Text

DISCHARGE HEAD

AutoCAD SHX Text

2" VENT WITH MESH SCREEN AND PRESSURE TRANSDUCER LINE

AutoCAD SHX Text

INNER 6" STEEL CASING

AutoCAD SHX Text

WELL DETAILS

AutoCAD SHX Text 12757458

AutoCAD SHX Text

AutoCAD SHX Text

NONE

AutoCAD SHX Text

DSS

AutoCAD SHX Text

KKPT

AutoCAD SHX Text

MARINE CORPS AIR STATION

AutoCAD SHX Text

CHERRY POINT, NORTH CAROLINA

AutoCAD SHX Text

JANUARY 2019

AutoCAD SHX Text

AutoCAD SHX Text 60537017

AutoCAD SHX Text 6584536

AutoCAD SHX Text N62470-14-D-9016

AutoCAD SHX Text

NORTH CAROLINA IPT

AutoCAD SHX Text

MARINE CORPS BASE - CAMP LEJEUNE, NORTH CAROLINA

AutoCAD SHX Text

CP18E01M

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

WO. NO

AutoCAD SHX Text

CP NO.

AutoCAD SHX Text

CONTR. NO.

AutoCAD SHX Text

DEPARTMENT OF THE NAVY

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

NAVAL FACILITIES ENGINEERING COMMAND

AutoCAD SHX Text

DES

AutoCAD SHX Text

DRW

AutoCAD SHX Text

SYM

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR

AutoCAD SHX Text

CHK

AutoCAD SHX Text

SATISFACTORY TO

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

ACTIVITY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

A/E INFO

AutoCAD SHX Text

OF

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

FINAL DRAWINGS

AutoCAD SHX Text

NAVFAC DRAWING NO.

AutoCAD SHX Text

CONSTR. CONTR. NO.

AutoCAD SHX Text

VERTICAL TURBINE PUMP & MOTOR

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text DEPTHS INDICATED TAKEN FROM TEST WELL DATA FOR BIDDING PURPOSES. ACTUAL WELL DEPTHS, SCREEN LENGTHS, SCREEN SLOT SIZES AND OTHER FINAL DESIGN PARAMETERS SHALL BE BASED ON RESULTS OF PILOT-HOLE TESTING, SAMPLE CHARACTERIZATION, AND GEOPHYSICAL LOGGING ASSOCIATED WITH EACH NEW WELL LOCATION.

AutoCAD SHX Text

10' LONG 12"%%C S/S TAIL PIECE

AutoCAD SHX Text SCREEN INTERVAL VARIES WITH LOCATION SEE PRELIMINARY WELL CONSTRUCTION DATA (THIS SHEET)

AutoCAD SHX Text

END SCREEN

AutoCAD SHX Text

BEGIN SCREEN

AutoCAD SHX Text 3' BENTONITE SEAL (THE GRAVEL PACKING MUST BE PARTIALLY DEVELOPED TO ENCOURAGE SETTLING BEFORE INSTALLING BENTONITE SEAL.)

AutoCAD SHX Text

CEMENT GROUT

AutoCAD SHX Text

WELL CONSTRUCTION DATA (THIS SHEET).

AutoCAD SHX Text

BOREHOLE

AutoCAD SHX Text 6"

AutoCAD SHX Text

FINISHED GROUND ELEV.

AutoCAD SHX Text

FFE (TOP OF SLAB) ELEV. = VARIES

AutoCAD SHX Text 24"

AutoCAD SHX Text

#3 GRAVEL PACK

AutoCAD SHX Text

12" TYPE 304 STAINLESS STEEL SCREEN

AutoCAD SHX Text

SUCTION STRAINER

AutoCAD SHX Text

BOWL ASSEMBLY

AutoCAD SHX Text

6" STEEL COLUMN PIPE. ENSURE WEIGHT BEARING, TORQUE RESISTANT FITTINGS.

AutoCAD SHX Text

12" INNER CASING (SDR 17 PVC)

AutoCAD SHX Text

20" BLACK STEEL OUTER CASING SET IN GROUT

AutoCAD SHX Text NOTES: CONSTRUCT WELL IN ACCORDANCE WITH N.C. ADMINISTRATIVE CODE 15A NCAC 02C.0107 STANDARDS OF CONSTRUCTION WATER SUPPLY WELLS.

AutoCAD SHX Text END OUTER (PIT) PIPE CASING - MINIMUM DEPTH VARIES WITH LOCATION. SEE PRELIMINARY

AutoCAD SHX Text

5' MIN. - 20' MAX.

AutoCAD SHX Text

BEGIN GRAVEL PACK

AutoCAD SHX Text

CENTRALIZERS TO KEEP DISCHARGE COLUMN AND PUMP CENTERED

AutoCAD SHX Text

BOTTOM OF WELL

AutoCAD SHX Text 1'

AutoCAD SHX Text

PRESSURE TRANSDUCER TO WALL MOUNTED TRANSMITTER

AutoCAD SHX Text HYDROSTATIC LEVEL MEASUREMENT TRANSDUCER SHALL BE MOUNTED WITHIN 1' OF TOP OF BOWL

AutoCAD SHX Text

WELDED 2" 316 SS VENT WITH #24 SS WIRE MESH SCREEN

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text

TOP OF PEDESTAL

AutoCAD SHX Text

FF ELEV.

AutoCAD SHX Text

12.75" DIA.

AutoCAD SHX Text

OPENING

AutoCAD SHX Text ONLY A SOLVENT-WELDED PLASTIC COUPLING OR FITTING MAY BE USED TO CONNECT SCREEN TO CASING.

AutoCAD SHX Text 72"

AutoCAD SHX Text

1/4" EXPANSION JOINT MATERIAL WITH SILICONE SEALANT

AutoCAD SHX Text

3/4" CHAMFER (TYP.)

AutoCAD SHX Text

1/4" EXPANSION JOINT MATERIAL W/ SILICONE JOINT SEALANT (4 SIDES)

AutoCAD SHX Text

#4 TIES (TYP.)

AutoCAD SHX Text

EPOXY ANCHORS, SIZE AND LENGTH PER PUMP MANUFACTURER (TYP. 4 LOCATIONS)

AutoCAD SHX Text

#5 @ 12" (8 TOTAL)

AutoCAD SHX Text

#4 TIES

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text #5 @ 12"

AutoCAD SHX Text CUT PIT CASING AS REQUIRED TO CONSTRUCT CONCRETE PUMP PEDESTAL. MIN. 30"X30"X72".

AutoCAD SHX Text

CONSTRUCTION JOINT BETWEEN WELL GROUT AND PUMP PEDESTAL

AutoCAD SHX Text GROUT ANNULAR VOID BETWEEN OUTER CASING AND BOREHOLE PRIOR TO DRILLING PRODUCTION WELL

AutoCAD SHX Text

GROUT BETWEEN INNER AND OUTER CASING

AutoCAD SHX Text N.T.S.

C503

E

P

LA

C E

P O

TA

B

LE

W

A

TE

R W

E

LL

S A

N D

IN

S

TA

LL

R A

W W

A

TE

R M

A

IN

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

N A

V

FA

C M

ID

LA

N T www.aecom.com(919) 461-1100

AECOM TECHNICAL SERVICES, INC.

1600 PERMIMETER PARK DRIVE

SUITE 400

MORRISVILLE, NC 27560

SITE PREPARATION NOTES

METAL SWING GATEA3

WELL HOUSE AND GENERATOR PAD SITE PREPARATION DETAILC1

GRAVEL PAVEMENTA1

AutoCAD SHX Text

WELL HOUSE DETAILS

AutoCAD SHX Text 12757459

AutoCAD SHX Text

AutoCAD SHX Text

NONE

AutoCAD SHX Text

DSS

AutoCAD SHX Text

KKPT

AutoCAD SHX Text

MARINE CORPS AIR STATION

AutoCAD SHX Text

CHERRY POINT, NORTH CAROLINA

AutoCAD SHX Text

JANUARY 2019

AutoCAD SHX Text

AutoCAD SHX Text 60537017

AutoCAD SHX Text 6584536

AutoCAD SHX Text N62470-14-D-9016

AutoCAD SHX Text

NORTH CAROLINA IPT

AutoCAD SHX Text

MARINE CORPS BASE - CAMP LEJEUNE, NORTH CAROLINA

AutoCAD SHX Text

CP18E01M

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

WO. NO

AutoCAD SHX Text

CP NO.

AutoCAD SHX Text

CONTR. NO.

AutoCAD SHX Text

DEPARTMENT OF THE NAVY

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

NAVAL FACILITIES ENGINEERING COMMAND

AutoCAD SHX Text

DES

AutoCAD SHX Text

DRW

AutoCAD SHX Text

SYM

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR

AutoCAD SHX Text

CHK

AutoCAD SHX Text

SATISFACTORY TO

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

ACTIVITY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

A/E INFO

AutoCAD SHX Text

OF

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

FINAL DRAWINGS

AutoCAD SHX Text

NAVFAC DRAWING NO.

AutoCAD SHX Text

CONSTR. CONTR. NO.

AutoCAD SHX Text

COMPACTED SUBGRADE

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

GEOGRID

AutoCAD SHX Text

12" GRAVEL SURFACE MATERIAL - NCDOT SIZE NO. ABC STONE

AutoCAD SHX Text

GRAVEL PAVEMENT SIDELINE TOP OF DRIVE (TOD) ELEV.

AutoCAD SHX Text X

AutoCAD SHX Text 12"

AutoCAD SHX Text

1. SEE CONTRACT SPECIFICATIONS FOR POROUS FILL MATERIAL, STRUCTURAL FILL MATERIAL, AND COMPACTION SEE CONTRACT SPECIFICATIONS FOR POROUS FILL MATERIAL, STRUCTURAL FILL MATERIAL, AND COMPACTION REQUIREMENTS. 2. PRIOR TO CONSTRUCTION, ALL VEGETATION, TOPSOIL, FILL, AND OTHER DELETERIOUS MATERIAL SHALL BE PRIOR TO CONSTRUCTION, ALL VEGETATION, TOPSOIL, FILL, AND OTHER DELETERIOUS MATERIAL SHALL BE REMOVED FROM WITHIN THE ENTIRE BUILDING AREA TO AN ELEVATION EQUAL TO 12" BELOW THE LOWEST ELEVATION OF THE BUILDING FOUNDATION, AND THE EXPOSED SUBGRADE LEVELED. FOR THE STRIPPING AND FILLING OPERATIONS, THE BUILDING AREA SHALL EXTEND FIVE (5) FEET MINIMUM BEYOND THE BUILDING LINE MEASURED AT FINISHED FLOOR ELEVATION. 3. AFTER STRIPPING, THE BUILDING AREA EXPOSED SUBGRADE SOILS SHALL BE LEVELED THEN PROOFROLLED . AFTER STRIPPING, THE BUILDING AREA EXPOSED SUBGRADE SOILS SHALL BE LEVELED THEN PROOFROLLED . THE PROOFROLLING OPERATION SHALL BE INSPECTED BY THE CONTRACTING OFFICER TO DETERMINE IF FURTHER EXCAVATION IS REQUIRED. COMPACTION OF THE SUBGRADE BEYOND THAT PERFORMED BY THE PROOFROLLING IS NOT REQUIRED. 4. COMPACTED STRUCTURAL FILL SHALL BE PLACED OVER THE ENTIRE BUILDING AREA TO THE BOTTOM OF THE COMPACTED STRUCTURAL FILL SHALL BE PLACED OVER THE ENTIRE BUILDING AREA TO THE BOTTOM OF THE POROUS FILL. 5. STRIP EXISTING SURFACE MATERIAL IN ACCORDANCE WITH SPECIFICATIONS. STRIP EXISTING SURFACE MATERIAL IN ACCORDANCE WITH SPECIFICATIONS. 6. SEE TYPICAL SITE PREPARATION DETAIL THIS SHEET.SEE TYPICAL SITE PREPARATION DETAIL THIS SHEET.

AutoCAD SHX Text

3 HORIZONTAL (MIN) : 1 VERTICAL CUT AREA (SEE PLAN)

AutoCAD SHX Text

3 HORIZONTAL (MIN) : 1 VERTICAL FILL AREA (SEE PLAN)

AutoCAD SHX Text

1/2" FLAT PVC

AutoCAD SHX Text

1/2" STEEL PLATE WELDED TO INSIDE OF 6" PIPE

AutoCAD SHX Text 4'-0"

AutoCAD SHX Text 5'-0"

AutoCAD SHX Text

3" CLEAR

AutoCAD SHX Text

FINISHED GRADE

AutoCAD SHX Text 6"

AutoCAD SHX Text

2"%%C SCHEDULE 40 STEEL PIPE

AutoCAD SHX Text

3000 PSI CONCRETE

AutoCAD SHX Text

"ROAD CLOSED" SIGN

AutoCAD SHX Text

NOTE: ALL STEEL TO BE GALVANIZED AFTER FABRICATION

AutoCAD SHX Text

AutoCAD SHX Text

6" SCHEDULE40 STEEL PIPE

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

5" SCHEDULE40 STEEL PIPE

AutoCAD SHX Text 2"

AutoCAD SHX Text

2" INSIDE DIAMETER GALVANIZED EYE BOLT (TYP.) EACH GATE

AutoCAD SHX Text 30'-0"

AutoCAD SHX Text

1/2" STEEL PLATE WELDED TO INSIDE OF 5" PIPE

AutoCAD SHX Text

2'-0" DIAMETER

AutoCAD SHX Text

4'-6" (TYP.)

AutoCAD SHX Text

4'-6" (TYP.)

AutoCAD SHX Text

1'-6" (TYP.)

AutoCAD SHX Text

4'-6" (TYP.)

AutoCAD SHX Text PROVIDE 18" (MIN.) LENGTH OF CHAIN. LOCK PROVIDED BY CONTRACTOR. PROVIDE CONTRACTING OFFICER WITH 2 KEYS TO LOCK.

AutoCAD SHX Text 5'-0"

AutoCAD SHX Text

BUILDING

AutoCAD SHX Text 5'-0"

AutoCAD SHX Text

FOOTING - SEE STRUCTURAL DRAWINGS

AutoCAD SHX Text 12"

AutoCAD SHX Text

FINISHED FLOOR ELEVATION

AutoCAD SHX Text

(SEE PLAN SHEETS)

AutoCAD SHX Text

SEE PLAN FOR FINISHED GRADES

AutoCAD SHX Text

SEE PLAN FOR FINISHED GRADES

AutoCAD SHX Text

APPROVED UNDISTURBED SUBGRADE

AutoCAD SHX Text

COMPACTED STRUCTURAL FILL

AutoCAD SHX Text NOTE: MAINTAIN DRAINAGE TO ELIMINATE ALL STANDING WATER AT ALL TIMES DURING CONSTRUCTION

AutoCAD SHX Text 1.0

AutoCAD SHX Text 1.5

AutoCAD SHX Text 1.0

AutoCAD SHX Text 1.5

AutoCAD SHX Text

SEE NOTE 2

AutoCAD SHX Text

EXISTING GRADE

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text N.T.S.

4" POROUS FILL MATERIAL

C504

E

P

LA

C E

P O

TA

B

LE

W

A

TE

R W

E

LL

S A

N D

IN

S

TA

LL

R A

W W

A

TE

R M

A

IN

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

N A

V

FA

C M

ID

LA

N T www.aecom.com(919) 461-1100

AECOM TECHNICAL SERVICES, INC.

1600 PERMIMETER PARK DRIVE

SUITE 400

MORRISVILLE, NC 27560

PIPE TRENCH DETAILSD1

AUTOMATIC AIR VALVE ASSEMBLY DETAILB1

BITUMINOUS PAVEMENT PATCH DETAILA1

CONCRETE BASE FOR UTILITY MARKERB2

UTILITY MARKER DETAILB4

VALVE BOX DETAILC2

GRAVEL DRIVEWAYC5

CONCRETE WALK SECTIONA2

AutoCAD SHX Text

RAW WATER MAIN DETAILS

AutoCAD SHX Text 12757460

AutoCAD SHX Text

AutoCAD SHX Text

NONE

AutoCAD SHX Text

DSS

AutoCAD SHX Text

KKPT

AutoCAD SHX Text

MARINE CORPS AIR STATION

AutoCAD SHX Text

CHERRY POINT, NORTH CAROLINA

AutoCAD SHX Text

JANUARY 2019

AutoCAD SHX Text

AutoCAD SHX Text 60537017

AutoCAD SHX Text 6584536

AutoCAD SHX Text N62470-14-D-9016

AutoCAD SHX Text

NORTH CAROLINA IPT

AutoCAD SHX Text

MARINE CORPS BASE - CAMP LEJEUNE, NORTH CAROLINA

AutoCAD SHX Text

CP18E01M

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

WO. NO

AutoCAD SHX Text

CP NO.

AutoCAD SHX Text

CONTR. NO.

AutoCAD SHX Text

DEPARTMENT OF THE NAVY

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

NAVAL FACILITIES ENGINEERING COMMAND

AutoCAD SHX Text

DES

AutoCAD SHX Text

DRW

AutoCAD SHX Text

SYM

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR

AutoCAD SHX Text

CHK

AutoCAD SHX Text

SATISFACTORY TO

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

ACTIVITY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

A/E INFO

AutoCAD SHX Text

OF

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

FINAL DRAWINGS

AutoCAD SHX Text

NAVFAC DRAWING NO.

AutoCAD SHX Text

CONSTR. CONTR. NO.

AutoCAD SHX Text

WIDTH

AutoCAD SHX Text

TRENCH

AutoCAD SHX Text

MATCH EXISTING, WHICHEVER IS GREATER.

AutoCAD SHX Text

PROVIDE MINIMUM THICKNESSES SHOWN OR

AutoCAD SHX Text

NOTE:

AutoCAD SHX Text

SAWCUT, TYP.

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

BASE COURSE

AutoCAD SHX Text 12"

AutoCAD SHX Text

MIN.

AutoCAD SHX Text

MIN.

AutoCAD SHX Text 12"

AutoCAD SHX Text

PAINT EXPOSED SURFACE AND BASE COURSE EDGES W/ TACK COAT

AutoCAD SHX Text

1.5" MIN. BITUMINOUS SURFACE COURSE OVER 2.5" BITUMINOUS BASE COURSE

AutoCAD SHX Text

10" MINIMUM AGGREGATE BASE COURSE

AutoCAD SHX Text

(3000 PSI) CONCRETE

AutoCAD SHX Text

2" GALVANIZED STEEL PIPE

AutoCAD SHX Text

WATER MAIN

AutoCAD SHX Text

4" PVC SLEEVE

AutoCAD SHX Text

2" MIN.

AutoCAD SHX Text

BRICK ON EDGE

AutoCAD SHX Text

3 COURSES OF

AutoCAD SHX Text 12"

AutoCAD SHX Text 8"

AutoCAD SHX Text 4"

AutoCAD SHX Text

FRAME COVER IN ACCORDANCE

AutoCAD SHX Text

2" CORPORATION STOP

AutoCAD SHX Text

W/ FS A-A 60005

AutoCAD SHX Text

FIG. 4, TYPE IV, SIZE 12 FRAME

AutoCAD SHX Text

FIG. 12, TYPE E, SIZE 12 COVER

AutoCAD SHX Text

PIPE SADDLE

AutoCAD SHX Text

1" COMBINATION AIR/ VACUUM RELEASE VALVE

AutoCAD SHX Text D

AutoCAD SHX Text

DETECTION

AutoCAD SHX Text

WIRE

AutoCAD SHX Text 12"

AutoCAD SHX Text A

AutoCAD SHX Text O.D.

AutoCAD SHX Text W

AutoCAD SHX Text A

AutoCAD SHX Text

TAPE

AutoCAD SHX Text

IDENTIFICATION

AutoCAD SHX Text W

AutoCAD SHX Text

TAPE

AutoCAD SHX Text

IDENTIFICATION

AutoCAD SHX Text

EMBEDMENT

AutoCAD SHX Text

PIPE

AutoCAD SHX Text A

AutoCAD SHX Text O.D.

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text

DETECTION

AutoCAD SHX Text

WIRE

AutoCAD SHX Text

BACKFILL-

AutoCAD SHX Text

FINAL

AutoCAD SHX Text 12"

AutoCAD SHX Text

SPRINGLINE

AutoCAD SHX Text

FOR PLASTIC PIPES

AutoCAD SHX Text

PIPE ZONE

AutoCAD SHX Text 6" - 12"

AutoCAD SHX Text

COVER

AutoCAD SHX Text

%%UNOTES:

AutoCAD SHX Text

PIPE DIA.

AutoCAD SHX Text "D"

AutoCAD SHX Text

MAXIMUM

AutoCAD SHX Text "A"

AutoCAD SHX Text 8"

AutoCAD SHX Text 10"

AutoCAD SHX Text

6" TO 15"

AutoCAD SHX Text

16" TO 21"

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text

MAXIMUM TRENCH WIDTH "W" TAKEN AT TOP OF PIPE

AutoCAD SHX Text

1. PROVIDE BEDDING MATERIAL IN ACCORDANCE WITH THE PROVIDE BEDDING MATERIAL IN ACCORDANCE WITH THE SPECIFICATIONS. 2. COMMON FILL, EXCEPT STRUCTURAL FILL TO BOTTOM OF COMMON FILL, EXCEPT STRUCTURAL FILL TO BOTTOM OF PAVEMENT SECTION OR STRUCTURES, SPREAD FOOTINGS AND CONCRETE SLABS. 3. 12" THICK BEDDING MATERIAL ENVELOPED IN GEOTEXTILE 12" THICK BEDDING MATERIAL ENVELOPED IN GEOTEXTILE LOCATIONS INDICATED. OVERLAY GEOTEXTILE FABRIC AT TOP AND ENDS, 36" MINIMUM. 4. PLACE TAPE 12" BELOW FINISHED GRADE IN UNPAVED AREAS & PLACE TAPE 12" BELOW FINISHED GRADE IN UNPAVED AREAS & 6" BELOW TOP OF SUBGRADE IN PAVED AREAS. 5. PLASTIC PIPES INCLUDE PVC AND HDPE PIPES.PLASTIC PIPES INCLUDE PVC AND HDPE PIPES.

AutoCAD SHX Text

SEE NOTE 3

AutoCAD SHX Text

SEE NOTE 3

AutoCAD SHX Text

SEE NOTE 2

AutoCAD SHX Text

TAPE

AutoCAD SHX Text

IDENTIFICATION

AutoCAD SHX Text O.D.

AutoCAD SHX Text

8" MIN.

AutoCAD SHX Text

12" MIN.

AutoCAD SHX Text

#57 STONE

AutoCAD SHX Text 12"

AutoCAD SHX Text

GEOTEXTILE ENVELOPE

AutoCAD SHX Text

GEOTEXTILE ENVELOPE W/ 36" OVERLAY (MIN.) AT TOP AND ENDS

AutoCAD SHX Text

6"MIN.

AutoCAD SHX Text

6"MIN.

AutoCAD SHX Text

PIPE

AutoCAD SHX Text

12" BEDDING MATERIAL

AutoCAD SHX Text

FOR NON-PLASTIC PIPES (EXCEPT STORM SEWER PIPE NOS. 1 TO 42 AND SANITARY PIPES)

AutoCAD SHX Text

FOR STORM SEWER PIPE NOS. 1 TO 42 AND SANITARY PIPES

AutoCAD SHX Text

SEE NOTE 4

AutoCAD SHX Text

SEE NOTE 4

AutoCAD SHX Text

INITIAL BACKFILL- STRUCTURAL FILL

AutoCAD SHX Text

BEDDING MATERAIL

AutoCAD SHX Text

BACKFILL-

AutoCAD SHX Text

FINAL

AutoCAD SHX Text

SEE NOTE 2

AutoCAD SHX Text

INITIAL BACKFILL- STRUCTURAL FILL

AutoCAD SHX Text

SEE NOTE 4

AutoCAD SHX Text

12" BEDDING MATERIAL

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text 12"

AutoCAD SHX Text 15"

AutoCAD SHX Text

24" TO 30"

AutoCAD SHX Text

33" TO 42"

AutoCAD SHX Text 18"

AutoCAD SHX Text

48" & LARGER

AutoCAD SHX Text 6" - 12"

AutoCAD SHX Text

COVER

AutoCAD SHX Text

BACKFILL-

AutoCAD SHX Text

FINAL

AutoCAD SHX Text

SEE NOTE 2

AutoCAD SHX Text

(PROVIDE OVER RAW WATER @ 300' ON CENTER AND BENDS)

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

W4 WIRE

AutoCAD SHX Text

1/2" CHAMFER (TYP.)

AutoCAD SHX Text

4 #3 STEEL RODS

AutoCAD SHX Text

1'-9" LONG

AutoCAD SHX Text

UTILITY MARKER (B4/C504)

AutoCAD SHX Text

GROUND LINE

AutoCAD SHX Text 2'-0"

AutoCAD SHX Text REINFORCEMENT TO BE #3 STEEL ROD, SECURLY HELD IN CAGES BY SPOT WELDED W4 WIRES ATTACHED TO ALL BARS APPROXIMATELY 8" FROM EACH END TO INSURE PROPER PLACING.

AutoCAD SHX Text

3000 PSIA MINIMUM CONCRETE

AutoCAD SHX Text

MINIMUM CLEARANCE 1"

AutoCAD SHX Text X"

AutoCAD SHX Text

RAW

AutoCAD SHX Text

WATER

AutoCAD SHX Text

INDICATE SIZE OF MAIN

AutoCAD SHX Text

EMBEDDED IN CONCRETE

AutoCAD SHX Text

2 1/2"%%C BRASS DISK

AutoCAD SHX Text

1 1/2" STUD

AutoCAD SHX Text

SECTION

AutoCAD SHX Text X"

AutoCAD SHX Text

RAW

AutoCAD SHX Text

PLAN

AutoCAD SHX Text

UTILITY TYPE

AutoCAD SHX Text

ENGRAVE/STAMP

AutoCAD SHX Text

WATER

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text

EACH VALVE BOX CENTER SECTION

AutoCAD SHX Text

FINISHED GRADE

AutoCAD SHX Text

VALVE BOX WITH COVER,

AutoCAD SHX Text

PAVEMENT

AutoCAD SHX Text

3' SQ. CONC.

AutoCAD SHX Text

VALVE BOX BASE

AutoCAD SHX Text

AS REQUIRED

AutoCAD SHX Text

TOTAL LENGTH OF VALVE BOX

AutoCAD SHX Text

TOP SECTION

AutoCAD SHX Text

MAX

AutoCAD SHX Text

EXTENSION STEM

AutoCAD SHX Text

BURIED VALVE

AutoCAD SHX Text

5"%%C SHAFT

AutoCAD SHX Text

STEEL RING SPACER AT TOP OF

AutoCAD SHX Text

PROVIDE 5"%%CX 1/2" THICK

AutoCAD SHX Text

OF THE VALVE BOX

AutoCAD SHX Text

ALIGNED WITH THE CENTER LINE

AutoCAD SHX Text

TO KEEP THE EXTENSION STEM

AutoCAD SHX Text

OPERATING NUT

AutoCAD SHX Text 6"

AutoCAD SHX Text 18"

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text VALVE BOX, CENTER SECTION (TYP) ADJUST SECTION LENGTH OR USE MULTIPLE SECTIONS TO SUIT THE TOTAL REQUIRED LENGTH OF VALVE BOX

AutoCAD SHX Text

MIN. 8"

AutoCAD SHX Text

CLEARANCE

AutoCAD SHX Text 12"

AutoCAD SHX Text

MIN

AutoCAD SHX Text

TRENCH

AutoCAD SHX Text

WIDTH

AutoCAD SHX Text 12"

AutoCAD SHX Text

MIN

AutoCAD SHX Text

6" AGGREGATE BASE COURSE

AutoCAD SHX Text

PIPE TRENCH SEE DETAIL D1/C504

AutoCAD SHX Text

COMPACTED BACKFILL

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text

COMPACTED SUBGRADE

AutoCAD SHX Text

4" CONCRETE

AutoCAD SHX Text

PROVIDE CONTROL JOINTS @ SPACING EQUAL

AutoCAD SHX Text

TO WIDTH OF SIDEWALK AND 1/2" EXPANSION

AutoCAD SHX Text

STRUCTURES AND EXISTING CONCRETE, UNLESS

AutoCAD SHX Text

NOTED OTHERWISE.

AutoCAD SHX Text

JOINTS EVERY 40' OF STRAIGHT RUN, AT

AutoCAD SHX Text

CHANGES IN DIRECTION AND AGAINST ALL

SIDEWALK NOTE:

6" BLOW- OFF INSTALLATION DETAIL

C505

R E

P

LA

C E

P O

TA

B

LE

W

A

TE

R W

E

LL

S A

N D

IN

S

TA

LL

R A

W W

A

TE

R M

A

IN

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

N A

V

FA

C M

ID

LA

N T www.aecom.com(919) 461-1100

AECOM TECHNICAL SERVICES, INC.

1600 PERMIMETER PARK DRIVE

SUITE 400

MORRISVILLE, NC 27560

BORE AND JACK DETAILA4

SECTION A-A

PIPE SUPPORT DETAILA3

6" BLOW-OFF INSTALLATION DETAILA2

AutoCAD SHX Text

AS

AutoCAD SHX Text 0'-9"

AutoCAD SHX Text 0'-3"

AutoCAD SHX Text 0'-2 1/2"

AutoCAD SHX Text 0'-5 1/2"

AutoCAD SHX Text

MIN. 0'-10 1/2"

AutoCAD SHX Text

REQ'D

AutoCAD SHX Text

TYPE 37 PIPE SUPPORT

AutoCAD SHX Text

SHANK TO FIT INTO 0'-2 1/2" SCHEDULE 40 STEEL PIPE

AutoCAD SHX Text

TYPE 38 ADJUSTABLE PIPE SUPPORT (USE SAME COATING SYSTEM AS PIPING)

AutoCAD SHX Text

MAX. 0'-15 1/4"

AutoCAD SHX Text

1" MIN. 3" MAX NON-SHRINK GROUT

AutoCAD SHX Text

STD PIPE FLANGE ATTACHED TO CONCRETE OR MASONRY W/4 SST STUD TYPE WEDGE ANCHORS

AutoCAD SHX Text

COMPACTED BACKFILL

AutoCAD SHX Text

(TAMPED IN 6" LIFTS)

AutoCAD SHX Text 1'-0"

AutoCAD SHX Text

6" DIP

AutoCAD SHX Text

3'-6" MIN.

AutoCAD SHX Text 3'-0"

AutoCAD SHX Text

3'-6" MIN.

AutoCAD SHX Text

CONC. BLOCK

AutoCAD SHX Text

CONC. THRUST BLOCKING

AutoCAD SHX Text

REQUIRED TEE, RJ ROTATED 45° DOWNWARD

AutoCAD SHX Text

6" 90° BEND, FLG

AutoCAD SHX Text

2 CU. YDS. CLASS B RIP RAP

AutoCAD SHX Text

6" MECHANICAL JOINT RESTRAINT GLAND

AutoCAD SHX Text

7 CU. FT. CRUSHED STONE MIN.

AutoCAD SHX Text

6" 90° BEND, MJ

AutoCAD SHX Text

?" THREADED ROD 2 REQ'D. EACH SECTION

AutoCAD SHX Text

?" DIA. DRAIN HOLE DRILLED IN PIPE SURROUND WITH STONE

AutoCAD SHX Text

VALVE BOX

AutoCAD SHX Text

6" GATE VALVE

AutoCAD SHX Text

6" 45° BEND, RJ

AutoCAD SHX Text

GENERAL DETAILS

AutoCAD SHX Text 12757461

AutoCAD SHX Text

AutoCAD SHX Text

NONE

AutoCAD SHX Text

KKPT

AutoCAD SHX Text

MARINE CORPS AIR STATION

AutoCAD SHX Text

CHERRY POINT, NORTH CAROLINA

AutoCAD SHX Text

JANUARY 2019

AutoCAD SHX Text

AutoCAD SHX Text 60537017

AutoCAD SHX Text 6584536

AutoCAD SHX Text N62470-14-D-9016

AutoCAD SHX Text

NORTH CAROLINA IPT

AutoCAD SHX Text

MARINE CORPS BASE - CAMP LEJEUNE, NORTH CAROLINA

AutoCAD SHX Text

CP18E01M

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

WO. NO

AutoCAD SHX Text

CP NO.

AutoCAD SHX Text

CONTR. NO.

AutoCAD SHX Text

DEPARTMENT OF THE NAVY

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

NAVAL FACILITIES ENGINEERING COMMAND

AutoCAD SHX Text

DES

AutoCAD SHX Text

DRW

AutoCAD SHX Text

SYM

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR

AutoCAD SHX Text

CHK

AutoCAD SHX Text

SATISFACTORY TO

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

ACTIVITY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

A/E INFO

AutoCAD SHX Text

OF

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

FINAL DRAWINGS

AutoCAD SHX Text

NAVFAC DRAWING NO.

AutoCAD SHX Text

CONSTR. CONTR. NO.

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text

STEEL CASING

AutoCAD SHX Text

CARRIER PIPE BRACE SHALL BE PLACED EVERY 6' AND PER MANUFACTURES RECOMMENDATIONS

AutoCAD SHX Text

SEAL EACH END OF CASING WITH SOLID CONCRETE BRICK AND MORTAR 12" MINIMUM LENGTH.

AutoCAD SHX Text

STEEL CASING

AutoCAD SHX Text

CARRIER PIPE

AutoCAD SHX Text

BAND

AutoCAD SHX Text

RISER

AutoCAD SHX Text

RUNNERS SHALL BE MIN. 2" WIDE

AutoCAD SHX Text

CARRIER PIPE

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text NOTES: 1. INSTALLATION SHALL BE DRY BORE AND JACKING OF SMOOTH INSTALLATION SHALL BE DRY BORE AND JACKING OF SMOOTH WALL STEEL PIPE. JETTING OR WET BORING WITH WATER SHALL NOT BE ALLOWED. 2. EACH END OF ENCASEMENT TO BE SEALED. ALL VOIDS OUTSIDE EACH END OF ENCASEMENT TO BE SEALED. ALL VOIDS OUTSIDE THE CASING PIPE SHALL BE COMPLETELY FILLED WITH GROUT AT SUFFICIENT PRESSURE TO INSURE NO SETTLEMENT OF ROADWAY. METHOD OF GROUTING SHALL BE AS APPROVED BY THE CONTRACTING OFFICER. 3. THE BORING OPERATION SHALL BE CONDUCTED IN A MANNER THE BORING OPERATION SHALL BE CONDUCTED IN A MANNER THAT THE FLOW OF TRAFFIC IS NOT IMPEDED OR IN SUCH A MANNER SO AS NOT TO CREATE A HAZARD. 4. IF AN OBSTRUCTION IS ENCOUNTERED DURING THE BORING IF AN OBSTRUCTION IS ENCOUNTERED DURING THE BORING OPERATION, THE AUGER SHALL BE WITHDRAWN THE EXCESS CASING PIPE CUT-OFF, CAPPED AND THE INTERIOR AND EXTERIOR VOIDS SHALL BE COMPLETELY FILLED WITH GROUT UNDER PRESSURE. 5. CONTRACTOR SHALL FIELD ADJUST AND INSTALL PROPER PIPE CONTRACTOR SHALL FIELD ADJUST AND INSTALL PROPER PIPE BRACES TO ACCOMPLISH GRADE AND INVERTS AS SHOWN ON THE DRAWINGS.

AutoCAD SHX Text

COMPLETELY FILL VOID OUTSIDE OF CASING W/GROUT SEE NOTE 2

AutoCAD SHX Text

EACH SECTION OF ENCASEMENT PIPE SHALL BE BUTT-WELDED TO THE ADJACENT CASING PIPE

AutoCAD SHX Text

COMPLETELY FILL VOID OUTSIDE OF CASING W/ GROUT

AutoCAD SHX Text

FASTEN BRACE TO PIPE W/ HEAVY DUTY STUDS, NUTS AND WASHERS.

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text N.T.S.

NOTE: A DUCTILE IRON DOUBLE SOCKET INVERT TEE WITH FLANGE BRANCH MAY BE USED IN LIEU OF THE TEE AND 45° BEND

EROSION AND SEDIMENT CONTROL NOTES

E

P

LA

C E

P O

TA

B

LE

W

A

TE

R W

E

LL

S A

N D

IN

S

TA

LL

R A

W W

A

TE

R M

A

IN

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

N A

V

FA

C M

ID

LA

N T www.aecom.com(919) 461-1100

AECOM TECHNICAL SERVICES, INC.

1600 PERMIMETER PARK DRIVE

SUITE 400

MORRISVILLE, NC 27560

C701

STABILIZATION REQUIREMENTS

SITE DESCRIPTION STABILIZATION TIME TIMEFRAME EXCEPTIONS

TEMPORARY SEEDING MIXTURES

PLANTING DATE SPECIES APPLICATION RATE

PERMANENT SEEDING MIXTURES

PLANTING DATE SPECIES APPLICATION RATE

PERMANENT SEEDING MIXTURES

PLANTING DATE SPECIES APPLICATION RATE

UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND ALL VEGETATIVE AND STRUCTURAL EROSION AND ALL VEGETATIVE AND STRUCTURAL EROSION AND VEGETATIVE AND STRUCTURAL EROSION AND VEGETATIVE AND STRUCTURAL EROSION AND AND STRUCTURAL EROSION AND AND STRUCTURAL EROSION AND STRUCTURAL EROSION AND STRUCTURAL EROSION AND EROSION AND EROSION AND AND AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED IN CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED IN CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED IN PRACTICES WILL BE CONSTRUCTED AND MAINTAINED IN PRACTICES WILL BE CONSTRUCTED AND MAINTAINED IN WILL BE CONSTRUCTED AND MAINTAINED IN WILL BE CONSTRUCTED AND MAINTAINED IN BE CONSTRUCTED AND MAINTAINED IN BE CONSTRUCTED AND MAINTAINED IN CONSTRUCTED AND MAINTAINED IN CONSTRUCTED AND MAINTAINED IN AND MAINTAINED IN AND MAINTAINED IN MAINTAINED IN MAINTAINED IN IN IN ACCORDANCE WITH THE EROSION CONTROL LAWS OF THE STATE OF NORTH WITH THE EROSION CONTROL LAWS OF THE STATE OF NORTH WITH THE EROSION CONTROL LAWS OF THE STATE OF NORTH THE EROSION CONTROL LAWS OF THE STATE OF NORTH THE EROSION CONTROL LAWS OF THE STATE OF NORTH EROSION CONTROL LAWS OF THE STATE OF NORTH EROSION CONTROL LAWS OF THE STATE OF NORTH CONTROL LAWS OF THE STATE OF NORTH CONTROL LAWS OF THE STATE OF NORTH LAWS OF THE STATE OF NORTH LAWS OF THE STATE OF NORTH OF THE STATE OF NORTH OF THE STATE OF NORTH THE STATE OF NORTH THE STATE OF NORTH STATE OF NORTH STATE OF NORTH OF NORTH OF NORTH NORTH NORTH CAROLINA, SPECIFICALLY THE SEDIMENT POLLUTION CONTROL ACT OF 1973, AS SPECIFICALLY THE SEDIMENT POLLUTION CONTROL ACT OF 1973, AS SPECIFICALLY THE SEDIMENT POLLUTION CONTROL ACT OF 1973, AS THE SEDIMENT POLLUTION CONTROL ACT OF 1973, AS THE SEDIMENT POLLUTION CONTROL ACT OF 1973, AS SEDIMENT POLLUTION CONTROL ACT OF 1973, AS SEDIMENT POLLUTION CONTROL ACT OF 1973, AS POLLUTION CONTROL ACT OF 1973, AS POLLUTION CONTROL ACT OF 1973, AS CONTROL ACT OF 1973, AS CONTROL ACT OF 1973, AS ACT OF 1973, AS ACT OF 1973, AS OF 1973, AS OF 1973, AS 1973, AS 1973, AS AS AS AMENDED, AND THE LOCAL EROSION AND SEDIMENT CONTROL ORDINANCES. THE FOLLOWING SEQUENCE OF EVENTS AND EROSION CONTROL MEASURES SHALL FOLLOWING SEQUENCE OF EVENTS AND EROSION CONTROL MEASURES SHALL FOLLOWING SEQUENCE OF EVENTS AND EROSION CONTROL MEASURES SHALL SEQUENCE OF EVENTS AND EROSION CONTROL MEASURES SHALL SEQUENCE OF EVENTS AND EROSION CONTROL MEASURES SHALL OF EVENTS AND EROSION CONTROL MEASURES SHALL OF EVENTS AND EROSION CONTROL MEASURES SHALL EVENTS AND EROSION CONTROL MEASURES SHALL EVENTS AND EROSION CONTROL MEASURES SHALL AND EROSION CONTROL MEASURES SHALL AND EROSION CONTROL MEASURES SHALL EROSION CONTROL MEASURES SHALL EROSION CONTROL MEASURES SHALL CONTROL MEASURES SHALL CONTROL MEASURES SHALL MEASURES SHALL MEASURES SHALL SHALL SHALL BE INCORPORATED INTO THE CONSTRUCTION SCHEDULE FOR THIS PROJECT AND INCORPORATED INTO THE CONSTRUCTION SCHEDULE FOR THIS PROJECT AND INCORPORATED INTO THE CONSTRUCTION SCHEDULE FOR THIS PROJECT AND INTO THE CONSTRUCTION SCHEDULE FOR THIS PROJECT AND INTO THE CONSTRUCTION SCHEDULE FOR THIS PROJECT AND THE CONSTRUCTION SCHEDULE FOR THIS PROJECT AND THE CONSTRUCTION SCHEDULE FOR THIS PROJECT AND CONSTRUCTION SCHEDULE FOR THIS PROJECT AND CONSTRUCTION SCHEDULE FOR THIS PROJECT AND SCHEDULE FOR THIS PROJECT AND SCHEDULE FOR THIS PROJECT AND FOR THIS PROJECT AND FOR THIS PROJECT AND THIS PROJECT AND THIS PROJECT AND PROJECT AND PROJECT AND AND AND SHALL APPLY TO ALL CONSTRUCTION ACTIVITIES WITHIN THE PROJECT LIMITS. 1. CONTACT NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ) CONTACT NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ) NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ) NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ) CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ) CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ) DEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ) DEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ) OF ENVIRONMENTAL QUALITY (NCDEQ) OF ENVIRONMENTAL QUALITY (NCDEQ) ENVIRONMENTAL QUALITY (NCDEQ) ENVIRONMENTAL QUALITY (NCDEQ) QUALITY (NCDEQ) QUALITY (NCDEQ) (NCDEQ) (NCDEQ) DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES (DEMLR) WASHINGTON OF ENERGY, MINERAL, AND LAND RESOURCES (DEMLR) WASHINGTON OF ENERGY, MINERAL, AND LAND RESOURCES (DEMLR) WASHINGTON ENERGY, MINERAL, AND LAND RESOURCES (DEMLR) WASHINGTON ENERGY, MINERAL, AND LAND RESOURCES (DEMLR) WASHINGTON MINERAL, AND LAND RESOURCES (DEMLR) WASHINGTON MINERAL, AND LAND RESOURCES (DEMLR) WASHINGTON AND LAND RESOURCES (DEMLR) WASHINGTON AND LAND RESOURCES (DEMLR) WASHINGTON LAND RESOURCES (DEMLR) WASHINGTON LAND RESOURCES (DEMLR) WASHINGTON RESOURCES (DEMLR) WASHINGTON RESOURCES (DEMLR) WASHINGTON (DEMLR) WASHINGTON (DEMLR) WASHINGTON WASHINGTON WASHINGTON REGIONAL OFFICE ONE WEEK PRIOR TO THE BEGINNING OF CONSTRUCTION AT OFFICE ONE WEEK PRIOR TO THE BEGINNING OF CONSTRUCTION AT OFFICE ONE WEEK PRIOR TO THE BEGINNING OF CONSTRUCTION AT ONE WEEK PRIOR TO THE BEGINNING OF CONSTRUCTION AT ONE WEEK PRIOR TO THE BEGINNING OF CONSTRUCTION AT WEEK PRIOR TO THE BEGINNING OF CONSTRUCTION AT WEEK PRIOR TO THE BEGINNING OF CONSTRUCTION AT PRIOR TO THE BEGINNING OF CONSTRUCTION AT PRIOR TO THE BEGINNING OF CONSTRUCTION AT TO THE BEGINNING OF CONSTRUCTION AT TO THE BEGINNING OF CONSTRUCTION AT THE BEGINNING OF CONSTRUCTION AT THE BEGINNING OF CONSTRUCTION AT BEGINNING OF CONSTRUCTION AT BEGINNING OF CONSTRUCTION AT OF CONSTRUCTION AT OF CONSTRUCTION AT CONSTRUCTION AT CONSTRUCTION AT AT AT 252-948-3859. 2. PRIOR TO ANY LAND DISTURBING ACTIVITIES INSTALL ALL TEMPORARY EROSION PRIOR TO ANY LAND DISTURBING ACTIVITIES INSTALL ALL TEMPORARY EROSION TO ANY LAND DISTURBING ACTIVITIES INSTALL ALL TEMPORARY EROSION TO ANY LAND DISTURBING ACTIVITIES INSTALL ALL TEMPORARY EROSION ANY LAND DISTURBING ACTIVITIES INSTALL ALL TEMPORARY EROSION ANY LAND DISTURBING ACTIVITIES INSTALL ALL TEMPORARY EROSION LAND DISTURBING ACTIVITIES INSTALL ALL TEMPORARY EROSION LAND DISTURBING ACTIVITIES INSTALL ALL TEMPORARY EROSION DISTURBING ACTIVITIES INSTALL ALL TEMPORARY EROSION DISTURBING ACTIVITIES INSTALL ALL TEMPORARY EROSION ACTIVITIES INSTALL ALL TEMPORARY EROSION ACTIVITIES INSTALL ALL TEMPORARY EROSION INSTALL ALL TEMPORARY EROSION INSTALL ALL TEMPORARY EROSION ALL TEMPORARY EROSION ALL TEMPORARY EROSION TEMPORARY EROSION TEMPORARY EROSION EROSION EROSION AND SEDIMENT CONTROL MEASURES AS DEPICTED IN SHEETS C101-C103, SEDIMENT CONTROL MEASURES AS DEPICTED IN SHEETS C101-C103, SEDIMENT CONTROL MEASURES AS DEPICTED IN SHEETS C101-C103, CONTROL MEASURES AS DEPICTED IN SHEETS C101-C103, CONTROL MEASURES AS DEPICTED IN SHEETS C101-C103, MEASURES AS DEPICTED IN SHEETS C101-C103, MEASURES AS DEPICTED IN SHEETS C101-C103, AS DEPICTED IN SHEETS C101-C103, AS DEPICTED IN SHEETS C101-C103, DEPICTED IN SHEETS C101-C103, DEPICTED IN SHEETS C101-C103, IN SHEETS C101-C103, IN SHEETS C101-C103, SHEETS C101-C103, SHEETS C101-C103, C101-C103, C101-C103, C301-C312, CD101-CD103, AND E301-E303. 3. THE EROSION CONTROL REVIEW AND INSPECTION WILL BE ADDRESSED BY THE EROSION CONTROL REVIEW AND INSPECTION WILL BE ADDRESSED BY EROSION CONTROL REVIEW AND INSPECTION WILL BE ADDRESSED BY EROSION CONTROL REVIEW AND INSPECTION WILL BE ADDRESSED BY CONTROL REVIEW AND INSPECTION WILL BE ADDRESSED BY CONTROL REVIEW AND INSPECTION WILL BE ADDRESSED BY REVIEW AND INSPECTION WILL BE ADDRESSED BY REVIEW AND INSPECTION WILL BE ADDRESSED BY AND INSPECTION WILL BE ADDRESSED BY AND INSPECTION WILL BE ADDRESSED BY INSPECTION WILL BE ADDRESSED BY INSPECTION WILL BE ADDRESSED BY WILL BE ADDRESSED BY WILL BE ADDRESSED BY BE ADDRESSED BY BE ADDRESSED BY ADDRESSED BY ADDRESSED BY BY BY NCDEQ DEMLR, LAND QUALITY SECTION. 4. AREAS WHICH ARE NOT TO BE DISTURBED SHALL BE CLEARLY MARKED BY AREAS WHICH ARE NOT TO BE DISTURBED SHALL BE CLEARLY MARKED BY WHICH ARE NOT TO BE DISTURBED SHALL BE CLEARLY MARKED BY WHICH ARE NOT TO BE DISTURBED SHALL BE CLEARLY MARKED BY ARE NOT TO BE DISTURBED SHALL BE CLEARLY MARKED BY ARE NOT TO BE DISTURBED SHALL BE CLEARLY MARKED BY NOT TO BE DISTURBED SHALL BE CLEARLY MARKED BY NOT TO BE DISTURBED SHALL BE CLEARLY MARKED BY TO BE DISTURBED SHALL BE CLEARLY MARKED BY TO BE DISTURBED SHALL BE CLEARLY MARKED BY BE DISTURBED SHALL BE CLEARLY MARKED BY BE DISTURBED SHALL BE CLEARLY MARKED BY DISTURBED SHALL BE CLEARLY MARKED BY DISTURBED SHALL BE CLEARLY MARKED BY SHALL BE CLEARLY MARKED BY SHALL BE CLEARLY MARKED BY BE CLEARLY MARKED BY BE CLEARLY MARKED BY CLEARLY MARKED BY CLEARLY MARKED BY MARKED BY MARKED BY BY BY FENCING, FLAGS, OR SIGNS, ETC. 5. UPON ACCEPTANCE OF ALL EROSION AND SEDIMENT CONTROL MEASURES, UPON ACCEPTANCE OF ALL EROSION AND SEDIMENT CONTROL MEASURES, ACCEPTANCE OF ALL EROSION AND SEDIMENT CONTROL MEASURES, ACCEPTANCE OF ALL EROSION AND SEDIMENT CONTROL MEASURES, OF ALL EROSION AND SEDIMENT CONTROL MEASURES, OF ALL EROSION AND SEDIMENT CONTROL MEASURES, ALL EROSION AND SEDIMENT CONTROL MEASURES, ALL EROSION AND SEDIMENT CONTROL MEASURES, EROSION AND SEDIMENT CONTROL MEASURES, EROSION AND SEDIMENT CONTROL MEASURES, AND SEDIMENT CONTROL MEASURES, AND SEDIMENT CONTROL MEASURES, SEDIMENT CONTROL MEASURES, SEDIMENT CONTROL MEASURES, CONTROL MEASURES, CONTROL MEASURES, MEASURES, MEASURES, COMMENCE EXCAVATION AND/OR GRADING ACTIVITIES. THE CONTRACTOR WILL EXCAVATION AND/OR GRADING ACTIVITIES. THE CONTRACTOR WILL EXCAVATION AND/OR GRADING ACTIVITIES. THE CONTRACTOR WILL AND/OR GRADING ACTIVITIES. THE CONTRACTOR WILL AND/OR GRADING ACTIVITIES. THE CONTRACTOR WILL GRADING ACTIVITIES. THE CONTRACTOR WILL GRADING ACTIVITIES. THE CONTRACTOR WILL ACTIVITIES. THE CONTRACTOR WILL ACTIVITIES. THE CONTRACTOR WILL THE CONTRACTOR WILL THE CONTRACTOR WILL THE CONTRACTOR WILL CONTRACTOR WILL CONTRACTOR WILL WILL WILL BE RESTRICTED TO THE LIMITS OF DISTURBANCE AS SHOWN ON THE RESTRICTED TO THE LIMITS OF DISTURBANCE AS SHOWN ON THE RESTRICTED TO THE LIMITS OF DISTURBANCE AS SHOWN ON THE TO THE LIMITS OF DISTURBANCE AS SHOWN ON THE TO THE LIMITS OF DISTURBANCE AS SHOWN ON THE THE LIMITS OF DISTURBANCE AS SHOWN ON THE THE LIMITS OF DISTURBANCE AS SHOWN ON THE LIMITS OF DISTURBANCE AS SHOWN ON THE LIMITS OF DISTURBANCE AS SHOWN ON THE OF DISTURBANCE AS SHOWN ON THE OF DISTURBANCE AS SHOWN ON THE DISTURBANCE AS SHOWN ON THE DISTURBANCE AS SHOWN ON THE AS SHOWN ON THE AS SHOWN ON THE SHOWN ON THE SHOWN ON THE ON THE ON THE THE THE CONSTRUCTION PLANS FOR EXCAVATION, EQUIPMENT STAGING ACTIVITIES AND PLANS FOR EXCAVATION, EQUIPMENT STAGING ACTIVITIES AND PLANS FOR EXCAVATION, EQUIPMENT STAGING ACTIVITIES AND FOR EXCAVATION, EQUIPMENT STAGING ACTIVITIES AND FOR EXCAVATION, EQUIPMENT STAGING ACTIVITIES AND EXCAVATION, EQUIPMENT STAGING ACTIVITIES AND EXCAVATION, EQUIPMENT STAGING ACTIVITIES AND EQUIPMENT STAGING ACTIVITIES AND EQUIPMENT STAGING ACTIVITIES AND STAGING ACTIVITIES AND STAGING ACTIVITIES AND ACTIVITIES AND ACTIVITIES AND AND AND TEMPORARY STOCKPILING OF EXCAVATED SOIL ALONG THE LENGTH OF STOCKPILING OF EXCAVATED SOIL ALONG THE LENGTH OF STOCKPILING OF EXCAVATED SOIL ALONG THE LENGTH OF OF EXCAVATED SOIL ALONG THE LENGTH OF OF EXCAVATED SOIL ALONG THE LENGTH OF EXCAVATED SOIL ALONG THE LENGTH OF EXCAVATED SOIL ALONG THE LENGTH OF SOIL ALONG THE LENGTH OF SOIL ALONG THE LENGTH OF ALONG THE LENGTH OF ALONG THE LENGTH OF THE LENGTH OF THE LENGTH OF LENGTH OF LENGTH OF OF OF PIPELINES. 6. LIMIT TRENCH EXCAVATION TO THE AMOUNT OF PIPE THAT CAN BE LIMIT TRENCH EXCAVATION TO THE AMOUNT OF PIPE THAT CAN BE TRENCH EXCAVATION TO THE AMOUNT OF PIPE THAT CAN BE TRENCH EXCAVATION TO THE AMOUNT OF PIPE THAT CAN BE EXCAVATION TO THE AMOUNT OF PIPE THAT CAN BE EXCAVATION TO THE AMOUNT OF PIPE THAT CAN BE TO THE AMOUNT OF PIPE THAT CAN BE TO THE AMOUNT OF PIPE THAT CAN BE THE AMOUNT OF PIPE THAT CAN BE THE AMOUNT OF PIPE THAT CAN BE AMOUNT OF PIPE THAT CAN BE AMOUNT OF PIPE THAT CAN BE OF PIPE THAT CAN BE OF PIPE THAT CAN BE PIPE THAT CAN BE PIPE THAT CAN BE THAT CAN BE THAT CAN BE CAN BE CAN BE BE BE CONSTRUCTED AND BACKFILLED IN ONE DAY, OR 50 LINEAL FEET, WHICHEVER AND BACKFILLED IN ONE DAY, OR 50 LINEAL FEET, WHICHEVER AND BACKFILLED IN ONE DAY, OR 50 LINEAL FEET, WHICHEVER BACKFILLED IN ONE DAY, OR 50 LINEAL FEET, WHICHEVER BACKFILLED IN ONE DAY, OR 50 LINEAL FEET, WHICHEVER IN ONE DAY, OR 50 LINEAL FEET, WHICHEVER IN ONE DAY, OR 50 LINEAL FEET, WHICHEVER ONE DAY, OR 50 LINEAL FEET, WHICHEVER ONE DAY, OR 50 LINEAL FEET, WHICHEVER DAY, OR 50 LINEAL FEET, WHICHEVER DAY, OR 50 LINEAL FEET, WHICHEVER OR 50 LINEAL FEET, WHICHEVER OR 50 LINEAL FEET, WHICHEVER 50 LINEAL FEET, WHICHEVER 50 LINEAL FEET, WHICHEVER LINEAL FEET, WHICHEVER LINEAL FEET, WHICHEVER FEET, WHICHEVER FEET, WHICHEVER WHICHEVER WHICHEVER IS LESS. EXCAVATED TRENCH MATERIAL MUST BE STOCKPILED WITHIN THE LESS. EXCAVATED TRENCH MATERIAL MUST BE STOCKPILED WITHIN THE LESS. EXCAVATED TRENCH MATERIAL MUST BE STOCKPILED WITHIN THE EXCAVATED TRENCH MATERIAL MUST BE STOCKPILED WITHIN THE EXCAVATED TRENCH MATERIAL MUST BE STOCKPILED WITHIN THE TRENCH MATERIAL MUST BE STOCKPILED WITHIN THE TRENCH MATERIAL MUST BE STOCKPILED WITHIN THE MATERIAL MUST BE STOCKPILED WITHIN THE MATERIAL MUST BE STOCKPILED WITHIN THE MUST BE STOCKPILED WITHIN THE MUST BE STOCKPILED WITHIN THE BE STOCKPILED WITHIN THE BE STOCKPILED WITHIN THE STOCKPILED WITHIN THE STOCKPILED WITHIN THE WITHIN THE WITHIN THE THE THE DEFINED LIMITS OF DISTURBANCE. OPEN TRENCHES SHALL BE BACKFILLED AND LIMITS OF DISTURBANCE. OPEN TRENCHES SHALL BE BACKFILLED AND LIMITS OF DISTURBANCE. OPEN TRENCHES SHALL BE BACKFILLED AND OF DISTURBANCE. OPEN TRENCHES SHALL BE BACKFILLED AND OF DISTURBANCE. OPEN TRENCHES SHALL BE BACKFILLED AND DISTURBANCE. OPEN TRENCHES SHALL BE BACKFILLED AND DISTURBANCE. OPEN TRENCHES SHALL BE BACKFILLED AND OPEN TRENCHES SHALL BE BACKFILLED AND OPEN TRENCHES SHALL BE BACKFILLED AND TRENCHES SHALL BE BACKFILLED AND TRENCHES SHALL BE BACKFILLED AND SHALL BE BACKFILLED AND SHALL BE BACKFILLED AND BE BACKFILLED AND BE BACKFILLED AND BACKFILLED AND BACKFILLED AND AND AND STABILIZED AT THE END OF EACH WORK DAY. 7. PROVIDE PUMP FILTER BAGS OR OTHER APPROVED DEWATERING DEVICES FOR PROVIDE PUMP FILTER BAGS OR OTHER APPROVED DEWATERING DEVICES FOR PUMP FILTER BAGS OR OTHER APPROVED DEWATERING DEVICES FOR PUMP FILTER BAGS OR OTHER APPROVED DEWATERING DEVICES FOR FILTER BAGS OR OTHER APPROVED DEWATERING DEVICES FOR FILTER BAGS OR OTHER APPROVED DEWATERING DEVICES FOR BAGS OR OTHER APPROVED DEWATERING DEVICES FOR BAGS OR OTHER APPROVED DEWATERING DEVICES FOR OR OTHER APPROVED DEWATERING DEVICES FOR OR OTHER APPROVED DEWATERING DEVICES FOR OTHER APPROVED DEWATERING DEVICES FOR OTHER APPROVED DEWATERING DEVICES FOR APPROVED DEWATERING DEVICES FOR APPROVED DEWATERING DEVICES FOR DEWATERING DEVICES FOR DEWATERING DEVICES FOR DEVICES FOR DEVICES FOR FOR FOR DEWATERING OF TRENCH EXCAVATION AS NEEDED. 8. SOIL SUPPLEMENTS, SEED AND MULCH, IF APPLICABLE, SHOULD BE APPLIED SOIL SUPPLEMENTS, SEED AND MULCH, IF APPLICABLE, SHOULD BE APPLIED SUPPLEMENTS, SEED AND MULCH, IF APPLICABLE, SHOULD BE APPLIED SUPPLEMENTS, SEED AND MULCH, IF APPLICABLE, SHOULD BE APPLIED SEED AND MULCH, IF APPLICABLE, SHOULD BE APPLIED SEED AND MULCH, IF APPLICABLE, SHOULD BE APPLIED AND MULCH, IF APPLICABLE, SHOULD BE APPLIED AND MULCH, IF APPLICABLE, SHOULD BE APPLIED MULCH, IF APPLICABLE, SHOULD BE APPLIED MULCH, IF APPLICABLE, SHOULD BE APPLIED IF APPLICABLE, SHOULD BE APPLIED IF APPLICABLE, SHOULD BE APPLIED APPLICABLE, SHOULD BE APPLIED APPLICABLE, SHOULD BE APPLIED SHOULD BE APPLIED SHOULD BE APPLIED BE APPLIED BE APPLIED APPLIED APPLIED WITHIN SEVEN DAYS AFTER THE PIPELINE/UTILITY LINE IS CONSTRUCTED. 9. THE CONTRACTOR SHALL LIMIT SITE ACCESS BY CONSTRUCTION VEHICLES TO THE CONTRACTOR SHALL LIMIT SITE ACCESS BY CONSTRUCTION VEHICLES TO CONTRACTOR SHALL LIMIT SITE ACCESS BY CONSTRUCTION VEHICLES TO CONTRACTOR SHALL LIMIT SITE ACCESS BY CONSTRUCTION VEHICLES TO SHALL LIMIT SITE ACCESS BY CONSTRUCTION VEHICLES TO SHALL LIMIT SITE ACCESS BY CONSTRUCTION VEHICLES TO LIMIT SITE ACCESS BY CONSTRUCTION VEHICLES TO LIMIT SITE ACCESS BY CONSTRUCTION VEHICLES TO SITE ACCESS BY CONSTRUCTION VEHICLES TO SITE ACCESS BY CONSTRUCTION VEHICLES TO ACCESS BY CONSTRUCTION VEHICLES TO ACCESS BY CONSTRUCTION VEHICLES TO BY CONSTRUCTION VEHICLES TO BY CONSTRUCTION VEHICLES TO CONSTRUCTION VEHICLES TO CONSTRUCTION VEHICLES TO VEHICLES TO VEHICLES TO TO TO ENTRANCES PROTECTED BY A STONE CONSTRUCTION ENTRANCE. SEDIMENT PROTECTED BY A STONE CONSTRUCTION ENTRANCE. SEDIMENT PROTECTED BY A STONE CONSTRUCTION ENTRANCE. SEDIMENT BY A STONE CONSTRUCTION ENTRANCE. SEDIMENT BY A STONE CONSTRUCTION ENTRANCE. SEDIMENT A STONE CONSTRUCTION ENTRANCE. SEDIMENT A STONE CONSTRUCTION ENTRANCE. SEDIMENT STONE CONSTRUCTION ENTRANCE. SEDIMENT STONE CONSTRUCTION ENTRANCE. SEDIMENT CONSTRUCTION ENTRANCE. SEDIMENT CONSTRUCTION ENTRANCE. SEDIMENT ENTRANCE. SEDIMENT ENTRANCE. SEDIMENT SEDIMENT SEDIMENT SHALL BE REMOVED FROM PAVED AREAS ON A DAILY BASIS. ANY TEMPORARY BE REMOVED FROM PAVED AREAS ON A DAILY BASIS. ANY TEMPORARY BE REMOVED FROM PAVED AREAS ON A DAILY BASIS. ANY TEMPORARY REMOVED FROM PAVED AREAS ON A DAILY BASIS. ANY TEMPORARY REMOVED FROM PAVED AREAS ON A DAILY BASIS. ANY TEMPORARY FROM PAVED AREAS ON A DAILY BASIS. ANY TEMPORARY FROM PAVED AREAS ON A DAILY BASIS. ANY TEMPORARY PAVED AREAS ON A DAILY BASIS. ANY TEMPORARY PAVED AREAS ON A DAILY BASIS. ANY TEMPORARY AREAS ON A DAILY BASIS. ANY TEMPORARY AREAS ON A DAILY BASIS. ANY TEMPORARY ON A DAILY BASIS. ANY TEMPORARY ON A DAILY BASIS. ANY TEMPORARY A DAILY BASIS. ANY TEMPORARY A DAILY BASIS. ANY TEMPORARY DAILY BASIS. ANY TEMPORARY DAILY BASIS. ANY TEMPORARY BASIS. ANY TEMPORARY BASIS. ANY TEMPORARY ANY TEMPORARY ANY TEMPORARY TEMPORARY TEMPORARY ACCESS CONSTRUCTED FOR PIPELINE WORK MUST BE STABILIZED WITH A CONSTRUCTED FOR PIPELINE WORK MUST BE STABILIZED WITH A CONSTRUCTED FOR PIPELINE WORK MUST BE STABILIZED WITH A FOR PIPELINE WORK MUST BE STABILIZED WITH A FOR PIPELINE WORK MUST BE STABILIZED WITH A PIPELINE WORK MUST BE STABILIZED WITH A PIPELINE WORK MUST BE STABILIZED WITH A WORK MUST BE STABILIZED WITH A WORK MUST BE STABILIZED WITH A MUST BE STABILIZED WITH A MUST BE STABILIZED WITH A BE STABILIZED WITH A BE STABILIZED WITH A STABILIZED WITH A STABILIZED WITH A WITH A WITH A A A NON-GRADE AGGREGATE. 10. SELF INSPECTION AND SELF MONITORING: SELF INSPECTION AND SELF MONITORING: 10.1. SELF INSPECTION: THE CONTRACTOR SHALL PERFORM AN INSPECTION OF SELF INSPECTION: THE CONTRACTOR SHALL PERFORM AN INSPECTION OF INSPECTION: THE CONTRACTOR SHALL PERFORM AN INSPECTION OF INSPECTION: THE CONTRACTOR SHALL PERFORM AN INSPECTION OF THE CONTRACTOR SHALL PERFORM AN INSPECTION OF THE CONTRACTOR SHALL PERFORM AN INSPECTION OF CONTRACTOR SHALL PERFORM AN INSPECTION OF CONTRACTOR SHALL PERFORM AN INSPECTION OF SHALL PERFORM AN INSPECTION OF SHALL PERFORM AN INSPECTION OF PERFORM AN INSPECTION OF PERFORM AN INSPECTION OF AN INSPECTION OF AN INSPECTION OF INSPECTION OF INSPECTION OF OF OF THE AREA COVERED BY THE PLAN AFTER EACH PHASE OF THE PLAN HAS AREA COVERED BY THE PLAN AFTER EACH PHASE OF THE PLAN HAS AREA COVERED BY THE PLAN AFTER EACH PHASE OF THE PLAN HAS COVERED BY THE PLAN AFTER EACH PHASE OF THE PLAN HAS COVERED BY THE PLAN AFTER EACH PHASE OF THE PLAN HAS BY THE PLAN AFTER EACH PHASE OF THE PLAN HAS BY THE PLAN AFTER EACH PHASE OF THE PLAN HAS THE PLAN AFTER EACH PHASE OF THE PLAN HAS THE PLAN AFTER EACH PHASE OF THE PLAN HAS PLAN AFTER EACH PHASE OF THE PLAN HAS PLAN AFTER EACH PHASE OF THE PLAN HAS AFTER EACH PHASE OF THE PLAN HAS AFTER EACH PHASE OF THE PLAN HAS EACH PHASE OF THE PLAN HAS EACH PHASE OF THE PLAN HAS PHASE OF THE PLAN HAS PHASE OF THE PLAN HAS OF THE PLAN HAS OF THE PLAN HAS THE PLAN HAS THE PLAN HAS PLAN HAS PLAN HAS HAS HAS BEEN COMPLETED AND AFTER ESTABLISHMENT OF TEMPORARY GROUND COMPLETED AND AFTER ESTABLISHMENT OF TEMPORARY GROUND COMPLETED AND AFTER ESTABLISHMENT OF TEMPORARY GROUND AND AFTER ESTABLISHMENT OF TEMPORARY GROUND AND AFTER ESTABLISHMENT OF TEMPORARY GROUND AFTER ESTABLISHMENT OF TEMPORARY GROUND AFTER ESTABLISHMENT OF TEMPORARY GROUND ESTABLISHMENT OF TEMPORARY GROUND ESTABLISHMENT OF TEMPORARY GROUND OF TEMPORARY GROUND OF TEMPORARY GROUND TEMPORARY GROUND TEMPORARY GROUND GROUND GROUND COVER IN ACCORDANCE WITH G.S. 113A-57(2). THE CONTRACTOR SHALL IN ACCORDANCE WITH G.S. 113A-57(2). THE CONTRACTOR SHALL IN ACCORDANCE WITH G.S. 113A-57(2). THE CONTRACTOR SHALL ACCORDANCE WITH G.S. 113A-57(2). THE CONTRACTOR SHALL ACCORDANCE WITH G.S. 113A-57(2). THE CONTRACTOR SHALL WITH G.S. 113A-57(2). THE CONTRACTOR SHALL WITH G.S. 113A-57(2). THE CONTRACTOR SHALL G.S. 113A-57(2). THE CONTRACTOR SHALL G.S. 113A-57(2). THE CONTRACTOR SHALL 113A-57(2). THE CONTRACTOR SHALL 113A-57(2). THE CONTRACTOR SHALL THE CONTRACTOR SHALL THE CONTRACTOR SHALL CONTRACTOR SHALL CONTRACTOR SHALL SHALL SHALL MAINTAIN AND MAKE AVAILABLE A RECORD OF THE INSPECTION AT THE AND MAKE AVAILABLE A RECORD OF THE INSPECTION AT THE AND MAKE AVAILABLE A RECORD OF THE INSPECTION AT THE MAKE AVAILABLE A RECORD OF THE INSPECTION AT THE MAKE AVAILABLE A RECORD OF THE INSPECTION AT THE AVAILABLE A RECORD OF THE INSPECTION AT THE AVAILABLE A RECORD OF THE INSPECTION AT THE A RECORD OF THE INSPECTION AT THE A RECORD OF THE INSPECTION AT THE RECORD OF THE INSPECTION AT THE RECORD OF THE INSPECTION AT THE OF THE INSPECTION AT THE OF THE INSPECTION AT THE THE INSPECTION AT THE THE INSPECTION AT THE INSPECTION AT THE INSPECTION AT THE AT THE AT THE THE THE SITE OF THE LAND-DISTURBING ACTIVITY. THE RECORD SHALL SET OUT OF THE LAND-DISTURBING ACTIVITY. THE RECORD SHALL SET OUT OF THE LAND-DISTURBING ACTIVITY. THE RECORD SHALL SET OUT THE LAND-DISTURBING ACTIVITY. THE RECORD SHALL SET OUT THE LAND-DISTURBING ACTIVITY. THE RECORD SHALL SET OUT LAND-DISTURBING ACTIVITY. THE RECORD SHALL SET OUT LAND-DISTURBING ACTIVITY. THE RECORD SHALL SET OUT ACTIVITY. THE RECORD SHALL SET OUT ACTIVITY.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .