Attachments.pdf
PDF 31 MB Posted
- Attached to
- Dry Dock Lift Federal contract opportunity
- Solicitation number
- N3904019R0008
About this file
Attachments
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N3904019R0008_A01.pdf | ||
| N3904019R0008.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
001 VRC SPECIFICATION
INSTALLATION RESPONSIBILITIES
CONTRACTOR RESPONSIBILITIES:
a. Furnish labor and material handling equipment for off-loading and placing item on government provided foundations.
b. Provide and install upper and lower fasteners (including anchor plates, studs, nuts, etc.) in accordance with the manufacturers design requirements.
c. Set and rough level the machine on its foundation.
d. Level and align machine.
e. Connect machine to the provided utilities hook-up.
f. Provide all necessary tools, gages, and instrumentation necessary to perform the required tests.
g. Provide and charge all systems with fluids in accordance with manufacturer's instructions.
GOVERNMENT RESPONSIBILITIES
a. Provide utilities hook-up within 20 feet of the machine
b. Provide material for performance testing (weights) at receiving activity.
Attachment “C” DD1 VRC SPECIFICATION
ATTACHMENT C: Submittal Summary
NOTE: See Attachment A for additional required submittals
Specification - Required Submittals
Title Specification
Paragraph Contractor's Due Date
Government Review Time
(Business Days)
Copies
Hazardous Material Certification 3.1.6 & 3.7.4.2.1
60 DAYS AFTER CONTRACT
AWARD 3 1
Material Safety Data Sheets Information 3.1.6.2 PRIOR TO INSTALLATION 3 1
Lubrication, if potential contact with water 3.1.7 PRIOR TO INSTALLATION 3 1
Gears Certification 3.2.5
PRIOR TO START OF
FABRICATION 3 1
Welding Qualifications 3.2.6 & 3.7.4.2.5
PRIOR TO START OF
FABRICATION 3 1
Corrosion Control System (Duplex Coating) 3.2.8
SUBMIT WITH DESIGN
WORK PACKAGE 10 1
Fall Protection Plans 3.3.9
SUBMIT WITH DESIGN
WORK PACKAGE 10 1
Brake Adjustment / Settings / Pad Thickness 3.3.12
PRIOR TO START OF
ACCEPTANCE TEST 3 1
Rack and Pinion Alignment Procedure, if used 3.3.13
PRIOR TO START OF
ACCEPTANCE TEST 3 1
Lifting Attachment Proof Test and VT/MT 3.3.18 PRIOR TO SHIPMENT 5 1
Contractor Progress Report 3.7.2 RECURRING BI-WEEKLY 5 1
Preliminary Design Work Package 3.7.3.1 90 DAYS AFTER AWARD 10 1
Final Design Work Package 3.7.3.2
90 DAYS AFTER
ACCEPTANCE OF
PRELIMINARY DWP 10 1
Work Execution Plan / Schedule 3.7.3.4 30 DAYS AFTER AWARD 5 1
Final O&M Manual 3.7.3.9 & 3.7.5.2
45 DAYS AFTER
COMPLETION OF
ACCEPTANCE TESTING 10 3
Lifting Sketches 3.7.3.10.7
SUBMIT WITH DESIGN
WORK PACKAGE 10 1
Software & Licenses 3.7.3.10.5.1
45 DAYS AFTER
COMPLETION OF
ACCEPTANCE TESTING 15 1
Attachment “C” DD1 VRC SPECIFICATION
As-Built Drawings 3.7.3.10.9 & 3.7.5.2
45 DAYS AFTER
COMPLETION OF
ACCEPTANCE TESTING 10 1
Inspection Records 3.7.4.1
10 DAYS PRIOR TO START
OF ACCEPTANCE TESTING 5 1
Periodic Overload Testing Certification 3.7.4.2.2
PRIOR TO START OF
ACCEPTANCE TEST 3 1
Carriage Drop Test Certification 3.7.4.2.3
PRIOR TO START OF
ACCEPTANCE TEST 3 1
Loss of Power Test 3.7.4.2.4
PRIOR TO START OF
ACCEPTANCE TEST 3 1
Acceptance Test Procedure 3.7.4.3
PRIOR TO START OF
ACCEPTANCE TEST 5 1
Letter of Certification 3.7.4.4
PRIOR TO START OF
ACCEPTANCE TEST 5 1
Test Report 3.7.5.1
10 DAYS AFTER
COMPLETION OF
ACCEPTANCE TESTING 5 1
Contractor's Designated Representative 3.8.7 PRIOR TO INSTALLATION 3 1
Weight Handling Equipment Certificate of Compliance 3.8.12
10 DAYS PRIOR TO
EQUIPMENT ARRIVAL 5 1
Critical Lift Plan 3.8.13
10 DAYS PRIOR TO
EQUIPMENT ARRIVAL 5 1
Training, Course Outline and Manuals 3.9
15 DAYS PRIOR TO START
OF TRAINING 5 1
| DD1 VRC Specification |
| DD1 VRC Attachment A |
| DD1 VRC Attachment B |
| ATTACHMENT C w software license |
| DD1 VRC Attachment D |
| DD1 VRC Attachment E |
| DD1 VRC Attachment F |
File details come from the government source that posted it.