QASP_Matrix_for_YFN_1203.pdf
PDF 262 KB Posted
- Attached to
- Barge Overhaul Federal contract opportunity
- Solicitation number
- N3904018R0017
About this file
QASP Matrix
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N3904018R0017_Amendment__3.pdf | ||
| N3904018R0017_Amendment__2.pdf | ||
| Full_SOW.pdf | ||
| N3904018R0017_Amendment__1.pdf | ||
| SOW.pdf | ||
| N3904018R0017.pdf | ||
| YFN_1203_QASP.pdf | ||
| List_of_Identity_Proofing_Documents.pdf | ||
| ID_Form_Requirements.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N39040-18-R-0017
Attachment 3
QUALITY ASSURANCE SURVEILLANCE PLAN,(MATRIX)
YFN 1203 REPAIR AND UPGRADE
Deliverable or Service
Requirement
Measurement/
Metric
Performance Standards Maximum Error Rate
Method of Surveillance
Procedures to be taken when performance standards are met/not met
Hazardous Waste
Control
077-11-001
Quality
Timeliness
Responsiveness
Contractor’s ability to satisfactorily meet the customer’s expectations of completed work.
On time delivery of products, status reports, invoicing
Contractor’s written response within
3 days of CDR(s)
How well the contractor responds to customer concerns and the approach used to resolve problems.
0% -Contracting Officer’s
Representative (COR) review of Hazardous
Waste Manifest Form and
Generator Identification number.
-Customer feedback
FAR Clause 52.212-4 “Contract Terms and
Conditions – Inspection /Acceptancce
Positive: Letters of Commendation and/or
Appreciation, Favorable Performance
Reviews.
Negative: Performance will be documented on
CPARS.
In Addition, FAR 52.246-6 (f), (g) and (h).
Underwater Hull
Inspection and
Repair
110-11-001 concerns and the approach used to resolve problems.
0% -COR review UT inspection results.
-COR visually inspect completed work
- Customer feedback
Conditions – Inspection /Acceptance
Void; Clean, Inspect, and Preserve.
123-21-001
0% COR review initial inspection report
-Unannounced inspections conducted by the COR and/or by (ACOR)
-COR review of final inspection report.
Exterior
Attachment; Remove
150-11-001
How well the contractor responds to customer concerns and the approach used to resolve problems.
0% -COR inspect completed work.
Watertight Hatch and Inclined Ladder;
Install
167-11-001
-COR inspect completed
Exterior Door;
Replace
167-11-002 used to resolve problems.
Interior Lighting
Modification
332-11-001
Contractor’s written response within 3 days of CDR(s)
0% -COR witness testing of newly installed equipment.
LAN Remove, Modify, Install
409-11-001 concerns and the approach used to resolve problems.
0% -Unannounced inspections conducted by the COR.
Exterior Lighting;
Modify and Install
422-11-001 concerns and the approach used to resolve problems.
Telephone System;
Remove and Install
0% -COR visually inspect completed work.
432-11-001
Install Heater
511-11-001
Remove Fan
512-11-001 concerns and the approach used to resolve problems.
HVAC System; Install
512-90-001 concerns and the approach used to resolve problems.
Air Conditioning
Unit; Install
514-11-001 concerns and the approach used to resolve problems.
Storeroom
Arrangement;
Accomplish
608-11-001 concerns and the approach used to resolve problems.
Fender; Replace
611-11-001
0% -COR inspect newly installed equipment.
Lifeline and
Stanchion; Replace
612-11-001 concerns and the approach used to resolve problems.
0% -COR inspect newly
Handrail and
Stanchion; Install
612-11-002 concerns and the approach used to
0%
-COR inspect newly
Window; Remove
624-11-001 concerns and the approach used to resolve problems.
0% -COR review water hose test results.
-COR visually inspect completed work
- Customer feedback
Superstructure
Preservation;
631-11-001 concerns and the approach used to resolve problems.
0% COR inspect completed
-Unannounced inspections conducted by the COR and/or by (ACOR)
-COR review of final inspection report.
Underwater Hull and Freeboard
Preservation;
Accomplish
631-31-001 used to resolve problems.
Zincs; Replace
633-11-001 concerns and the approach used to resolve problems.
Main Deck Exterior;
Preserve
634-11-001 used to resolve problems.
Deck Tile; Install
634-11-002
Bulkhead Insulation;
Repair
635-11-001 concerns and the approach used to resolve problems.
Storeroom
Insulation; Install
635-11-002 concerns and the approach used to resolve problems.
Overhead ceiling;
Install
637-11-001
0% -COR visually inspect
Office Furniture; Quality Contractor’s ability to satisfactorily 0% -COR inspect furniture. FAR Clause 52.212-4 “Contract Terms and
Provide
644-11-001
Provide Temporary
Services
992-11-002 concerns and the approach used to
0%
-COR inspection for location of connections, fire alarm system components.
-Inspect protective deck covering.
Towing Service;
Provide
992-11-001
0% -COR inspect towing equipment.
Cleaning and
Pumping;
0% -COR inspect completed work.
992-31-001 resolve problems
Drydocking, Fleeting and Undocking;
concerns and the approach used to
0% -COR witness events.
File details come from the government source that posted it.