Full_SOW.pdf

PDF 953 KB Posted

Attached to
Barge Overhaul Federal contract opportunity
Solicitation number
N3904018R0017
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Complete SOW

View the file

Other files for this federal contract opportunity

Other files attached to Barge Overhaul, newest first.
File Type Posted
N3904018R0017_Amendment__3.pdf PDF
N3904018R0017_Amendment__2.pdf PDF
N3904018R0017_Amendment__1.pdf PDF
SOW.pdf PDF
N3904018R0017.pdf PDF
YFN_1203_QASP.pdf PDF
List_of_Identity_Proofing_Documents.pdf PDF
QASP_Matrix_for_YFN_1203.pdf PDF
ID_Form_Requirements.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRELIMINARY SPECIFICATION

SHIP: YFN-1203 (RMC 20552) ITEM NO: 077-01-001

COAR: 16 PCN: YFN1-A077

CMP: NONE

PLANNER: ROBERTS, JEARLD

SSP: BOST-509-18 1 of 5 ITEM NO: 077-01-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Hazardous Waste Produced on Naval Vessels; control

1.2 Location of Work:

1.2.1 Throughout the Ship

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Resource Conservation and Recovery Act (RCRA)

2.2 49 U.S.C. 5103, Federal Hazardous Materials Transportation Act

2.3 Applicable Hazardous Waste Manifest Form

2.4 10 U.S.C. 7311

3. REQUIREMENTS:

3.1 Manage and dispose of all hazardous waste listed in 3.5 in accordance with 2.1 and 2.2.

3.1.1 When a Navy generator number is required by this Work Item, submit the original of 2.3 to the SUPERVISOR for assignment of Environmental Protection Agency (EPA) or delegated state environmental agency identification number.

3.1.2 Manage and transport for Navy disposal, Navy-generated

hazardous waste listed in 3.5 in accordance with 2.1 and 2.2, as designated by the SUPERVISOR.

Report: HAZARDOUS WASTE MANIFEST SITUATIONAL + 2 days

3.1.3 Submit one legible copy, in hard copy or approved

transferrable media, of 2.3 signed by the owner or operator of the disposal facility to the SUPERVISOR within 48 hours of receipt from owner or operator of disposal facility.

3.2 Complete documentation required by 2.1 and 2.2, using EPA or delegated state environmental agency identification number in accordance with 2.4.

3.2.1 Documentation related to hazardous waste generated solely by the physical actions of Ship's Force or Navy employees (termed Navy- Generated Hazardous Waste) on board the vessel shall only bear a generator identification number issued to the Navy pursuant to applicable law. The contractor shall obtain SUPERVISOR'S concurrence with the categorization of the waste as Navy-generated before completion of the manifest. The manifest prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been

SHIP: YFN-1203 (RMC 20552)

SSP: BOST-509-18 2 of 5 ITEM NO: 077-01-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

identified.

3.2.2 Documentation related to hazardous waste generated solely by the physical actions of contractor personnel (termed Contractor- Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law.

Regardless of the presence of other material in or on the shipboard systems or structure which may have qualified a waste stream as hazardous, where the contractor performs work on a system or structure using materials (whether or not the use of such materials was specified by the Navy) which by themselves would cause the waste from such work to be a hazardous waste, documentation related to such waste shall only bear a generator number issued to the contractor.

3.2.3 Documentation related to hazardous waste generated by the combined physical actions of Navy and contractor personnel (termed Co-Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law and shall also cite in the remarks block a generator identification number issued to the Navy pursuant to applicable law. When the contractor merely drains a system and such drainage creates hazardous waste or the contractor performs work on system or structure using materials which by themselves would not cause the waste from such work to be hazardous waste but such work nonetheless creates a hazardous waste, documentation related to such waste shall bear a generator identification number issued to the contractor and shall also cite in the remarks block a generator identification number issued to the Navy. The contractor shall sign the generator certification on the Uniform Hazardous Waste Manifest whenever use of the manifest is required for disposal. The contractor shall obtain SUPERVISOR's concurrence with the categorization of the wastes as co-generated before completion of the manifest. Manifests prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.

3.3 If the contractor, while performing work at a Government facility, cannot obtain a separate generator identification number from the state in which the availability will be performed, the contractor shall notify the SUPERVISOR within three business days of receipt of written notification by the state. After obtaining approval of the SUPERVISOR, the contractor shall use the Navy site generator identification number and insert in the remarks block the contractor generator identification number issued for the site where his main facilities are located.

3.4 If, for availabilities at a contractor-owned or controlled facility, the Navy cannot obtain a separate generator identification number for use at a contractor facility, the Navy shall notify the contractor within three business days of receipt of notification by the state. The contractor shall dispose of hazardous waste in accordance with 2.1, 2.2, and 3.2.3.

3.5 Hazardous waste, as identified in 2.1, expected to be produced during performance of this Job Order:

AMOUNT

TYPE NAVY CO-GENERATED CONTRACTOR

SSP: BOST-509-18 3 of 5 ITEM NO: 077-01-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

Acid Solutions (may include _____ ____________ __________ spent sulfamic, citric, chromic, nitric, sulfuric, hydrochloric, etc.)

Ethylene Glycol (Antifreeze) _____ ____________ __________

Sodium Hydroxide _____ ____________ __________

Cleaning Solvents _____ 15 Gallons __________

Sodium Phosphates (Tri, Bi, _____ ____________ __________ or Mono)

Fluorocarbons _____ ____________ __________

Morpholine _____ ____________ __________

Sodium Chromates _____ ____________ __________

Hydrazine _____ ____________ __________

Carbohydrazide _____ ____________ __________

Methyl Ethyl Ketone _____ ____________ __________

Spent Abrasive Blast Material _____ 2 Ton __________

(contaminated with a known hazardous waste)

Trichloroethane _____ 5 Gallon __________

Miscellaneous Chemicals _____ 5 Gallon __________

(Ignitable)

Miscellaneous Chemicals _____ 5 Gallon __________

(Corrosive)

Miscellaneous Chemicals _____ ____________ __________

(TCLP Toxic)

Miscellaneous Chemicals _____ 10 Gallon __________

(Reactive)

Oil (Synthetic) _____ ____________ __________

Paints (Enamel, Latex, _____ 20 Gallon __________

Epoxy, thinners, oil based, rubber paint, nonskid, lacquer, remover, varnishes)

Paints (May include lead, _____ 5 Pounds __________ cadmium, or chrome)

Paint Strippers (phenols, _____ __________ __________

SSP: BOST-509-18 4 of 5 ITEM NO: 077-01-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

lead, chromium)

Asbestos Tile Debris _____ 6000 Pounds

Wool Felt (contaminated _____ __________ __________ with chromium and PCB's)

Ventilation Debris/Residue

(heavy metals, e.g., cadmium, chromium) _____ ___________

Insulation (May contain lead) _____ 40 Square Feet

Oily Rags _____ 30 Pounds

3.6 Notify the SUPERVISOR at least one working day prior to shipment of hazardous waste for disposal.

Report: HAZARDOUS WASTE LISTING SITUATIONAL + 3 days

3.7 Submit one legible copy, in hard copy or approved transferrable media, of a report identifying type, amount, and disposal cost of waste listed in 3.5 that was removed during the performance of this Job Order to the SUPERVISOR.

3.7.1 The report shall include analysis or other method used to identify the waste and state whether each listed waste was hazardous (with generator assignment), non-hazardous, or did not exist.

3.7.1.1 Chemical analysis shall be accomplished by laboratories with state or EPA approved quality assurance programs.

3.7.2 The contractor shall make an effort to minimize hazardous waste generation by reducing the volume or toxicity by neutralizing, recycling, or otherwise removing it from the requirements of Subtitle C of 2.1 and include a description of such efforts in the report.

3.8 Nothing contained in this Work Item shall relieve the contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits in connection with hazardous waste handling and disposal in the performance of this contract.

4. NOTES:

4.1 The waste listed in 3.5 is based on the best information available at the time of preparation of the solicitation. Hazardous waste generated during the actual performance of the work may vary in type or amount from waste listed in 3.5 which may result in renegotiation for credit or increase pursuant to Paragraph (b) of 2.4. The contractor is expected to use best management practice to identify and dispose of all hazardous waste. Some of the substances listed in 3.5 may be neutralized, recycled, or otherwise removed from the requirements of

SSP: BOST-509-18 5 of 5 ITEM NO: 077-01-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

Subtitle C of 2.1. Inclusion of these substances in the waste listed in

3.5 does not preclude the contractor from taking action consistent with

2.1 to reduce or eliminate the hazardous constituents of any waste required to be disposed of under the contract in accordance with 2.2.

Processes that add hazardous constituents to the bilges may require that bilge water be disposed of as a hazardous waste.

4.1.1 The types and amounts of wastes listed in 3.5 are estimates of waste to be disposed of under this contract as required by 2.4. They are not estimates of the amount of the work involved in generating that waste. The work requirements of each individual Work Item specify the actual work to be accomplished.

4.2 Hazardous wastes are determined by one or more of the following methods:

4.2.1 Chemical analysis which shows that the material

characteristics of ignitability, corrosivity, reactivity, and/or toxicity (Toxicity Characteristic Leachate Procedure - TCLP) exceed the limits for that material in 40 CFR 261.20 Subpart C.

4.2.2 Reference to a Material Safety Data Sheet (MSDS).

4.2.3 Applying knowledge of the hazardous characteristics of the waste in light of the materials or the process used.

4.3 Asbestos, bilge water, oil/water including sludge, debris and other contaminants, sludge which includes solids and sludge from ballast tanks, CHT tanks, voids, oily waste tanks, fuel ballast tanks, fuel oil tanks, skegs (West coast), PCB's (Maryland), etc., apply only in those states listing them as hazardous waste. When an availability is to be performed in a state where these items are hazardous waste, an estimate of the amount to be generated shall be included in 3.5.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.

SHIP: YFN-1203 (RMC 20552) ITEM NO: 110-11-001

COAR: 16 PCN: YFN1-A632

CMP: NONE

PLANNER: ROBERTS, JEARLD

DEMERS, RAY

SSP: BOST-509-18 1 of 2 ITEM NO: 110-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Underwater Hull Inspection and Repair; accomplish

1.2 Location of Work:

1.2.1 Underwater Hull, Including Skegs, Sides and Stern

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

2.2 S0103-1300379 Rev A, 500 Ton Open Lighter Outboard Profile, Framing & Structural Details

2.3 T9074-AS-GIB-010/271, Requirements for Nondestructive Testing Methods

3. REQUIREMENTS:

(V)(G) "VISUAL INSPECTION"

3.1 Accomplish a visual inspection within the first 24 hours after drydocking of barge, upon completion of the hydro pressure water wash cleaning of the underwater hull, from the bottom of the keel to the upper boottop limit, including shell plating, sea chests, skegs and structural members for structural integrity, deterioration, pitting, cracks and areas of damage or distortion, using 2.2 as guidance.

Report: CONDITIONS FOUND SITUATIONAL + 3 days

3.1.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing conditions found to the

SUPERVISOR.

3.2 Accomplish ultrasonic tests on the underwater hull plating in accordance with 2.3, within 72 hours of drydocking, in 200 locations as designated by the SUPERVISOR, using 2.2 as guidance.

Report: ULTRASONIC TEST RESULTS AND SKETCH SITUATIONAL + 5 days

3.2.1 Submit one legible copy, in hard copy or approved

transferrable media, of a sketch which includes specific locations with respect to frames, strakes, port or starboard, and existing welded butts and seams to the SUPERVISOR.

SSP: BOST-509-18 2 of 2 ITEM NO: 110-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

3.2.1.1 Sketch shall show location of each reading, original

material thickness, existing material thickness, and percentage of material thickness reduction.

3.2.1.2 Notate if reading is taken over existing doubler plate.

3.3 Accomplish the following repairs as determined by the visual inspection in 3.1 and ultrasonic testing results of 3.2 in locations as designated by the SUPERVISOR.

3.3.1 Vee-out and weld a total of 100 linear feet of splits, cracks, deteriorated and damaged welds.

3.3.2 Clad weld a total of 500 square inches of plating defects.

3.3.2.1 Surfaces shall be ground to smooth metal prior to

welding.

3.3.2.2 Fill local pits and grooves with weld metal prior to the application of principal build-up layers.

3.3.3 Install new a total of 200 square feet of 15.3 pound steel doubler plates conforming to ASTM A-36.

3.3.3.1 Install new steel doubler plates with plug welds slots spaced at 18 inch centers. Seal weld all edges of plates with 3/8 inch fillet welds.

3.3.3.2 Locate plug welds on doubler plates to align with backup structure.

3.3.4 Accomplish the requirements of 009-12 of 2.1, including Table 3, Column A, Lines One through 7.

3.3.5 Accomplish the requirements of 009-25 of 2.1, for the local air hose test of the repaired weld seams and new hull plating.

Allowable leakage: None.

3.4 Accomplish the requirements of 009-32 of 2.1, for new and disturbed surfaces.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: YFN-1203 (RMC 20552) ITEM NO: 123-21-001

COAR: 16 PCN: YFN1-A123

CMP: NONE

PLANNER: ROBERTS, JEARLD

DEMERS, RAY

SSP: BOST-509-18 1 of 2 ITEM NO: 123-21-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Void; clean, inspect, and preserve

1.2 Location of Work:

1.2.1 Throughout the Barge

1.3 Identification:

1.3.1 Quantity (6 EA), Void, Nos. One through 6 (including Quantity (11 EA), associated raised bolted access cover and Quantity (One EA), flush bolted access cover)

2. REFERENCES:

2.1 Standard Items

2.2 YFN 1203-600-8719839, Arrangement Modifications Incid Barge Upgrade

3. REQUIREMENTS:

(V)(G) "VOID INSPECTION"

3.1 Accomplish a joint visual inspection with the SUPERVISOR of each void listed in 1.3 and located in 1.2 for existing preservation coating, structural integrity, deterioration, pitting, cracks, and areas of damage or distortion including structural members, manhole covers and associated coamings.

Report: INSPECTION RESULTS SITUATIONAL + 3 days

3.1.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing type, extent, and location of defects to the SUPERVISOR.

3.1.2 Accomplish the requirements of 009-25 of 2.1 for preliminary air test of each void. Test pressure shall be 2 PSIG.

3.2 Accomplish the following repairs to each void listed in 1.3 and located in 1.2, using 2.2 as guidance:

3.2.1 Vee-out and weld repair 10 linear feet of deteriorated and damaged welds as designated by the SUPERVISOR.

3.2.2 Accomplish the requirements of 009-12 of 2.1, including Table 3, Column A, Lines One through 7.

3.2.2.1 Accomplish nondestructive testing in accordance with

Line 11.

3.3 Accomplish the requirements of 009-32 of 2.1, including Table 4, Line 19 for a total of 500 square feet of void surfaces listed in 1.3 and

SSP: BOST-509-18 2 of 2 ITEM NO: 123-21-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

located in 1.2, including interior surfaces of access covers as designated by the SUPERVISOR.

3.3.1 Topcoat color shall match existing.

3.3.2 Accomplish the requirements of Paragraph 3.1.6 of 009-32 for surface preparation in lieu of abrasive blasting.

3.4 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line One or 2, for exterior surfaces of each void access cover listed in 1.3.1, including associated coaming.

3.5 Accomplish the requirements of 009-25 of 2.1 for air test of each void listed in 1.3 and located in 1.2. Test pressure shall be 2 PSIG.

Maintain test pressure for 15 minutes for temperature stabilization prior to start of test. Hold test pressure for 10 minutes. Allowable drop in pressure: None.

3.6 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 The possibility of lead based paint exist in interior surfaces of voids listed in 1.3. Contractor shall take safety precautions as required by Paragraphs 3.1.1 and 3.1.2 of 009-32.

4.2 Voids listed in 1.3 are opened and closed in Work Item 992-31-001, Cleaning and Pumping; accomplish.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: YFN-1203 (RMC 20552) ITEM NO: 150-11-001

COAR: 16 PCN: YFN1-A150

CMP: NONE

PLANNER: DEMERS, RAY

SSP: BOST-509-18 1 of 1 ITEM NO: 150-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Exterior Attachment; remove

1.2 Location of Work:

1.2.1 Superstructure, Frames 5 and 51, Port and Starboard

1.3 Identification:

1.3.1 Quantity (30 EA), Exterior Attachment (padeyes, hooks, brackets, etc.)

2. REFERENCES:

2.1 Standard Items

3. REQUIREMENTS:

3.1 Remove existing equipment listed in 1.3 and located in 1.2 as designated by the SUPERVISOR.

3.1.1 Chip and grind surfaces flush and smooth in way of removals.

3.2 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 None

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: YFN-1203 (RMC 20552) ITEM NO: 167-11-001

COAR: 16 PCN: YFN1-A167

CMP: NONE

PLANNER: ROBERTS, JEARLD

DEMERS, RAY

SSP: BOST-509-18 1 of 2 ITEM NO: 167-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Watertight Hatch and Inclined Ladder; install

1.2 Location of Work:

1.2.1 Main Deck, Office Number One, Frames 36-39, Port

1.3 Identification:

1.3.1 Quantity (One EA), Hatch WT Raised, 36 Inch by 60 Inch, Individually Dogged, 12 Dog, Short Side Hinged, Steel w/o Scuttle

1.3.2 Quantity (One EA), 60 Degree, 30 inch wide, Inclined Ladder

2. REFERENCES:

2.1 Standard Items

2.2 YFN 1203-167-8719841, Hatch Installation Barge Upgrade

2.3 YFN 1203-600-8719839, Arrangement Modifications Incid Barge Upgrade

2.4 YFN 1203-622-8719842, Store Room #1 Installation Barge Upgrade

2.5 805-1624079, Hatch W. T. Raised, Indv Dogged, 36 X 60, w/o Scuttle

2.6 805-1624072, Hatch W.T. Raised, Indv Dogged, Misc Details

2.7 805-1624071, Hatch W.T. Raised, Indv Dogged, Dog Hinge and Misc Det.

2.8 804-860039, Inclined Ladder, Steel, Assemblies and Details

2.9 804-860041, Inclined Ladder, Aluminum and Steel Tread Details

3. REQUIREMENTS:

3.1 Install new hatch and inclined ladder listed in 1.3 in location listed in 1.2 in accordance with 2.2, using 2.3 through 2.9 as guidance.

3.1.1 Accomplish the requirements of 009-12 of 2.1, including Table 3, Column A, Lines One through 7.

3.1.2 Accomplish the requirements of 009-32 of 2.1, including Table 3, Line One, for new hatch and deck coaming.

3.2 Adjust the dogs, hinges, and wedges for positive dogging action.

3.3 Accomplish the requirements of 009-25 of 2.1 for a chalk test of the new hatch installed in 3.1.

3.4 Accomplish the requirements of 009-25 of 2.1 for the air hose test of the new hatch installed in 3.1. Allowable leakage: None.

3.5 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

SSP: BOST-509-18 2 of 2 ITEM NO: 167-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: YFN-1203 (RMC 20552) ITEM NO: 167-11-002

COAR: 16 PCN: YFN1-A168

CMP: NONE

PLANNER: ROBERTS, JEARLD

DEMERS, RAY

SSP: BOST-509-18 1 of 2 ITEM NO: 167-11-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Exterior Door; replace

1.2 Location of Work:

1.2.1 Vestibule, Main Deck Starboard, Frame 5

1.2.2 Main Deck, Starboard, Frame 41

1.2.3 Main Deck, Port, Frame 25

1.3 Identification:

1.3.1 Quantity (3 EA), Weathertight Door, 36 inches X 66 inches, RH (Inward Swing), 9 inch sill, Passage Set with Handle, Freeman Marine Equipment Series 1111 (w/o Window), Item No. One of 2.2

2. REFERENCES:

2.1 Standard Items

2.2 YFN 1203-600-8719839, Arrangement Modifications Incid Barge Upgrade

3. REQUIREMENTS:

3.1 Remove existing and install new doors, with door water shed for the equipment listed in 1.3 in location listed in 1.2 in accordance with 2.2.

3.1.1 Provide handle for each weathertight door as designated by the

SUPERVISOR.

3.1.2 Insert bulkhead removal area with new plating same thickness and type as existing to receive each new door.

3.1.3 Accomplish the requirements of 009-12 of 2.1, including Table 3, Column A, Lines One through 7.

3.1.4 Match drill new doors and bulkhead receiving doors using 2.2 as guidance.

3.2 Accomplish the requirements of 009-25 of 2.1 for a water (exterior) hose test of each door installed in 3.1, using Note 23 of 2.2 as guidance. Allowable leakage: None.

3.3 Accomplish the requirements of 009-11 of 2.1.

(V)(G) "OPERATIONAL TEST"

3.4 Accomplish an operational test of each new door installed in 3.1 for opening and closing with no binding and ease of operation.

3.5 Accomplish the requirements of 009-32 of 2.1 for new and disturbed

SSP: BOST-509-18 2 of 2 ITEM NO: 167-11-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

4.1 Known source for doors listed in 1.3 as follows:

Freeman Marine Equipment Inc.

28336 Hunter Creek Road

Gold Beach, OR 97444

POC: Jason Setzer

Ph: (888)373-3626 ext. 109

FAX: (541)247-2114

4.1.1 Handle type for weathertight doors to be determined by the

SUPERVISOR.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: YFN-1203 (RMC 20552) ITEM NO: 332-11-001

COAR: 16 PCN: YFN1-A332

CMP: NONE

PLANNER: ROBERTS, JEARLD

DEMERS, RAY

SSP: BOST-509-18 1 of 2 ITEM NO: 332-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Interior Overhead Lighting Modification and Installation;

accomplish

1.2 Location of Work:

1.2.1 Main Deck, Interior

1.2.2 Hold, Interior

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

2.2 YFN 1203-331-8719843, Miscellaneous Lighting Mods Barge Upgrade

2.3 MIL-STD-2003, Electric Plant Installation Standard Methods for Surface Ships and Submarines

2.4 MIL-STD-1310, Shipboard Bonding, Grounding, and Other Techniques for Electromagnetic Compatibility and Safety

3. REQUIREMENTS:

3.1 Accomplish the requirements of 2.2 for interior lighting

modifications and installations in locations listed in 1.2, in accordance with 2.3.

3.1.1 Accomplish the requirements of 009-12 of 2.1, including Table 3, Column A, Lines One through 7.

3.1.2 Bond and ground equipment in accordance with 2.4.

3.2 Remove 41 each existing 2 ft. X 4 ft. Fluorescent Light Troffers throughout the main deck interior, and install new 41 each 2 ft. X 4 ft.

LED Troffer Panel Lights similar or equal to Hykolity P/N HY-72W Panel 5000k in Daylight White color.

(V)(G) "OPERATIONAL TEST"

3.3 Accomplish an operational test of newly installed equipment.

3.3.1 Energize and de-energize lights using associated light

switches. Ensure lights illuminate in the "ON" position and extinguish in the "OFF" position. Return switches to the "ON" position when test is completed.

3.4 Accomplish the requirements of 009-32 of 2.1 for new and disturbed

SSP: BOST-509-18 2 of 2 ITEM NO: 332-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: YFN-1203 (RMC 20552) ITEM NO: 409-11-001

COAR: 16 PCN: YFN1-A409

CMP: NONE

PLANNER: ROBERTS, JEARLD

SSP: BOST-509-18 1 of 2 ITEM NO: 409-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Local Area Network (LAN) Remove, Modify and Install;

accomplish

1.2 Location of Work:

1.2.1 Throughout the Barge

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

2.2 YFN 1203-436-8719845, LAN/Telephone Mods Barge Upgrade

2.3 MIL-STD-2003, Electric Plant Installation Standard Methods for Surface Ships and Submarines

2.4 MIL-STD-1310, Shipboard Bonding, Grounding, and Other Techniques for Electromagnetic Compatibility and Safety

3. REQUIREMENTS:

3.1 Accomplish removals, modifications and new installations of the Barge NMCI (NNPI), Legacy Local Area Network (LAN) systems in location listed in 1.2 in accordance with 2.2 and 2.3 as follows:

3.1.1 The existing Barge NMCI (NNPI) LAN System drop boxes and associated drop box cabling shall be disconnected and removed back to the existing NMCI server cabinet. Retain the NMCI server cabinet at existing location.

3.1.2 The existing Barge Legacy LAN System shall be removed in its entirety to include all cabling and associated equipment.

3.1.3 Install new connectors at cable termination points.

3.1.4 Install electrical cables in accordance with 2.3.

3.1.5 Bond and ground equipment in accordance with 2.4.

3.2 Test each cable conductor and associated connector for continuity and complete circuit in accordance with 2.3. Ensure terminal connections are tight.

Report: RESULTS OF ELECTRICAL TEST SITUATIONAL + 3 days

3.2.1 Submit one legible copy, in hard copy or electronic media, of a report listing results of the requirements of 3.2, including circuit number, lead numbers, and readings obtained, to the SUPERVISOR within 48 hours of completion of tests.

SSP: BOST-509-18 2 of 2 ITEM NO: 409-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

3.3 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: YFN-1203 (RMC 20552) ITEM NO: 422-11-001

COAR: 16 PCN: YFN1-A422

CMP: NONE

PLANNER: ROBERTS, JEARLD

DEMERS, RAY

SSP: BOST-509-18 1 of 2 ITEM NO: 422-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Exterior Lighting Modification and Installation; accomplish

1.2 Location of Work:

1.2.1 Exterior Weather Decks, Port and Starboard

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

2.2 YFN 1203-331-8719843, Miscellaneous Lighting Mods Barge Upgrade

2.3 MIL-STD-2003, Electric Plant Installation Standard Methods for Surface Ships and Submarines

2.4 MIL-STD-1310, Shipboard Bonding, Grounding, and Other Techniques for Electromagnetic Compatibility and Safety

3. REQUIREMENTS:

3.1 Accomplish the requirements of 2.2 for exterior lighting

modifications and installations in locations listed in 1.2, in accordance with 2.3.

3.1.1 Bond and ground equipment in accordance with 2.4.

3.1.2 Remove unused foundations, cable hangers, wireways, brackets, control switches, and studs. Chip and grind surfaces flush and smooth in way of removals.

3.1.3 Remove existing stuffing tubes and patch with plating of same type and thickness of surrounding plating in way of removals.

3.1.4 Accomplish the requirements of 009-12 of 2.1, including Table 3, Column A, Lines One through 7.

3.1.5 Accomplish the requirements of 009-25 of 2.1 for an air hose, water hose, or vacuum box test of each patched area. Allowable leakage: None.

3.2 Remove 6 each existing sodium wallpak exterior lights and install new 6 each LED wallpak lights similar or equal to Lumark P/N WPL4A.

(V)(G) "OPERATIONAL TEST"

3.3 Accomplish an operational test of newly installed equipment in 3.1 and 3.2.

3.3.1 Energize and de-energize lights using associated light

switches. Ensure lights illuminate in the "ON" position and

SSP: BOST-509-18 2 of 2 ITEM NO: 422-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

extinguish in the "OFF" position. Return switches to the "ON" position when test is completed.

3.4 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: YFN-1203 (RMC 20552) ITEM NO: 432-11-001

COAR: 16 PCN: YFN1-A432

CMP: NONE

PLANNER: ROBERTS, JEARLD

DEMERS, RAY

SSP: BOST-509-18 1 of 2 ITEM NO: 432-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Telephone System CKT "J", Remove and Install; accomplish

1.2 Location of Work:

1.2.1 Throughtout the Barge

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

2.2 YFN 1203-331-8719845, LAN/Telephone Mods Barge Upgrade

2.3 MIL-STD-2003, Electric Plant Installation Standard Methods for Surface Ships and Submarines

2.4 MIL-STD-1310, Shipboard Bonding, Grounding and Other Techniques for Electromagnetic Compatibility and Safety

3. REQUIREMENTS:

3.1 Remove existing barge telephone system in its entirety to include all cabling and associated equipment in location listed in 1.2.

3.2 Accomplish the installation of the Dial Telephone System CKT "J" and associated cabling and equipment in location listed in 1.2, in accordance with 2.2 and 2.3.

3.2.1 Bond and ground equipment in accordance with 2.4.

3.2.2 Accomplish the requirements of 009-12 of 2.1, including Table 3, Column A, Lines One through 7.

3.2.3 Template installation to suit existing barge conditions.

(V)(G) "OPERATIONAL TEST"

3.3 Accomplish an operational test of the Dial Telephone System CKT "J" installed in 3.2, using 2.2 and manufacturer's operation manual as guidance.

Report: OPERATIONAL TEST RESULTS SITUATIONAL + 3 days

3.3.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.3 to the SUPERVISOR.

3.3.2 Call to and from each telephone to verify proper transmission

SSP: BOST-509-18 2 of 2 ITEM NO: 432-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

and receiving from each telephone set.

3.4 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces to match surrounding areas.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: YFN-1203 (RMC 20552) ITEM NO: 511-11-001

COAR: 16 PCN: YFN1-A511

CMP: NONE

PLANNER: ROBERTS, JEARLD

SSP: BOST-509-18 1 of 2 ITEM NO: 511-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Unit Heater; install

1.2 Location of Work:

1.2.1 Hold, Frames 36-45, Port and Starboard

1.3 Identification:

1.3.1 Quantity (One EA), Electric Unit Heater (2-38-1), 480 VAC, 3 Phase, 7.5 KW, Item No. One of 2.2 (Similar or equal to Dayton Model No. 2YU67)

1.3.2 Quantity (One EA), Electric Unit Heater (2-39-2), 480 VAC, 3 Phase, 7.5 KW, Item No. One of 2.2 (Similar or equal to Dayton Model No. 2YU67)

2. REFERENCES:

2.1 Standard Items

2.2 YFN 1203-512-8719847, HVAC Mods Hold Barge Upgrade

2.3 YFN 1203-321-8719844, Miscellaneous Power Mods Barge Upgrade

2.4 MIL-STD-2003, Electric Plant Installation Standard Methods for Surface Ships and Submarines

2.5 MIL-STD-1310, Shipboard Bonding, Grounding, and Other Techniques for Electromagnetic Compatibility and Safety

3. REQUIREMENTS:

3.1 Accomplish the requirements of 2.2 and 2.3 for installation of the equipment listed in 1.3 and associated controls in locations listed in 1.2.

3.1.1 Electrical installations shall be in accordance with 2.4.

3.1.2 Bond and ground equipment in accordance with 2.5.

3.1.3 Install new label plates in accordance with 2.3.

(V)(G) "OPERATIONAL TEST"

3.2 Accomplish an operational test of the equipment installed in 3.1 in accordance with 2.3 and manufacture's instructions.

3.3 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 None

5. GOVERNMENT FURNISHED MATERIAL (GFM):

SSP: BOST-509-18 2 of 2 ITEM NO: 511-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: YFN-1203 (RMC 20552) ITEM NO: 514-11-001

COAR: 16 PCN: YFN1-A514

CMP: NONE

PLANNER: ROBERTS, JEARLD

DEMERS, RAY

SSP: BOST-509-18 1 of 2 ITEM NO: 514-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Air Conditioning Unit; replace

1.2 Location of Work:

1.2.1 Barge Deck House

1.3 Identification:

1.3.1 Quantity (6 EA), Air Conditioning (AC) Unit, 15,000 BTU, 12 amps, 115 volt, 60 Hz, Item No. One of 2.2 (Similar or equal to Frigidaire Model FFRE1533Q1)

2. REFERENCES:

2.1 Standard Items

2.2 YFN 1203-512-8719846, HVAC Modifications Barge Upgrade

2.3 YFN 1203-331-8719843, Miscellanous Lighting Mod Barge Upgrade

3. REQUIREMENTS:

3.1 Remove existing exhaust fan and louver, and blank removal area to facilitate installation of new equipment listed in 1.3 and located in 1.2, in accordance with 2.2 and 2.3.

3.1.1 Install new 2 Inch x 2 Inch x 1/4 Inch angle iron support foundation and braces capable of supporting the weight of each AC Unit.

3.1.1.1 Accomplish the requirements of 009-12 of 2.1, including Table 3, Column A, Lines One through 7.

3.1.2 Seal exterior opening to ensure AC units are snug in access cuts. Allowable gaps between each unit and adjacent bulkhead: None.

3.1.2.1 Accomplish the requirements of 009-25 of 2.1 for a air hose test of sealing surface. Allowable leakage: None.

(V)(G) "OPERATIONAL TEST"

3.2 Energize and test each AC unit installed in 3.1. Ensure each AC unit functions in accordance with manufacturer's specifications and designed sequence of operation.

3.3 Accomplish the requirements of 009-32 of 2.2 for new and disturbed surfaces.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

SSP: BOST-509-18 2 of 2 ITEM NO: 514-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: YFN-1203 (RMC 20552) ITEM NO: 608-11-001

COAR: 16 PCN: YFN1-A001

CMP: NONE

PLANNER: ROBERTS, JEARLD

DEMERS, RAY

SSP: BOST-509-18 1 of 2 ITEM NO: 608-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Storeroom Arrangement; accomplish

1.2 Location of Work:

1.2.1 Hold, Frames 36-45, Port and Starboard

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

2.2 YFN 1203-622-8719842, Store Room #1 Installation Barge Upgrade

2.3 YFN 1203-600-8719839, Arrangement Modifications Incid Barge Upgrade

2.4 YFN 1203-321-8719844, Miscellaneous Power Mods Barge Upgrade

2.5 YFN 1203-331-8719843, Miscellaneous Lighting Mods Barge Upgrade

2.6 YFN 1203-167-8719841, Hatch Installation Barge Upgrade

2.7 S3306-921770, Clips and Sub-bases for Metal Furniture

3. REQUIREMENTS:

3.1 Accomplish the requirements of 2.2 and 2.3 in locations listed in 1.2, using 2.4 through 2.6 as guidance for new storeroom modifications.

3.1.1 Remove 30 linear feet of abandoned steel piping, fittings, and associated hangers. Cap piping at shell and deck connections for a total of (6) locations, in location listed in 1.2 as designated by the SUPERVISOR.

3.1.2 Template exact size, configuration, and location from existing barge conditions.

3.1.3 Install new clips and sub-bases in accordance with 2.7.

3.1.4 Accomplish the requirements of 009-12 of 2.1, including Table 3, Column A, Lines One through 7.

3.1.4.1 Accomplish nondestructive testing in accordance with

Line 11.

3.2 Accomplish the requirements of 009-25 of 2.1 for local air hose test in way of new attachment welds on watertight bulkheads and deck surfaces in location 1.2. Allowable leakage: None.

3.3 Accomplish the requirements of 009-32 of 2.1, including Table 5, Lines 3, 4, 5 or 6, for interior surfaces of bulkheads and shell including framing.

3.4 Accomplish the requirements of 009-32 of 2.1 for new and disturbed

SSP: BOST-509-18 2 of 2 ITEM NO: 608-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

surfaces.

4. NOTES:

4.1 Work in conjunction with Work Items 511-11-001, Unit Heater;

install, 167-11-001, Watertight Hatch and Inclined Ladder; install and 635-11-002, Storeroom No. One Thermal Insulation; install.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: YFN-1203 (RMC 20552) ITEM NO: 611-11-001

COAR: 16 PCN: YFN1-A611

CMP: NONE

PLANNER: ROBERTS, JEARLD

DEMERS, RAY

SSP: BOST-509-18 1 of 2 ITEM NO: 611-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Fender; replace

1.2 Location of Work:

1.2.1 Exterior Hull

1.3 Identification:

1.3.1 Quantity (504 LF), D Shape O Bore Fender, 9.25 inch W X 10 inch H, similar or equal to Pacific Marine P/N DO-909B

2. REFERENCES:

2.1 Standard Items

2.2 YFN 1203-611-8719840, Fender Modification Incid Barge Upgrade

2.3 YFN 1203-601-8719838, Misc Removals Incid Barge Upgrade

2.4 YFN 1203-600-8719839, Arrangement Modifications Incid Barge Upgrade

3. REQUIREMENTS:

3.1 Remove existing and install new fenders including flatbar retainer listed in 1.3 and located in 1.2, in accordance with 2.2 through 2.4.

3.1.1 Accomplish the requirements of 009-12 of 2.1, including Table 3, Column A, Lines One through 7.

3.1.2 Chip and grind surfaces flush and smooth in way of removals.

3.1.3 The areas covered by fenders shall receive a complete hull preservation system prior to installing new fenders.

3.1.4 Template exact size, configuration, and location from existing barge conditions.

3.1.5 Install new galvanized steel mounting fasteners.

3.2 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 Work in conjunction with Work Items 110-11-001, Underwater Hull Inspection and Repair; accomplish, 631-31-001, Underwater Hull and Freeboard; preserve and 123-11-001, Void; clean, inspect, and preserve.

4.2 Known source for fender listed in 1.3 as follows:

Pacific Marine & Industrial

POC: Kevin Wildenberg www.pacificmarine.net kwildenberg@pacificmarine.net

SSP: BOST-509-18 2 of 2 ITEM NO: 611-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

Phone: (510) 233-2310 x205

Fax: (510) 233-2322

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: YFN-1203 (RMC 20552) ITEM NO: 612-11-002

COAR: 16 PCN: YFN1-A512

CMP: NONE

PLANNER: ROBERTS, JEARLD

DEMERS, RAY

SSP: BOST-509-18 1 of 1 ITEM NO: 612-11-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Rooftop Coaming; modify

1.2 Location of Work:

1.2.1 Top of Barge

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

2.2 YFN 1203-601-8719838, Misc Removals Incid Barge Upgrade

2.3 YFN 1203-600-8719839, Arrangement Modifications Incid Barge Upgrade

3. REQUIREMENTS:

3.1 Modify existing rooftop coaming in accordance with Detail 20-E of 2.2, in 10 each existing cut locations to allow proper drainage.

3.2 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 Preservation accomplished in Work Item 631-11-001, Superstructure Preservation; accomplish.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: YFN-1203 (RMC 20552) ITEM NO: 612-11-003

COAR: 16 PCN: YFN1-A613

CMP: NONE

PLANNER: ROBERTS, JEARLD

DEMERS, RAY

SSP: BOST-509-18 1 of 2 ITEM NO: 612-11-003

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Handrail and Stanchion; install

1.2 Location of Work:

1.2.1 Top of Barge

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

2.2 YFN 1203-600-8719839, Arrangement Modifications Incid Barge Upgrade

2.3 612-7010382, Handrail Details

2.4 804-5184155, Liferails, Lifelines and Awning Stanchions (Alum and Steel) Details and L/M

3. REQUIREMENTS:

3.1 Install new steel stanchions and handrails in location listed in 1.2 in accordance of 2.2, using 2.3 and 2.4 as guidance.

3.2 Accomplish the requirements of 009-12 of 2.1, including Table 3, Column A, Lines One through 7.

3.2.1 Accomplish nondestructive testing in accordance with Line 11.

3.2.2 Accomplish the requirements of 009-25 of 2.1 for an air hose, water hose, or vacuum box test of each stanchion base. Allowable leakage: None.

(V)(G) "STATIC LOAD TEST"

3.3 Accomplish a static load test on the handrails and stanchions installed in 3.1.

3.3.1 Accomplish a static load test of 10 percent of the installed stanchion and handrails. A test load of 300 pounds shall be applied horizontally outboard at the top of the stanchion and perpendicular to the railing and held for ten minutes. Remove the test load and inspect the lifeline rails, stanchions and surrounding structure for evidence of damage or permanent deformation. Allowable damage: None.

3.4 Accomplish the requirements of 009-11 of 2.1.

3.5 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4.1 Preservation accomplished in Work Item 631-11-001, Superstructure

SSP: BOST-509-18 2 of 2 ITEM NO: 612-11-003

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.