Interior_Decking,_Sec_C,_SOW_HRMC.pdf

PDF 354 KB Posted

Attached to
Commercial Industrial Services (CIS) Interior Decking Federal contract opportunity
Solicitation number
N3225319R0024
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to Commercial Industrial Services (CIS) Interior Decking, newest first.
File Type Posted
N3225319R0024-Amendment03.pdf PDF
N3225319R0024-Amendment02.pdf PDF
N32253-19-R-0024_Q&A.pdf PDF
Interior_Decking_SOW_HRMC_RevA.pdf PDF
N3225319R0024-Amendment01.pdf PDF
3._Safety_and_Health_MOA__final_6sept2017.pdf PDF
5._099-010PH_RMMCO_Check-In_v01_2014_updates.pdf PDF
N3225319R0024-Solicitation.pdf PDF
4._Environmental_Guide_for_Ktr_on_Ship_Projects.pdf PDF
2._099-01_thru_07_2010_with_FOUO_pages_removed.pdf PDF
1._Interior_Decking,_Sec_C,_SOW_HRMC.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION C – DESCRIPTIONS AND SPECIFICATIONS (v10)

STATEMENT OF WORK:

COMMERCIAL INDUSTRIAL SERVICES (CIS) FOR THE INTERIOR DECK

COVERING SYSTEM REMOVAL, REPAIR, INSTALLATION, AND REPLACEMENT

SERVICES CONTRACT.

PURPOSE:

The primary purpose of the Commercial Industrial Services (CIS) Interior Deck Covering

Services contract is to provide labor, services, equipment, and materials for the removal, repair, installation, and replacement of interior deck covering system onboard U.S. Navy ships and other Government vessels within the area of responsibility (AOR) of the Pearl Harbor Naval

Shipyard and Intermediate Repair Facility (PHNSY&IMF) and the Hawaii Regional

Maintenance Center (HRMC).

The effort required hereunder shall be performed in accordance with the statement of work and references and in accordance with all other terms and conditions set forth herein.

C.1. REFERENCES:

C.1.1 The requirements of the following references shall be utilized in the execution of this contract unless otherwise stated herein. Whenever specifications, Naval Sea Systems Command

(NAVSEA) Standard Items (NSI), standards, drawings, publications or other documents undergo subsequent revisions, the contractor shall use the latest revised version during task order execution.

C.1.1.2 If future revisions result in a change to the contractor’s price, the Contractor shall promptly notify the contract administration office of the revision details and the expected impact.

The Administrative Contracting Officer (ACO) will then negotiate and incorporate the necessary changes via bilateral modification to the contract.

C1.1.3 When future revisions result in no change to the contractor’s price, the Contractor shall utilize the latest version as soon as the change becomes, known without a need for a contract modification.

(a) NAVSEA Standard Items

1. Category I NAVSEA STANDARD ITEMS (NSI) is viewed, using the internet at http://www.navsea.navy.mil/Home/RMC/CNRMC/OurPrograms/SSRAC.aspx and shall be invoked on all task orders.

charles.feldman Draft

2. The following Category II NAVSEA STANDARD ITEMS (NSI) may be viewed on the internet at http://www.navsea.navy.mil/Home/RMC/CNRMC/OurPrograms/SSRAC.aspx and shall be invoked on all task orders:

009-05 Temporary Access; accomplish

009-26 Deck Covering; accomplish

009-32 Cleaning and Painting Requirements; accomplish

(b) OPNAVINST 5100.23G; Navy Safety and Occupational Health Program Manual

(c) Occupational Safety and Health Act (OSHA) of 1970

(d) Code of Federal Regulations (CFR) Title 29 Labor, Chapter XVII Occupational Safety and

Health Administration, Department of Labor, Part 1910 Occupational Safety and Health

Standards

(e) CFR Title 29 Labor, Chapter XVII Occupational Safety and Health Administration, Department of Labor, Part 1913 Occupational Safety and Health Standards for Shipyard

Employment

(f) CFR Title 40 Protection of Environment, Chapter 1 Environmental Protection Agency, Subchapter C Air Programs, Part 63 National Emission Standards for Hazardous Air Pollutants for Source Categories, Subpart II National Emission Standards for Shipbuilding and Ship Repair

(Surface Coating)

(g) CFR Title 40 Protection of Environment, Chapter 1 Environmental Protection Agency, Subchapter I Solid Wastes, Parts 260 through 273

(h) CFR Title 49 Transportation, Chapter 1 Pipeline and Hazardous Materials Safety, Administration, Department of Transportation, Parts 100 through 157

(i) United States Code (USC) Title 10, Subtitle C, Part IV, Chapter 633, Section 7311, Repair or

Maintenance of Naval Vessels: Handling of Hazardous Waste

(j) PHNSY&IMF Local Standard Items (LSI) No. 099-02PH through 099-07P are in effect throughout this Statement of Work. Pay particular attention to LSI 009-05.

(k) PHNSY&IMF ltr. 5090 Ser. 106.3/076 of 20 Oct 2011, Enclosure (1) Contractors

Environmental Specification Guidelines rev. January 17, 2013

(l) Safety and Health Work Practices for Contractors working with Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility (PHNSY & IMF) MOA 6 Sept 2015

(m) National Fire Protection Association (NFPA) Standard 312, Standards for Fire Protection of

Vessels During Construction, Conversion, Repair and Lay-up. Online at https://www.nfpa.org/

(n) NFPA Standard 306, Standards for the Control of Gas Hazards on Vessels. Online at https://www.nfpa.org/

(o) Resource Conservation and Recovery Act (RCRA) Laws and Regulations. Online at https://www.epa.gov/rcra

(p) Commander Fleet Forces Command Instruction (COMFLTFORCOMINST) 4790.3 Work

Authorization Form (WAF)

(q) NAVSEA Standard Work Template 077-001; Hazardous Waste Produced on Naval Vessels;

control

(r) S9086-T8-STM-010; Naval Ship’s Technical Manual (NSTM) Chapter 593; Pollution

Control.

(s) NAVSEA S9086-CH-STM-030/CH074, Volume 3; Gas Free Engineering

(t) Naval Ships’ Technical Manual S9086-VG-STM-010 Chapter 634 Deck Coverings, General

(u) Naval Ships’ Technical Manual S9086-VD-STM-010 Chapter 631 Preservation of Ships in

Service – General.

(v) MIL-STD-1423, Department of Defense Design Criteria Standard. Fire Performance

Requirements and Approved Specifications for Interior Finish Materials and Furnishings (Naval

Shipboard Use)

(aa) MIL-PRF-32150, Performance Specifications, Deck Tiles, Wear Resistant

(ab) MIL-PRF-24613, Performance Specifications, Deck Covering Materials, Interior, Cosmetic, Polymeric

(ac) MIL-PRF-32854, Performance Specifications, Deck Covering Materials, Monolithic

(ad) MIL-DTL-13562, Detail Specification, Matting or Sheet, Floor Covering Insulating for

High Voltage Application

(ae) MIL-PRF-3135, Performance Specifications, Deck Covering Underlay Materials

(af) MIL-PRF-24156, Performance Specification, Cement, Epoxy, Metal Repair and Hull

Smoothing (Metric)

(ag) MIL-DTL-24441, Detail Specification, Paint, Epoxy-Polyamide, General Specification for

(ah) MIL-D-23134, Military Specification, Deck Underlay and Covering, Insulating, Magnesia, Aggregate Mixture.

C.1.2 Other references not listed above may also be invoked, as required, for individual task orders. Specific references and associated technical documentation for individual task orders shall be identified on each task order.

C.1.3 If the Contractor does not have copies of the references (documents, technical manuals, military standards, procedures, and regulations etc.), notify the Contracting Officer

Representative (COR) so that copies can be disseminated.

C.2 GENERAL REQUIREMENTS:

C.2.1 The quality of all services rendered shall conform to the highest standard in the relevant profession, trade or field of endeavor. Without additional expense to the Government, the

Contractor shall be responsible for obtaining any necessary insurance, licenses and permits, and for complying with all applicable laws, codes and regulations, in connection with the performance of the work. The Contractor is responsible for ensuring that proper safety and health precautions are taken to protect the workers and the property of others.

C.2.2 All work being performed in this contract shall be accomplished in accordance with (IAW) references C.1.1(a) through C.1.1(ah).

C.2.3 The Contractor shall provide all management, administrative services, labor, materials, tools, equipment, labor, rigging services, crane services, gas free services, scaffolding, transportation, disposal, utilities (i.e. air, water and electricity, etc.) and required services and support to accomplish the work specified in this contract.

C.2.4 The Contractor shall provide all cranes necessary to accomplish the work under this contract, including floating cranes when required and cranes with a boom capacity great enough to reach ships berthed second ship out IAW references C.1.1(a) and C.1.1(w) through C.1.1(ah).

C.2.5 The Contractor may utilize government utilities available at the pier. Contractor must ship check what is or is not available at all berthing locations for work. The government is not responsible for any utilities not available at the berth. Contractor is responsible for all hookups equipment and cost, subject to coordination SY and NAVFAC through the COR coordination.

C.2.6 The Contractor shall comply with the Occupational Safety and Health Standard for

Shipyard Employment (CFR, Title 29, Part 1913) promulgated under Public Law A85-742, Amended Section 41 of the Longshoremen’s and Harbor Workers Compensation Act (33

U.S.C.942) and adopted by the Department of Labor as Occupational Safety and Regulations, for all work being performed under this contract on the navigable waters of the United States including any dry-dock or marine railway. Nothing contained in this contract or any task order there under shall be construed as relieving the Contractor from any obligation, which it may have for compliance with the aforesaid regulations IAW references C.1.1(a) through C.1.1(ah).

C.2.7 The Contractor shall immediately notify the ACO and COR, verbally and by submission of a Condition Found Report (CFR) of any difficulties that may jeopardize the completion of specified work.

C.2.8 The Government will not be responsible for work delays or stoppages caused by the

Contractor’s failure to comply with registration and access requirements. Similarly, the

Government shall monitor and take appropriate action against Contractors who repeatedly or egregiously violate access control requirements.

C.2.9 The Contractor shall complete the work requirement specified in the task order within the

Period of Performance (POP) provided which includes weekends and holidays. When weekend work or outside normal working hours are required, the contractor will coordinate NLT the

Friday before executing the work with the COR. Normal working hours are between 6:00 AM to

6:00 PM Sunday through Saturday.

C.2.10 The Contractor shall notify the Contracting Officer Representative (COR) prior to start of work noting equipment and systems that require isolation so that tag outs can be accomplished as required.

C.2.11 The Contractor shall follow procedures for system tag-out IAW references C.1.1(a) through C.1.1(ah).

C.2.12 The Contractor shall notify the COR immediately when all work required by the task order are completed and the system is ready for activation and removal of tags.

C.2.13 The Contractor shall coordinate schedules of work-affected areas with the other contractors and (COR) daily at the beginning of each shift.

C.2.14 The Contractor awarded a task order shall submit a Test and Inspection Plan (TIP) and a

Production Schedule specific to each task order. The TIP and Production Schedule shall be submitted to the COR and the Quality Assurance Specialist (QAS) electronically no later than three (3) day prior to the start of productive work for all task orders under this contract.

C.2.15 When required, the Contractor shall attend ship checks as specified by the COR to identify the work requirements, Period of Performance and other pertinent information. The

Contractor shall immediately notify the COR if the Contractor will be delayed or will be unable to attend the ship check.

C.2.15.1 Notification of non-attendance to a ship-check will be conveyed in writing through email to ask for waiver of the requirement on case-by-case bases. Waivers are reflective as a negative trend.

C.2.15.2 Highly satisfactory tasking rating may offset negative trend at the end of the tasking review.

C.2.16 The Contractor shall be responsible for the removal of all interferences or equipment necessary to accomplish the work specified on this contract and the task order. The Contractor shall reinstall all previously removed interferences or equipment upon completion of the work specified on this contract or task order IAW reference C.1.1. (a) through C.1.1(ah).

C.2.17 The Contractor shall ensure required engineering controls to prevent environmental pollutant discharges from work areas and safety boundaries are in place prior to the start of the work required in this contract.

C.2.18 Nothing in this contract shall relieve the Contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including, but not limited to obtaining of licenses and permits, in connection with the use of hazardous material and the generation of hazardous waste in the performance of this contract.

C.2.19 The Contractor shall comply with applicable federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

C.3 SCOPE OF WORK:

C.3.1 Within 24 hours of start of the Period of Performance (POP), the Contractor shall submit one legible copy, in hard copy or electronic media, a Condition Found Report (CFR) to the COR identifying discrepancies associated with the equipment/areas specified in each task order. The

Contractor shall be responsible for discrepancies or damages not noted in the initial CFR.

C.3.2 The Contractor shall submit one legible copy, in hard copy or electronic media, of subsequent CFR’s identifying discrepancies or damages associated with the description of work to the COR within 4 hours of conditions found.

C.3.3 Prior to the start of work under each task order the Contractor shall ensure that the required

Work Authorization Form (WAF) is properly filled out and authorized IAW the ships WAF

Program and references C.1.1(a) and C.1.1.(p). The authorized WAF shall be posted at the primary and secondary entrances to the location of work. In the event the ship does not have an established WAF program, the Contractor will provide the necessary documents.

NOTE: Typical routing for ship’s force concurrences requires 3 days.

The Contractor shall establish an account in Electronic-Systems Operations Management System

(E-SOMS) in order to produce an Electronic Work Authorization Form (E-WAF) to obtain ship departmental concurrences via routing on the vessel.

C.3.4 The Contractor shall be responsible for cleanup of any spills and/or mitigation of hazards associated with the work being performed hereunder, from the ship and from the Naval Facility

IAW all applicable regulations and references C.1.1(a) through C.1.1(ah).

C.3.5 The Contractor shall be responsible for the cleanliness of the work area. All waste created by the Contractor as a result of the removal and installations, specified herein, shall be removed from the ship as required and at the end of each shift.

C.3.6 The Contractor shall be responsible to gas free the space(s) IAW with C.1.1(a) through

C.1.1(ah). The Contractor shall provide gas-free certification and maintain certification IAW 29

Code of Federal Regulations Part 1913. The Contractor shall post the gas free certificate on the job site during the performance period.

C.3.7 The Contractor shall verify that all DC deck fittings are free, removable, and operational and perform an unobstructed flow test of each deck drain(s), where installed, prior to disturbance of the existing deck covering system IAW the requirements of the statement of work and

C.3.8 All Contractor personnel and equipment must be licensed/registered/certified to operate/maintain/service all equipment involved in the performance of the requirements of this contract.

C.4 INSPECTION PROCEDURES:

C.4.1 (I) Inspections require verification and documentation by a separate individual, other than the person who has accomplished the work, who is qualified as an inspector and currently certified where required by the technical documents (e.g., NAVSEA Basic Paint Inspector

{NBPI}, National Association of Corrosion Engineers {NACE}, non-destructive testing, electrical cableway inspections, etc.).

C.4.2 (V) Inspections require verification and documentation by the qualified tradesperson, trade supervisor, or inspector.

C.4.3 (G) A symbol inserted in a work item to establish a point in the sequence of accomplishment of work at which time the COR shall be notified by the prime contractor in all cases to permit observation of a specific test or inspection (I) (V) by the government.

C.4.4 For (G) checkpoints scheduled during normal working hours, the Contractor shall notify the COR of checkpoints via electronic method. Notification shall be at least four hours, but not more than one working day, prior to commencing the specific requirements in the paragraph annotated with the symbol (G). Notify the COR not later than four hours before the end of the last preceding day shift when tests or inspections following a (G) checkpoint is scheduled after normal day shift working hours, on a weekend, or on a federal holiday. Notify the COR at least

48 hours, but not more than 72 hours, prior to commencing (G) checkpoints to be performed at a

Contractor's/Subcontractor’s plant located in excess of 50 miles by the most direct roadway nearest to the place of performance of the contract. Document the date, time, and identification of the COR notified.

C.4.5 For (G) checkpoints scheduled during normal working hours, the Contractor shall notify the COR for cancellation of the scheduled test or inspection as soon as known, but no later than one hour prior to the scheduled check point.

C.4.6 For (G) checkpoints scheduled after normal working hours, on a weekend, or a federal holiday, the Contractor shall notify the COR to cancel a scheduled test or inspection as soon as known, but no later than two hours prior to the scheduled check point.

C.5 CERAMIC TILES (QUARRY AND/OR PORCELAIN)

C.5.1 The Contractor shall provide labor, services, equipment, and materials for the removal of the existing deck covering system, and the subsequent surface preparation, cleaning, and coating application IAW the requirements of NAVSEA SI 009-26 including Attachment A, the

NAVSEA SI 009-32, the statement of work, and references C.1.1(a) through C.1.1(ah).

C.5.1.1 The Contractor shall provide labor, services, equipment, and materials for the installation on the entire deck of new Ceramic Tiles (Quarry and/or Porcelain) deck covering system.

Include new underlayment material and new waterproof membrane IAW the requirements of

NAVSEA SI 009-26 including Attachment A, the NAVSEA SI 009-32, the statement of work and references C.1.1(a) through C.1.1(ah).

C.5.1.2 The removal and installation shall include the Cove Base (Bull Nose) tiles, where installed, around the perimeter of the compartment, stalls, and equipment foundations

C.5.2 The Contractor shall conduct a preliminary inspection of the locations listed in the task order designated for the installation of the new Ceramic Tiles (Quarry and/or Porcelain) deck covering system, IAW the requirements of the statement of work and references C.1.1(a) through

C.1.1(ah). The inspection shall include adjacent compartments that will be affected by the installation of the new Ceramic Tiles (Quarry and/or Porcelain) deck covering system.

C.5.2.1 The Contractor shall coordinate with the COR to determine the type, color, pattern, and size of Ceramic Tiles (Quarry and/or Porcelain) deck covering system to be installed.

C.5.2.2 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraphs C.5.2 and C.5.2.1 to the

COR. The Contractor shall be responsible for discrepancies or damages not noted in the CFR.

(I) CHECKPOINT: Unobstructed Flow Test – Deck Drain(s)

C.5.3 The Contractor shall verify that all DC deck fittings are free, removable, and operational

C.5.3.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.5.3 to the COR. The

Contractor shall be responsible for discrepancies or damages not noted in the CFR.

(V) CHECKPOINT: Surface Preparation, Cleaning, and Coating Application

C.5.4 The Contractor shall accomplish the surface preparation, cleaning and coating application of the exposed substrate and adjacent vertical surfaces IAW the requirements of the statement of work and references C.1.1(a) through C.1.1(ah).

C.5.4.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.5.4 to the COR. The

(I) CHECKPOINT: Underlayment Slope and Fairness – Positive Drain(s)

C.5.5 The Contractor shall ensure that the underlayment material is installed smooth and fair and provides positive draining to deck drain(s), where installed, IAW the requirements of the statement of work and references C.1.1(a) through C.1.1(ah).

C.5.5.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable

5media, of a CFR detailing the results of the requirement of paragraph C.5.5 to the COR. The

(I)(G) CHECKPOINT: Waterproof Membrane

C.5.6 The Contractor shall ensure that the waterproof membrane is cured and installed IAW the requirements of the statement of work and references C.1.1(a) through C.1.1(ah).

C.5.6.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable

5media, of a CFR detailing the results of the requirement of paragraph C.5.6 to the COR. The

C.5.7 The Contractor shall verify that all DC deck fittings are free, removable, and operational and perform an unobstructed flow test of each deck drain(s), where installed, IAW the

(V)(G) CHECKPOINT: Installed and Cured Ceramic Tiles (Quarry and/or Porcelain)

Deck Covering System

C.5.8 The Contractor shall accomplish an inspection of the completely installed and cured

Ceramic Tiles (Quarry and/or Porcelain) deck covering system IAW the requirements of the

(V)(G) CHECK POINT: Final Contamination/Damage Inspection

C.5.9 The Contractor shall accomplish an inspection of the inspection of the locations listed in the task order and affected compartments ensuring the removal of all protective covering, services, and equipment utilized in the installation of the new Ceramic Tiles (Quarry and/or

Porcelain) deck covering system.

C.5.10 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraphs C.5.7, C.5.8, and C.5.9 to the COR. The Contractor shall be responsible for discrepancies or damages not noted in the

CFR.

C.6 WEAR-RESISTANT DECK TILES, MIL-PRF-32150

C.6.1 The Contractor shall provide labor, services, equipment, and materials for the removal of application IAW the requirements of NAVSEA SI 009-26 including Attachment B, the

C.6.1.1 The Contractor shall provide labor, services, equipment, and materials for the installation on the entire deck of new Wear-Resistant Deck Tiles deck covering system, to include new underlayment material and new waterproof membrane IAW the requirements of NAVSEA SI

009-26 including Attachment B, the NAVSEA SI 009-32, the statement of work and references

C.1.1(a) through C.1.1(ah).

C.6.2 The Contractor shall conduct a preliminary inspection of the locations listed in the task order designated for the installation of the new Wear-Resistant Deck Tiles deck covering system

IAW the requirements of the statement of work and references C.1.1(a) through C.1.1(ah). The inspection shall include adjacent compartments that will be affected by the installation of the new Wear-Resistant Deck Tiles deck covering system.

C.6.2.1 The Contractor shall coordinate with the SAR and the COR to determine the type, color, pattern, and size of Wear-Resistant Deck Tiles to be installed.

C.6.2.2 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraphs C.6.2 and C.6.2.1 to the

C.6.3 The Contractor shall verify that all DC deck fittings are free, removable, and operational

C.6.3.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.6.3 to the COR. The

C.6.4 The Contractor shall accomplish the surface preparation, cleaning and coating application

C.6.4.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.6.4 to the COR. The

C.6.5 The Contractor shall ensure that the underlayment material is installed smooth and fair and

C.6.5.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable

5media, of a CFR detailing the results of the requirement of paragraph C.6.5 to the COR. The

C.6.6 The Contractor shall ensure that the waterproof membrane is cured and installed IAW the

C.6.6.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable

5media, of a CFR detailing the results of the requirement of paragraph C.6.6 to the COR. The

C.6.7 The Contractor shall verify that all DC deck fittings are free, removable, and operational and perform an unobstructed flow test of each deck drain(s), where installed, of the completely installed and cured Wear-Resistant Deck Tiles deck covering system IAW the requirements of the statement of work and references C.1.1(a) through C.1.1(ah).

(V)(G) CHECKPOINT: Installed Wear-Resistant Deck Tiles Deck Covering System

C.6.8 The Contractor shall accomplish an inspection of the completely installed and cured Wear-

Resistant Deck Tiles deck covering system IAW the requirements of the statement of work and

C.6.9 The Contractor shall accomplish an inspection of the inspection of the locations listed in services, and equipment utilized in the installation of the new Wear-Resistant Deck Tiles deck covering system.

C.6.10 The Contractor shall submit one legible copy, in hard copy or approved transferrable

5media, of a CFR detailing the results of the requirement of paragraphs C.6.7, C.6.8, and C.6.9 to the COR. The Contractor shall be responsible for discrepancies or damages not noted in the

C.7: CHEMICAL-RESISTANT FLOORING, MIL-PRF-32584

C.7.1 The Contractor shall provide labor, services, equipment, and materials for the removal of the existing deck covering system, and the subsequent surface Preparation, Cleaning, and coating application IAW the requirements of NAVSEA SI 009-26 including Attachment C, the

C.7.1.1 The Contractor shall provide labor, services, equipment, and materials for the installation on the entire deck of new Chemical-Resistant Flooring deck covering system, to include new underlayment material, new waterproof membrane, new color coat, new colored flakes, and new seal coat with aggregate, IAW the requirements of NAVSEA SI 009-26 including Attachment C, the NAVSEA SI 009-32, the statement of work and references C.1.1(a) through C.1.1(ah).

C.7.2 The Contractor shall conduct a preliminary inspection of the locations listed in the task order designated for the installation of the new Chemical-Resistant Flooring deck covering system IAW the requirements of the statement of work and references C.1.1(a) through installation of the new Chemical-Resistant Flooring deck covering system.

C.7.2.1 The Contractor shall coordinate with the COR to determine the color coat, and the color and size of flakes for the Chemical-Resistant Flooring to be installed.

C.7.2.2 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraphs C.7.2 and C.7.2.1 to the

C.7.3 The Contractor shall verify that all DC deck fittings are free, removable, and operational

C.7.3.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.7.3 to the COR. The

C.7.4 The Contractor shall accomplish the surface preparation, cleaning and coating application

C.7.4.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.7.4 to the COR. The

C.7.5 The Contractor shall ensure that the underlayment material is installed smooth and fair and

C.7.5.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable

5media, of a CFR detailing the results of the requirement of paragraph C.7.5 to the COR. The

C.7.6 The Contractor shall ensure that the waterproof membrane is cured and installed IAW the

C.7.6.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable

5media, of a CFR detailing the results of the requirement of paragraph C.7.6 to the COR. The

C.7.7 The Contractor shall verify that all DC deck fittings are free, removable, and operational and perform an unobstructed flow test of each deck drain(s)s, where installed, of the completely installed and cured Chemical-Resistant Flooring deck covering system IAW the requirements of

(V)(G) CHECKPOINT: Installed and Cured Chemical-Resistant Flooring Deck Covering

System

C.7.8 The Contractor shall accomplish an inspection of the completely installed and cured

Chemical-Resistant Flooring deck covering system IAW the requirements of the statement of work and references C.1.1(a) through C.1.1(ah).

C.7.9 The Contractor shall accomplish an inspection of the inspection of the locations listed in services, and equipment utilized in the installation of the new Chemical-Resistant Flooring deck

C.7.10 The Contractor shall submit one legible copy, in hard copy or approved transferrable

5media, of a CFR detailing the results of the requirement of paragraphs C.7.7, C.7.8, and C.7.9

C.8 ELECTRICAL GRADE SHEETING AND MATTING, MIL-DTL-13562

C.8.1 The Contractor shall provide labor, services, equipment, and materials for the removal of application IAW the requirements of NAVSEA SI 009-26 including Attachment D, the

C.8.1.1 The Contractor shall provide labor, services, equipment, and materials for the installation on the entire deck of new Electrical Grade Sheeting and Matting deck covering system described in paragraph C.8.1.2 and C.8.1.3, to include new underlayment material, IAW the requirements of NAVSEA SI 009-26 including Attachment D, the NAVSEA SI 009-32, the statement of work and references C.1.1(a) through C.1.1(ah).

C.8.1.2 Electrical Grade Sheeting and Matting deck covering system IAW the requirements of

NAVSEA SI 009-26 including Attachment D, Paragraph 1, sub-paragraphs A, B, C and D, the statement of work, and references C.1.1(a) through C.1.1(ah).

C.8.1.3 Electrical Grade Sheeting and Matting (Loose Lay) deck covering system IAW the requirements of NAVSEA SI 009-26, Attachment D, Paragraph 2, sub-paragraphs A and B, the statement of work, and references C.1.1(a) through C.1.1(ah).

C.8.2 The Contractor shall conduct a preliminary inspection of the locations listed in the task order designated for the installation of the new Electrical Grade Sheeting and Matting deck covering system IAW the requirements of the statement of work and references C.1.1(a) through installation of the new Electrical Grade Sheeting and Matting deck covering system.

C.8.2.1 The Contractor shall coordinate with the SAR and the COR to determine the color and pattern of Electrical Grade Sheeting and Matting to be installed.

C.8.2.2 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraphs C.8.2 and C.8.2.1 to the

C.8.3 The Contractor shall verify that all DC deck fittings are free, removable, and operational

C.8.3.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.8.3 to the COR. The

C.8.4 The Contractor shall accomplish the surface preparation, cleaning, and coating application

C.8.4.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.8.4 to the COR. The

C.8.5 The Contractor shall ensure that the underlayment material is installed smooth and fair and

C.8.5.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.8.5 to the COR. The

C.8.6 The Contractor shall verify that all DC deck fittings are free, removable, and operational installed and cured Electrical Grade Sheeting and Matting deck covering system IAW the

(V)(G) CHECKPOINT: Installed and Cured Electrical Grade Sheeting and Matting Deck

Covering System

C.8.7 The Contractor shall accomplish an inspection of the completely installed and cured

Electrical Grade Sheeting and Matting deck covering system IAW the requirements of the

C.8.8 The Contractor shall accomplish an inspection of the inspection of the locations listed in services, and equipment utilized in the installation of the new Electrical Grade Sheeting and

Matting deck covering system.

C.8.9 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraphs C.8.6, C.8.7, and C.8.8 to the COR. The Contractor shall be responsible for discrepancies or damages not noted in the

C. 9 SOLID VINYL AND VINYL COMPOSITION TILE

C.9.1 The Contractor shall provide labor, services, equipment, and materials for the removal of application IAW the requirements of NAVSEA SI 009-26 including Attachment F, the

C.9.1.1 The Contractor shall provide labor, services, equipment, and materials for the installation on the entire deck of the new Solid Vinyl and Vinyl Composition Tile deck covering system, to include new underlayment material, IAW the requirements of NAVSEA SI 009-26 including

Attachment F, the NAVSEA SI 009-32, the statement of work and references C.1.1(a) through

C.1.1(ah).

C.9.2 The Contractor shall conduct a preliminary inspection of the locations listed in the task order designated for the installation of the new Solid Vinyl and Vinyl Composition Tile deck covering system IAW the requirements of the statement of work and references C.1.1(a) through installation of the new Solid Vinyl and Vinyl Composition Tile deck covering system.

C.9.2.1 The Contractor shall coordinate with the COR to determine the type, color, pattern, and size of Solid Vinyl and Vinyl Composition Tile to be installed.

C.9.2.2 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraphs C.9.2 and C.9.2.1 to the

C.9.3 The Contractor shall verify that all DC deck fittings are free, removable, and operational and perform an unobstructed flow test of each deck drain(s), when installed, prior to disturbance

C.9.3.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.9.3 to the COR. The

C.9.4 The Contractor shall accomplishment the surface preparation, cleaning, and coating application of the exposed substrate and adjacent vertical surfaces IAW the requirements of the

C.9.4.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.9.4 to the COR. The

C.9.5 The Contractor shall ensure that the underlayment material is installed smooth and fair and

C.9.5.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable

5media, of a CFR detailing the results of the requirement of paragraph C.9.5 to the COR. The

C.9.6 The Contractor shall verify that all DC deck fittings are free, removable, and operational and perform an unobstructed flow test of each deck drain(s), when installed, of the completely installed and cured Solid Vinyl and Vinyl Composition Tile deck covering system IAW the

(V)(G) CHECKPOINT: Installed and Cured Solid Vinyl and Vinyl Composition Tile Deck

Covering System

C.9.7 The Contractor shall accomplish an inspection of the completely installed and cured Solid

Vinyl and Vinyl Composition Tile deck covering system IAW the requirements of the statement of work and references C.1.1(a) through C.1.1(ah).

C.9.8 The Contractor shall accomplish an inspection of the inspection of the locations listed in services, and equipment utilized in the installation of the new Solid Vinyl and Vinyl

Composition Tile deck covering system.

C.9.9 The Contractor shall submit one legible copy, in hard copy or approved transferrable

5media, of a CFR detailing the results of the requirement of paragraphs C.9.6, C.9.7, and C.9.8

C.10 COSMETIC POLYMERIC (PRC), MIL-PRF-24613

C.10.1 The Contractor shall provide labor, services, equipment, and materials for the removal of application IAW the requirements of NAVSEA SI 009-26, MIL-PRF-24613, the NAVSEA SI

009-32, the statement of work, and references C.1.1(a) through C.1.1(ah).

C.10.1.1 The Contractor shall provide labor, services, equipment, and materials for the installation on the entire deck of the new Cosmetic Polymeric (PRC) deck covering system, to include new underlayment material, new waterproof membrane, new color coat, new colored flakes, and new seal coat with aggregate, IAW the requirements of NAVSEA SI 009-26, MIL-

PRF-24613, the NAVSEA SI 009-32, the statement of work and references C.1.1(a) through

C.10.2 The Contractor shall conduct a preliminary inspection of the locations listed in the task order designated for the installation of the new Cosmetic Polymeric (PRC) deck covering system

IAW the requirements of the statement of work and references C.1.1(a) through C.1.1(ah). The inspection shall include adjacent compartments that will be affected by the installation of the new Cosmetic Polymeric (PRC) deck covering system.

C.10.2.1 The Contractor shall coordinate with the COR to determine the right color and pattern of Cosmetic Polymeric (PRC) to be installed.

C.10.2.2 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraphs C.10.2 and C.10.2.1 to the

C.10.3 The Contractor shall verify that all DC deck fittings are free, removable, and operational

C.10.3.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.10.3 to the COR. The

C.10.4 The Contractor shall accomplishment the surface preparation, cleaning and coating

C.10.4.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.10.4 to the COR. The

C.10.5 The Contractor shall ensure that the underlayment material is installed smooth and fair and provides positive draining to deck drain(s), where installed, IAW the requirements of the

C.10.5.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable

5media, of a CFR detailing the results of the requirement of paragraph C.10.5 to the COR. The

C.10.6 The Contractor shall ensure that the waterproof membrane is cured and installed IAW the

C.10.6.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable

5media, of a CFR detailing the results of the requirement of paragraph C.10.6 to the COR. The

C.10.7 The Contractor shall verify that all DC deck fittings are free, removable, and operational installed and cured Cosmetic Polymeric (PRC) deck covering system IAW the requirements of

(V)(G) CHECKPOINT: Installed and Cured Cosmetic Polymeric (PRC) Deck Covering

System

C.10.8 The Contractor shall accomplish an inspection of the completely installed and cured

Cosmetic Polymeric (PRC) deck covering system IAW the requirements of the statement of work and references C.1.1(a) through C.1.1(ah).

C.10.9 The Contractor shall accomplish an inspection of the inspection of the locations listed in services, and equipment utilized in the installation of the new Cosmetic Polymeric (PRC) deck

C.10.10 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraphs C.10.7, C.10.8, and

C.10.9 to the COR. The Contractor shall be responsible for discrepancies or damages not noted in the CFR.

C.11 REPAIR OF EXISTING DECK COVERING SYSTEM:

C.11.1 The Contractor shall provide the labor, services, equipment, and materials to repairs the existing deck covering system IAW the requirements of NAVSEA SI 009-26 including all attachments, the NAVSEA SI 009-32, specifications, the statement of work, and references

C.11.1.1 Repair, Recoat or Recolor and Reseal: The repair shall include the remove the damaged deck covering, damaged underlayment (not to exceed 35% of the entire deck), damaged underlayment material, and damaged waterproof membrane and the subsequent surface preparation, cleaning, and coating application. Installation of new underlayment material, new waterproof membrane, and new deck covering system on removed areas only. Recoat or recolor and reseal (with new colored flakes and new aggregate) the entire deck to provide an even color, appearance, and texture of the entire deck.

a. Chemical-Resistant Flooring, MIL-PRF-32584

b. Cosmetic Polymeric (PRC), MIL-PRF-24613

C.11.1.2 The repair shall include the removal to substrate of only the damaged tiles, damaged underlayment material, and damaged waterproof membrane, and the subsequent surface preparation, cleaning, and coating application. Installation of the new underlayment material, new waterproof membrane, and new deck covering system on removed areas only for the following deck covering systems:

a. Ceramic Tiles (Quarry and/or Porcelain), including Cove Base (Bull Nose)

b. Wear-Resistant Deck Tiles), MIL-PRF-32150

c. Solid Vinyl and Vinyl Composition Tile

C.11.1.3 The repair shall include the removal of the entire existing Electrical Grade Sheeting and

Matting, removal to substrate of only the damaged underlayment material (not to exceed 35% of the entire deck), and the subsequent surface preparation, cleaning, and coating application.

Installation of new underlayment material on removed areas only. Installation of the new

Electrical Grade Sheeting and Matting deck covering system on the entire deck.

a. Electrical Grade Sheeting and Matting, MIL-DTL-13562 – NAVSEA SI 009-26 including

Attachment D Paragraph 1.

b. Electrical Grade Sheeting and Matting (Loose Lay), MIL-DTL-13562 – NAVSEA SI 009-26 including Attachment D Paragraph 2.

C.11.1.4 The repair shall include the removal of the entire existing Carpeting, removal to substrate of only the damaged underlayment (not to exceed 35% of the entire deck), and the subsequent surface preparation, cleaning, and coating application. Installation of new underlayment material on removed areas only. Installation of the new Carpeting deck covering system on the entire deck:

C.11.2 The Contractor shall conduct a preliminary inspection of the locations listed in the task order designated for the repair of the existing deck covering system IAW the requirements of the statement of work and references C.1.1(a) through C.1.1(ah). The inspection shall include adjacent compartments that will be affected by the repair of the existing deck covering system.

C.11.2.1 The Contractor shall coordinate with the COR to determine the right color, pattern, and size of deck covering system to be installed as part of the repair.

C.11.2.2 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraphs C.11.2 and C.11.2.1 to the

C.11.3 The Contractor shall verify that all DC deck fittings are free, removable, and operational

C.11.3.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.11.3 to the COR. The

C.11.4 The Contractor shall accomplishment the surface preparation, cleaning and coating

C.11.4.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.11.4 to the COR. The

Contractor shall be responsible for discrepancies or damages not noted in the CFR.

C.11.5 The Contractor shall ensure that the underlayment material is installed smooth and fair

C.11.5.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable

5media, of a CFR detailing the results of the requirement of paragraph C.11.5 to the COR. The

C.11.6 The Contractor shall ensure that the waterproof membrane is cured and installed IAW the

C.11.6.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.11.6 to the COR. The

C.11.7 The Contractor shall verify that all DC deck fittings are free, removable, and operational installed and cured deck covering system IAW the requirements of the statement of work and

(V)(G) CHECKPOINT: Installed and Cured Deck Covering System

C.11.8 The Contractor shall accomplish an inspection of the completely installed and cured deck covering system IAW the requirements of the statement of work and references C.1.1(a) through

C.11.9 The Contractor shall accomplish an inspection of the inspection of the locations listed in services, and equipment utilized in the repair of the existing deck covering system.

C.11.10 The Contractor shall submit one legible copy, in hard copy or approved transferrable

5media, of a CFR detailing the results of the requirement of paragraphs C.11.7, C.11.8, and

C.11.9 to the COR. The Contractor shall be responsible for discrepancies or damages not noted

C.12 DECK COVERING SYSTEM WITH INSULATING DECK COVERING

UNDERLAYMENT MATERIAL CONFORMING TO MIL-D-18873 OR MIL-D-23134:

C.12.1 The Contractor shall provide the labor, services, equipment, and materials for the removal of existing deck covering system listed below, insulating underlayment material conforming to

MIL-D-18873 or MIL-D-23134, subsequent surface preparation, cleaning, and coating application IAW the requirements of the NAVSEA SI 009-26 including all attachments, the

NAVSEA SI 009-32, specifications, the statement of work, and references C.1.1(a) through

c. Electrical Grade Sheeting and Matting, MIL-DTL-13562 – NAVSEA SI 009-26 including

Attachment D Paragraph 1.

d. Electrical Grade Sheeting and Matting (Loose Lay), MIL-DTL-13562 – NAVSEA SI 009-26

C.12.1.1 The Contractor shall provide labor, services, equipment, and materials for the installation on the entire deck of the new deck covering system listed below, to include new insulating underlayment material conforming to MIL-D-18873 or MIL-D-23134, new waterproof membrane, new color coat, new colored flakes, and new seal coat with aggregate, IAW the requirements of NAVSEA SI 009-26, the NAVSEA SI 009-32, the statement of work and

C.12.1.2 The Contractor shall provide labor, services, equipment, and materials for the installation on the entire deck of the new deck covering system listed below, to include new underlayment material conforming to MIL-D-18873 or MIL-D-23134, IAW the requirements of

NAVSEA SI 009-26, the NAVSEA SI 009-32, the statement of work and references C.1.1(a) through C.1.1(ah).

C.12.2 The Contractor shall conduct a preliminary inspection of the locations listed in the task

C.12.2.1 The Contractor shall coordinate with the COR to determine the right color, pattern, and

C.12.2.2 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraphs C.12.2 and C.12.2.1 to the

C.12.3 The Contractor shall verify that all DC deck fittings are free, removable, and operational

C.12.3.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.13.3 to the COR. The

C.12.4 The Contractor shall accomplishment the surface preparation, cleaning and coating

C.12.4.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.12.4 to the COR. The

C.12.5 The Contractor shall ensure that the underlayment material is installed smooth and fair

C.12.5.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable

5media, of a CFR detailing the results of the requirement of paragraph C.12.5 to the COR. The

C.12.6 The Contractor shall ensure that the waterproof membrane is cured and installed IAW the

C.12.6.1 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR detailing the results of the requirement of paragraph C.12.6 to the COR. The

C.12.7 The Contractor shall verify that all DC deck fittings are free, removable, and operational

C.12.8 The Contractor shall accomplish an inspection of the completely installed and cured deck

C.12.9 The Contractor shall accomplish an inspection of the inspection of the locations listed in

C.12.10 The Contractor shall submit one legible copy, in hard copy or approved transferrable

5media, of a CFR detailing the results of the requirement of paragraphs C.12.7, C.12.8, and

C.12.9 to the COR. The Contractor shall be responsible for discrepancies or damages not noted

C.13 REPAIR OF DECK COVERING SYSTEM WITH INSULATING DECK

COVERING INSULATING UNDERLAYMENT MATERIAL CONFORMING TO MIL-

D-18873 OR MIL-D-23134:

C.13.1 The Contractor shall provide the labor, services, equipment, and materials to repairs the

C.13.1.1 Repair, Recoat or Recolor and Reseal: The repair shall include the remove the damaged deck covering, damaged underlayment material conforming to MIL-D-18873 or MIL-

D-23134 (not to exceed 35% of the entire deck), damaged underlayment material, and damaged waterproof membrane and the subsequent surface preparation, cleaning, and coating application.

Installation of new underlayment material, new waterproof membrane, and new deck covering system on removed areas only. Recoat or recolor and reseal (with aggregate) the entire deck to provide an even color, appearance, and texture of the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.