N32253-14-T-0034_0003.pdf
PDF 23 KB Posted
- Attached to
- Barge Repairs and Preservation Work at Contractor's Facility Federal contract opportunity
- Solicitation number
- N3225314T0034
About this file
Amendment 0003 to provide Questions Answers.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N32253-14-T-0034-0002.pdf | ||
| N32253-14-T-0034-0001.pdf | ||
| Attachment_1_-_SSPH-539-14_Redacted.pdf | ||
| N32253-14-T-0034.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The reason for this amendment is to provide questions and answ ers.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 11-Aug-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N32253-14-T-0034
X 9B. DATED (SEE ITEM 11)
09-Jul-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Aug-2014
CODE
PHNSY & IMF
667 SAFEGUARD ST., STE. 100
JBPHH HI 96860-5033
N32253 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N32253-14-T-0034
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0003
a. QUESTIONS AND ANSWERS
(1) QUESTION:
110-11-001, I have no way of knowing what other interference will be encountered prior to determination of repair areas.
501-90-001/631-12-001, I don’t see any insulation work on this item any guesses?
Would it be possible to have insulation be addressed by CFR once the government knows the areas that are to be repaired? It would alleviate a lot of the guess work.
ANSWER:
It will be acceptable to submit via CFR once the areas are determined.
(2) QUESTION:
Work Item 110-11-001, can you define the locations of the 800 square feet to be replaced so that we can define the effort to remove and replace interferences? We cannot determine accurate prices for unknown interferences.
ANSWER:
Deck plating renewal is on the weather deck at:
(a) 03 level from frame 38 to frame 56, port deckhouse edge to stbd deckhouse edge.
(b) 02 level from frame 8 to frame 68, port deckhouse edge to stbd deckhouse edge.
(c) Main deck level from frame 0 to frame 75, deckhouse to main deck hull edge.
Delete paragraphs 1.2.2 and 1.2.4
Revise paragraph 3.2 from “200 square feet” to “400 square feet”.
(3) QUESTION:
Work Item 582-28-001, what diameter line would the government like us to purchase? Would the government like eyes on each end of the lines? If so how large should the eyes be?
N32253-14-T-0034
ANSWER:
Line shall be 1-5/16 inch diameter with 6-feet eyes.
(4) QUESTION:
Work Item 514-90-001, paragraph 3.2, can you define how many panels and number of frames to be removed, as there is no way to quantify the amount of panels and frames to be removed from the description of the paragraph.
ANSWER:
The ceiling tile assembly is located in all interior spaces of this barge.
(a) 2nd deck from frame 8 to frame 68, port to starboard
(b) Main deck, from frame 8 to frame 72, port to starboard
(c) 01 level frame 8 to frame 72, port to starboard
(d) 02 level frame 50 to frame 56, port to starboard
(5) QUESTION:
Work Item 514-90-001, can you define number of square feet of bare fiberglass insulation to be replace with new cloth faced insulation?
ANSWER:
Approximately 27,258 square feet. Contractor should factor in drop off.
(6) QUESTION:
Work Item 123-90-001, reference 2.9 general note 4.06: shall we assume the compartment in question contains or does not contain epoxy coating system?
ANSWER:
Disregard Note 4.06. Assume the removal of entire existing coating due to deterioration of existing coating.
b. The due date for quotes remains unchanged at 15 August 2014, 10:00 AM, HST.
(End of Summary of Changes)