Specification SSPH-539-14
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N32253-14-T-0034_0003.pdf | ||
| N32253-14-T-0034-0002.pdf | ||
| N32253-14-T-0034-0001.pdf | ||
| N32253-14-T-0034.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PEARL HARBOR, HAWAII −
SUPSHIP SAN DIEGO DET. PEARL HARBOR
SSPH−539−14SPECIFICATION NUMBER: SSP:
DEPARTMENT OF THE NAVY
SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED
SHIP CHARACTERISTICS
22 MAY 2014
SHIP: SSP−539−14
I N D E X
009−01
009−02
009−03
009−04
009−05
009−06
009−07
009−08
009−10
009−18
009−19
009−20
009−21
009−23
009−24
009−29
009−34
009−35
ITEM NO.
07−NOV−13
29−JUL−11
17−JAN−13
07−NOV−13
17−JAN−13
17−JAN−13
17−JAN−13
07−NOV−13
29−JUL−11
17−JAN−13
29−JUL−11
17−JAN−13
29−JUL−11
17−JAN−13
17−JAN−13
29−JUL−04
17−JAN−13
07−NOV−13
DATE
General Criteria; accomplish
Environmental Compliance Reports for Material Usage at
Naval Facilities; provide
Toxic and Hazardous Substances; control
Quality Management System; provide
Temporary Accesses; provide
Maintaining Protection and Cleanliness from Non−Radioactive
Operations; accomplish
Confined Space Entry, Certification, Fire Prevention and
Housekeeping; accomplish
Fire Protection at Contractor’s Facility; accomplish
Shipboard Asbestos−Containing Material (ACM); control
Magnetic Material; control
Provisioning Technical Documentation (PTD); provide
Government Property; control
Logistics and Technical Data; provide
Interferences; remove and install
Authorization, Control, Isolation, Blanking, and Tagging
Requirements; accomplish
Asbestos−Free Pipe Hanger Liner Material; install
Fire Protection of Unmanned Vessels at Contractor’s
Facility; provide
Confined Space Entry, Certification, Fire Prevention
Utilizing Military Fire Watches, and Housekeeping;
accomplish
TITLE
CATEGORY I. FY−15 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE
ITEMS THAT ARE STRUCK OUT ON THIS INDEX DO NOT APPLY TO THIS CONTRACT.
009−39
009−40
009−59
009−60
009−61
009−64
009−65
009−67
009−69
009−70
009−72
009−73
009−74
009−77
009−79
009−80
009−81
009−82
009−83
19−JUL−07
29−JUL−11
29−JUL−11
07−NOV−13
17−JAN−13
29−JUL−11
29−JUL−11
17−JAN−13
07−NOV−13
17−JAN−13
17−JAN−13
07−NOV−13
17−JAN−13
17−JAN−13
29−JUL−11
29−JUL−11
17−JAN−13
29−JUL−11
17−JAN−13
Technical Manual Contract Requirement (TMCR) for New
Technical Manuals for Commercial Equipment/ Component;
provide
Requirements for Contractor Cranes, Multi−Purpose Machines and Material Handling Equipment at Naval Facilities;
accomplish
Organotin Antifouling Material; control
Schedule and Associated Reports for Availabilities Over 9
Weeks in Duration; provide and manage
Shipboard Use of Fluorocarbons; control
Synthetic Fire−Resistant Hydraulic Fluid; control
Polychlorinated Biphenyls (PCBs); control
Integrated Total Ship Testing; manage
Heavy Weather Plan; provide
Confined Space Entry, Certification, Fire Prevention and
Housekeeping for Unmanned Vessels; accomplish
Physical Security at Private Contractor’s Facility;
accomplish
Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install
Occupational, Safety and Health Requirements; accomplish
Cofferdam Requirements; accomplish
Government Owned Material (GOM); status reporting
Ship’s Facilities; provide
Compartment Closeout; accomplish
Data Requirements When Installing an Equal Component Vice
Specified Component; provide
Wire Rope Fitting Verification; provide
009−84
009−86
009−87
009−88
009−89
009−93
009−94
009−95
009−97
009−99
009−100
009−101
009−102
009−103
009−106
009−108
009−109
009−110
17−JAN−13
01−AUG−08
17−JAN−13
29−JUL−11
29−JUL−11
17−JAN−13
17−JAN−13
17−JAN−13
17−JAN−13
17−JAN−13
30−JUL−10
17−JAN−13
29−JUL−11
29−JUL−11
06−JAN−14
29−JUL−11
29−JUL−11
29−JUL−11
Accountability of Temporary Fasteners; provide
Recovery of Chlorofluorocarbon (CFC) Refrigerants and Fire
Suppressant Halon (H) Materials; accomplish
Chemical Disinfection Procedures; accomplish
Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas−Contaminated
Tanks, Spaces, and Piping; certify
Purchase and Inspection Requirements for Contractor
Furnished Anodes; accomplish
Emergency Planning and Community Right−to−Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide
General Environmental Requirements for Work at Contractor’s
Facility; accomplish
Mechanically Attached Fittings (MAF’s) for Piping Systems;
install
Shipbuilding and Ship Repair Operations National Emission
Standard for Hazardous Air Pollutants (NESHAPS) for Surface
Coating Information; provide
Ship Departure Report; provide
Ship’s Stability Process Control Procedure (PCP); maintain
Requirements for Mooring, Entry to and Departure from
Contractor’s Facility; accomplish
Alteration Verification; provide
Weight and Moment Change Data; provide
Work Authorization Form Coordinator (WAFCOR); provide
Aircraft Carrier Requirements for Mooring, Entry to, Movement within, and Departure from Contractor’s Facility;
accomplish
Special Requirements for Non−SUBSAFE Work on SUBSAFE−
Certified Vessels; accomplish
Special Requirements for Non−Nuclear Work on Nuclear
Vessels; accomplish
009−111
009−112
009−117
009−118
009−120
009−121
07−NOV−13
29−JUL−11
06−JAN−14
17−JAN−13
06−JAN−14
06−JAN−14
Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration; provide and manage
Prevention of Radiographic−Inspection Ionizing−Radiation
Hazards; accomplish
AEGIS Light Off (ALO) Support for AEGIS Weapons Systems
Assessments (AWSA); provide
CG Deck Loading; accomplish
Fact Finding and Critique of Unplanned Events; manage
Ship Assessment/Inspection Requirements; provide
009−09
009−11
009−12
009−13
009−14
009−15
009−16
009−17
009−22
009−25
009−26
009−27
009−28
009−30
009−31
009−32
009−33
009−36
009−37
ITEM NO.
06−JAN−14
17−JAN−13
07−NOV−13
17−JAN−13
17−JAN−13
17−JAN−13
29−JUL−11
07−NOV−13
17−JAN−13
17−JAN−13
17−JAN−13
07−NOV−13
29−JUL−11
29−JUL−11
07−NOV−13
07−NOV−13
29−JUL−11
30−JUL−10
DATE
Process Control Procedure (PCP); provide and accomplish
Insulation and Lagging Requirements; accomplish
Welding, Fabrication, and Inspection Requirements;
accomplish
Meters; repair and certify calibration
Gages and Thermometers; repair and certify calibration
Rotating Machinery; balance
Electronic Equipment; repair
Rotating Electrical Equipment; repair
Shipboard Electric Cable; test
Structural Boundary Test; accomplish
Deck Covering Requirements; accomplish
Material Identification and Control (MIC) for Level I
Systems; accomplish
Cancelled 30 JUL 2010
Boiler Sample Tubes; inspect
Boiler Waterjet Cleaning; accomplish
Cleaning and Painting Requirements; accomplish
Rotating Electrical Equipment; rewind
Controller; repair
General Procedures for Woodwork; accomplish
TITLE
CATEGORY II. FY−15 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB
ORDER
009−38
009−41
009−42
009−43
009−44
009−45
009−46
009−47
009−48
009−49
009−50
009−51
009−52
009−53
009−54
009−55
009−56
009−57
009−58
009−62
009−63
17−JAN−13
19−JUL−07
19−JUL−07
17−JAN−13
07−NOV−13
29−JUL−11
17−JAN−13
29−JUL−11
29−JUL−11
29−JUL−11
29−JUL−11
17−JAN−13
29−JUL−11
29−JUL−11
30−JUL−10
30−JUL−10
29−JUL−11
17−JAN−13
17−JAN−13
29−JUL−11
29−JUL−11
Boiler, Catapult Accumulator and Reboiler Dry Lay−up;
accomplish
Technical Manual Contract Requirement (TMCR) for a
Topically Structured Technical Manual; provide
Technical Manual Contract Requirement (TMCR) for Updating
Technical Manuals; provide
Light−Off Assessment (LOA) Support for Steam Propulsion
System; provide
Light−Off Assessment (LOA) Support for Gas Turbine
Propulsion System; provide
Tapered Plug Valve; repair
Butterfly Valve, Synthetic and Metal Seated; repair
Gate Valve; repair
Pressure Seal Bonnet Valve; repair (shop)
Pressure Seal Bonnet Valve; repair (in−line)
Horizontal Swing Check Valve; repair
Globe, Globe Angle, and Globe Stop Check Valve; repair
Relief Valve; repair
Bolted Bonnet Steam Valve; repair (shop)
Bolted Bonnet Steam Valve; repair (in−line)
Regulating/Reducing Valve; repair
Main Propulsion Boiler Wet Lay−Up; accomplish
Reduction Gear Security Requirements; accomplish
Pump and Driver Shaft Alignment; accomplish
Boiler Handhole and Manhole Seats and Plates; inspect
Lubricating Oils and Hydraulic Fluids; analyze
009−66
009−68
009−71
009−75
009−76
009−78
009−85
009−90
009−91
009−92
009−96
009−98
009−104
009−105
009−107
009−113
009−114
009−115
009−116
009−119
17−JAN−13
29−JUL−11
17−JAN−13
29−JUL−11
29−JUL−11
07−NOV−13
19−JUL−07
07−NOV−13
07−NOV−13
29−JUL−11
29−JUL−11
30−JUL−10
29−JUL−11
17−JAN−13
17−JAN−13
07−NOV−13
07−NOV−13
07−NOV−13
29−JUL−11
06−JAN−14
Light−Off Assessment (LOA) Support for Diesel Propulsion
System; provide
Bolted Bonnet Valve; repair
Testing Requirements for Piping Systems; accomplish
Circuit Breaker; repair
Waveguide and Transmission Line Temporary Lay−Up, Pressurization, and Purging; accomplish
Passive Countermeasures System (PCMS) Material
Repair/Installation Requirements; accomplish
Government Sponsored Planning Yard/Configuration Data
Manager (CDM) On−Site Representative Facility; provide
Technical Representative; provide
Propeller In−Place Inspection; accomplish
Resilient Mount; remove and install
Ball Valve; repair
Monel Fasteners; inspect
Vibration Testing and Analysis; accomplish
Thermal Sprayed Coatings for Machinery Component Repair;
accomplish
Piping System Cleanliness (Non−Nuclear); accomplish
Rotating Electrical Equipment with Sealed Insulation
Systems (SIS); rewind
Mold Remediation; accomplish
Bearing Rebabbitting; accomplish
Auxiliary and Waste Heat Boiler Sodium Nitrate Wet
Layup; accomplish
Expanded Process Control Procedure (EPCP); provide and accomplish
077−28−001
110−11−001
123−90−001
501−90−001
512−11−001
514−90−001
551−11−001
582−28−001
583−00−001
603−28−001
631−12−001
634−28−001
992−00−001
992−28−001
997−28−001
ITEM NO.
Hazardous Waste Produced on Naval Vessels
Weather Decks; replace and preserve
ShipAlt WI−BM−38, Rake Tank Modifications; accomplish
CHT System Upgrades; accomplish
Supply and Exhaust Ventilation Duct Cleaning; accomplish
Piping System Modifications; accomplish
Refrigerator and Freezer Condensing and Evaporator Unit
Assemblies; replace
Mooring Lines; replace
Transfer of Boat Custody; accomplish
Accommodation Ladder Installation; accomplish
EXTERIOR HULL; clean and preserve
Interior PRC Decking; resurface and repair
Temporary Electrical Services; provide
Logistics Services
Drydocking and Undocking; accomplish
TITLE______________
ITEM NO: 077−28−0011 of 6
( 077−28−001ITEM NO:
26−539COAR:
NONECMP:
DEFRIESPLANNER:
SHIP:
PCN: PE14−L000
SCOPE
REFERENCES
REQUIREMENTS
1.
2.
3.
1.2.1
1.3.1
Throughout the Ship
Not Applicable.
Location of Work:
Identification:
2.1
2.2
2.3
2.4
2.5
2.6
2.7
Resource Conservation and Recovery Act (RCRA)
Federal Hazardous Materials Transportation Act, 49 U.S.C. $5103
Applicable Hazardous Waste Manifest Form
10 U.S.C. 7311
Toxic Substance Control Act (TSCA)
40 CFR 763, Subpart E
40 CFR 61, Subpart M
Hazardous Waste Produced on Naval Vessels
Manage and dispose of all hazardous waste listed in 3.5 in accordance with 2.1, 2.2, 2.5 through 2.7.
When a Navy generator number is required by this Work Item, submit the original of 2.3 to the SUPERVISOR for assignment of Environmental
Protection Agency (EPA) or delegated state environmental agency identification number.
Manage and transport for Navy disposal, Navy generated hazardous waste listed in 3.5 in accordance with 2.1, 2.2, 2.5 through 2.7 as designated by the SUPERVISOR.
1.1
1.2
1.3
Title:
3.1.1
3.1.2
3.1
ITEM NO: 077−28−0012 of 6
SHIP:
Complete documentation required by 2.1, using EPA identification numbers in accordance with 2.4.
Submit one legible copy of 2.3 signed by the owner or operator of the disposal facility to the SUPERVISOR within 48 hours of receipt from owner or operator of disposal facility.
Submit One legible copy of certificate of disposal signed by the owner or operator of the disposal facility to the SUPERVISOR Code 350, within 48 hours of receipt from owner or operator of disposal facility.
Documentation related to hazardous waste generated solely by the physical actions of Ship’s Force or Navy employees (termed Navy−Generated
Hazardous Waste) on board the vessel shall only bear a generator identification number issued to the Navy pursuant to applicable law. The contractor shall obtain SUPERVISOR’S concurrence with the categorization of the waste as Navy− generated before completion of the manifest. The manifest prepared shall be presented to the SUPRVISOR for completion after the hazardous waste has been idntified.
Documentation related to hazardous waste generated solely by the physical actions of contractor personnel (termed Contractor−Generated Hazardous
Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law. Regardless of the presence of other material in or on the shipboard systems or structure which may have qualified a waste stream as hazardous, where the contractor performs work on a system or structure using materials (whether or not the use of such materials was specified by the Navy) which by themselves would cause the waste from such work to be a hazardous industrial waste, documentation related to such waste shall only bear a generator number issued to the contractor.
Documentation related to hazardous waste generated by the combined physical actions of Navy and contractor personnel (termed Co−Generated
Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law and shall also cite in the remarks block a generator identification number issued to the Navy pursuant to applicable law.
When the contractor merely drains a system and such drainage creates hazardous waste or the contractor performs work on system or structure using materials which by themselves would not cause the waste from such work to be hazardous waste but such waste nonetheless creates a hazardous waste, documentation related to such waste shall bear a generator identification number issued to the contractor and shall also cite in the remarks block a generator number issued to the Navy. The contractor shall sign the generator certification on the Uniform
Hazardous Waste Manifest whenever use of the manifest is required for disposal.
The contractor shall obtain SUPERVISOR’s concurrence with the categorization of the wastes as co−generated before completion of the manifest. Manifests prepared
3.1.3
3.1.4
3.2.1
3.2.2
3.2.3
3.2
ITEM NO: 077−28−0013 of 6
If the contractor, while performing work at a Government facility, cannot obtain a separate generator identification number from the state in which the availability will be performed, the contractor shall notify the SUPERVISOR within three business days of receipt of written notification by the state.
After obtaining approval of the SUPERVISOR, the contractor shall use the Navy site generator identification number and insert in the remarks block the contractor generator identification number issued for the site where his main facilities are located.
If, for availabilities at a contractor−owned or controlled facility, the
Navy cannot obtain a separate generator identification number for use at a contractor facility, the Navy shall notify the contractor within three business days of receipt of notification by the state. The contractor shall dispose of hazardous waste in accordance with 2.1, 2.2, 2.5 through 2.7, and 3.2.3.
Hazardous waste, as identified in 2.1, expected to be produced during performance of this Job Order:
AMOUNT TYPE NAVY CO−GENERATED CONTRACTOR
Asbestos and/or Asbestos contained material (ACM)
Bilge Water Oil/Water
PCB’s (debris/articles contaminated w/PCB)
Chromic Acid Hydrochloric Acid
Nitric Acid Sodium Nitrite
Sulfuric Acid Other Acid Solutions
Ethylene Glycol (Anti−freeze) _____________________________________ 300 Gallons
Sodium Hydroxide
Cleaning Solvents
Sodium Phosphates (Tri, Bi, or Mono)
Sodium Chromates shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.
3.3
3.4
3.5
ITEM NO: 077−28−0014 of 6
AMOUNT TYPE NAVY CO−GENERATED CONTRACTOR
Fluorocarbons ______________________________________________________ 200 Pounds
Morpholine
Hydrazine
Methyl Ethyl Ketone
Spent Abrasive Blast Material ______________________________________ 20 Cubic
Yards
(Contaminated with a known hazardous waste)
Trichloroethane
Mercury (liquid/equipment)
Miscellaneous Chemicals (Flammable) ________________________________ One Gallon
Miscellaneous Chemicals (Corrosive)
Miscellaneous Chemicals (TCLP Toxic) _______________________________ One Gallon
Miscellaneous Chemicals (Reactive)
Oil (Synthetic)
Paints (Enamel, Latex, Epoxy, thinners, oil based, rubber paint, ________________________________ 20 Gallons non−skid, lacquer, remover, vanishes)
Paints (May include lead, cadmium, _________________________________ 2 Gallons or chrome)
Paint Strippers (phenols, lead, chromium) __________________________ 2 Gallons
Sludge (Contaminated with a known hazardous waste)
Creosote
ITEM NO: 077−28−0015 of 6
NOTES4.
Hydroblast Water ___________________________________________________ 500 Gallons
Notify the SUPERVISOR at least one working day prior to shipment of hazardous waste for disposal.
Submit one legible copy, in hard copy or electronic media, of a report identifying type, amount, and disposal cost of hazardous waste listed in 3.5 that was removed during the performance of this Job Order tothe SUPERVISOR.
Nothing contained in this Work Item shall relieve the contractor from complying with applicable Federal, state and local laws, codes, ordinances and regulations, including the obtaining of licenses and permits in connection with hazardous waste handling and disposal in the performance of this contract.
The waste listed in 3.5 is based on the best information available at the time of preparation of the solicitation. Hazardous waste generated during the actual performance of the work may vary in type or amount from waste listed in 3.5 which may result in renegotiation for credit or increase pursuant to
Paragraph (b) of 2.4. The contractor is expected to use best management practice to identify and dispose of all hazardous waste. Some of the substances listed in
3.5 may be neutralized, recycled or otherwise removed from the requirements of
Subtitle C of 2.1. Inclusion of these substances in the waste listed in 3.5 does not preclude the contractor from taking action consistent with 2.1 to reduce or eliminate the hazardous constituents of any industrial waste required to be disposed of under the contract in accordance with 2.2. Processes that add hazardous constituents to the bilges may require that bilge water be disposed of as a hazardous waste.
Hazardous wastes are determined by one or more of the following methods:
Provide $0 dollars for managing and disposing of all hazardous waste listed in 3.5. Total cost greater or less than the above dollar amount will be the subject of an equitable adjustment.
The report shall include analysis or other method used to identify the waste and state whether each listed waste was hazardous (with generator assignment), non−hazardous, or did not exist.
The contractor shall make an effort to minimize hazardous waste generation by reducing the volume or toxicity by neutralizing, recycling, or otherwise removing it from the requirements of Subtitle C of 2.1 and include a description of such efforts in the report.
Chemical analysis shall be accomplished by laboratories with state or EPA approved quality assurance programs.
3.7.1.1
3.5.1
3.7.1
3.7.2
3.6
3.7
3.8
4.1
4.2
ITEM NO: 077−28−0016 of 6
GOVERNMENT FURNISHED MATERIAL (GFM)5.
5.1
5.2
5.3
Asbestos, bilge water, oil/water including sludge, debris and other contaminants, sludge which includes solids and sludge from ballast tanks, CHT tanks, voids, oily waste tanks, fuel ballast tanks, fuel oil tanks, skegs (West coast), PCB’s (Maryland), etc., apply only in those states listing them as hazardous waste. When an availability is to be performed in a state where these items are hazardous waste, an estimate of the amount to be generated shall be included in 3.5.
Chemical analysis which shows that the material characteristics of ignitability, corrosivity, reactivity, and/or toxicity (Toxicity
Characteristic Leachate Procedure − TCLP) exceed the limits for that material in
40 CFR 261.20 Subpart C.
Reference to the applicable Material Safety Data Sheets (MSDS) or
Applying knowledge of the hazardous characteristics of the waste in light of the materials or the process used.
1. None.
1. None.
1. None.
LLTM
PUSH MATERIAL
KITTED MATERIAL
4.2.1
4.2.2
4.2.3
4.3
ITEM NO: 110−11−0011 of 3
( 110−11−001ITEM NO:
26−539COAR:
NONECMP:
UPCHURCHPLANNER:
SHIP:
PCN: PE14−L00F
SCOPE
REFERENCES
REQUIREMENTS
1.
2.
3.
1.2.1
1.2.2
1.2.3
1.2.4
1.3.1
Main Deck
01 Level Weather Deck
02 Level Weather Deck
03 Level Weather Deck
Not Applicable
Location of Work:
Identification:
(I)(G) "NDT TESTING"
2.1
2.2
2.3
2.4
2.5
Standard Items (FY−15)
T9074−AS−GIB−010/271, Requirements for Nondestructive Testing Methods
101−6831721 Rev C, Bottom and Main Deck Scantling Plans
150−6831723 Rev D, Deck House Scantlings
MIL−STD−2035, Nondestructive Testing Acceptance Criteria
Weather Decks; replace and preserve
Accomplish ultrasonic tests on deck plating located in 1.2 in 100 locations, as designated by the SUPERVISOR, in accordance with 2.2, using 2.3 and
2.4 for guidance. The accept or reject criteria shall be in accordance with 2.5.
Submit one legible copy, in hard copy or approved transferrable media, of a sketch which includes specific locations with respect to frames, port and starboard and existing welded butts and seams to the SUPERVISOR.
1.1
ITEM NO: 110−11−0012 of 3
NOTES
GOVERNMENT FURNISHED MATERIAL (GFM)
4.
5.
Remove existing and and install new 200 square feet of deck plating for each area listed in 1.2 for a total of 800 square feet, based on the results of
3.1, in accordance with 2.3 and 2.4, as designated by the SUPERVISOR.
Accomplish the requirements of 009−25 of 2.1 for local air hose test of new plating installed in 3.2. Allowable leakage: None
Accomplish the requirements of 009−32 of 2.1, including Table 2, Line 13 for the preservation of decks listed in 1.2 and installation of pressure sensitive nonskid.
Accomplish the requirements of 009−32 of 2.1 for new and disturbed surfaces.
None.
Record location of all existing nonskid prior to removal.
New deck plating shall conform to the material requirements of
2.3 and 2.4.
Template exact size, shape, and configuration from existing shipboard conditions.
Chip and grind surfaces flush in way of repairs.
Accomplish the requirements of 009−12 of 2.1, including Table 3, Column A, Lines One through 7.
Accomplish Note 51 for installation of additional coat of primer.
Nonskid shall be installed in accordance with the report submitted in 3.1.1.3.
Sketch shall show location of each reading, original material thickness, existing material thickness, and percentage of material thickness reduction to the SUPERVISOR. Submit 4 legible copies of a report listing inspection results in 3.7 to the SUPERVISOR, within 24 hours upon completion of inspections.Record location of all existing nonskid prior to removal.
Submit one legible copy of a report listing inspection results of 3.1.2 to the SUPERVISOR, within 24 hours upon completion of inspections.
3.1.1.1
3.1.2.1
3.1.2
3.2.1
3.2.2
3.2.3
3.2.4
3.4.1
3.4.2
3.2
3.3
3.4
ITEM NO: 110−11−0013 of 3
5.1
5.2
5.3
1. None.
1. None.
1. None.
LLTM
PUSH MATERIAL
KITTED MATERIAL
ITEM NO: 123−90−0011 of 2
( 123−90−001ITEM NO:
26−539COAR:
NONECMP:
UPCHURCHPLANNER:
SHIP:
PCN: PE14−L00E
SCOPE
REFERENCES
REQUIREMENTS
1.
2.
3.
1.2.1
1.3.1
Throughout the Ship
Not Applicable
Location of Work:
Identification:
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
Standard Items (FY−15)
123−8507347, Access Mods Install Watertight Door Rake Tank Stowage
145−8507348, Compartment & Access Modifications
302−8516181, Power System Modifications 2−68−0 And 2−0−0 Conversion
303−8516182, Lighting System Modifications 2−68−0 And 2−0−0 Conversion
436−8516588, IC Circuit F Modifications Incid to SD Stowage Upgrade
501−8507693, Mods for SD Strm No. 5 Instl Main & 2nd Deck, FR 68−85
(P/S)
603−8507345, SD Storeroom No. 5 Grating Installation
605−8507346, Paint & Insulation SD Storeroom 2−68−0−A
ShipAlt WI−BM−38, Rake Tank Modifications; accomplish
Accomplish the requirements of 2.2 through 2.9 for the modification and installation of Shipalt WI−BM−38.
Chip and grind surfaces flush in way of removals.
Accomplish the requirements of 009−12 of 2.1, including Table 3, Columns A and D, Lines One through 7.
1.1
ITEM NO: 123−90−0012 of 2
NOTES
GOVERNMENT FURNISHED MATERIAL(GFM)
4.
5.
5.1
5.2
5.3
(V)(G) "CHALK TEST"
(V)(G) "OPERATIONAL TEST"
Accomplish a chalk test on each structural closure listed in 2.2 and 2.4 through 2.9. Chalk imprint shall be centered with 100 percent contact.
Accomplish the requirements of 009−25 of 2.1 for air hose test of all new structural welds affected by this work item. Allowable leakage: None.
Accomplish an operational test of all equipment affected by this work item not covered by the testing of 2.2, 2.4, 2.5, and 2.7.
Accomplish the requirements of 009−32 of 2.1 for new and disturbed surfaces.
Accomplish an operational test of all doors affected by this work item. No binding or sticking of assembly allowed.
Operate each door through 4 open/dogged closed cycles.
Binding or sticking of any assembly shall require repeat of 3.5.1 through 3.5.1.1.
1. None.
1. None.
1. None.
LLTM
PUSH MATERIAL
KITTED MATERIAL
3.4.1.1
3.4.1.2
3.4.1
3.2
3.3
ITEM NO: 501−90−0011 of 4
( 501−90−001ITEM NO:
26−539COAR:
NONECMP:
CROWELLPLANNER:
SHIP:
PCN: PE14−L00B
SCOPE
REFERENCES
1.
2.
1.2.1
1.3.1
CHT Pump Room (2−36−2−E)
Quantity (2 EA.), Numbers 1 and 2 CHT Pumps
1.3.1.1
1.3.1.2
Quantity (2 EA.), Numbers 1 and 2 Motors, Mfr ID:
5K215NN6705, 7.5 HP, 1745 RPM, Frame: 215 TNCZ, Mfr:
General Electric, APL: 175505054
Quantity (One EA), Controller−Duplex, MAG, LVP, SZ 1, 440V, 60 HZ 1SPD 1WDG DRPR, Mfr ID: 194B7582G1S2, Mfr: General Electric, APL: 986000842X
Location of Work:
Identification:
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
Standard Items (FY−15)
185−8429130, CHT System Upgrade, CHT Pump Fndns
545−8429137, ARR Mod Incid to CHT System Upgrade
302−8429216, Pwr Sys Mod Incid to CHT Sys Upgrade
506−8429138, CHT Piping Mods Incid to CHT System Upgrades
401−7647066, Install Sound Pwrd Phone CKT Incd CHT
436−7647064 A, Install H2S Alm Sys
436−7647065, Install Air Flow Alm Sys
501−7647109, Vent Mod CHT Pmp Rm
528−7645236, CHT Ppg Mods
CHT System Upgrades; accomplish
1.1
1.2
ITEM NO: 501−90−0012 of 4
REQUIREMENTS3.
2.11
2.12
2.13
2.14
2.15
2.16
2.17
2.18
593−7647074, Sewg CHT Sys Instr Plts
593−7647075, Ppg Mod Incd to CHT Upgr
600−7647107, Lift Padeye CHT Pmp Rm
803−7647108, Test Memo CHT Pmp Rm Padeye
593−66012, MACHALT−Sanitary Waste Holding Tank Flanged Level Censor
Replacement
S9086−CH−STM−030/CH−074 Rev 4, Naval Ships’ Technical Manual Chapter
074 Volume 3 − Gas Free Engineering
PHNSY & IMF C/400 Reference #106.3−001, VCHT/CHT Tank(s) Cleaning and
Entry
MIL−STD−777, Schedule of Piping, Valves, Fittings, and Associated
Piping Components for Naval Surface Ships
Accomplish the requirements of 2.2 through 2.17, and using 2.18 as guidance, for removals, modifications, and installations of the equipment listed in 1.3 and located in 1.2.
Open, empty, clean, render dry, ventilate, and maintain the tank located in 1.2.1, "Safe for Workers" and "Safe for Hot Work".
Accomplish a visual inspection of the CHT tank for existing preservation coating, structural integrity, deterioration, pitting, cracks, and areas of damage or distortion, including sounding tubes, tanks vents, overflows, piping, structural members, anodes, manhole covers, and to validate the proposed piping arrangements prior to performing work.
Accomplish the requirements of 009−12 of 2.1, including Table
One, Columns A and B, Lines One through 10 and Table 3, Column A, Lines One through 7.
Accomplish the requirements of 009−71 of 2.1 for new and disturbed piping.
Submit one legible copy, in approved transferrable media within 48 hours of completion of inspection, of a report listing the results of the requirements of 3.1.2. Report shall include a recommendation of revisions necessary to accomplish modifications per note 6 of 2.5.
Accomplish tests in accordance with Test Notes T−2
3.1.2.1
3.1.4.1
3.1.1
3.1.2
3.1.3
3.1.4
ITEM NO: 501−90−0013 of 4
NOTES
GOVERNMENT FURNISHED MATERIAL(GFM)
4.
5.
5.1
(V)(G) "TANK COMPLETION TEST"
(V)(G) "TANK INSPECTION"
(V)(G) "OPERATIONAL TEST"
TOTAL
QUANTITY
PROVIDED
NAME OF
PART
PIECE
NO.
REF
NO.
NATIONAL
STOCK NO.
PARA
NO.________ _______ ______ ____ __________ ____
1. 2 EA CHT Pump 5, 6 2.3 None 3.1
Inspect each tank for cleanliness prior to final closing.
Accomplish an operational test of equipment, piping, electrical components and controls for proper operation within their control limits as specified in 2.1 through 2.5.
Accomplish the requirements of 009−32 of 2.1 for new and disturbed surfaces.
None.
Accomplish the requirements of 009−25 of 2.1 for an air hose, water hose, or vacuum box test of the Sewage CHT tank in accordance with Test
Note T−5. Allowable Leakage: None
Verify proper direction of rotation for the new CHT motors.
Measure and record cold insulation resistances of windings to ground using a 500−volt megger.
Measure and record voltage to verify that the recordings are in accordance with nameplate data.
Accomplish an operational check on the controllers to ensure both automatic and manual operation is satisfactory.
through T−4 of 2.5.
Submit one legible copy, in approved transferrable media, within 48 hours of completion of testing of a report listing the results of the requirements of 3.3.1 through 3.3.4.
LLTM:
3.3.4.1
3.1.5
3.3.1
3.3.2
3.3.3
3.3.4
3.2
3.3
ITEM NO: 501−90−0014 of 4
5.2
5.3
2. 2 EA Resevoir, Low pressure air charging
8 2.3 None 3.1
1. None.
1. None.
PUSH MATERIAL
KITTED MATERIAL
ITEM NO: 512−11−0011 of 2
( 512−11−001ITEM NO:
26−539COAR:
NONECMP:
DEFRIESPLANNER:
SHIP:
PCN: PE14−L009
SCOPE
REFERENCES
REQUIREMENTS
1.
2.
3.
1.2.1
1.2.2
1.2.3
1.2.4
1.2.5
1.3.1
1.3.2
2nd Deck
Main Deck
01 Level
02 Level
03 Level
Quantity (One EA), Exhaust Ventilation System
Quantity (One EA), Supply Ventilation System
Location of Work:
Identification:
2.1
2.2
2.3
Standard Items (FY−15)
512−6831710, HVAC System Diagram
NAVSEA LETTER 9514 SER 9210/021 DTD 20 MAY 2009, DRY ICE CLEANING OF
VENTILATION DUCTS
Supply and Exhaust Ventilation Duct Cleaning; accomplish
Accomplish "Dry Ice" cleaning of ventilation systems located throughout the barge from the hold to 03 level exterior ventilation hoods to the last ventilation diffuser of each run of the supply and exhaust system as shown in 2.2 and as directed by the SUPERVISOR.
Accomplish the requirements of 009−09 of 2.1 for submittal of PCP for approval by NAVSEA prior to start of work.
1.1
ITEM NO: 512−11−0012 of 2
NOTES
GOVERNMENT FURNISHED MATERIAL (GFM)
4.
5.
5.1
5.2
5.3
(V)(G) "CLEANLINESS INSPECTION"
Accomplish the requirements of 2.3 for the CO2 and O2 readings and monitoring of all spaces prior to, during, and after all vent cleaning operations.
Accomplish a visual inspection prior to cleaning and after cleaning of interior surfaces of each ventilation system branch line listed in 1.3 for verification of cleanliness and completion of work prior to installation access plates. Method for inspection shall be visual. Accept criteria for cleanliness shall be in accordance with paragraph 3.1.3.
Install matchmarked ventilation components removed in 3.1.2, using retained fasteners and 2.2 for guidance. All flange joints removed shall be reinstalled using new rubber gasket in accordance with 2.2.
Accomplish the requirements of 009−32 of 2.1 for new and disturbed surfaces.
None.
Matchmark and remove ventilation access plates as required to allow access for cleaning operations. Retain ventilation parts and fasteners for reuse.
Clean interior surfaces free of loose rust, dirt, grease, lint and other foreign matter.
Submit one legible copy, in approved transferrable media, of a report listing results of the requirements of 3.2 to the SUPERVISOR.
1. None.
1. None.
1. None.
LLTM
PUSH MATERIAL
KITTED MATERIAL
3.1.3
3.3.1
3.2
3.3
3.4
ITEM NO: 514−90−0011 of 3
( 514−90−001ITEM NO:
26−539COAR:
NONECMP:
DEFRIESPLANNER:
SHIP:
PCN: PE14−L007
PE14−L008
SCOPE
REFERENCES
REQUIREMENTS
1.
2.
3.
1.2.1
1.3.1
Throughout the Ship
Not Applicable
Location of Work:
Identification:
2.1
2.2
2.3
2.4
2.5
2.6
2.7
Standard Items (FY−15)
528−7645234, Plumbing Drain Piping Mods Main Deck
528−7645235, Plumbing Drain System, Plumbing Drain Piping Mods − Hold
528−7645236, CHT System CHT Piping Mods
528−7645239, Plumbing Drain Piping Mods 01 Level & Up
533−7645237, Potable Water System, Potable Water System Mods Main Deck
& Below
533−7645238, Potable Water System, Pot Water System 01 LVL/ABV
Piping System Modifications; accomplish
Accomplish the requirements of 2.2 through 2.7 for the ripout, installations and modifications of the existing piping systems from 2nd deck to below 02 level.
Chip and grind surfaces flush in way of removals.
Template all work to suit existing conditions.
Accomplish the requirements of 009−12 of 2.1, including Table
1.1
3.1.2
ITEM NO: 514−90−0012 of 3
NOTES
GOVERNMENT FURNISHED MATERIAL(GFM)
4.
5.
5.1
(V)(G) "OPERATIONAL TEST"
Remove all drop ceiling panels with framing in the location listed in
1.2 as directed by the SUPERVISOR.
Accomplish the Cleaning Notes of 2.2 through 2.3 and 2.5 through 2.7.
Accomplish the requirements of 009−107 of 2.1 for the piping installed in 2.4.
Accomplish the requirements of 009−71 of 2.1 for a static head pressure test of new and disturbed piping installed in 2.2 through 2.7.
Accomplish the Test Notes of 2.2 through 2.7.
Accomplish the Disinfecting Notes of 2.6 and 2.7.
Accomplish an operational test of equipment, piping, electrical components, and controls affected by this work item for proper operation within their control limits in accordance with the Test Notes of 2.2 through 2.7.
Accomplish the requirements of 009−11 of 2.1 for new and disturbed lagging and insulation.
Accomplish the requirements of 009−32 of 2.1 for new and disturbed piping and surfaces.
None.
One, Columns A and B, Lines One through 10 and Table 3, Column A, Lines One through 7.
Replace all existing bare fiberglass insulation with new cloth faced insulation.
Accomplish the requirements of 009−32 of 2.1 for all areas above light fixtures. Paint shall be flat/matte black in color.
General cleaning shall be Level III.
Accomplish an operational test of all equipment affected by this work item not covered by the Test Notes of 2.2 through 2.7.
1. None.
LLTM:
3.2.1
3.2.2
3.4.1
3.8.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
ITEM NO: 514−90−0013 of 3
5.2
5.3
1. None.
1. None.
PUSH MATERIAL
KITTED MATERIAL
ITEM NO: 551−11−0011 of 2
( 551−11−001ITEM NO:
26−539COAR:
NONECMP:
CROWELLPLANNER:
SHIP:
PCN: PE14−L00D
SCOPE
REFERENCES
REQUIREMENTS
1.
2.
3.
1.2.1
1.3.1
2nd Deck to 02 LVL, FR 49−75 (P)
Quantity (1 EA.) Refrigerator and Freezer Condensing and
Evaporator Unit Assemblies
1.3.1.1
1.3.1.2
Quantity (1 EA.) , Freeze Box Condensing Unit
Assembly. Unit shall be equal to Larkin Model, LHT031L6C, 14360 BTU/HR @ −10 F SST and 90 F ambient.
Assembly listed in 2.04 of General Notes in 2.3.
Quantity (1 EA), Chill Box Condensing Unit Assembly.
Unit shall be equal to Larkin Model, LHT020X6C, 1600
BTU/HR @ +25 F SST and 90 F Ambient. Assembly listed in 2.04 of General Notes in 2.3.
Location of Work:
Identification:
2.1
2.2
2.3
2.4
Standard Items (FY−15)
302−8573817, Power System Modifications Incid to Refrigerator Upgrade.
503−8573095, Regt Piping & Equipment MODS Incid to Refrigerant
Upgrade Main DK & 2nd Deck.
113−8573207, Refrigeration Upgrade Modifications.
Refrigerator and Freezer Condensing and Evaporator Unit Assemblies;
replace
Accomplish the requirements of 2.2 through 2.4 for the removals, modifications, and installations of equipment listed in 1.3 and located in 1.2.
Accomplish the requirements of 009−12 of 2.1 including, Table
1.1
ITEM NO: 551−11−0012 of 2
NOTES4.
(V)(G) "OPERATIONAL TEST"
Accomplish an operational test of equipment, piping, electrical components and controls for proper operation within their control limits as specified in 2.2 and 2.3.
Accomplish the requirements of 009−11 of 2.1 and 2.3 for the installation of new insulation on new piping.
Accomplish the requirements of 009−32 of 2.1 for new and disturbed surfaces.
None.
One, Column B, Lines One through 10 and Table 3, Column A, Lines One through 7.
Accomplish the requirements of 009−71 of 2.1 for new and disturbed piping.
Accomplish the requirements of 009−107 of 2.1.
Accomplish the recommended replacement of all parts identified in paragraph 2.05 of 2.3. These parts are V1, V2, F13, V3 and V4.
Submit one legible copy, in approved transferrable media, within
48 hours of completion of testing, a report listing the results of 3.2.
General cleaning shall be cleanliness Level II
3.1.3.1
3.1.2
3.1.3
3.1.4
3.2.1
3.2
3.3
ITEM NO: 582−28−0011 of 2
( 582−28−001ITEM NO:
26−539COAR:
NONECMP:
UPCHURCHPLANNER:
SHIP:
PCN: SERV−L000
SCOPE
REFERENCES
REQUIREMENTS
NOTES
GOVERNMENT FURNISHED MATERIAL(GFM)
1.
2.
3.
4.
5.
1.2.1
1.3.1
Throughout the Ship
None
5.1
5.2
Location of Work:
Identification:
2.1 Standard Items (FY−15)
Mooring Lines; replace
Accomplish the requirements to replace a total of 6 each, 2 each 120’ long, 4 each 90’ long existing mooring lines with new High Modulus Polyethylene
(HMPE) mooring lines.
Possible source of line of paragraph 3.1:
www.samsonrope.com
New lines shall be blue or black in color and of similar, diameter / circumference, length, and eyes as existing.
1. None.
1. None.
LLTM
PUSH MATERIAL
1.1
ITEM NO: 582−28−0012 of 2
5.3
1. None.
KITTED MATERIAL :
ITEM NO: 583−00−0011 of 2
( 583−00−001ITEM NO:
26−539COAR:
NONECMP:
DEFRIESPLANNER:
SHIP:
PCN: PE14−L003
SCOPE
REFERENCES
REQUIREMENTS
NOTES
GOVERNMENT FURNISHED MATERIAL (GFM)
1.
2.
3.
4.
5.
1.3.1 None
5.1
Location of Work: Contractor’s Plant
Identification:
2.1 Attachment (A): Boat Custody Form
Transfer of Boat Custody; accomplish
The Government will deliver custody of the boat to the Contractor at the place designated in the specifications and upon completion of availability will accept custody of the boat at the place designated in the specification.
Upon receiving custody of the boat from the activity, complete Part A of
2.1. Submit one copy, in approved transferrable media, of 2.1 to the SUPERVISOR within 24 hours after delivery of the boat.
After returning custody of the boat to the activity, complete Part B of
2.1. Submit one copy, in approved transferrable media, of 2.1 to the SUPERVISOR within 24 hours after redelivery of the boat.
None.
The Contractor will be responsible for the boat during the time in which he has custody.
1. None.
LLTM:
1.1
3.1
3.2
3.3
ITEM NO: 583−00−0012 of 2
5.2
5.3
1. None.
1. None.
PUSH MATERIAL
KITTED MATERIAL
ITEM NO: 603−28−0011 of 2
( 603−28−001ITEM NO:
26−539COAR:
NONECMP:
UPCHURCHPLANNER:
SHIP:
PCN: PE14−L00C
SCOPE
REFERENCES
REQUIREMENTS
1.
2.
3.
1.2.1
1.3.1
Throughout The Ship
Not Applicable
Location of Work:
Identification:
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.11
Standard Items (FY−15)
111−8517988, Accomodation Ladder & Quarterdeck Installation 01 Level
603−8517984, Accomodation Ladder and Davits Installation
111−8517989, 01 LVL Accomodation Ladder Platform Extension
510−8575141, Weather Deck Drain Accomodation Ladder Install
605−8573182, Paint, Insulation and Deck Covering − Modifications 01
Level Accomodation Ladder
501−8519537, Hvac Modification 01 Level Quarter Deck 01−68−1−Q, 01−02
Level, Frame 67−73, Starboard
803−8517985, Accomodation Ladder Test Memo
302−8573815, Power System Modifications Incidental to Accomodation
Ladder Davit & New Quarter Deck Installation
303−8573816, Lighting System Modifications Incidental to Accomodation
Ladder and New Quarter Deck Installation
433−8519266, IC Modifications to Accomodations to Accomodation Ladder
Installation
Accommodation Ladder Installation; accomplish
1.1
1.2
ITEM NO: 603−28−0012 of 2
NOTES
GOVERNMENT FURNISHED MATERIAL(GFM)
4.
5.
5.1
5.2
5.3
(I)(G) "LOAD TEST"
Accomplish the requirements of 2.2 through 2.11 for the installation of the quarterdeck enclosure, accommodation ladder assembly and support structures using 2.9 for guidance.
Accomplish the requirements of 009−12 of 2.1, including Table 3, Column
A and D, Lines One through 7.
Accomplish the requirements of 009−25 for air hose test of all new structural boundary welds. Allowable leakage: None.
Accomplish ladder and davit test in accordance with 2.8.
Accomplish the requirements of 009−32 of 2.1 for all new and disturbed surfaces.
None.
Accomplish the requirements of 009−11 of 2.1, for installation of new insulation in accordance with 2.6.
Accomplish a chalk test on each structural closure listed in 2.2.
Chalk imprint shall be centered with 100 percent contact.
Submit one legible copy, in hard copy or electronic media, of completed test memorandum 2.8 to the SUPERVISOR within 72 hours of completion.
1. None.
1. None.
1. None.
LLTM
PUSH MATERIAL
KITTED MATERIAL
3.1.2
3.4.1
3.1
3.2
3.3
3.4
ITEM NO: 631−12−0011 of 4
( 631−12−001ITEM NO:
26−539COAR:
NONECMP:
UPCHURCHPLANNER:
SHIP:
PCN: PE14−L004
PE14−L005
SCOPE
REFERENCES
REQUIREMENTS
1.
2.
3.
1.2.1
1.2.2
Underwater Hull: From Keel Areas Up To Upper Boottop Limit
Throughout, Including Port and Starboard Skegs
Freeboard and Exterior Hull: From Upper Boottop Limit to the
Main Deck Edges Throughout.
Location of Work:
Identification:
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
Standard Items (FY−15)
101−6831721 Rev C, BOTTOM & MAIN DECK SCANTLING PLANS
602−6831718 Rev C, HULL DESIGNATION & MARKINGS
T9074−AS−GIB−010/271, REQUIREMENTS FOR NONDESTRUCTIVE TESTING METHODS
101−6831720 Rev C, CONSTRUCTION PROFILE & LONGITUDINAL FRAMING
085−6831715 Rev B, DOCKING PLAN & CATHODIC PROTECTION
S9086−VF−STM−010, Chapter 633, Cathodic Protection
114−6831731 Rev A, SKEG DETAILS
EXTERIOR HULL; clean and preserve
Drain and steam out to maintain Safe For Hot Work both skegs. Upon completion of weld repairs, preserve interiors by fill and draining both skegs with rust preventative compound MIL−C−16173, Grade 1, and installation of new monel plugs conforming to QQ−N−281, Class B and of similar dimensions to existing using 2.8 for guidance.
1.1
1.2
1.3
ITEM NO: 631−12−0012 of 4
(I)(G) "ULTRASONIC TESTING"
Remove and scrap all existing hull zinc anodes assemblies except the mounting studs located throughout 1.2.1, using 2.6 for guidance. Grind smooth shell areas affected by zinc removals.
Accomplish the requirements of 009−32 of 2.1, including Table One, Line
4, for preservation of the surface listed in 1.2.1.
Accomplish the requirements of 009−32 of 2.1, including Table 2, Line
One or 2, Columns A to C and G, for preservation of the surface listed in 1.2.2.
Accomplish a visual inspection of all cleaned surfaces in 3.4 through
3.5 for heavy pitting, crack, holes, deterioration and other structural deficiencies after primer coating application.
Accomplish ultrasonic inspection of underwater hull plating up to upper boottopping limits in 1.2, in 4−feet by 4−feet grid pattern in accordance with paragraph 6 of 2.4 and using 2.2 for guidance. Thickness readings shall be taken where deterioration or thickness loss is evident. Accomplish an additional 50 readings in locations as designated by the SUPERVISOR.
Crop out damaged and deteriorated hull plating and framing, and install
Renew a total of 40−each deteriorated unusable studs as directed by the SUPERVISOR. New studs shall be in accordance with 2.6
For all remaining studs, clean threads with wire brush to remove all foreign matter.
Ensure availability of weld marks for re−establishing layout of hull boottop prior to removal of preservation, using 2.2 and 2.3 for guidance.
Clean and preserve exposed hull areas when craft is fleeted.
Submit One legible copy of a report listing inspection results in
3.6 showing locations of deficiencies, proposed solutions and/or repair recommendations to the SUPERVISOR. The report shall include the cost estimates, material availability and time impact to the SUPERVISOR.
Submit 4 legible copies of a report listing inspection results in
3.7 to the SUPERVISOR, within 24 hours upon completion of inspections.
The report shall state sizes and areas of corrosion, locations, pitting, thickness readings, structural deficiencies and/or repair recommendations.
Provide sketches with locations of all thickness readings of hull plating taken in 3.7.
3.6.1.1
3.6.1.2
3.2.1
3.2.2
3.3.1
3.3.2
3.5.1
3.6.1
3.2
3.3
3.4
3.5
3.6
3.7
ITEM NO: 631−12−0013 of 4 new section conforming to MIL−S−22698 at hull areas in 1.2, as designated by the
SUPERVISOR using 2.2 and 2.5 for details and material requirements and as follows:
Accomplish weld repairs throughout the hull plating, including skeg plating in 1.2, as designated by the SUPERVISOR and as follows:
Accomplish the requirements of 009−12 of 2.1, including Table 3, Columns
A and D, Lines One through 7.
Accomplish the requirements of 009−25 of 2.1, for local air hose testing of all new hull insert plating in 3.7. Allowable leakage: None.
Install new zinc anodes, nuts, and washers in accordance with 2.6 and using 2.7 for guidance.
Accomplish the requirements of 009−32 of 2.1 for new and disturbed surfaces.
Total 600 square feet of hull and/or freeboard plating, using
15.3 pound steel insert plating. New plating varies from 3−feet by 4−feet to 4− feet by 5−feet in size.
Total of 200 linear feet of hull framing.
Template all new work to suit craft and equipment.
Clad weld total 400 square inches of isolated deep pits.
Vee out and weld repair total 120 linear feet of cracked, deteriorated, and eroded welds.
Mask and install protective coverings on zinc anode studs during paint application operations.
Paint system shall be completed in way of zinc anodes prior to installation.
Reapply colors and marking recorded to match original, using 2.3 for guidance.
Prepare areas and paint/install draft warning markers at: bow area One−port and One−starboard side, stern area, One−port aside and One− starboard side. Draft warning markers shall conform to TT−E−489, FED STD 595, Color No. 12197, International Orange, 12−inches high by 36−inches wide.
Bottom edges of draft warning markers shall be positioned on the top edges of boottop.
3.12.1.1
3.12.1.2
3.7.1
3.7.2
3.7.3
3.8.1
3.8.2
3.11.1
3.11.2
3.12.1
3.8
3.9
3.10
3.11
3.12
ITEM NO: 631−12−0014 of 4
NOTES
GOVERNMENT FURNISHED MATERIAL(GFM)
4.
5.
5.1
5.2
5.3
Submit One legible copy of completed NAVSEA form 9997/1, preservation data to the SUPERVISOR upon preservation completion.
Accomplish the requirements of 009−32 of 2.1, for new and disturbed surfaces.
Draft warning marker can be pressure sensitive printed material.
Stencil and paint in the following: "IN CASE OF
EMERGENCY/FLOODING − CONTACT SHIPYARD WATCH OFFICE, Ph: 474−1271", as designated by the SUPERVISOR, total 4 locations. Lettering shall conform to TT−E−489, FED
STD, Color No. 17038, black, 2−inches high.
Apply the designation "US NAVY YRBM53" to the port and starboard sides of the hull as shown in ref 2.3.
Apply the designation "FWD" and "AFT" to the bow and transom respectively to it’s previous location prior to hull preservation.
1. None.
1. None.
1. None.
LLTM
PUSH MATERIAL
KITTED MATERIAL
3.12.1.3
3.12.1.4
3.12.1.5
3.13
3.14
ITEM NO: 634−28−0011 of 2
( 634−28−001ITEM NO:
26−539COAR:
NONECMP:
CROWELLPLANNER:
SHIP:
PCN: PE14−L00A
SCOPE
REFERENCES
REQUIREMENTS
NOTES
1.
2.
3.
4.
1.2.1
1.3.1
Throughout the Ship
Not Applicable
Location of Work:
Identification:
2.1 Standard Items (FY−15)
Interior PRC Decking; resurface and repair
Accomplish the requirements of 009−26 of 2.1, including Attachment C, paragraphs A to D and F, for the resurfacing of all interior decks listed in
1.2.1.
Accomplish the requirements of 009−32 of 2.1 for all new and disturbed surfaces.
None.
Accomplish the requirements of 009−26 of 2.1, including
Attachment C, paragraph E for a total of 300 square feet of deteriorated decking system down to base metal as directed by the SUPERVISOR.
New PRC decking base coat and color chips shall be of similar color sequence as existing.
Do not remove equipment and furnitures that are welded to the deck to accomplish PRC deck renewal.
Apply primer paint in accordance with manufacturer’s instructions and shall be compatible to underlayment and PRC deck system.
1.1
3.1.1.1
3.1.1
3.1.2
3.1.3
3.1
ITEM NO: 634−28−0012 of 2
GOVERNMENT FURNISHED MATERIAL(GFM)5.
5.1
5.2
5.3
1. None.
1. None.
1. None.
LLTM
PUSH MATERIAL
KITTED MATERIAL
ITEM NO: 992−00−0011 of 2
( 992−00−001ITEM NO:
26−539COAR:
NONECMP:
DEFRIESPLANNER:
SHIP:
PCN: PE14−L002
SCOPE
REFERENCES
REQUIREMENTS
NOTES
GOVERNMENT FURNISHED MATERIAL (GFM)
1.
2.
3.
4.
5.
5.1
5.2
Location of Work: Contractors Plant
Identification: Not Applicable
2.1 Standard Items (FY−15)
Temporary Electrical Services; provide
Provide, install and maintain temporary 115 volt, 20 amp, electrical services on a 24 hours basis for the entire contract availability period to support BARGE PROGRAM security camera system located in COB Office (1−27−1−Q) as directed by the SUPERVISOR.
Disconnect and remove temporary services equipment when directed by the
SUPERVISOR.
None.
In the event of a partial or total loss of electrical power, the contractor shall provide standby portable electric generator(s), to maintain and restore back up shore power with equal capability of systems disrupted in the performance of this work.
1. None.
1. None.
LLTM
PUSH MATERIAL
1.1
3.1
ITEM NO: 992−00−0012 of 2
5.3
1. None.
KITTED MATERIAL :
ITEM NO: 992−28−0011 of 2
( 992−28−001ITEM NO:
26−539COAR:
NONECMP:
CROWELLPLANNER:
SHIP:
PCN: PE14−B005
SCOPE
REFERENCES
REQUIREMENTS
NOTES
1.
2.
3.
4.
1.2.1
1.3.1
BRAVO/SIERRA Piers, Pearl Harbor/Contractor’s Plant
Not Applicable
Location of Work:
Identification:
2.1 None
Logistics Services
Provide rigger, tug and pilot services for the unmooring, transfer and movement of craft from BRAVO/SIERRA piers Pearl Harbor, Contractor’s Plant.
Provide rigger, tug and pilot services for the unmooring, transfer and movement of craft from the contractor’s plant back to BRAVO/SIERRA piers Pearl
Harbor.
Coordinate pickup and delivery arrangements with barge representative 10 working days prior to movement of craft each way.
Contact the SUPERVISOR, Availability Manager or TDO, 3 working days prior for Pearl Harbor entry/exit clearances with the following information:
None.
Name of commercial tug/company.
Estimated time of arrival (ETA) at Pearl Harbor.
Estimated time of departure (ETD) at Pearl Harbor.
1.1
3.4.1
3.4.2
3.4.3
3.1
3.2
3.3
ITEM NO: 992−28−0012 of 2
GOVERNMENT FURNISHED MATERIAL(GFM)5.
5.1
5.2
5.3
1. None.
1. None.
1. None.
LLTM
PUSH MATERIAL
KITTED MATERIAL
ITEM NO: 997−28−0011 of 7
( 997−28−001ITEM NO:
26−539COAR:
NONECMP:
DEFRIESPLANNER:
SHIP:
PCN: PE14−L001
SCOPE
REFERENCES
REQUIREMENTS
1.
2.
3.
1.2.1
1.3.1
Contractor’s Plant
Not Applicable
Location of Work:
Identification:
2.1
2.2
2.3
2.4
2.5
Standard Items (FY−15)
SFLC STANDARD SPECIFICATION 8634, Drydocking
085−6831715 Rev B, DOCKING PLAN & CATHODIC PROTECTION
S9086−7G−STM−010/CH−997, Docking Instructions and Routine Work in Dry
Dock
S9086−CH−STM−010/CH−074, Welding and Allied Processes
Drydocking and Undocking; accomplish
Furnish a sound dock, dockmaster, qualified personnel, and necessary equipment to safely and satisfactorily dock the
Routine drydocking and undockings…