Specification SSPH-539-14

View the file

Other files for this federal contract opportunity

Other files attached to Barge Repairs and Preservation Work at Contractor's Facility, newest first.
File Type Posted
N32253-14-T-0034_0003.pdf PDF
N32253-14-T-0034-0002.pdf PDF
N32253-14-T-0034-0001.pdf PDF
N32253-14-T-0034.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PEARL HARBOR, HAWAII −

SUPSHIP SAN DIEGO DET. PEARL HARBOR

SSPH−539−14SPECIFICATION NUMBER: SSP:

DEPARTMENT OF THE NAVY

SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED

SHIP CHARACTERISTICS

22 MAY 2014

SHIP: SSP−539−14

I N D E X

009−01

009−02

009−03

009−04

009−05

009−06

009−07

009−08

009−10

009−18

009−19

009−20

009−21

009−23

009−24

009−29

009−34

009−35

ITEM NO.

07−NOV−13

29−JUL−11

17−JAN−13

07−NOV−13

17−JAN−13

17−JAN−13

17−JAN−13

07−NOV−13

29−JUL−11

17−JAN−13

29−JUL−11

17−JAN−13

29−JUL−11

17−JAN−13

17−JAN−13

29−JUL−04

17−JAN−13

07−NOV−13

DATE

General Criteria; accomplish

Environmental Compliance Reports for Material Usage at

Naval Facilities; provide

Toxic and Hazardous Substances; control

Quality Management System; provide

Temporary Accesses; provide

Maintaining Protection and Cleanliness from Non−Radioactive

Operations; accomplish

Confined Space Entry, Certification, Fire Prevention and

Housekeeping; accomplish

Fire Protection at Contractor’s Facility; accomplish

Shipboard Asbestos−Containing Material (ACM); control

Magnetic Material; control

Provisioning Technical Documentation (PTD); provide

Government Property; control

Logistics and Technical Data; provide

Interferences; remove and install

Authorization, Control, Isolation, Blanking, and Tagging

Requirements; accomplish

Asbestos−Free Pipe Hanger Liner Material; install

Fire Protection of Unmanned Vessels at Contractor’s

Facility; provide

Confined Space Entry, Certification, Fire Prevention

Utilizing Military Fire Watches, and Housekeeping;

accomplish

TITLE

CATEGORY I. FY−15 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE

ITEMS THAT ARE STRUCK OUT ON THIS INDEX DO NOT APPLY TO THIS CONTRACT.

009−39

009−40

009−59

009−60

009−61

009−64

009−65

009−67

009−69

009−70

009−72

009−73

009−74

009−77

009−79

009−80

009−81

009−82

009−83

19−JUL−07

29−JUL−11

29−JUL−11

07−NOV−13

17−JAN−13

29−JUL−11

29−JUL−11

17−JAN−13

07−NOV−13

17−JAN−13

17−JAN−13

07−NOV−13

17−JAN−13

17−JAN−13

29−JUL−11

29−JUL−11

17−JAN−13

29−JUL−11

17−JAN−13

Technical Manual Contract Requirement (TMCR) for New

Technical Manuals for Commercial Equipment/ Component;

provide

Requirements for Contractor Cranes, Multi−Purpose Machines and Material Handling Equipment at Naval Facilities;

accomplish

Organotin Antifouling Material; control

Schedule and Associated Reports for Availabilities Over 9

Weeks in Duration; provide and manage

Shipboard Use of Fluorocarbons; control

Synthetic Fire−Resistant Hydraulic Fluid; control

Polychlorinated Biphenyls (PCBs); control

Integrated Total Ship Testing; manage

Heavy Weather Plan; provide

Confined Space Entry, Certification, Fire Prevention and

Housekeeping for Unmanned Vessels; accomplish

Physical Security at Private Contractor’s Facility;

accomplish

Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install

Occupational, Safety and Health Requirements; accomplish

Cofferdam Requirements; accomplish

Government Owned Material (GOM); status reporting

Ship’s Facilities; provide

Compartment Closeout; accomplish

Data Requirements When Installing an Equal Component Vice

Specified Component; provide

Wire Rope Fitting Verification; provide

009−84

009−86

009−87

009−88

009−89

009−93

009−94

009−95

009−97

009−99

009−100

009−101

009−102

009−103

009−106

009−108

009−109

009−110

17−JAN−13

01−AUG−08

17−JAN−13

29−JUL−11

29−JUL−11

17−JAN−13

17−JAN−13

17−JAN−13

17−JAN−13

17−JAN−13

30−JUL−10

17−JAN−13

29−JUL−11

29−JUL−11

06−JAN−14

29−JUL−11

29−JUL−11

29−JUL−11

Accountability of Temporary Fasteners; provide

Recovery of Chlorofluorocarbon (CFC) Refrigerants and Fire

Suppressant Halon (H) Materials; accomplish

Chemical Disinfection Procedures; accomplish

Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas−Contaminated

Tanks, Spaces, and Piping; certify

Purchase and Inspection Requirements for Contractor

Furnished Anodes; accomplish

Emergency Planning and Community Right−to−Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide

General Environmental Requirements for Work at Contractor’s

Facility; accomplish

Mechanically Attached Fittings (MAF’s) for Piping Systems;

install

Shipbuilding and Ship Repair Operations National Emission

Standard for Hazardous Air Pollutants (NESHAPS) for Surface

Coating Information; provide

Ship Departure Report; provide

Ship’s Stability Process Control Procedure (PCP); maintain

Requirements for Mooring, Entry to and Departure from

Contractor’s Facility; accomplish

Alteration Verification; provide

Weight and Moment Change Data; provide

Work Authorization Form Coordinator (WAFCOR); provide

Aircraft Carrier Requirements for Mooring, Entry to, Movement within, and Departure from Contractor’s Facility;

accomplish

Special Requirements for Non−SUBSAFE Work on SUBSAFE−

Certified Vessels; accomplish

Special Requirements for Non−Nuclear Work on Nuclear

Vessels; accomplish

009−111

009−112

009−117

009−118

009−120

009−121

07−NOV−13

29−JUL−11

06−JAN−14

17−JAN−13

06−JAN−14

06−JAN−14

Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration; provide and manage

Prevention of Radiographic−Inspection Ionizing−Radiation

Hazards; accomplish

AEGIS Light Off (ALO) Support for AEGIS Weapons Systems

Assessments (AWSA); provide

CG Deck Loading; accomplish

Fact Finding and Critique of Unplanned Events; manage

Ship Assessment/Inspection Requirements; provide

009−09

009−11

009−12

009−13

009−14

009−15

009−16

009−17

009−22

009−25

009−26

009−27

009−28

009−30

009−31

009−32

009−33

009−36

009−37

ITEM NO.

06−JAN−14

17−JAN−13

07−NOV−13

17−JAN−13

17−JAN−13

17−JAN−13

29−JUL−11

07−NOV−13

17−JAN−13

17−JAN−13

17−JAN−13

07−NOV−13

29−JUL−11

29−JUL−11

07−NOV−13

07−NOV−13

29−JUL−11

30−JUL−10

DATE

Process Control Procedure (PCP); provide and accomplish

Insulation and Lagging Requirements; accomplish

Welding, Fabrication, and Inspection Requirements;

accomplish

Meters; repair and certify calibration

Gages and Thermometers; repair and certify calibration

Rotating Machinery; balance

Electronic Equipment; repair

Rotating Electrical Equipment; repair

Shipboard Electric Cable; test

Structural Boundary Test; accomplish

Deck Covering Requirements; accomplish

Material Identification and Control (MIC) for Level I

Systems; accomplish

Cancelled 30 JUL 2010

Boiler Sample Tubes; inspect

Boiler Waterjet Cleaning; accomplish

Cleaning and Painting Requirements; accomplish

Rotating Electrical Equipment; rewind

Controller; repair

General Procedures for Woodwork; accomplish

TITLE

CATEGORY II. FY−15 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB

ORDER

009−38

009−41

009−42

009−43

009−44

009−45

009−46

009−47

009−48

009−49

009−50

009−51

009−52

009−53

009−54

009−55

009−56

009−57

009−58

009−62

009−63

17−JAN−13

19−JUL−07

19−JUL−07

17−JAN−13

07−NOV−13

29−JUL−11

17−JAN−13

29−JUL−11

29−JUL−11

29−JUL−11

29−JUL−11

17−JAN−13

29−JUL−11

29−JUL−11

30−JUL−10

30−JUL−10

29−JUL−11

17−JAN−13

17−JAN−13

29−JUL−11

29−JUL−11

Boiler, Catapult Accumulator and Reboiler Dry Lay−up;

accomplish

Technical Manual Contract Requirement (TMCR) for a

Topically Structured Technical Manual; provide

Technical Manual Contract Requirement (TMCR) for Updating

Technical Manuals; provide

Light−Off Assessment (LOA) Support for Steam Propulsion

System; provide

Light−Off Assessment (LOA) Support for Gas Turbine

Propulsion System; provide

Tapered Plug Valve; repair

Butterfly Valve, Synthetic and Metal Seated; repair

Gate Valve; repair

Pressure Seal Bonnet Valve; repair (shop)

Pressure Seal Bonnet Valve; repair (in−line)

Horizontal Swing Check Valve; repair

Globe, Globe Angle, and Globe Stop Check Valve; repair

Relief Valve; repair

Bolted Bonnet Steam Valve; repair (shop)

Bolted Bonnet Steam Valve; repair (in−line)

Regulating/Reducing Valve; repair

Main Propulsion Boiler Wet Lay−Up; accomplish

Reduction Gear Security Requirements; accomplish

Pump and Driver Shaft Alignment; accomplish

Boiler Handhole and Manhole Seats and Plates; inspect

Lubricating Oils and Hydraulic Fluids; analyze

009−66

009−68

009−71

009−75

009−76

009−78

009−85

009−90

009−91

009−92

009−96

009−98

009−104

009−105

009−107

009−113

009−114

009−115

009−116

009−119

17−JAN−13

29−JUL−11

17−JAN−13

29−JUL−11

29−JUL−11

07−NOV−13

19−JUL−07

07−NOV−13

07−NOV−13

29−JUL−11

29−JUL−11

30−JUL−10

29−JUL−11

17−JAN−13

17−JAN−13

07−NOV−13

07−NOV−13

07−NOV−13

29−JUL−11

06−JAN−14

Light−Off Assessment (LOA) Support for Diesel Propulsion

System; provide

Bolted Bonnet Valve; repair

Testing Requirements for Piping Systems; accomplish

Circuit Breaker; repair

Waveguide and Transmission Line Temporary Lay−Up, Pressurization, and Purging; accomplish

Passive Countermeasures System (PCMS) Material

Repair/Installation Requirements; accomplish

Government Sponsored Planning Yard/Configuration Data

Manager (CDM) On−Site Representative Facility; provide

Technical Representative; provide

Propeller In−Place Inspection; accomplish

Resilient Mount; remove and install

Ball Valve; repair

Monel Fasteners; inspect

Vibration Testing and Analysis; accomplish

Thermal Sprayed Coatings for Machinery Component Repair;

accomplish

Piping System Cleanliness (Non−Nuclear); accomplish

Rotating Electrical Equipment with Sealed Insulation

Systems (SIS); rewind

Mold Remediation; accomplish

Bearing Rebabbitting; accomplish

Auxiliary and Waste Heat Boiler Sodium Nitrate Wet

Layup; accomplish

Expanded Process Control Procedure (EPCP); provide and accomplish

077−28−001

110−11−001

123−90−001

501−90−001

512−11−001

514−90−001

551−11−001

582−28−001

583−00−001

603−28−001

631−12−001

634−28−001

992−00−001

992−28−001

997−28−001

ITEM NO.

Hazardous Waste Produced on Naval Vessels

Weather Decks; replace and preserve

ShipAlt WI−BM−38, Rake Tank Modifications; accomplish

CHT System Upgrades; accomplish

Supply and Exhaust Ventilation Duct Cleaning; accomplish

Piping System Modifications; accomplish

Refrigerator and Freezer Condensing and Evaporator Unit

Assemblies; replace

Mooring Lines; replace

Transfer of Boat Custody; accomplish

Accommodation Ladder Installation; accomplish

EXTERIOR HULL; clean and preserve

Interior PRC Decking; resurface and repair

Temporary Electrical Services; provide

Logistics Services

Drydocking and Undocking; accomplish

TITLE______________

ITEM NO: 077−28−0011 of 6

( 077−28−001ITEM NO:

26−539COAR:

NONECMP:

DEFRIESPLANNER:

SHIP:

PCN: PE14−L000

SCOPE

REFERENCES

REQUIREMENTS

1.

2.

3.

1.2.1

1.3.1

Throughout the Ship

Not Applicable.

Location of Work:

Identification:

2.1

2.2

2.3

2.4

2.5

2.6

2.7

Resource Conservation and Recovery Act (RCRA)

Federal Hazardous Materials Transportation Act, 49 U.S.C. $5103

Applicable Hazardous Waste Manifest Form

10 U.S.C. 7311

Toxic Substance Control Act (TSCA)

40 CFR 763, Subpart E

40 CFR 61, Subpart M

Hazardous Waste Produced on Naval Vessels

Manage and dispose of all hazardous waste listed in 3.5 in accordance with 2.1, 2.2, 2.5 through 2.7.

When a Navy generator number is required by this Work Item, submit the original of 2.3 to the SUPERVISOR for assignment of Environmental

Protection Agency (EPA) or delegated state environmental agency identification number.

Manage and transport for Navy disposal, Navy generated hazardous waste listed in 3.5 in accordance with 2.1, 2.2, 2.5 through 2.7 as designated by the SUPERVISOR.

1.1

1.2

1.3

Title:

3.1.1

3.1.2

3.1

ITEM NO: 077−28−0012 of 6

SHIP:

Complete documentation required by 2.1, using EPA identification numbers in accordance with 2.4.

Submit one legible copy of 2.3 signed by the owner or operator of the disposal facility to the SUPERVISOR within 48 hours of receipt from owner or operator of disposal facility.

Submit One legible copy of certificate of disposal signed by the owner or operator of the disposal facility to the SUPERVISOR Code 350, within 48 hours of receipt from owner or operator of disposal facility.

Documentation related to hazardous waste generated solely by the physical actions of Ship’s Force or Navy employees (termed Navy−Generated

Hazardous Waste) on board the vessel shall only bear a generator identification number issued to the Navy pursuant to applicable law. The contractor shall obtain SUPERVISOR’S concurrence with the categorization of the waste as Navy− generated before completion of the manifest. The manifest prepared shall be presented to the SUPRVISOR for completion after the hazardous waste has been idntified.

Documentation related to hazardous waste generated solely by the physical actions of contractor personnel (termed Contractor−Generated Hazardous

Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law. Regardless of the presence of other material in or on the shipboard systems or structure which may have qualified a waste stream as hazardous, where the contractor performs work on a system or structure using materials (whether or not the use of such materials was specified by the Navy) which by themselves would cause the waste from such work to be a hazardous industrial waste, documentation related to such waste shall only bear a generator number issued to the contractor.

Documentation related to hazardous waste generated by the combined physical actions of Navy and contractor personnel (termed Co−Generated

Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law and shall also cite in the remarks block a generator identification number issued to the Navy pursuant to applicable law.

When the contractor merely drains a system and such drainage creates hazardous waste or the contractor performs work on system or structure using materials which by themselves would not cause the waste from such work to be hazardous waste but such waste nonetheless creates a hazardous waste, documentation related to such waste shall bear a generator identification number issued to the contractor and shall also cite in the remarks block a generator number issued to the Navy. The contractor shall sign the generator certification on the Uniform

Hazardous Waste Manifest whenever use of the manifest is required for disposal.

The contractor shall obtain SUPERVISOR’s concurrence with the categorization of the wastes as co−generated before completion of the manifest. Manifests prepared

3.1.3

3.1.4

3.2.1

3.2.2

3.2.3

3.2

ITEM NO: 077−28−0013 of 6

If the contractor, while performing work at a Government facility, cannot obtain a separate generator identification number from the state in which the availability will be performed, the contractor shall notify the SUPERVISOR within three business days of receipt of written notification by the state.

After obtaining approval of the SUPERVISOR, the contractor shall use the Navy site generator identification number and insert in the remarks block the contractor generator identification number issued for the site where his main facilities are located.

If, for availabilities at a contractor−owned or controlled facility, the

Navy cannot obtain a separate generator identification number for use at a contractor facility, the Navy shall notify the contractor within three business days of receipt of notification by the state. The contractor shall dispose of hazardous waste in accordance with 2.1, 2.2, 2.5 through 2.7, and 3.2.3.

Hazardous waste, as identified in 2.1, expected to be produced during performance of this Job Order:

AMOUNT TYPE NAVY CO−GENERATED CONTRACTOR

Asbestos and/or Asbestos contained material (ACM)

Bilge Water Oil/Water

PCB’s (debris/articles contaminated w/PCB)

Chromic Acid Hydrochloric Acid

Nitric Acid Sodium Nitrite

Sulfuric Acid Other Acid Solutions

Ethylene Glycol (Anti−freeze) _____________________________________ 300 Gallons

Sodium Hydroxide

Cleaning Solvents

Sodium Phosphates (Tri, Bi, or Mono)

Sodium Chromates shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.

3.3

3.4

3.5

ITEM NO: 077−28−0014 of 6

AMOUNT TYPE NAVY CO−GENERATED CONTRACTOR

Fluorocarbons ______________________________________________________ 200 Pounds

Morpholine

Hydrazine

Methyl Ethyl Ketone

Spent Abrasive Blast Material ______________________________________ 20 Cubic

Yards

(Contaminated with a known hazardous waste)

Trichloroethane

Mercury (liquid/equipment)

Miscellaneous Chemicals (Flammable) ________________________________ One Gallon

Miscellaneous Chemicals (Corrosive)

Miscellaneous Chemicals (TCLP Toxic) _______________________________ One Gallon

Miscellaneous Chemicals (Reactive)

Oil (Synthetic)

Paints (Enamel, Latex, Epoxy, thinners, oil based, rubber paint, ________________________________ 20 Gallons non−skid, lacquer, remover, vanishes)

Paints (May include lead, cadmium, _________________________________ 2 Gallons or chrome)

Paint Strippers (phenols, lead, chromium) __________________________ 2 Gallons

Sludge (Contaminated with a known hazardous waste)

Creosote

ITEM NO: 077−28−0015 of 6

NOTES4.

Hydroblast Water ___________________________________________________ 500 Gallons

Notify the SUPERVISOR at least one working day prior to shipment of hazardous waste for disposal.

Submit one legible copy, in hard copy or electronic media, of a report identifying type, amount, and disposal cost of hazardous waste listed in 3.5 that was removed during the performance of this Job Order tothe SUPERVISOR.

Nothing contained in this Work Item shall relieve the contractor from complying with applicable Federal, state and local laws, codes, ordinances and regulations, including the obtaining of licenses and permits in connection with hazardous waste handling and disposal in the performance of this contract.

The waste listed in 3.5 is based on the best information available at the time of preparation of the solicitation. Hazardous waste generated during the actual performance of the work may vary in type or amount from waste listed in 3.5 which may result in renegotiation for credit or increase pursuant to

Paragraph (b) of 2.4. The contractor is expected to use best management practice to identify and dispose of all hazardous waste. Some of the substances listed in

3.5 may be neutralized, recycled or otherwise removed from the requirements of

Subtitle C of 2.1. Inclusion of these substances in the waste listed in 3.5 does not preclude the contractor from taking action consistent with 2.1 to reduce or eliminate the hazardous constituents of any industrial waste required to be disposed of under the contract in accordance with 2.2. Processes that add hazardous constituents to the bilges may require that bilge water be disposed of as a hazardous waste.

Hazardous wastes are determined by one or more of the following methods:

Provide $0 dollars for managing and disposing of all hazardous waste listed in 3.5. Total cost greater or less than the above dollar amount will be the subject of an equitable adjustment.

The report shall include analysis or other method used to identify the waste and state whether each listed waste was hazardous (with generator assignment), non−hazardous, or did not exist.

The contractor shall make an effort to minimize hazardous waste generation by reducing the volume or toxicity by neutralizing, recycling, or otherwise removing it from the requirements of Subtitle C of 2.1 and include a description of such efforts in the report.

Chemical analysis shall be accomplished by laboratories with state or EPA approved quality assurance programs.

3.7.1.1

3.5.1

3.7.1

3.7.2

3.6

3.7

3.8

4.1

4.2

ITEM NO: 077−28−0016 of 6

GOVERNMENT FURNISHED MATERIAL (GFM)5.

5.1

5.2

5.3

Asbestos, bilge water, oil/water including sludge, debris and other contaminants, sludge which includes solids and sludge from ballast tanks, CHT tanks, voids, oily waste tanks, fuel ballast tanks, fuel oil tanks, skegs (West coast), PCB’s (Maryland), etc., apply only in those states listing them as hazardous waste. When an availability is to be performed in a state where these items are hazardous waste, an estimate of the amount to be generated shall be included in 3.5.

Chemical analysis which shows that the material characteristics of ignitability, corrosivity, reactivity, and/or toxicity (Toxicity

Characteristic Leachate Procedure − TCLP) exceed the limits for that material in

40 CFR 261.20 Subpart C.

Reference to the applicable Material Safety Data Sheets (MSDS) or

Applying knowledge of the hazardous characteristics of the waste in light of the materials or the process used.

1. None.

1. None.

1. None.

LLTM

PUSH MATERIAL

KITTED MATERIAL

4.2.1

4.2.2

4.2.3

4.3

ITEM NO: 110−11−0011 of 3

( 110−11−001ITEM NO:

26−539COAR:

NONECMP:

UPCHURCHPLANNER:

SHIP:

PCN: PE14−L00F

SCOPE

REFERENCES

REQUIREMENTS

1.

2.

3.

1.2.1

1.2.2

1.2.3

1.2.4

1.3.1

Main Deck

01 Level Weather Deck

02 Level Weather Deck

03 Level Weather Deck

Not Applicable

Location of Work:

Identification:

(I)(G) "NDT TESTING"

2.1

2.2

2.3

2.4

2.5

Standard Items (FY−15)

T9074−AS−GIB−010/271, Requirements for Nondestructive Testing Methods

101−6831721 Rev C, Bottom and Main Deck Scantling Plans

150−6831723 Rev D, Deck House Scantlings

MIL−STD−2035, Nondestructive Testing Acceptance Criteria

Weather Decks; replace and preserve

Accomplish ultrasonic tests on deck plating located in 1.2 in 100 locations, as designated by the SUPERVISOR, in accordance with 2.2, using 2.3 and

2.4 for guidance. The accept or reject criteria shall be in accordance with 2.5.

Submit one legible copy, in hard copy or approved transferrable media, of a sketch which includes specific locations with respect to frames, port and starboard and existing welded butts and seams to the SUPERVISOR.

1.1

ITEM NO: 110−11−0012 of 3

NOTES

GOVERNMENT FURNISHED MATERIAL (GFM)

4.

5.

Remove existing and and install new 200 square feet of deck plating for each area listed in 1.2 for a total of 800 square feet, based on the results of

3.1, in accordance with 2.3 and 2.4, as designated by the SUPERVISOR.

Accomplish the requirements of 009−25 of 2.1 for local air hose test of new plating installed in 3.2. Allowable leakage: None

Accomplish the requirements of 009−32 of 2.1, including Table 2, Line 13 for the preservation of decks listed in 1.2 and installation of pressure sensitive nonskid.

Accomplish the requirements of 009−32 of 2.1 for new and disturbed surfaces.

None.

Record location of all existing nonskid prior to removal.

New deck plating shall conform to the material requirements of

2.3 and 2.4.

Template exact size, shape, and configuration from existing shipboard conditions.

Chip and grind surfaces flush in way of repairs.

Accomplish the requirements of 009−12 of 2.1, including Table 3, Column A, Lines One through 7.

Accomplish Note 51 for installation of additional coat of primer.

Nonskid shall be installed in accordance with the report submitted in 3.1.1.3.

Sketch shall show location of each reading, original material thickness, existing material thickness, and percentage of material thickness reduction to the SUPERVISOR. Submit 4 legible copies of a report listing inspection results in 3.7 to the SUPERVISOR, within 24 hours upon completion of inspections.Record location of all existing nonskid prior to removal.

Submit one legible copy of a report listing inspection results of 3.1.2 to the SUPERVISOR, within 24 hours upon completion of inspections.

3.1.1.1

3.1.2.1

3.1.2

3.2.1

3.2.2

3.2.3

3.2.4

3.4.1

3.4.2

3.2

3.3

3.4

ITEM NO: 110−11−0013 of 3

5.1

5.2

5.3

1. None.

1. None.

1. None.

LLTM

PUSH MATERIAL

KITTED MATERIAL

ITEM NO: 123−90−0011 of 2

( 123−90−001ITEM NO:

26−539COAR:

NONECMP:

UPCHURCHPLANNER:

SHIP:

PCN: PE14−L00E

SCOPE

REFERENCES

REQUIREMENTS

1.

2.

3.

1.2.1

1.3.1

Throughout the Ship

Not Applicable

Location of Work:

Identification:

2.1

2.2

2.3

2.4

2.5

2.6

2.7

2.8

2.9

Standard Items (FY−15)

123−8507347, Access Mods Install Watertight Door Rake Tank Stowage

145−8507348, Compartment & Access Modifications

302−8516181, Power System Modifications 2−68−0 And 2−0−0 Conversion

303−8516182, Lighting System Modifications 2−68−0 And 2−0−0 Conversion

436−8516588, IC Circuit F Modifications Incid to SD Stowage Upgrade

501−8507693, Mods for SD Strm No. 5 Instl Main & 2nd Deck, FR 68−85

(P/S)

603−8507345, SD Storeroom No. 5 Grating Installation

605−8507346, Paint & Insulation SD Storeroom 2−68−0−A

ShipAlt WI−BM−38, Rake Tank Modifications; accomplish

Accomplish the requirements of 2.2 through 2.9 for the modification and installation of Shipalt WI−BM−38.

Chip and grind surfaces flush in way of removals.

Accomplish the requirements of 009−12 of 2.1, including Table 3, Columns A and D, Lines One through 7.

1.1

ITEM NO: 123−90−0012 of 2

NOTES

GOVERNMENT FURNISHED MATERIAL(GFM)

4.

5.

5.1

5.2

5.3

(V)(G) "CHALK TEST"

(V)(G) "OPERATIONAL TEST"

Accomplish a chalk test on each structural closure listed in 2.2 and 2.4 through 2.9. Chalk imprint shall be centered with 100 percent contact.

Accomplish the requirements of 009−25 of 2.1 for air hose test of all new structural welds affected by this work item. Allowable leakage: None.

Accomplish an operational test of all equipment affected by this work item not covered by the testing of 2.2, 2.4, 2.5, and 2.7.

Accomplish the requirements of 009−32 of 2.1 for new and disturbed surfaces.

Accomplish an operational test of all doors affected by this work item. No binding or sticking of assembly allowed.

Operate each door through 4 open/dogged closed cycles.

Binding or sticking of any assembly shall require repeat of 3.5.1 through 3.5.1.1.

1. None.

1. None.

1. None.

LLTM

PUSH MATERIAL

KITTED MATERIAL

3.4.1.1

3.4.1.2

3.4.1

3.2

3.3

ITEM NO: 501−90−0011 of 4

( 501−90−001ITEM NO:

26−539COAR:

NONECMP:

CROWELLPLANNER:

SHIP:

PCN: PE14−L00B

SCOPE

REFERENCES

1.

2.

1.2.1

1.3.1

CHT Pump Room (2−36−2−E)

Quantity (2 EA.), Numbers 1 and 2 CHT Pumps

1.3.1.1

1.3.1.2

Quantity (2 EA.), Numbers 1 and 2 Motors, Mfr ID:

5K215NN6705, 7.5 HP, 1745 RPM, Frame: 215 TNCZ, Mfr:

General Electric, APL: 175505054

Quantity (One EA), Controller−Duplex, MAG, LVP, SZ 1, 440V, 60 HZ 1SPD 1WDG DRPR, Mfr ID: 194B7582G1S2, Mfr: General Electric, APL: 986000842X

Location of Work:

Identification:

2.1

2.2

2.3

2.4

2.5

2.6

2.7

2.8

2.9

2.10

Standard Items (FY−15)

185−8429130, CHT System Upgrade, CHT Pump Fndns

545−8429137, ARR Mod Incid to CHT System Upgrade

302−8429216, Pwr Sys Mod Incid to CHT Sys Upgrade

506−8429138, CHT Piping Mods Incid to CHT System Upgrades

401−7647066, Install Sound Pwrd Phone CKT Incd CHT

436−7647064 A, Install H2S Alm Sys

436−7647065, Install Air Flow Alm Sys

501−7647109, Vent Mod CHT Pmp Rm

528−7645236, CHT Ppg Mods

CHT System Upgrades; accomplish

1.1

1.2

ITEM NO: 501−90−0012 of 4

REQUIREMENTS3.

2.11

2.12

2.13

2.14

2.15

2.16

2.17

2.18

593−7647074, Sewg CHT Sys Instr Plts

593−7647075, Ppg Mod Incd to CHT Upgr

600−7647107, Lift Padeye CHT Pmp Rm

803−7647108, Test Memo CHT Pmp Rm Padeye

593−66012, MACHALT−Sanitary Waste Holding Tank Flanged Level Censor

Replacement

S9086−CH−STM−030/CH−074 Rev 4, Naval Ships’ Technical Manual Chapter

074 Volume 3 − Gas Free Engineering

PHNSY & IMF C/400 Reference #106.3−001, VCHT/CHT Tank(s) Cleaning and

Entry

MIL−STD−777, Schedule of Piping, Valves, Fittings, and Associated

Piping Components for Naval Surface Ships

Accomplish the requirements of 2.2 through 2.17, and using 2.18 as guidance, for removals, modifications, and installations of the equipment listed in 1.3 and located in 1.2.

Open, empty, clean, render dry, ventilate, and maintain the tank located in 1.2.1, "Safe for Workers" and "Safe for Hot Work".

Accomplish a visual inspection of the CHT tank for existing preservation coating, structural integrity, deterioration, pitting, cracks, and areas of damage or distortion, including sounding tubes, tanks vents, overflows, piping, structural members, anodes, manhole covers, and to validate the proposed piping arrangements prior to performing work.

Accomplish the requirements of 009−12 of 2.1, including Table

One, Columns A and B, Lines One through 10 and Table 3, Column A, Lines One through 7.

Accomplish the requirements of 009−71 of 2.1 for new and disturbed piping.

Submit one legible copy, in approved transferrable media within 48 hours of completion of inspection, of a report listing the results of the requirements of 3.1.2. Report shall include a recommendation of revisions necessary to accomplish modifications per note 6 of 2.5.

Accomplish tests in accordance with Test Notes T−2

3.1.2.1

3.1.4.1

3.1.1

3.1.2

3.1.3

3.1.4

ITEM NO: 501−90−0013 of 4

NOTES

GOVERNMENT FURNISHED MATERIAL(GFM)

4.

5.

5.1

(V)(G) "TANK COMPLETION TEST"

(V)(G) "TANK INSPECTION"

(V)(G) "OPERATIONAL TEST"

TOTAL

QUANTITY

PROVIDED

NAME OF

PART

PIECE

NO.

REF

NO.

NATIONAL

STOCK NO.

PARA

NO.________ _______ ______ ____ __________ ____

1. 2 EA CHT Pump 5, 6 2.3 None 3.1

Inspect each tank for cleanliness prior to final closing.

Accomplish an operational test of equipment, piping, electrical components and controls for proper operation within their control limits as specified in 2.1 through 2.5.

Accomplish the requirements of 009−32 of 2.1 for new and disturbed surfaces.

None.

Accomplish the requirements of 009−25 of 2.1 for an air hose, water hose, or vacuum box test of the Sewage CHT tank in accordance with Test

Note T−5. Allowable Leakage: None

Verify proper direction of rotation for the new CHT motors.

Measure and record cold insulation resistances of windings to ground using a 500−volt megger.

Measure and record voltage to verify that the recordings are in accordance with nameplate data.

Accomplish an operational check on the controllers to ensure both automatic and manual operation is satisfactory.

through T−4 of 2.5.

Submit one legible copy, in approved transferrable media, within 48 hours of completion of testing of a report listing the results of the requirements of 3.3.1 through 3.3.4.

LLTM:

3.3.4.1

3.1.5

3.3.1

3.3.2

3.3.3

3.3.4

3.2

3.3

ITEM NO: 501−90−0014 of 4

5.2

5.3

2. 2 EA Resevoir, Low pressure air charging

8 2.3 None 3.1

1. None.

1. None.

PUSH MATERIAL

KITTED MATERIAL

ITEM NO: 512−11−0011 of 2

( 512−11−001ITEM NO:

26−539COAR:

NONECMP:

DEFRIESPLANNER:

SHIP:

PCN: PE14−L009

SCOPE

REFERENCES

REQUIREMENTS

1.

2.

3.

1.2.1

1.2.2

1.2.3

1.2.4

1.2.5

1.3.1

1.3.2

2nd Deck

Main Deck

01 Level

02 Level

03 Level

Quantity (One EA), Exhaust Ventilation System

Quantity (One EA), Supply Ventilation System

Location of Work:

Identification:

2.1

2.2

2.3

Standard Items (FY−15)

512−6831710, HVAC System Diagram

NAVSEA LETTER 9514 SER 9210/021 DTD 20 MAY 2009, DRY ICE CLEANING OF

VENTILATION DUCTS

Supply and Exhaust Ventilation Duct Cleaning; accomplish

Accomplish "Dry Ice" cleaning of ventilation systems located throughout the barge from the hold to 03 level exterior ventilation hoods to the last ventilation diffuser of each run of the supply and exhaust system as shown in 2.2 and as directed by the SUPERVISOR.

Accomplish the requirements of 009−09 of 2.1 for submittal of PCP for approval by NAVSEA prior to start of work.

1.1

ITEM NO: 512−11−0012 of 2

NOTES

GOVERNMENT FURNISHED MATERIAL (GFM)

4.

5.

5.1

5.2

5.3

(V)(G) "CLEANLINESS INSPECTION"

Accomplish the requirements of 2.3 for the CO2 and O2 readings and monitoring of all spaces prior to, during, and after all vent cleaning operations.

Accomplish a visual inspection prior to cleaning and after cleaning of interior surfaces of each ventilation system branch line listed in 1.3 for verification of cleanliness and completion of work prior to installation access plates. Method for inspection shall be visual. Accept criteria for cleanliness shall be in accordance with paragraph 3.1.3.

Install matchmarked ventilation components removed in 3.1.2, using retained fasteners and 2.2 for guidance. All flange joints removed shall be reinstalled using new rubber gasket in accordance with 2.2.

Accomplish the requirements of 009−32 of 2.1 for new and disturbed surfaces.

None.

Matchmark and remove ventilation access plates as required to allow access for cleaning operations. Retain ventilation parts and fasteners for reuse.

Clean interior surfaces free of loose rust, dirt, grease, lint and other foreign matter.

Submit one legible copy, in approved transferrable media, of a report listing results of the requirements of 3.2 to the SUPERVISOR.

1. None.

1. None.

1. None.

LLTM

PUSH MATERIAL

KITTED MATERIAL

3.1.3

3.3.1

3.2

3.3

3.4

ITEM NO: 514−90−0011 of 3

( 514−90−001ITEM NO:

26−539COAR:

NONECMP:

DEFRIESPLANNER:

SHIP:

PCN: PE14−L007

PE14−L008

SCOPE

REFERENCES

REQUIREMENTS

1.

2.

3.

1.2.1

1.3.1

Throughout the Ship

Not Applicable

Location of Work:

Identification:

2.1

2.2

2.3

2.4

2.5

2.6

2.7

Standard Items (FY−15)

528−7645234, Plumbing Drain Piping Mods Main Deck

528−7645235, Plumbing Drain System, Plumbing Drain Piping Mods − Hold

528−7645236, CHT System CHT Piping Mods

528−7645239, Plumbing Drain Piping Mods 01 Level & Up

533−7645237, Potable Water System, Potable Water System Mods Main Deck

& Below

533−7645238, Potable Water System, Pot Water System 01 LVL/ABV

Piping System Modifications; accomplish

Accomplish the requirements of 2.2 through 2.7 for the ripout, installations and modifications of the existing piping systems from 2nd deck to below 02 level.

Chip and grind surfaces flush in way of removals.

Template all work to suit existing conditions.

Accomplish the requirements of 009−12 of 2.1, including Table

1.1

3.1.2

ITEM NO: 514−90−0012 of 3

NOTES

GOVERNMENT FURNISHED MATERIAL(GFM)

4.

5.

5.1

(V)(G) "OPERATIONAL TEST"

Remove all drop ceiling panels with framing in the location listed in

1.2 as directed by the SUPERVISOR.

Accomplish the Cleaning Notes of 2.2 through 2.3 and 2.5 through 2.7.

Accomplish the requirements of 009−107 of 2.1 for the piping installed in 2.4.

Accomplish the requirements of 009−71 of 2.1 for a static head pressure test of new and disturbed piping installed in 2.2 through 2.7.

Accomplish the Test Notes of 2.2 through 2.7.

Accomplish the Disinfecting Notes of 2.6 and 2.7.

Accomplish an operational test of equipment, piping, electrical components, and controls affected by this work item for proper operation within their control limits in accordance with the Test Notes of 2.2 through 2.7.

Accomplish the requirements of 009−11 of 2.1 for new and disturbed lagging and insulation.

Accomplish the requirements of 009−32 of 2.1 for new and disturbed piping and surfaces.

None.

One, Columns A and B, Lines One through 10 and Table 3, Column A, Lines One through 7.

Replace all existing bare fiberglass insulation with new cloth faced insulation.

Accomplish the requirements of 009−32 of 2.1 for all areas above light fixtures. Paint shall be flat/matte black in color.

General cleaning shall be Level III.

Accomplish an operational test of all equipment affected by this work item not covered by the Test Notes of 2.2 through 2.7.

1. None.

LLTM:

3.2.1

3.2.2

3.4.1

3.8.1

3.2

3.3

3.4

3.5

3.6

3.7

3.8

3.9

3.10

ITEM NO: 514−90−0013 of 3

5.2

5.3

1. None.

1. None.

PUSH MATERIAL

KITTED MATERIAL

ITEM NO: 551−11−0011 of 2

( 551−11−001ITEM NO:

26−539COAR:

NONECMP:

CROWELLPLANNER:

SHIP:

PCN: PE14−L00D

SCOPE

REFERENCES

REQUIREMENTS

1.

2.

3.

1.2.1

1.3.1

2nd Deck to 02 LVL, FR 49−75 (P)

Quantity (1 EA.) Refrigerator and Freezer Condensing and

Evaporator Unit Assemblies

1.3.1.1

1.3.1.2

Quantity (1 EA.) , Freeze Box Condensing Unit

Assembly. Unit shall be equal to Larkin Model, LHT031L6C, 14360 BTU/HR @ −10 F SST and 90 F ambient.

Assembly listed in 2.04 of General Notes in 2.3.

Quantity (1 EA), Chill Box Condensing Unit Assembly.

Unit shall be equal to Larkin Model, LHT020X6C, 1600

BTU/HR @ +25 F SST and 90 F Ambient. Assembly listed in 2.04 of General Notes in 2.3.

Location of Work:

Identification:

2.1

2.2

2.3

2.4

Standard Items (FY−15)

302−8573817, Power System Modifications Incid to Refrigerator Upgrade.

503−8573095, Regt Piping & Equipment MODS Incid to Refrigerant

Upgrade Main DK & 2nd Deck.

113−8573207, Refrigeration Upgrade Modifications.

Refrigerator and Freezer Condensing and Evaporator Unit Assemblies;

replace

Accomplish the requirements of 2.2 through 2.4 for the removals, modifications, and installations of equipment listed in 1.3 and located in 1.2.

Accomplish the requirements of 009−12 of 2.1 including, Table

1.1

ITEM NO: 551−11−0012 of 2

NOTES4.

(V)(G) "OPERATIONAL TEST"

Accomplish an operational test of equipment, piping, electrical components and controls for proper operation within their control limits as specified in 2.2 and 2.3.

Accomplish the requirements of 009−11 of 2.1 and 2.3 for the installation of new insulation on new piping.

Accomplish the requirements of 009−32 of 2.1 for new and disturbed surfaces.

None.

One, Column B, Lines One through 10 and Table 3, Column A, Lines One through 7.

Accomplish the requirements of 009−71 of 2.1 for new and disturbed piping.

Accomplish the requirements of 009−107 of 2.1.

Accomplish the recommended replacement of all parts identified in paragraph 2.05 of 2.3. These parts are V1, V2, F13, V3 and V4.

Submit one legible copy, in approved transferrable media, within

48 hours of completion of testing, a report listing the results of 3.2.

General cleaning shall be cleanliness Level II

3.1.3.1

3.1.2

3.1.3

3.1.4

3.2.1

3.2

3.3

ITEM NO: 582−28−0011 of 2

( 582−28−001ITEM NO:

26−539COAR:

NONECMP:

UPCHURCHPLANNER:

SHIP:

PCN: SERV−L000

SCOPE

REFERENCES

REQUIREMENTS

NOTES

GOVERNMENT FURNISHED MATERIAL(GFM)

1.

2.

3.

4.

5.

1.2.1

1.3.1

Throughout the Ship

None

5.1

5.2

Location of Work:

Identification:

2.1 Standard Items (FY−15)

Mooring Lines; replace

Accomplish the requirements to replace a total of 6 each, 2 each 120’ long, 4 each 90’ long existing mooring lines with new High Modulus Polyethylene

(HMPE) mooring lines.

Possible source of line of paragraph 3.1:

www.samsonrope.com

New lines shall be blue or black in color and of similar, diameter / circumference, length, and eyes as existing.

1. None.

1. None.

LLTM

PUSH MATERIAL

1.1

ITEM NO: 582−28−0012 of 2

5.3

1. None.

KITTED MATERIAL :

ITEM NO: 583−00−0011 of 2

( 583−00−001ITEM NO:

26−539COAR:

NONECMP:

DEFRIESPLANNER:

SHIP:

PCN: PE14−L003

SCOPE

REFERENCES

REQUIREMENTS

NOTES

GOVERNMENT FURNISHED MATERIAL (GFM)

1.

2.

3.

4.

5.

1.3.1 None

5.1

Location of Work: Contractor’s Plant

Identification:

2.1 Attachment (A): Boat Custody Form

Transfer of Boat Custody; accomplish

The Government will deliver custody of the boat to the Contractor at the place designated in the specifications and upon completion of availability will accept custody of the boat at the place designated in the specification.

Upon receiving custody of the boat from the activity, complete Part A of

2.1. Submit one copy, in approved transferrable media, of 2.1 to the SUPERVISOR within 24 hours after delivery of the boat.

After returning custody of the boat to the activity, complete Part B of

2.1. Submit one copy, in approved transferrable media, of 2.1 to the SUPERVISOR within 24 hours after redelivery of the boat.

None.

The Contractor will be responsible for the boat during the time in which he has custody.

1. None.

LLTM:

1.1

3.1

3.2

3.3

ITEM NO: 583−00−0012 of 2

5.2

5.3

1. None.

1. None.

PUSH MATERIAL

KITTED MATERIAL

ITEM NO: 603−28−0011 of 2

( 603−28−001ITEM NO:

26−539COAR:

NONECMP:

UPCHURCHPLANNER:

SHIP:

PCN: PE14−L00C

SCOPE

REFERENCES

REQUIREMENTS

1.

2.

3.

1.2.1

1.3.1

Throughout The Ship

Not Applicable

Location of Work:

Identification:

2.1

2.2

2.3

2.4

2.5

2.6

2.7

2.8

2.9

2.10

2.11

Standard Items (FY−15)

111−8517988, Accomodation Ladder & Quarterdeck Installation 01 Level

603−8517984, Accomodation Ladder and Davits Installation

111−8517989, 01 LVL Accomodation Ladder Platform Extension

510−8575141, Weather Deck Drain Accomodation Ladder Install

605−8573182, Paint, Insulation and Deck Covering − Modifications 01

Level Accomodation Ladder

501−8519537, Hvac Modification 01 Level Quarter Deck 01−68−1−Q, 01−02

Level, Frame 67−73, Starboard

803−8517985, Accomodation Ladder Test Memo

302−8573815, Power System Modifications Incidental to Accomodation

Ladder Davit & New Quarter Deck Installation

303−8573816, Lighting System Modifications Incidental to Accomodation

Ladder and New Quarter Deck Installation

433−8519266, IC Modifications to Accomodations to Accomodation Ladder

Installation

Accommodation Ladder Installation; accomplish

1.1

1.2

ITEM NO: 603−28−0012 of 2

NOTES

GOVERNMENT FURNISHED MATERIAL(GFM)

4.

5.

5.1

5.2

5.3

(I)(G) "LOAD TEST"

Accomplish the requirements of 2.2 through 2.11 for the installation of the quarterdeck enclosure, accommodation ladder assembly and support structures using 2.9 for guidance.

Accomplish the requirements of 009−12 of 2.1, including Table 3, Column

A and D, Lines One through 7.

Accomplish the requirements of 009−25 for air hose test of all new structural boundary welds. Allowable leakage: None.

Accomplish ladder and davit test in accordance with 2.8.

Accomplish the requirements of 009−32 of 2.1 for all new and disturbed surfaces.

None.

Accomplish the requirements of 009−11 of 2.1, for installation of new insulation in accordance with 2.6.

Accomplish a chalk test on each structural closure listed in 2.2.

Chalk imprint shall be centered with 100 percent contact.

Submit one legible copy, in hard copy or electronic media, of completed test memorandum 2.8 to the SUPERVISOR within 72 hours of completion.

1. None.

1. None.

1. None.

LLTM

PUSH MATERIAL

KITTED MATERIAL

3.1.2

3.4.1

3.1

3.2

3.3

3.4

ITEM NO: 631−12−0011 of 4

( 631−12−001ITEM NO:

26−539COAR:

NONECMP:

UPCHURCHPLANNER:

SHIP:

PCN: PE14−L004

PE14−L005

SCOPE

REFERENCES

REQUIREMENTS

1.

2.

3.

1.2.1

1.2.2

Underwater Hull: From Keel Areas Up To Upper Boottop Limit

Throughout, Including Port and Starboard Skegs

Freeboard and Exterior Hull: From Upper Boottop Limit to the

Main Deck Edges Throughout.

Location of Work:

Identification:

2.1

2.2

2.3

2.4

2.5

2.6

2.7

2.8

Standard Items (FY−15)

101−6831721 Rev C, BOTTOM & MAIN DECK SCANTLING PLANS

602−6831718 Rev C, HULL DESIGNATION & MARKINGS

T9074−AS−GIB−010/271, REQUIREMENTS FOR NONDESTRUCTIVE TESTING METHODS

101−6831720 Rev C, CONSTRUCTION PROFILE & LONGITUDINAL FRAMING

085−6831715 Rev B, DOCKING PLAN & CATHODIC PROTECTION

S9086−VF−STM−010, Chapter 633, Cathodic Protection

114−6831731 Rev A, SKEG DETAILS

EXTERIOR HULL; clean and preserve

Drain and steam out to maintain Safe For Hot Work both skegs. Upon completion of weld repairs, preserve interiors by fill and draining both skegs with rust preventative compound MIL−C−16173, Grade 1, and installation of new monel plugs conforming to QQ−N−281, Class B and of similar dimensions to existing using 2.8 for guidance.

1.1

1.2

1.3

ITEM NO: 631−12−0012 of 4

(I)(G) "ULTRASONIC TESTING"

Remove and scrap all existing hull zinc anodes assemblies except the mounting studs located throughout 1.2.1, using 2.6 for guidance. Grind smooth shell areas affected by zinc removals.

Accomplish the requirements of 009−32 of 2.1, including Table One, Line

4, for preservation of the surface listed in 1.2.1.

Accomplish the requirements of 009−32 of 2.1, including Table 2, Line

One or 2, Columns A to C and G, for preservation of the surface listed in 1.2.2.

Accomplish a visual inspection of all cleaned surfaces in 3.4 through

3.5 for heavy pitting, crack, holes, deterioration and other structural deficiencies after primer coating application.

Accomplish ultrasonic inspection of underwater hull plating up to upper boottopping limits in 1.2, in 4−feet by 4−feet grid pattern in accordance with paragraph 6 of 2.4 and using 2.2 for guidance. Thickness readings shall be taken where deterioration or thickness loss is evident. Accomplish an additional 50 readings in locations as designated by the SUPERVISOR.

Crop out damaged and deteriorated hull plating and framing, and install

Renew a total of 40−each deteriorated unusable studs as directed by the SUPERVISOR. New studs shall be in accordance with 2.6

For all remaining studs, clean threads with wire brush to remove all foreign matter.

Ensure availability of weld marks for re−establishing layout of hull boottop prior to removal of preservation, using 2.2 and 2.3 for guidance.

Clean and preserve exposed hull areas when craft is fleeted.

Submit One legible copy of a report listing inspection results in

3.6 showing locations of deficiencies, proposed solutions and/or repair recommendations to the SUPERVISOR. The report shall include the cost estimates, material availability and time impact to the SUPERVISOR.

Submit 4 legible copies of a report listing inspection results in

3.7 to the SUPERVISOR, within 24 hours upon completion of inspections.

The report shall state sizes and areas of corrosion, locations, pitting, thickness readings, structural deficiencies and/or repair recommendations.

Provide sketches with locations of all thickness readings of hull plating taken in 3.7.

3.6.1.1

3.6.1.2

3.2.1

3.2.2

3.3.1

3.3.2

3.5.1

3.6.1

3.2

3.3

3.4

3.5

3.6

3.7

ITEM NO: 631−12−0013 of 4 new section conforming to MIL−S−22698 at hull areas in 1.2, as designated by the

SUPERVISOR using 2.2 and 2.5 for details and material requirements and as follows:

Accomplish weld repairs throughout the hull plating, including skeg plating in 1.2, as designated by the SUPERVISOR and as follows:

Accomplish the requirements of 009−12 of 2.1, including Table 3, Columns

A and D, Lines One through 7.

Accomplish the requirements of 009−25 of 2.1, for local air hose testing of all new hull insert plating in 3.7. Allowable leakage: None.

Install new zinc anodes, nuts, and washers in accordance with 2.6 and using 2.7 for guidance.

Accomplish the requirements of 009−32 of 2.1 for new and disturbed surfaces.

Total 600 square feet of hull and/or freeboard plating, using

15.3 pound steel insert plating. New plating varies from 3−feet by 4−feet to 4− feet by 5−feet in size.

Total of 200 linear feet of hull framing.

Template all new work to suit craft and equipment.

Clad weld total 400 square inches of isolated deep pits.

Vee out and weld repair total 120 linear feet of cracked, deteriorated, and eroded welds.

Mask and install protective coverings on zinc anode studs during paint application operations.

Paint system shall be completed in way of zinc anodes prior to installation.

Reapply colors and marking recorded to match original, using 2.3 for guidance.

Prepare areas and paint/install draft warning markers at: bow area One−port and One−starboard side, stern area, One−port aside and One− starboard side. Draft warning markers shall conform to TT−E−489, FED STD 595, Color No. 12197, International Orange, 12−inches high by 36−inches wide.

Bottom edges of draft warning markers shall be positioned on the top edges of boottop.

3.12.1.1

3.12.1.2

3.7.1

3.7.2

3.7.3

3.8.1

3.8.2

3.11.1

3.11.2

3.12.1

3.8

3.9

3.10

3.11

3.12

ITEM NO: 631−12−0014 of 4

NOTES

GOVERNMENT FURNISHED MATERIAL(GFM)

4.

5.

5.1

5.2

5.3

Submit One legible copy of completed NAVSEA form 9997/1, preservation data to the SUPERVISOR upon preservation completion.

Accomplish the requirements of 009−32 of 2.1, for new and disturbed surfaces.

Draft warning marker can be pressure sensitive printed material.

Stencil and paint in the following: "IN CASE OF

EMERGENCY/FLOODING − CONTACT SHIPYARD WATCH OFFICE, Ph: 474−1271", as designated by the SUPERVISOR, total 4 locations. Lettering shall conform to TT−E−489, FED

STD, Color No. 17038, black, 2−inches high.

Apply the designation "US NAVY YRBM53" to the port and starboard sides of the hull as shown in ref 2.3.

Apply the designation "FWD" and "AFT" to the bow and transom respectively to it’s previous location prior to hull preservation.

1. None.

1. None.

1. None.

LLTM

PUSH MATERIAL

KITTED MATERIAL

3.12.1.3

3.12.1.4

3.12.1.5

3.13

3.14

ITEM NO: 634−28−0011 of 2

( 634−28−001ITEM NO:

26−539COAR:

NONECMP:

CROWELLPLANNER:

SHIP:

PCN: PE14−L00A

SCOPE

REFERENCES

REQUIREMENTS

NOTES

1.

2.

3.

4.

1.2.1

1.3.1

Throughout the Ship

Not Applicable

Location of Work:

Identification:

2.1 Standard Items (FY−15)

Interior PRC Decking; resurface and repair

Accomplish the requirements of 009−26 of 2.1, including Attachment C, paragraphs A to D and F, for the resurfacing of all interior decks listed in

1.2.1.

Accomplish the requirements of 009−32 of 2.1 for all new and disturbed surfaces.

None.

Accomplish the requirements of 009−26 of 2.1, including

Attachment C, paragraph E for a total of 300 square feet of deteriorated decking system down to base metal as directed by the SUPERVISOR.

New PRC decking base coat and color chips shall be of similar color sequence as existing.

Do not remove equipment and furnitures that are welded to the deck to accomplish PRC deck renewal.

Apply primer paint in accordance with manufacturer’s instructions and shall be compatible to underlayment and PRC deck system.

1.1

3.1.1.1

3.1.1

3.1.2

3.1.3

3.1

ITEM NO: 634−28−0012 of 2

GOVERNMENT FURNISHED MATERIAL(GFM)5.

5.1

5.2

5.3

1. None.

1. None.

1. None.

LLTM

PUSH MATERIAL

KITTED MATERIAL

ITEM NO: 992−00−0011 of 2

( 992−00−001ITEM NO:

26−539COAR:

NONECMP:

DEFRIESPLANNER:

SHIP:

PCN: PE14−L002

SCOPE

REFERENCES

REQUIREMENTS

NOTES

GOVERNMENT FURNISHED MATERIAL (GFM)

1.

2.

3.

4.

5.

5.1

5.2

Location of Work: Contractors Plant

Identification: Not Applicable

2.1 Standard Items (FY−15)

Temporary Electrical Services; provide

Provide, install and maintain temporary 115 volt, 20 amp, electrical services on a 24 hours basis for the entire contract availability period to support BARGE PROGRAM security camera system located in COB Office (1−27−1−Q) as directed by the SUPERVISOR.

Disconnect and remove temporary services equipment when directed by the

SUPERVISOR.

None.

In the event of a partial or total loss of electrical power, the contractor shall provide standby portable electric generator(s), to maintain and restore back up shore power with equal capability of systems disrupted in the performance of this work.

1. None.

1. None.

LLTM

PUSH MATERIAL

1.1

3.1

ITEM NO: 992−00−0012 of 2

5.3

1. None.

KITTED MATERIAL :

ITEM NO: 992−28−0011 of 2

( 992−28−001ITEM NO:

26−539COAR:

NONECMP:

CROWELLPLANNER:

SHIP:

PCN: PE14−B005

SCOPE

REFERENCES

REQUIREMENTS

NOTES

1.

2.

3.

4.

1.2.1

1.3.1

BRAVO/SIERRA Piers, Pearl Harbor/Contractor’s Plant

Not Applicable

Location of Work:

Identification:

2.1 None

Logistics Services

Provide rigger, tug and pilot services for the unmooring, transfer and movement of craft from BRAVO/SIERRA piers Pearl Harbor, Contractor’s Plant.

Provide rigger, tug and pilot services for the unmooring, transfer and movement of craft from the contractor’s plant back to BRAVO/SIERRA piers Pearl

Harbor.

Coordinate pickup and delivery arrangements with barge representative 10 working days prior to movement of craft each way.

Contact the SUPERVISOR, Availability Manager or TDO, 3 working days prior for Pearl Harbor entry/exit clearances with the following information:

None.

Name of commercial tug/company.

Estimated time of arrival (ETA) at Pearl Harbor.

Estimated time of departure (ETD) at Pearl Harbor.

1.1

3.4.1

3.4.2

3.4.3

3.1

3.2

3.3

ITEM NO: 992−28−0012 of 2

GOVERNMENT FURNISHED MATERIAL(GFM)5.

5.1

5.2

5.3

1. None.

1. None.

1. None.

LLTM

PUSH MATERIAL

KITTED MATERIAL

ITEM NO: 997−28−0011 of 7

( 997−28−001ITEM NO:

26−539COAR:

NONECMP:

DEFRIESPLANNER:

SHIP:

PCN: PE14−L001

SCOPE

REFERENCES

REQUIREMENTS

1.

2.

3.

1.2.1

1.3.1

Contractor’s Plant

Not Applicable

Location of Work:

Identification:

2.1

2.2

2.3

2.4

2.5

Standard Items (FY−15)

SFLC STANDARD SPECIFICATION 8634, Drydocking

085−6831715 Rev B, DOCKING PLAN & CATHODIC PROTECTION

S9086−7G−STM−010/CH−997, Docking Instructions and Routine Work in Dry

Dock

S9086−CH−STM−010/CH−074, Welding and Allied Processes

Drydocking and Undocking; accomplish

Furnish a sound dock, dockmaster, qualified personnel, and necessary equipment to safely and satisfactorily dock the

Routine drydocking and undockings…