N3220521R4155 A0004.docx
DOCX document 32 KB Posted
- Attached to
- USNS SUPPLY MTA Federal contract opportunity
- Solicitation number
- N3220521R4155
About this file
This document summarizes clarification questions and answers regarding a solicitation for mid-term availability work on the USNS SUPPLY. The solicitation is seeking offers from East and Gulf Coast contractors to perform work at their facilities, and was issued by the Department of the Navy Military Sealift Command. Clarification questions covered work items ranging from SSDG module external repair to annual firefighting inspections. Answers provided specifications for materials, clarified work scopes, and addressed pricing and estimation concerns.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| J - 2 Category A Items USNS SUPPLY Revision Amendment A0006.xls | XLS spreadsheet | |
| N3220521R4155 A0006.docx | DOCX document | |
| N3220521R4155 A0005.docx | DOCX document | |
| N3220521R4155 A0003.docx | DOCX document | |
| N3220521R4155 A0002.docx | DOCX document | |
| J - 2 Category A Items USNS SUPPLY.xls | XLS spreadsheet | |
| J - 2 Category A Items SUPPLY.xls | XLS spreadsheet | |
| N3220521R4155 A0001.docx | DOCX document | |
| J Attachments.zip | ZIP file | |
| N3220521R4155 USNS SUPPLY MTA.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3220521R4155
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION J - LIST OF DOCUMENTS, EXHIBITS & OTHER ATTACHMENTS
The following have been added by full text:
RFC RESPONSES AMENDMENT 0004
MILITARY SEALIFT COMMAND
N3220521R4155
Request for Clarification
SPECIFICATION ITEM NO.: 0326
PARAGRAPH / SECTION NO: 7.2
TITLE: SSDG Module External Repair
QUESTION: Paragraph 7.2.1 directs to remove approximately 25’ of bulkhead. Is the 25’ of bulkhead a total or is it 25’ per module?
What is the thickness of the material to be installed?
ANSWER:25’ per module, ½” A36
SPECIFICATION ITEM NO.: 402
PARAGRAPH / SECTION NO: 1.1, 3.1
TITLE: Steering Pump Overhaul
QUESTION: Paragraph 1.1 states “This item describes the requirement to perform RADAR Preventative maintenance and annual ABS inspection on FAR-2117/3CM radar system.”However, paragraph 3.1 lists “Two 3CM and One 10CM Antenna/ Pedestal/ MTR/ Display and Two Furuno ECDIS Units”. Please clarify if the intent is to only perform maintenance on the “3CM” units or all units listed in paragraph 3.1.
ANSWER: All units listed Two 3CM and One 10CM Antenna/ Pedestal/ MTR/ Display and Two Furuno ECDIS Units
SPECIFICATION ITEM NO.: 526
PARAGRAPH / SECTION NO: Para. 7.2.2.1, Para. 7.2.2.2
TITLE: Test Equipment and CRL Calibration
QUESTION: Item paragraphs 7.2.2.1 and 7.2.2.2 state 20% of gauges and 10% of thermometers will require replacement. Because of the wide range of manufacturers, types, sizes, pressure/temperature ranges, etc., can the replacements be the subject of a CCO as there is not a conclusive way to estimate the cost of replacements?
ANSWER: Please see revised WI
SPECIFICATION ITEM NO.: 1003
PARAGRAPH / SECTION NO: Para. 2.2, Para. 2.3
TITLE: Unrep Gear
QUESTION: Is a clearer print quality of references per para’s 2.2 and 2.3 available?
ANSWER: Sorry, that is the only drawing in the MSC System
SPECIFICATION ITEM NO.: 502
PARAGRAPH / SECTION NO: 7.4
TITLE: Annual Firefighting ABS Inspections
QUESTION: Paragraph 7.4 references paragraph 2.0, Section 2.1.20. There is no 2.1.20. References stop at 2.1.17. Please advise.
ANSWER: 2.1.20 has been deleted, please disregard
SPECIFICATION ITEM NO.: Various
PARAGRAPH / SECTION NO: Various
TITLE: VARIOUS
QUESTION: Amendment 0003 addressed many Requests for Clarifications. However, many of the questions contained in the Requests for Clarifications were not answered:
0102 In the note between paragraphs 7.19 and 7.20 and as well in paragraph 7.20 reference is made to enclosure 2.2.2. Where can the Enclosure be found?
0310 The list that keeps getting referred to contains (24) lube and fuel oil hoses where are the other (4) hoses identified?
0113 Is the T-Beam 1-1/2” x 1-1/2” x 1/4" or 2” x 2” x 1/4" or 2-1/2” x 2-1/2” x 1/4" or 3” x 3” x 1/4"?
0025 The work item specifically refers to Work Item 019 which establishes what the base security measures are. Category B Work Item 0025, if activated, adds to the requirements established by a Work Item 019. If the contractor is not providing vessel specific security how does MSC intend to implement increased vessel security?
0120 Fifteen (15) sockets in the vicinity of a single location would take less effort than fifteen (15) sockets not in vicinity of each other. Therefore, please identify the (15) specific sockets that are to be repaired from the (29) that are identified in the highlighted drawing provided? In addition, will the Peck + Hale Part Number PH1112-3C cross tie piece be acceptable for this installation?
ANSWER:
-0102: Wager guide see attached
-0113: 2” x 2” x 1/4" -0310: 24 hoses, port engineer can’t count
-0025: Via “B” item CCO. Activation is not currently expected.
-0120: Ship has not provided an updated cross tie list. The 29 will be gauged by Ships force and determined during walk through. All tie downs will be on the external 01 Level and can be worked from the outside. No interferneces will require removal. See attached DWG
SPECIFICATION ITEM NO.: 0102
PARAGRAPH / SECTION NO: 2.1.1
TITLE: A Tank Vent and Goose Necks
QUESTION: Reference 2.1.1 shows that all vent/check valve assemblies are wager 1750. There are two versions of this vent/check valve assembly full float and half float. Which version is required?
ANSWER: Full
SPECIFICATION ITEM NO.: 0526
PARAGRAPH / SECTION NO: 7.2.2.1-7.2.2.2
TITLE: Test Equipment and CRL Calibration
QUESTION:
Paragraph 7.2.2.1 states “20% of gauges will require replacement (approx., $7,500.00)” Paragraph 7.2.2.2 sates “10 % of Thermometers will require replacement (approx., $5,000.00)”
Can the government revise spec to address material pricing concerns by removing “20% of gauges” and “10% of thermometers” and revising the $7,500.00 & $5,000.00 material for gauges and thermometers as a Level of Effort (LOE) material for each paragraph?
ANSWER: No
SPECIFICATION ITEM NO.: 0531
PARAGRAPH / SECTION NO: 3.2.2
TITLE: A misc Equip and motor overhaul
QUESTION: There are no references provided for Motor listed in paragraph 3.2.2 for supply fan S01-469-1. No information on motor model number, size or type is provided in paragraph 3.2.2. Please provide references and motor model number, size & type.
ANSWER: Work Item 0531 was accidentally added into the references zip file for Amendment 0003. There is no work item 0531 included in this package.
SPECIFICATION ITEM NO.: 0310
PARAGRAPH / SECTION NO: 3.2.1, 3.2.2
TITLE: A SSDG Hose Replacement
Question: Previously answered bidders calls for only 29 hoses to be replaced for enclosure 2.4 for fuel oil and lube oil hoses only. Contractor only counts 24 hoses for fuel oil and lube oil listed enclosure 2.4. Please advise. Enclosure has a RE classification for all fittings which states reusable. For bidding purposes will all hose fittings be reused unless determine unusable after inspection and will cost be covered under a CFR?
ANSWER: 24 hoses. Fitting are reusable