J-3_Cat-B.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
USNS YUKON FY19 ROH/DD SYNOPSIS Federal contract opportunity
Solicitation number
N3220519R4012
Issued by
Department of the Navy Military Sealift Command

About this file

J-3

View the file

Other files for this federal contract opportunity

Other files attached to USNS YUKON FY19 ROH/DD SYNOPSIS, newest first.
File Type Posted
N3220519R40120004.docx DOCX document
Amendment_0003.docx DOCX document
RFC_-_004_Clarification_on_pricing_sheet_-_Response.doc DOC document
RFC_-_005_Clarification_J-3_-_Response.doc DOC document
J-2_Cat-A.xlsx XLSX spreadsheet
N3220519R4012-0002.docx DOCX document
RFC_001_-_Answer.doc DOC document
RFC_002_-_Answer.doc DOC document
J-2_Cat-A.xlsx XLSX spreadsheet
RFC_003_-_Answer.doc DOC document
N3220519R4012-0001.docx DOCX document
CDRL,_SWI-0010.pdf PDF
J-10_Interport_Differential.doc DOC document
CDRL,_SWI-0011.pdf PDF
CDRL,_SWI-0012.pdf PDF
CDRL,_SWI-0005.pdf PDF
CDRL,_SWI-0020.pdf PDF
CDRL,_SWI-0018.pdf PDF
J-9_Disclsr_Lobbying_Activities_SF-LLL.doc DOC document
N3220519R4012.pdf PDF
CDRL,_SWI-0021.pdf PDF
CDRL,_SWI-0004.pdf PDF
J-8_RFC.doc DOC document
CDRL,_SWI-0019.pdf PDF
J-3_Cat-B.xlsx XLSX spreadsheet
J-12_Past_Perf_Data.docx DOCX document
CDRL,_SWI-0015.pdf PDF
CDRL,_SWI-0017.pdf PDF
J-13,_Past_Perf_Questionaire.docx DOCX document
CDRL,_SWI-0016.pdf PDF
J-11_MSC_Dry-Dock_Evaluation_Form.docx DOCX document
J-14,_NDA_.docx DOCX document
CDRL,_SWI-0006.pdf PDF
CDRL,_SWI-0014.pdf PDF
CDRL,_SWI-0024.pdf PDF
Yukon_J&A_Redacted.pdf PDF
CDRL,_SWI-0001.pdf PDF
J-4_YUKON_Redacted.pdf PDF
J-2_Cat-A.xlsx XLSX spreadsheet
CDRL,_SWI-0013.pdf PDF
CDRL,_SWI-0023.pdf PDF
CDRL,_SWI-0022.pdf PDF
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cat B Items

GENERAL REQUIREMENTQTYUIUnit PriceTotalPRIME ContractorSUBCONTRACTOROTHER COSTS
ITEM NO.TITLE CAT B ITEMPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICETotal Labor HoursTotal MaterialTOTAL PRICE
CATEGORY "B"
025PHYSICAL SECURITY AT CONTRACTOR'S FACILITY
7.11COST TO ESTABLISH PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION CHARLIE1DAY
7.12COST TO ESTABLISH PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION DELTA1DAY
7.11COST TO MAINTAIN PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION CHARLIE1DAY
7.12COST TO MAINTAIN PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION DELTA1DAY
Sub-Total
030CONTINUATION OF SERVICESQTYUIUnit PriceTotalPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICETotal Labor HoursTotal MaterialTOTAL PRICE
7.1Overhaul Management Team15DAYS
7.2General Services For The Ship15DAYS
7.3Telephone Services15DAYS
7.4Project Planning and Monitoring15DAYS
7.5Fire Protection and Ship's Safety15DAYS
7.6Shipboard Access and Security15DAYS
7.7Gas Free Certificates15DAYS
Sub-Total
119STRUCTURAL STEEL REPLACEMENTQTYUIUnit PriceTotalPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICETotal Labor HoursTotal MaterialTOTAL PRICE
7.1.1Steel Plate Replacement20000LBS
7.1.2Rolled Steel Structural Shapes10000LBS
7.2.1Vee-out and re-weld one (1) 6" long or less cracked fillet weld50EA
7.2.2Vee-out and re-weld one (1) 7"-12" long cracked fillet weld50EA
7.3.1Replace One Striker Plate20EA
Sub-Total
909ZINC ANODE REPLACEMENTQTYUIUnit PriceTotalPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICETotal Labor HoursTotal MaterialTOTAL PRICE
7.2.1 (a)Type ZSS-12200ea
7.2.1 (b)Type ZHC-2350ea
7.2.1 (c)Type ZHC-4750ea
7.2.1 (d)Type ZEP Style B50ea
Sub-Total
911DRYDOCKING AND UNDOCKING SHIP CONTINUATIONQTYUIUnit PriceTotalPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICETotal Labor HoursTotal MaterialTOTAL PRICE
7.1Submit unit price per day up to a maximum of TEN (10) days to continue all services in accordance with parent item if directed10DAYS
Sub-Total
915TAILSHAFT SURVEYQTYUIUnit PriceTotalPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICETotal Labor HoursTotal MaterialTOTAL PRICE
1.1This item describes the requirements to remove, examine and reinstall the port propeller hub and the port and stbd stern tube shafts and tail shafts.
Sub-Total
TOTAL

&"Times New Roman,Regular"&10YUKON (T-AO 202)

&"Times New Roman,Bold"&14
CATEGORY "B" ITEMS&"Times New Roman,Regular"&10N3220519R4012

ATTACHMENT J-3