J-11_MSC_Dry-Dock_Evaluation_Form.docx

DOCX document 117 KB Posted

Attached to
USNS YUKON FY19 ROH/DD SYNOPSIS Federal contract opportunity
Solicitation number
N3220519R4012
Issued by
Department of the Navy Military Sealift Command

About this file

J-11 MSC Dry Dock Evaluation Form

View the file

Other files for this federal contract opportunity

Other files attached to USNS YUKON FY19 ROH/DD SYNOPSIS, newest first.
File Type Posted
N3220519R40120004.docx DOCX document
Amendment_0003.docx DOCX document
RFC_-_004_Clarification_on_pricing_sheet_-_Response.doc DOC document
RFC_-_005_Clarification_J-3_-_Response.doc DOC document
J-2_Cat-A.xlsx XLSX spreadsheet
J-3_Cat-B.xlsx XLSX spreadsheet
N3220519R4012-0002.docx DOCX document
RFC_001_-_Answer.doc DOC document
RFC_002_-_Answer.doc DOC document
J-2_Cat-A.xlsx XLSX spreadsheet
RFC_003_-_Answer.doc DOC document
N3220519R4012-0001.docx DOCX document
CDRL,_SWI-0010.pdf PDF
J-10_Interport_Differential.doc DOC document
CDRL,_SWI-0011.pdf PDF
CDRL,_SWI-0012.pdf PDF
CDRL,_SWI-0005.pdf PDF
CDRL,_SWI-0020.pdf PDF
CDRL,_SWI-0018.pdf PDF
J-9_Disclsr_Lobbying_Activities_SF-LLL.doc DOC document
N3220519R4012.pdf PDF
CDRL,_SWI-0021.pdf PDF
CDRL,_SWI-0004.pdf PDF
J-8_RFC.doc DOC document
CDRL,_SWI-0019.pdf PDF
J-3_Cat-B.xlsx XLSX spreadsheet
J-12_Past_Perf_Data.docx DOCX document
CDRL,_SWI-0015.pdf PDF
CDRL,_SWI-0017.pdf PDF
J-13,_Past_Perf_Questionaire.docx DOCX document
CDRL,_SWI-0016.pdf PDF
J-14,_NDA_.docx DOCX document
CDRL,_SWI-0006.pdf PDF
CDRL,_SWI-0014.pdf PDF
CDRL,_SWI-0024.pdf PDF
Yukon_J&A_Redacted.pdf PDF
CDRL,_SWI-0001.pdf PDF
J-4_YUKON_Redacted.pdf PDF
J-2_Cat-A.xlsx XLSX spreadsheet
CDRL,_SWI-0013.pdf PDF
CDRL,_SWI-0023.pdf PDF
CDRL,_SWI-0022.pdf PDF
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MSC DRYDOCK EVALUATION FORM

Ship name:
USNS YUKON
Hull No:
T-AO 202

PART A (to be completed by MSC)

PART B (to be completed by ALL shipyards)

Drydock Certification / Classification Info

Shipyard name

Drydock No.

Drydock Type Graving |_| Floating |_| Marine Railway |_|

Certified? Yes |_| No |_|

Certifying / Classifying Agency

Certificate No.

Date of expiration

Ship Characteristics
English measure
Metric measure

Provide date in English and Metric Units:

Length, overall
677
ft -
6
in
206.5 m

Drydock Characteristics

Breadth, molded
97
ft -
6
in
29.7 m

Length, overall ft-in m

Draft, light load line
36
ft -
0
in
11.0 m

Breadth ft-in m

Gross Tonnage (U. S.)
20705
Tons
Displacement, Full Load
42,382
LT

43091.3 MT

Maximum drydock lift capability

LT

MT

Minimum Displacement/Draft

Displacement
25550
LT

MT

Draft - forward
20
ft -
0
in
6.1m

Maximum entry draft rating:

LT

MT

Draft – aft
27
ft -
0
in
8.2 m
Max stern trim for graving dock
5
ft -
3
in
1.6 m

Water depths around dock ft-in m area and approaches, tidal conditions, Anticipated Arrival Draft and any unusual conditions for entering/

Draft - forward
20
ft -
0
in
6.1 m

leaving the drydock.

Draft - aft
27
ft -
0
in
8.2 m

Depth Over Floor ft-in m

Positioning Clearances

Depth Over Blocks ft-in m

Bottom: keel to drydock floor
6
ft -
0
in
1.8 m

Depth Over Sill ft-in m

Side: hull to drydock wall
10
ft -
0
in
3.0 m

Depth Over KEEL ft-in m

Loading Pressures

Max block loading
23.8
Tons Per square ft.
260.3 per sq mtr

Note: All blocks to be positioned under longitudinal strength members and transverse bulkheads.

Max Block Loading Capability

Blocking Requirements

Block Capability

LT/ft2

LT/m2

Construction
CONCRETE/HARDWOOD

SOFTWOOD

2-INCHS

Shaped

Keel & Side Block Information

Cap material

Construction

Cap thickness (min)

Cap Material

Side blocks (e.g., shaped, wedged, etc.)

Cap Thickness in cm

Block Age

Hardwood: White Oak, California Laurel, Oregon Myrtle, Iron bark, Height ft-in m

Blue Gum, American Rock Elm or Preserved Red Oak.

Width ft-in m

Softwood: Douglas Fir, Tamarack, Long Leaf Pine or Hemlock

Length ft-in m

MSC DRYDOCK EVALUATION FORM (cont’d)

PART A (to be completed by MSC)

PART B (to be completed by ALL shipyards)

Provide data in English and Metric units

Minimum Required Services

Electrical power

Minimum Available Services

AC volts
450
VAC

Electrical power

number of phases
3

AC volts

VAC

amperage (total)
2400
Amps

number of phases

frequency
60
Hz

amperage (total) amps

number of lines
6

frequency

Hz number of lines

Ground connections

number
2

Ground connections

cable size, each
1,000,000
cir mils

number cable size, each cir mils

Sewage connections

number
2

Sewage connections

pipe size
2 1/2
inch ips

number

capacity
1,000
gals per day
3,785 liters per day

pipe size inch ips cm

(IF REQ’D)

capacity gal/day ltr/day

Fire Main

number of connections
8

Fire Main

connection size
2 ½
inch ips

number of connections

pressure
150
Psig
10.5kg per sq cm

connection size inch ips cm

capacity
1000
gals per min
3785 liters per min

pressure psig kg/m2 capacity gpm ltr/min

Aux Seawater

pressure
150
Psig
10.5kg per sq cm

Aux Seawater

capacity
1700
gals per min
6587.5 liters per min

pressure psig kg/m2 capacity gpm ltr/min

Fresh Water

pressure
150
Psig
10.5kg per sq cm

Fresh Water

capacity
40
gals per min
49,63MT per day

pressure psig kg/m2 capacity gpm ltr/min

Compressed Air

pressure
150
Psig
10.5 kg per sq cm

Compressed Air

capacity
750
cu ft per min
21240 liters per min
pressure
120
psig
8,448
kg/m2
capacity
5,600
cfm
21,196
ltr/min

Shore Steam

pressure
150
psig
10.5kg per sq cm

Shore Steam

capacity
6,000
lbs per hour
2,721.6 kg per hour
pressure
125
psig
8.79
kg/m2
capacity
18,574
lb/hr
8,425
kg/hr
High Pressure Water Wash pressure
3,000
psig
210.9kg per sq cm
High Pressure Water Wash pressure
40,000
psig
2,813
kg per sq cm

Safety Response Plans Required

Safety Response Plans Available (circle correct answer)

Firefighting
YesX
No|_|
Firefighting
Yes
No
Flooding (accidental)
YesX
No|_|
Flooding (accidental)
Yes
No
Earthquake
YesX
No|_|
Earthquake
Yes
No
Typhoon
Yes|_|
NoX
Typhoon
Yes
No

MSC DRYDOCK EVALUATION FORM (cont’d)

PART C (to be completed by Shipyard if drydock is not certified by IACS or under MIL STD 1625C)

Dockmaster info

Contractor name

Dockmaster name

Certifying Agency

Certificate No.

Years experience

Drydock Insurance Info

Is Drydock insured?
Yes |_|No |_|

Insurer

Policy No.

Amount Insured

Date of expiration

IS SNUBBING NECESSARY?

YES NO

IS FIRE PROTECTION AVAILABLE

ON BUILDING WAY?

YES NO

TIDAL RANGE (DIFF. OF M.L. M.H)

CERTIFICATION DATE &

CERTIFIED BY WHOM

LIFT CAPACITY

(std. tons)

TYPE

CRANES SERVING WAY

NO.

AT DROP

OFF

OVER

WAY END

DEPTH OF WATER

LENGTH OF LAUNCHING RUN DEPTH OF RUN AT M.L.W.

[ ] END LENGTH: LENGTH:

[ ] SIDE

[ ] BASIN WIDTH: WIDTH:

[ ] SLAB

DEPTH: DEPTH:

[ ] END LENGTH: LENGTH:

[ ] SIDE

[ ] BASIN WIDTH: WIDTH:

[ ] SLAB

DEPTH: DEPTH:

[ ] END LENGTH: LENGTH:

[ ] SIDE

[ ] BASIN WIDTH: WIDTH:

[ ] SLAB

DEPTH: DEPTH:

[ ] END LENGTH: LENGTH:

[ ] SIDE

[ ] BASIN WIDTH: WIDTH:

[ ] SLAB

DEPTH: DEPTH:

[ ] END LENGTH: LENGTH:

[ ] SIDE

[ ] BASIN WIDTH: WIDTH:

[ ] SLAB

DEPTH: DEPTH:

NO. LAUNCHING DIMENSIONS MAXIMUM SHIP SIZE

OF (check one) (ton 2,240 lbs)

WAY

[ ] END LENGTH: LENGTH:

[ ] SIDE

[ ] BASIN WIDTH: WIDTH:

[ ] SLAB

DEPTH: DEPTH:

BUILDING WAYS (M. I. W.)

SHIPYARD DATA

Telephone No:

Telex No:

Date Found:

SHIPYARD AND ADDRESS

Commander (Code M-4E3) Military Sealift Command Norfolk, VA 23511-4419 NOTE: If survey form has been previously submitted, then enter changes only.

MSC SHIP REPAIR FACILITY SURVEY

LIST ANY OTHER RESTRICTIONS (include projects under construction which will after navigational restrictions) DISTANCE TO NEAREST DISTANCE TO NEAREST AIRPORT RAILROAD CONNECTION (identify)

MAXIMUM SHIP SIZE

ACCOMMODATED

LENGTH OA-BEAM

DOCK

NO.

DRY DOCKS (continued) LEGEND (abbreviation of services) Fresh Water --- F.W. - G.P.M. - P.S.I. Steam --- S - P/HR - P.S.I. Electric Power --- E - V - AC - AMP Fire Protection --- FP - G.P.M. - P.S.I.

Salt Water ----- S.W. - G.P.M. - P.S.I Air ------ A - C.F.M. - P.S.I. Electric Power --- E - V- DC - AMP Sanitary Sewer --SS - YES - NO

DATE CERTIFIED, CERTIFIED BY WHOM, &

DATE CERTIFICATION EXPIRES

LIFTING CAPACITY

(ton 2,240)

DEPTH/DRAFT

OVER OVER OVER

SILL FLOOR KEEL

(GD) BLOCKS

CLEAR WIDTH

at top cradle (MR), at keel at top inboard block wing wall (FD, GD) height

LENGTH

at coping (GD), at keel blocks OVERALL on cradle (MR), on PONTOON

(FD)

MATERIAL TYPE

Floating--(FD) Graving--(GD) Marine Railway (MR)

DOCK

SERVICES AVAILABLE

(Use abbreviation of service below)

USE

REPAIR/

OUTFIT-

ING

HEIGHT

OF

DOCK

(M.L.W.)

OUT-

BOARD

IN-

BOARD

WATER DEPTH

(M. L. W.)

LENGTH

(actual & usable)

ACT:

USE:

ACT:

USE:

ACT:

USE:

ACT:

USE:

ACT:

USE:

ACT:

USE:

TYPE

BERTHS OF SHIPS (Piers, Wharves, Bulkheads, etc.)DRY DOCKS (means high water)
MSC SHIP REPAIR FACILITY SURVEY (continued)SHIPYARD:

NAVIGATIONAL RESTRICTIONS (indicate at M.L.W.)

MINIMUM CHANNEL (depth width) MINIMUM HORIZONTAL AND VERTICAL BRIDGE CLEARANCES

BERTHING, SHOP OR YARD CRANES; STATIONARY, RAIL, MOBILE, OR BRIDGE (3 tons or over)

MAX REACH HEIGHT OF HOOK

NO TYPE CAPACITY MAX SPAN CAPACITY BOOM HEIGHT ABOVE BASE HEIGHT OF HOOK AREA SERVICE DATE CERTIFIED, CERTIFIED BY WHOM & (STD TONS) (BRIDGE) AT REACH LENGT HINGE ABOUT REACH (BRIDGE) DATE CERTIFICATION EXPIRES

ACREAGE LEGALLY CONTROLLED

IN USE DEVELOPED TOTAL

EXISTING LOCAL ORDINANCES LIMITING PRODUCTIVE USE

LIMITATION IMPOSED BY PROPERTY ZONING CLASSIFICATION

LIST TYPES OF WORK NORMALLY SUBCONTRACTED

RAW STEEL STORAGE (SQ. FT.) ___________________________________________________________

WELDING AND ASSEMBLY (SQ. FT.) _______________________________________________________

ALL OTHER SHOPS

(LIST NAMES AND DIMENSIONS)

LARGEST EXIT

WIDTH HEIGHT

DIMENSIONS OF

SHOP OR BUILDING

NAME OF SHOP

OR BUILDING

FABRICATING

PLATE

SHEET METAL

SUBASSEMBLY

WOOD WORKING

BOAT ASSEMBLY

OR MOLDING

BOILER

MACHINE

ELECTRICAL

ELECTRONIC

PIPE

FOUNDRY

RIGGER

STORAGE SPACE FOR COMPONENTS AND MATERIALS

(LIST DIMENSIONS FOR EACH AREA, PLUS TYPE MATERIAL STORED)

PRINCIPAL SHOPS AND BUILDINGS

SHIPYARD:
MSC SHIP FACILITY SURVEY (continued)

SHIPYARD:

MSC SHIP REPAIR FACILITY SURVEY (continued)

NAME AND TITLE OF SENIOR SURVEYOR SIGNATURE DATE SIGNED

ARE YOU CERTIFIED AS A SMALL BUSINESS? YES NO

REQUIRED SUBMITTALS TO ACCOMPANY THIS FORM:

1. PLOT PLAN OF YARD.

2. CERTIFIED DEPTH OF WATER PLOT

3. FOR EACH SHOP LISTED ON SHEET 4, A LIST OF MACHINE TOOLS AND

EQUIPMENT WHICH INDICATES THE CAPACITIES OF THE SHOP.

4. A GENERAL STATEMENT (INCLUE, NAME OF SHIP, DATES, AND

DOLLAR AMONT OF JOB) OF SHIP REPAPIR WORK WHICH HAS BEEN

ACCOMPLISHED BY THE APPLICANT.

5. LISTING OF OFFICIALS AND THE QUALIFICATIONS OF EACH FOR SHIP

REPAIR (INCLUDE AS A MINIMUM JOBS HELD, YEARS, HELD, ONE

LINE

6. IF FACILITIES ARE LOCATED AT MORE THAN ONE LOCATION THEN

LIST EACH FACILITY AND ITS LOCATION.

7. POINT OF CONTACT FOR INFORMATION SUBMITTED IN THIS FORM

(NAME/TITLE/PHONE NUMBER).

NORMAL

SHIFTS

NORMAL

MAXIMUM

POTENTIAL MAXIMUM

CURRENT

CURRENT

EMPLOYMENT

MANAGEMENT, ADMINISTRATION

PROFESSIONAL ENGINEERING

PRODUCTION SKILLED

PRODUCTION UNSKILLED

NONPRODUCTION

TOTAL:

LIST ANY EQUIPMENT OR CAPABILITY NOT OTHERWISE DESCRIBED IN THIS FORM

PART D (to be completed by ALL Shipyards)

1. The Offeror shall provide a list of the vessels (and their principal characteristics) drydocked in this drydock over the past 2 years. (Attach a separate page)

2.The Offeror shall describe the nature and cause of accidents experienced by the shipyard in drydocking operations over the past 5 years. The Offeror shall
describe corrective action taken or practices implemented to prevent recurrence of accident. (Attach a separate page)

I hereby certify that the above information is true and accurate.

Name and Title of Shipyard Official

Signature of Shipyard Official

Date

Attachment J – 11

ATTACHMENT J - 11

File details come from the government source that posted it.