Amendment0003.docx
DOCX document 39 KB Posted
- Attached to
- USNS MERCY (AH-19) MTA Federal contract opportunity
- Solicitation number
- N3220518R4551
About this file
Amendment 0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0006.docx | DOCX document | |
| 18-R-4551_Amend_0005.docx | DOCX document | |
| Amendment_0004.docx | DOCX document | |
| Q&A_ANSWERS__2.docx | DOCX document | |
| N3220518R4551_Amendment_2.docx | DOCX document | |
| Amendment_0001.docx | DOCX document | |
| ANSWER_001_-_Visa_info_request.docx | DOCX document | |
| N3220518R4551.docx | DOCX document | |
| REDACTED_MERCY_MTA_JA.pdf | ||
| J_Attachments.zip | ZIP file | |
| SYNOPSIS_N3220518R4551.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3220518R4551
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
C – 2 List Of Standard Work Items Included For This Solicitation:
Section 000 GENERAL
| 001 | Intent, Scope, Gen Requirements, Definitions Rev May 16 | N |
| 002 | Technical Representatives Rev Feb 14 | N |
| 003 | Approach, Berth And Mooring Requirements Rev 21 Jan 16 | N |
| 004 | Testing And Quality Assurance Rev Feb 14 | N |
| 005 | Electrical Safety Procedure Requirements Rev Feb 14 | N |
| 006 | Heavy Weather Plan Rev Feb 14 | N |
| 007 | Cold Weather Plan Rev Feb 14 | N |
| 010 | Furnish Office For Overhaul Management Team (OMT) Rev Feb 14 | A |
| 011 | Furnish General Services (T-AH) Rev Feb 14 | A |
| 012 | Telephone Services Rev Feb 14 | A |
| 013 | Project Planning And Production Monitoring Reports | A |
| 014 | Preparation Of Weight And Moment Report Rev Feb 14 | A |
| 015 | Integrated Logistics And Gfm Support Requirements Rev Feb 14 | A |
| 016 | Fire Protection And Ships Safety Program Rev 28 Sep 17 | A |
| 017 | Handling Ships Stores Rev Feb 14 | A |
| 018 | Delivery And Redelivery Of The Vessel Rev May 16 | A |
| 019 | Shipboard Access And Security, Rev Aug 15 | A |
| 020 | Gas Free Certificates Rev Feb 14 | A |
| 021 | Clean And Gas Free Tanks, Voids And Cofferdams & Space ADM 1 | A |
| 022 | Machinery Space Turn-Over, Dock Trials And Sea Trials | A |
| 023 | Hazardous Waste Disposal At A Contractors Facility | A |
| 024 | Physical Security At Private Contractors Facility | N |
| 025 | Physical Security At Private Contractors Facility 24 Oct 2017 | B |
| 030 | Continuation Of Service Rev Feb 14 | B |
Section 100 HULL STRUCTURE
| 101 | Distilling Plant Deck And Foundation Refurbishment | A | |
| 102 | Distilling Plant Deck And Foundation Steel Replacement | ||
| Refurbishment (Vr17-0087) (Eslp) | B | ||
| 103 | Ballast Tank Ladder Renewals (Vr15-0085) | A | |
| 104 | Potable Water Tank Preservation (Vr18-0011) | A | |
| 105 | Chock Foundation On Deck Repair (Vr17-0055) | A | |
| 106 | Aft House Window Repairs (Vr-16-0094) | A | |
| 107 | Main Air Ejector Decking 20’ Flat Replacement (Vr17-0193) ADM 1 | A | |
| 108 | Remove Unauthorized Port Holes (Vr-17-0082) | A | |
| 109 | SA 6 Bildge Decking Mechanical Clean And Paint (Vr17-0145) | A | |
| 110 | Nonskid Deck Preservation (Vr 17-176) | A | |
| 111 | Hydraulic Piping Bulkhead Penetration Install (Vr17-0102) | A | |
| 112 | Sa 6 Stuctural Mods (Osr 753,754,758 Abs/Uscg) (M&R) (Talt-Dg) | A | |
| 113 | Connex Box Foundation Modifications (Abs/Uscg) (M&R) (Talt-Dg) | A | |
| 114 | Mmr Work Shop Modifications (Osr 760 Abs/Uscg) (M&R) (Talt-Dg) | A | |
| 115 | Main Space Side Shell Repairs (Vr 17-0125) | A | |
| 116 | Shaft Alley Stairwell Modification (Talt-Dg) ADM 1 | A | |
| 117 | Potable Water Tank Repairs (Vr 18-011) | A | |
| 118 | Forced Draft Blower Flat Decking 01-97-0 (Vr17-191) | A | |
| 119 | Boiler Decking Repairs (Vr17-011) (Ut In Jan) ADM 1 | A | |
| 120 | MSD Unit Decking (Vr17-0047) (Ut In Jan) | A |
Section 200 MACHINERY, PROPULSION
| 201 | Boiler Tube Mapping (Eslp) | A |
| 202 | Ut Steam And Firemain Piping (Eslp) | A |
| 203 | Auxiliary Salt Water Piping Renewal (Eslp) | A |
| 204 | Steam Pipe Hanger Assembly Repair (M&R) | A |
| 205 | Boiler Desuperheater Repair (Vr17-104) Smart Item | A |
| 206 | Boiler Periscope Install (Osr 745 Abs/Uscg M&R) (Talt-Dg) | A |
| 207 | Auxiliary Exhaust Piping Removals (Vr 17-168) | A |
| 208 | Boiler Sliding Foot (Pmia) | A |
| 209 | Soot Blower Equalizing Line Installation | A |
| 210 | Boiler Survey (Abs-Uscg) | A |
| 211 | Boiler Mount (5 Year) | A |
| 212 | Boiler Safety Valve (Abs-Uscg) | A |
Section 300 ELECTRICAL
| 301 | Adg Turborcharger Replacement Shipyard Support (Talt-Dg) | A |
| 302 | Boiler Soot Blower Control Install | A |
| 303 | Switchboard Cleaning (Vr 17-065) | A |
| 304 | Group Controller Cleaning (Vr 17-065) | A |
| 305 | Msd Controller | A |
| 306 | Miscellaneous Motor Overhaul | B |
Section 500 MACHINERY, AUXILIARIES SYSTEMS
| 501 | Tank Level Indicators Phase 2 (Vr14-0099) (Eslp) | B |
| 502 | Distilling Plant Overhauls (Eslp) | B |
| 503 | Sw Flushing Reducing Station 1&2 Discharge Piping Renewal | A |
| 504 | Plumbing System Piping Renewal Phase 1 | A |
| 505 | Plumbing System Drain Piping Replacement Phase 1 | B |
| 506 | Aft Galley Sink Drain Piping Repairs (Vr 17-216) | A |
| 507 | Steam System Valve Repairs (Vr 17-218) ADM 1 | A |
| 508 | Mooring Winch Brake Band Overhaul 1&2(Vr17-0195) | A |
| 509 | #2 And #3 A/C Plant Condenser Retube (Vr 17-077) | A |
| 510 | Ac Sw Strainer Replacement (Vr-17-100) | A |
| 511 | Adg #3 Overhaul, Overhaul 36 Fuel; Injectors (Vr 17-0149) | A |
| 512 | Ssdg Salt Water Cooling Piping Repairs (Vr 18-010) | A |
| 513 | Potable Water Heater Install (Osr 743 Abs/Uscg) (M&R) (Talt-Dg) | A |
| 514 | Sewage Piping Repairs (Vr 17-131) | A |
| 515 | Forward Reefer Sw Piping Repairs (Vr15-0088) | A |
| 516 | Bildge System Install (Osr 736-740 Abs/Uscg) (M&R) (Talt-Dg) | A |
| 517 | Steering Gear Control Repair And Calibrate (Vr 18-012) | A |
| 518 | Fan Coil Orifice And Valve Installation Smart Hit Thermo | A |
| 519 | Overhaul Ballast Valve Mov & Firemain Crossover Mov | A |
| 520 | Steering Gear Eductor Installation | A |
Section 600 OUTFITTING, FURNISHINGS AND HABITABILITY
| 601 | Aft Galley Equipment Groom (Pmia) | A |
| 602 | Steam Kettle Relief Valve Hydrostatic Testing (Pmia) | A |
| 603 | Toilet And Shower Space Deck Repairs (Vr 17-140) | A |
| 604 | Vinyl Deck Tile Repairs (Vr17-0151) (Vr17-0140) | A |
| 605 | Habitability Space Preservation (Vr 17-140) | A |
| 606 | Helo Shelter Repairs (Vr 17-219) | A |
| 607 | Rhib And Tender Engine Service (Vr17-0096) | A |
| 608 | Tender Boat Hull Gellcoat Repair (Vr 18-013) | A |
Section 700 SPONSORS: MTF
| 701 | O2n2 Plant Hvac Mods Talt Xx | A |
| 702 | Laundry Mods Talt Xx | A |
| 703 | Laundry Equipment Inspection (Pmia) | A |
| 704 | Galley Equipment Inspection (Pmia) | A |
| 705 | Paitent Ward Galley Equipment (Pmia) | A |
Section 800 HEATING, VENTILATION, AND AIR CONDITIONING
| 801 | Vent Fan Repair And Overhaul Engine Room Fans (Vr17-0051) | A |
| 802 | Laundry Ventilation Cleaning (Vr17-147) | A |
| 803 | Galley Ventilation Cleaning (Vr17-147) | A |
| 804 | Vent Cleaning Aft Frame 60 And Fwd Galley (Vr17-0147) | A |
| 805 | Ventilation Damper Repaires (Vr 18-009) | A |
| 806 | Ventilation Damper Replacement (Vr 18-009) | A |
| 807 | Air Handler Fan And Motor Repair (Vr 18-017) | A |
| 808 | Vent Fan Repairs (Vr 18-017) | A |
Section 900 DOCKING AND UNDOCKING
901 Inclining And Dead Weight Survey (Outstanding Abs Comment) B
(End of Summary of Changes) image1.wmf
File details come from the government source that posted it.