(Hour)
PAGE(S)
until 02:00 PM local t ime 19 May 2017
X
A X B X C X D
EX
X
G F 76 - 89
90 - 115 X H 116 - 118 chris.meconnahey@navy .mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 118
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N32205 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
MSCHQ NORFOLK BLDG T-26
conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
CHRISTOPHER S. MECONNAHEY 757-443-5807
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 2 3 - 23
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
24 - 36
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
38 - 40
41 - 42 X K REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 43 - 46 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 47 - 65 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
66 - 74
PART II - CO NTRACT CLAUSES
MILITARY SEALIFT COMMAND NORFOLK
471 EAST C STREET BLDG T-26
NORFOLK VA 23511
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
18 Apr 2017
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N32205-17-R-3515
Section A - Solicitation/Contract Form
PREAMBLE
MSC SOLICITATION N32205-17-R-3515
DRY TIME
UNDER FAR PART 15
1. This Request for Proposals (RFP) is a solicitation for offers to perform a Charter Party (the “contract” or
“Charter”) in accordance with the terms and conditions herein.
2. The Charter, when awarded, will consist of the completed Standard Form SF-33, this Preamble, the Box format, included in Section B as completed by the offeror, Section B, “Supplies or Services and Prices” through Section J, “List of Attachments,” and all Attachments listed in Section J as completed by the offeror
3. The signature of the Contracting Officer on the SF-33 signifies acceptance of the Contractor’s proposal and award of the Charter. The SF-33, the Box format, Sections B through J, and Attachments listed in Section J contain in full all of the amendments, references, responses, deletions, additions and interlineations made by both parties to the RFP and the proposal as of the Charter Party date. In the event that there is any inconsistency between the terms and conditions of this solicitation and those in an Offeror’s proposal, this solicitation shall control, unless the Offeror clearly indicates that it has offered terms and conditions inconsistent with this solicitation and the Government has accepted the changed terms and conditions. All references to boxes in Section B through M shall be to the Box format unless otherwise stated.
4. Each of the parts or any portion thereof of this Charter Party shall be deemed severable, and should any part or any portion thereof be held invalid, illegal, or unenforceable, the remaining Parts and portions thereof shall continue in full force and effect. The headings herein are for the sake of convenience and reference only, and shall not affect the interpretation of this Charter Party.
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
DELIVERY AND REDELIVERY COSTS
FFP
Delivery / Redelivery
NET AMT
PSC Code: V124
FIRM PERIOD CHARTER HIRE
FFP
Firm Period Charter Hire
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FIRM PERIOD REIMBURSABLES
FFP
POP 01 SEPTEMBER 2017 - 31 AUGUST 2018
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification
OPTION 1 CHARTER HIRE
FFP
Option 1 Charter Hire
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide
OPTION 1 REIMBURSABLES
FFP
POP 01 SEPTEMBER 2018 - 31 AUGUST 2019
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide
OPTION 2 CHARTER HIRE
FFP
Option 2 Charter Hire
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide
OPTION 2 REIMBURSABLES
FFP
POP 01 SEPTEMBER 2019 - 31 AUGUST 2020
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide
OPTION 3 CHARTER HIRE
FFP
Option 3 Charter Hire
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide
OPTION 3 REIMBURSABLES
FFP
POP 01 SEPTEMBER 2020 - 31 AUGUAST 2021
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide
OPTION 4 CHARTER HIRE
FFP
Option 4 Charter Hire
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide
OPTION 4 REIMBURSABLES
FFP
POP 01 SEPTEMBER 2021 - 31 AUGUST 2022
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide
DRYTIME BOXES
Vessel(s):
Solicitation Number: N632205-17-R-3515 Contract Number (date):
1. Vessel(s) Required:
The vessel requirements are provided as Section C. Section C is hereby incorporated into the boxes for the purposes of FAR 52.212-4(as tailored) paragraph (s) ORDER OF PRECEDENCE (TAILORED).
See Block 75 for continuation.
2. Place / Range of Delivery: Little Creek, VA
3. Place / Range of Redelivery:
Little Creek, VA
4. Charter Period):
PERIOD OF PERFORMACE: BASE PERIOD IS
APPROXIMATELY 365 DAYS WITH 3-1 YEAR OPTIONS and a final 4th option of 11 mos.
5. Laydays:
Commencing/Cancelling : 01 September 2017
6. Terms/Conditions/Attachments added, deleted or modified:
Boxes 50 – 62 N/A
Solicitation Number: N632205-17-R-3515 Contract Number (date):
GENERAL DATA
7. Vessel/Flag/Year Built:
8. Proposal Firm Until:
9. Amendments Acknowledged (amendment numbers and dates):
10. Owner (style, address, phone, cell phone, pager, e-mail, fax):
11. Broker (address, phone, e-mail, fax):
12. Remittance address for hire (if other than box 10):
Solicitation Number : N32205-17-R-3515 Contract Number (date):
SECOND PERIOD
FULL OPERATIONAL STATUS RATE REDUCED OPERATIONAL
STATUS RATE
REDUCED OPERATIONAL STATUS
RATE
NOT APPLICABLE NOT APPLICABLE
13A. USD per diem
14A. USD per diem
15A. USD per diem
FIRST PERIOD
FULL OPERATIONAL STATUS RATE REDUCED OPERATIONAL
STATUS RATE
REDUCED OPERATIONAL STATUS
RATE
13. USD per diem
14. USD per diem
15. USD per diem
THIRD PERIOD
STATUS RATE
REDUCED OPERATIONAL STATUS
RATE
13B. USD per diem
14B. USD per diem
15B. USD per diem
FIFTH PERIOD
FULL OPERATIONAL STATUS RATE REDUCED OPERATIONAL STATUS
RATE
REDUCED OPERATIONAL STATUS
RATE
13D. USD per diem
14D. USD per diem
15D. USD per diem
FOURTH PERIOD
STATUS RATE
REDUCED OPERATIONAL STATUS
RATE
13C. USD per diem
14C. USD per diem
15C. USD per diem
Solicitation Number : N32205-16-R-3515 Contract Number (date):
16. Indicate anticipated crewing arrangements during ROS (Less Than 10 Days) and ROS (10 Days and Longer): N/A
17. Other Costs:
LAYDAYS PROPOSED
VESSEL DATA
Solicitation Number : N32205-17-R-3515 Contract Number (date):
18. Laydays Proposed: 19. Estimated Readiness Date:
20. Voluntary Intermodal Sealift Agreement (VISA) Status of Offeror and Vessel(s): N/A
21. Vessel type and, if applicable, MARAD design type:
22. Place built 23. Year built: Flag:
24. INMARSAT Ident.: 25. Vessel's e-mail/Fax:
26. Call Letters: 27. Official number:
28. Net registered tonnage: 29. Panama Canal tonnage:
30. Gross registered tonnage: 31. Suez Canal tonnage:
32. Beam (extreme)
a. (ft) b. (m)
33. Length Overall:
a. (ft) b. (m)
34. Immersion (on draft in Box 36):
a. (LT/in) b. (t/cm)
35. Length between perpendiculars:
a. (ft) b. (m)
36. Summer mean draft:
a. (ft) b. (m)
37. Deadweight capacity (on draft in Box 36):
a. (LT) b. (t)
38. Displacement, loaded (on draft in Box 36):
a. (LT/in) b. (t/cm)
39. Summer Load Line Freeboard:
a. (ft) b. (m)
40. Shaft Horsepower/kilowatts:
a. (hp) b. (kW)
41. Brake Horsepower/kilowatts:
a. (hp) b. (kW)
42. Nationality of Master/Officers/Crew: 43. Number of persons other than crew that can be carried:
44. Classification society entered and class assigned:
45. Insured value of vessel (USD): 46. Vessel's present position/destination:
47. Last dry-dock date (mm/dd/yy): 48. Next dry-dock date (mm/dd/yy):
49. MarAd subsidized vessel: Yes _____ No ______ Will not be subsidized after postaward sale.
50. Total grain cubic capacity (cu ft / cubic meters underdeck, exclusive of deep tanks, wing tanks, reefer spaces, and spaces fitted with cell guides): N/A
51. Total Bale cubic capacity (cu ft / cubic meters underdeck, exclusive of deep tanks, wing tanks, reefer spaces, and spaces fitted with cell guides): N/A
52. Number of tween decks: N/A
53. Cargo Space N/A
a. Square footage of cargo space (note particularly total ft2, ft2 with 10 ft clearance, ft2 underdeck, Ro/Ro Space):
b. Square meters of cargo space (note particularly total m2, m2 with 3.048 m clearance, m2 underdeck, Ro/Ro Space):
54. Total underdeck container capacity (TEU/FEU): N/A
55. Total on-deck container capacity (TEU/FEU): N/A
56. Total refrigerated-container capacity (TEU/FEU, including number/style of outlets):
N/A
57. Reefer-space capacity (cu ft / cu meters): N/A
58. Deep-tank capacity (cu ft/cu meters/bbls): N/A
59. Capacity of spaces fitted with cell guides (TEU): N/A
60. Amount and location of permanent ballast carried: N/A
61. General description of ramps (number, location, size, capacity, and type):
(note particularly weight of heaviest permissible vehicle in LT or t)
Solicitation Number (date): N32205-17-R-3515 ( ) Contract Number (date):
CARGO CAPACITY (continued)
62. General description of cargo spaces and special features:
GEAR
63. Number/location/SWL capacity of winches, derricks, booms, and cranes:
CASUALTIES / DEFICIENCIES
64. Has vessel been involved in any serious grounding or collision within twelve months from the submission date of this proposal?
(include full description if "yes")
65. Are any deficiencies lodged by any regulatory body outstanding against the Vessel? (include full description if "yes")
FUEL CONSUMPTION AT SERVICE SPEEDS
66. Average warranted speed (knots, for laden, moderate weather): 67. Average warranted speed (knots, for ballast, moderate weather):
68. Average fuel consumption (net bbls at 60 deg F and grade(s): for laden, moderate weather passage at speed identified in Box 66):
69. Average fuel consumption (net bbls at 60 deg F and grade(s): for ballast, moderate weather passage at speed identified in Box 67):
70. Auxiliaries underway fuel consumption (net bbls at 60 deg F and grade(s), only if not elsewhere identified):
71. Idle fuel period fuel consumption (net bbls at 60 deg F and grade(s)):
FUEL CONSUMPTION AT VARIABLE SPEEDS
Average fuel consumption (net bbls at 60 deg F for all grades and all engines/auxiliaries utilized while underway over moderate-weather passages at the speed, ranges, and grade(s) indicated): It is estimated without guarantee that the vessel will be in port 60% of the time and underway laden 40% of the time. Underway periods shall consist of independent steaming, convoy operations, transit to/from selected ports for vessel and cargo maintenance, or for cargo discharging/loading operations 72: Grades Consumed:
73 A. LADEN 73 B. BALLAST
Knots
Net bbls per mile
Net bbls per day
Operating Range (NM)
Knots Net bbls per mile Net bbls per day Operatin g Range
(NM)
08 08 09 09 10 10 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21 21 22 22
75. Cancellation Fee: The Contractor and Government agree the purpose of this clause is to induce the Contractor to offer to and to provide the required services when the Contractor otherwise would not offer to provide them because of the Contractor’s inability to recover its out-of-pocket costs in the event the Government does not exercise an option to extend the term of the contract or terminates the contract for the convenience of the Government.
In the event the Government does not exercise an option to extend the term of the contract or terminates the contract for convenience, the Contractor shall be entitled to not-to-exceed cancellation costs subject to the following conditions and according to the following schedule:
Prior to Delivery $ (of vessel) Vessel acquisition $ Reflagging $ Conversion/Modification $ During Fixed Performance Period $ Vessel acquisition $ Reflagging $ Conversion/Modification $
During 1st Option Performance Period $ Vessel acquisition $ Reflagging $ Conversion/Modification $
During 2nd Option Performance Period $ Vessel acquisition $ Reflagging $ Conversion/Modification $
During 3rd Option Performance Period $ Vessel acquisition $ Reflagging $ Conversion/Modification $
During 4th Option
Performance Period $ Vessel acquisition $ Reflagging $ Conversion/Modification $
"Cancellation costs" means, and only means, costs specifically identified by the Contractor in its proposal and actually incurred by the Contractor between contract award and vessel delivery to the Government including, and limited to, the following categories of costs: costs incurred by the Contractor for vessel acquisition, reflagging costs and modification, or conversion costs, and only to the extent such modification, or conversion costs were incurred in order for the vessel to meet contract requirements. The Government has sufficient working capital funds for these cancellation costs.
When requesting payment of cancellation costs, the Contractor shall provide evidence satisfactory to the Contracting Officer verifying that Contractor actually incurred the specified categories of cancellation costs prior to delivery of the vessel to the Government and the amount thereof.
The cancellation costs must be reasonable, allowable, and allocable to the contract as defined in FAR 31.201. The Government will not be obligated in any event to reimburse the Contractor for the specified categories of cancellation costs in excess of the amount allotted in the schedule above for each contract period regardless of anything to the contrary in the clause entitled "Termination for Convenience of the Government." The Contractor agrees that payment of the specified cancellation costs according to the schedule above for any contract period fully compensates the Contractor for the specified categories of cancellation costs. The Contractor waives any right it may have to claim any additional costs for the specified categories of cancellation costs in the event such cancellation costs become payable, whether as a result of a termination for convenience or as a result of the Government's failure to exercise an option. As used in this clause, the total amount payable by the Government for the specified categories of cancellation costs in the event the Government does not exercise an option or terminates the contract for convenience is as set forth in the schedule above.
This clause does not limit the rights of the Government under the clauses entitled “Default,” “Termination for Convenience of the Government,” “Loss of Vessel,” “No Cost Cancellation – Deficiencies,” “Remedies,” or “Excessive Time Lost.” The clauses entitled “Default,” “Loss of Vessel,” “No Cost Cancellation – Deficiencies,” “Remedies,” and “Excessive Time Lost” are not subject to cancellation costs.
Note: Pursuant to 10 U.S.C. § 2401, the Government is prohibited from entering into a vessel charter that contains a substantial termination liability. Offerors who submit substantial termination liabilities will not be considered for award. A substantial termination liability is defined by the statute as:
i. An agreement by the U.S., under the contract, to pay an amount equal to or greater than 25% of the value of the vessel for the termination liability; or
ii. An agreement by the U.S., under the contract, to pay an amount equal to or greater than 50% of the value of the vessel for the sum of the termination liability and the value of the total payments attributable to capital-hire.
B-2 CHARTER HIRE
B-2 CHARTER HIRE
B-2.1 Hire Rates. Charter hire for services under this Charter Party shall be payable at the applicable rates stipulated in Boxes 13–15 and shall be earned at the expiration of each fifteen (15) days of the charter period. Except as otherwise provided herein, said hire rates shall be considered payment in full for all services of the Vessel and Associated Equipment under this Charter including all overtime, penalty time, bonuses, payments, and emoluments payable to Master, Officers, and crew for services under this Charter, irrespective of the geographic scope of said service. Said hire rates are exclusive of the costs of fuel and port charges, which are addressed at Section H-20 (Fuel) and H-30 (Port Charges and Expenses), respectively.
B-2.2 Loss of Vessel. Should the Vessel be either lost or missing, or become a constructive total loss, this
Charter shall terminate and hire shall cease to be payable at the time of her loss or, if said time is unknown, at the time of the Vessel’s last received communication. If the Vessel should be off hire or missing when a payment of hire would otherwise be due, payment shall be made for all hire due for the charter period until the Vessel was lost or the last communication was received. Thereafter, payment shall be postponed until the off-hire period ceases or the safety of the Vessel is ascertained, as the case may be.
B-2.3 CLIN STRUCTURE. The CLIN structure may be unilaterally changed by the Government at award to accommodate the funding format.
FUNDING INFORMATION ONLY
(To be completed by the Government after contract award)
CLIN DESCRIPTION AMOUNT
0001 VESSEL CHARTER HIRE FIRM PERIOD
FOS
0002 REIMBURSABLE COST FIRM PERIOD
0003 DELIVERY AND REDLIVERY COSTS
1000 VESSEL CHARTER HIRE OPTION 1
FOS
1001 REIMBURSABLE COST OPTION 1
2000 VESSEL CHARTER HIRE OPTION 2
FOS
2001 REIMBURSABLE COST OPTION 2
3000 VESSEL CHARTER HIRE OPTION 3
FOS
3001 REIMBURSABLE COST OPTION 3
4000 VESSEL CHARTER HIRE OPTION 4
FOS
4001 REIMBURSABLE COST OPTION 4
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT
SECTION C
C-1 GENERAL
C-1.1 Scope of Work/Mission. The following paragraphs describe the general Scope of the Performance Work Statement.
C-1.2 Mission. The vessel shall serve as host/support ship for Naval Special Warfare East Coast
Surface Support Craft and accompany Submersible Ship Guided Missile Nuclear (SSGN) and Fast Attack Submarines (SSN) on Dry Deck Shelter certification and training exercises. The vessel shall serve host to twenty-five (25) sponsor personnel. Additionally, the vessel shall support local pier side training, diver training, coxswain training, SEAL Delivery Vehicle (SDV), Shallow Water Combat Submersible (SWCS), Dry Deck Shelter (DDS) and Dry Combat Submersible (DCS) operator training and surrogate SSGN/SSN training vessel operations. Vessel shall be used to provide hyperbaric chamber services for emergencies and routine decompression operations, replenishment/minor maintenance support, and personnel support. The vessel shall store flares in a pyrotechnically Ready Service Locker (RSL) as required by diver operations, gasoline, and carry a certified hyperbaric chamber per USCG requirements.
C-1.3 Operational Support. The vessel will be a support vessel to load out and support up to two primary systems at once (DCS, SDV/SWCS, DDS Hanger Trainer). A normal primary system load out is comprised of one (1) DCS or (1) DDS Hanger Trainer, and two SDV(s). Prior to launching a system, the vessel shall arrive at the prescribed launch point and establish station keeping. The vessel will display the necessary flags and signals for conducting small boat operations and launching/recovering submersibles. The government will coordinate all griping and stowing for sea of systems and deck gear with the vessel. The vessel will launch two 11m RIBs or CRRCs that will stay waterborne throughout the evolution as safety boats. The vessel operator will coordinate ship's position and navigation conditions with the government’s representative and launch the system to be operated. This may or may not include putting divers in the water for launch and recovery requirements. After launch, the vessel and government will coordinate the vessel’s movement to ensure radio and underwater communications are maintained. The vessel will coordinate with the government representative for recovering the system. When operations are complete, the vessel shall recover the safety boats (RIBs/CRRCs), and resume unrestricted operations of the ship. The vessel shall be able to launch/recover one primary system at a time.
C-1.4 Operational Control (OPCON). Naval Special Warfare Command (SPECWAR).
C-1.5 Area of Operations. Worldwide with the vessel primarily in Little Creek, VA.
C-1.6 Operating Tempo (OPTEMPO).
C-1.6.1 Schedule (OPTEMPO): 24 hours a day, seven days a week, whether at sea or in port.
C-1.6.2 Percent of time underway at transit speed (10 knots): 10% C-1.6.3 Percent of time underway at slow speeds/loiter speed (5 knots): 30% C-1.6.4 Percent of time in port: 60% (a majority of this time may be spent in a port other than Little Creek)
C-1.7 Ship Clearances. The Government will secure diplomatic clearances and operational area clearances when and where required.
C-1.8 Certifications. The vessel shall be certified by the USCG and classed by either the American Bureau of Shipping (ABS) or an International Association of Classification Societies (IACS) member society.
C-1.9 Manning Plan. The contractor shall submit a manning plan illustrating the crew level to meet all mission/Government requirements including crewing requirement within 30 days of award.
C-1.10 Personnel Contingency Plan. The contractor shall develop a contingency plan adequate to ensure that there will be no interruption of operations and maintenance service due to labor disruption within the service provider's own labor force. The contingency plan must also include a plan to address substitution of personnel when qualified/trained personnel are not available due to leave, sickness, death, etc. The contractor shall submit the plan to the Contracting Officer thirty (30) calendar days after contract award.
C-2 VESSEL REQUIREMENTS.
C-2.1 Vessel Characteristics.
C-2.2 Flag. The Vessel shall be a Jones Act qualified U.S.-flagged vessel.
C-2.3 Minimum Range and Transit Speed. 3,000 nautical miles (NM) at a minimum speed of 10 knots.
C-2.4 Endurance. Vessel shall be capable of supporting at-sea operation for up to 28 days without resupply. In addition, the support ships shall be able to operate in conditions up to and including sea state 5, in both equatorial and arctic waters, and conduct launch and recovery of small boats, Divers, RHIBs, PWC, DCS and SDV in conditions up to and including sea state 3.
C-2.5 Open Deck Space. Minimum of 2,000sq. ft of contiguous open deck space.
C-2.6 Deck Strength.
C-2.6.1 The vessel must have sufficient deck strength to load and transport the following GFE/CFE within the contiguous open deck space:
C-2.6.2 One NAVSEA certified Standard Navy Double-Lock Recompression Chamber System (SNDLRCS) including an Air Supply Rack Assembly (ASRA): consists of a standard 20' x 8' x 8' ISO shipping container 25,000 lb fully loaded
C-2.6.3 One (1) Recompression Chamber Life Support Skid (10’x 8’, 14,000 lbs) C-2.6.4 Mission-specific support vans (two (2) 8’x8’x20’ MILVANS, weighing up to 7,500 lbs. each) C-2.6.5 Six (6) Combat Rubber Raiding Craft (CRRCs) (Zodiac boats, models F470 and G4702.(12 ft x 6 ft x 2.5 ft, 265 lbs ) C-2.6.6 Two (2) 30-ft Rigid Hull Inflatable Boats (RHIBs) (30’x10’, 12,000 lbs each) C-2.6.7 Two (2) 24-ft. Rigid Hull Inflatable Boats (RHIBs) (24’x 11’, 9,000 lbs. each) C-2.6.8 Two (2) total SDVs weighing approximately 6,000 lbs. each (approximately 8,000 lbs each with water entrained; dimensions approximately 254.5”. x 54”. x 56.5”) C-2.6.9 Two (2) total SWCS weighing approximately 10,200 lbs (Approximately 18,700 lbs each with water entrained; Dimensions 268.5” x 60.6” x 59.6”) C-2.6.10 Two (2) RHIB Cradles (20’ x 8’, 1500 lbs each) C-2.6.11 One (1) SDV Battery Charger (8’x 8’, 6500 lbs) C-2.6.12 One (1) Air Compressor for Chamber Support and Scuba Charging (6’x 4’, approximately 2300 lbs) C-2.6.13 One (1) Jet Ski (13’ x 5’, 1500 lbs) C-2.6.14 One (1) 450 Gallon Gasoline Stowage Tank (5’ x 5’, 5700 lbs) (Contractor Furnished Equipment
(CFE))
C-2.6.15 One (1) Ready Service Locker (RSL) (5’ x 5’, 2000 lbs) C-2.6.16 One (1) Dry Submersible (40 x 9, 67,000 lbs) (Lithium battery powered) C-2.6.17 One (1) DCS Cradle (38’ x 8’, 28,000 lbs)
C-2.7 Maximum Draft. 20 feet C-2.8 Sea/Station Keeping. The vessel shall be equipped with an operable bow thruster and an operable Dynamic Positioning System Level Zero (0) or equivalent. The vessel shall be capable of maintaining a specific heading at speeds of one knot or greater and maintaining station within a 150-foot radius of the established position in conditions up to and including winds of 30 knots and Sea State 3.
C-2.9 Propulsion. The vessel shall be equipped with an operable bow thruster and main propulsion capable of maintaining station and heading as noted above. Propulsion horsepower shall be rated to safely tow a 67,000lb DCS if unable to conduct a normal recover on deck. Must be able to tow up to 5 days in up to Sea State 5 conditions. The minimum tow speed shall be 2 knots in up to sea state 3 and no minimum tow speed in higher sea states.
C-2.10 Craft Launch and Recovery System: The vessel shall be equipped with a launch and recovery system capable of launching and recovering CRRCs, RHIBs, DCS, and SDVs. The launch and recovery system shall be capable of lifting and supporting up to 67,000 lbs (DCS) to include interface equipment (28,000 lbs). If an elevator is used, the total weight of DCS and the interface gear (cradle) will be about 95,000 lbs. If some other type of lifting gear is used (A-Frame, crane, etc) only the weight of the vehicle 67K will be required.
The contractor shall be able to demonstrate that the launch and recovery system was manufactured in accordance with Navy standards or a recognized classification society standard (ABS Rules for Building and Classing Underwater Vehicles, Systems and Hyperbaric Facilities or equivalent standard). The contractor shall provide a safe means of controlling the motion of the craft during launch and recovery operations in order to prevent injury to personnel, both embarked and on deck, and damage to the craft.
The contractor shall be responsible for assisting Government personnel with loading, securing, and discharging mission equipment.
The contractor shall provide a safe means of controlling the motion of the craft during launch and recovery operations in order to prevent injury to personnel, both embarked and on deck, and damage to the craft.
The contractor shall be responsible for assisting Government personnel with loading, securing, and discharging mission equipment.
C-2.11 Small Boat Fuel Capacity. The vessel shall be equipped with a minimum 450-gallon external fuel storage tank (CFE) for gasoline and associated equipment to facilitate refueling RHIBs at sea.
Storage tank shall be approved by the USCG. Additionally, the contractor shall provide a means of refueling diesel fuel for sponsor GFE (generators, etc). The contractor will refuel Government small boats as required.
C-2.12 Fresh Water Supply. The vessel shall provide a minimum of 2,000 gallons of potable water production to support sponsor personnel and crew living onboard and 3,000 gallons fresh water daily on back deck for miscellaneous use, including but not limited to equipment wash down.
C-2.13 Compressed Air: The vessels shall provide divers quality air at 4,500 PSI at 30 CFM. US
Navy Diving and Manned Hyperbaric System Safety Certification Manual, NAVSEA (SS521-AA- MAN-010, Revision 2, and 1 Nov 2006) applies.
C-2.14 Sound Isolation/Vibration. The vessel shall be able to support underwater telephone and acoustic communication operations. These operations will be accomplished by a retractable tube that shall be installed in a suitable location that offers maximum separation from shipboard noise.
C-2.15 Underwater Tracking System. The vessel must be configured to receive a GFE Track Point Underwater Tracking System and an acoustic navigation transducer. The system shall be deployed by way of retractable tube of a minimum 12-inch diameter at least three to four feet below the bottom of the hull fitted with a hydraulic lifting winch, boom, or crane. Through-hull penetrations, retractable tubes, and lifting systems are to be provided by the contractor.
C-2.16 Underwater Communications. The vessel shall be able to support underwater telephone operations. Vessel shall accommodate underwater telephone compatible with GFE EDO 5400. The vessel shall be configured to receive a GFE acoustic navigation transducer. The underwater telephone shall be deployed by way of retractable tube of a minimum 12-inch diameter at least three to four feet below the bottom of the hull fitted with a hydraulic lifting winch, boom, or crane. Through- hull penetrations, retractable tubes, and lifting system are to be provided by the contractor.
C-2.17 Communication Equipment. The Contractor shall carry Marine VHF, ship’s cell phone, and a GFE Hydro Acoustic Information Link (HAIL) and shall accommodate the integration of NSW communications equipment and antennas, including secure HF/VHF/UHF/SATCOM, INMARSAT.
C-2.18 Climate Control. The contractor shall ensure all communication equipment is climate controlled with a maximum temperature of 80 degrees F. Communications equipment requires climate (AC/DH) control.
C-2.19 Navigation Equipment. The vessel shall be equipped with gyrocompass with repeaters, GPS, and radar. The radar shall be capable of surface search to a minimum of 25 NM. The vessel shall be able to accommodate a government provided Voyage Management System (VMS) and Track Point III.
C-2.20 Electrical Power. Vessel must be able to provide sufficient electrical power in the vicinity of the Government Furnished Equipment (GFE) identified in this document. At a minimum, four 480 VAC, 100 amp (Delta) and two 208 VAC 30 amp (Delta) outlets shall be provided. All GFE and Sponsor support and habitability areas require 60 Hz.
C-2.21 LIOH Battery Charging The vessel shall meet any USCG/IACS requirements to store, transport, and charge onboard lithium ion (LIOH) batteries for DCS and SDV.
C-2.22 Diver Staging Area. The vessel shall be equipped with a diver's staging area for launching and retrieving divers. At a minimum, staging area must consist of water access by ladder or removable bulkhead. The equipment used to handle the over-the-side divers should meet the requirements of U.S.
Navy Diving and Manned Hyperbaric System Safety Certification Manual, NAVSEA (SS521-AA- MAN-010, Revision 2, 1 Nov 2006), and U.S. Navy Diving Manual.
C-2.23 Conference Room. The contractor shall provide 200 sq. ft. of administrative/conference space sufficient to handle up to 25 personnel. Space shall have tables and seating to accommodate the above number, with power outlets providing standard 120 VAC power for computers and presentation equipment.
C-2.24 Conduct Operations. The contractor shall operate and navigate the ship safely in support of
Government operations.
C-2.25 Material Handling Operations. The contractor shall be responsible for the receipt, loading, storage and discharge of materials and stores pertaining to shipboard day-to-day operations. The contractor shall assist in loading, storage, and discharge of materials and stores for Government. The contractor shall arrange for any shore- side equipment if required for load/discharge operations.
C-2.26 Rigging Equipment. The contractor shall provide sufficient rigging equipment to support Sponsor operations.
C-2.27 Lifesaving Equipment. The contractor shall operate all lifesaving support systems in accordance with manufacturer's instructions at the time intervals and frequencies as required. Lifesaving support systems include, but are not limited to, life rafts, davits, winches, and craft engines.
C-2.28 Safety Drills. The contractor shall conduct all regulatory drills required. Government personnel will participate in all regulatory drills.
C-2.29 Support Sponsor Craft Operations. The contractor shall support all small craft, including SDVS, and zodiac boats, for launch and recovery operations.
C-2.30 Maintenance of GFE. When requested, the Contractor shall be responsible for maintaining
GFE on a reimbursable basis.
C-3 Personnel.
C-3.1 Contractor Facility Clearance. The company shall possess a SECRET facilities clearance prior to delivery of the vessel to support installation of sensitive government communication equipment before delivery, which shall be documented in Attachment 5 (DD-254).
C-3.2 Personnel Clearances and Screenings. The Master must hold a SECRET clearance. All crewmembers must be U.S citizens with valid U.S. passports for the full length of their assignment and will be required to submit to terrorist watch list checks. All crew members and non-crew members requiring access to the vessel shall be vetted using the El Paso Intelligence Center (EPIC) procedures described in Section H-15.
C-3.3 Vessel Crewing and Transportation. The vessel will be crewed to safely and efficiently operate the vessel, operate deck equipment and small boats, and perform mission operations on a 24-hour basis as described herein. Additionally, crewing for voyages in accordance with USCG Subchapter I certification will be maintained throughout the charter period. Licensing, STCW endorsements, and documentation are required in accordance with Coast Guard regulations as applicable to the vessel’s type, size, class, and service. The Master, officers, and crew shall possess valid and current licenses, certificates, and documents for the capacity in which each is employed. At all times while underway, the Contractor shall have at least one shipboard employee aboard who has USCG recognized first aid and CPR certification within the past 12 months. All transportation costs for crewmembers shall be to the Contractor’s account.
C-3.4 Conduct of Master, Officers, and Crew. If the Charterer shall have reason to be dissatisfied with the conduct of the Master, Officers, or crew, the Owner shall, on receiving particulars of the complaint from the Contracting Officer, investigate the matter and, if necessary, make a change in personnel.
C-3.5 Operational Responsibilities. The Master of the vessel shall be responsible at all times for the safety of the vessel and all on board. The Master of the vessel shall be responsible for meeting overall schedule requirements.
The Master shall work closely with the officer-in-charge (OIC) to ensure the mission is met. The Master of the vessel shall be under the direction of the Operational Commander with regards to the employment of the vessel, but shall not be under orders as regards safe navigation, care and custody of the vessel, and care and safety of equipment, gear, and persons onboard.
C-3.6 Functional Relationship. A healthy functional relationship between the contractor personnel
(officers and crew) and the Sponsor is extremely critical. It is essential that the Master and Sponsor appreciate their individual responsibilities and dependence upon each other for attainment of the overall objective. A cooperative partnership between the two entities must be maintained at all times. The attitude of the partnership developed between the two must extend to and be shared by all concerned. The Master and Government shall jointly prepare for all operations concerning the vessel.
C-3.7 On-Board Government Personnel. During operations there will be up to twenty-five (25)
Sponsor personnel on board. The Officer in Charge (OIC) will serve as the primary point of contact between the Government, onboard Sponsor personnel, and the contractor. The OIC is responsible for all Government personnel assigned to the vessel; logistics for all Government personnel and equipment; and working with the contractor (Master) to develop mission plans and plans of the day.
C-3.8 Irreconcilable Differences. Irreconcilable differences between shipboard personnel and the
Government regarding operations or other matters arising under this charter shall be fully documented and reported, by letter, message, or E-mail as appropriate, to the Contracting Officer for resolution.
C-4 OPERATIONAL RESPONSIBILITIES
C-4.1 Deck Equipment Preservation. The Contractor shall ensure all deck equipment is maintained in a working condition at all times.
C-4.2 Mission Essential Launch/Recovery Operations. The Contractor shall provide 24 hour launch/recover services in support of Government requirements. The Contractor shall ensure every available resource is used to maintain the system in a continual full operating status.
C-4.3 Operation of Systems. The Contractor shall operate all vessel systems to provide main and auxiliary propulsion, navigation, maneuvering, deck operations, and services to the Government to support the mission equipment, unit’s hotel services, and emergency operations.
C-4.4 Perform Maintenance. As a result of high OPTEMPO it is imperative the Contractor perform predictive, preventative and corrective maintenance as required to maintain the vessel’s equipment and systems in a high state of readiness in addition to maintaining the vessel in class at all times. The Contractor shall arrange for the discharge of small boat bilge waste. If for any reason emergent maintenance actions should render the vessel unable to get underway, to include the launch and recovery system, the Contractor shall immediately notify the Government to include an estimated time until the vessel is able to get underway. If performing operations, the senior government representative will be notified prior to executing any maintenance.
C-4.5 Vessel Modifications. The Government may at its option modify the vessels to meet new or changing mission requirements. The Government will either task the Contractor to perform or to subcontract for the modifications as a reimbursable item, or undertake the modifications itself. Any and all equipment put aboard as a result of the modifications will be Government Furnished Equipment (GFE). All GFE will be removed prior to the Vessel’s re-delivery at the expense of the Government, unless otherwise agreed to. The Contractor may not modify the vessel without approval of the Contracting Officer. Any approved modifications will be fully tested and verified by the appropriate Government authority. Mission related unforeseen structural modifications affecting class or the vessel’s certifications may be required. The costs of Government directed modifications, and the costs to restore the vessel to its original class or certification at award and as required by this contract shall be borne by the Government.
C-4.6 Sponsor Berthing/Living Spaces. The vessel must support berthing for 25 Government personnel, not greater than four (4) per stateroom, eight (8) per head. Curtained-off bunks are acceptable. Messing for the 25 personnel above shall be in accordance with Section C-5.2. The 25
Government personnel mentioned herein are in addition to any and all crew.
C-4.7 Laundry Services Facilities. The Contractor shall provide a 24-hour laundry facility for a minimum of 25 Government assigned personnel.
C-4.8 Food Service/Snacks/Laundry for Government Personnel. The Contractor shall provide three
(3) galley- prepared cafeteria style meals and hotel services for twenty-five (25) embarked Government personnel when not in port (unless specifically requested). Food provided to the Government shall have the most reasonable attainable degree of variety, quality, quantity, and nutritional value. The cost of meals and hotel services for the 25 embarked Government personnel shall be included in the contractor’s fixed price. Meal items at a minimum shall consist of the following:
C-4.8.1 Breakfast – Eggs/omelets, breakfast meat (one), fruit, donuts, bagels or sweet rolls, toast, hot or cold cereal, fruit juice, coffee, soft drinks, tea, milk and bottled water.
C-4.8.2 Lunch – One sandwich type (hamburger, tuna salad, grilled cheese, etc); two entrees (of which one shall be hot and consist of meat); vegetables, rice/potatoes, coffee, soft drinks, tea, milk and bottled water.
C-4.8.3 Dinner – Three entrees (of which two shall be hot and consist of meat), vegetables, rice/potatoes, dessert, coffee, soft drinks, tea, milk and bottled water.
C-4.8.4 Snack Foods. The Contractor shall provide snack foods and bottled water for Government personnel. Snack foods shall include foods such as cheese and crackers, fresh fruit, peanut butter and jelly, cookies or brownies, popcorn, ice cream, potato chips, etc.
C-4.8.5 Food Service for Additional Government Personnel. The Contractor shall provide galley prepared food service for additional personnel not permanently assigned to the vessel. It is the responsibility of the Contractor to collect for these meals. Breakfast shall be reimbursed at a not-to-exceed price of (US) $5.00 and lunch and dinner at a not to exceed price of (US) $12.50.
C-4.8.6 Food Service Operations. The Master or the Sponsors medical officer shall conduct weekly inspections of food service spaces and equipment which shall be forwarded to the Master for review and signature. These completed forms will be kept in a file for a minimum of one (1) year and made available for inspection when requested by Government representatives. Periodic Quality Assurance (QA) Inspections of the food service operation will be conducted by Government representatives.
These QA visits will include a sanitation inspection using NAVMED Form 6240/1. If the ship’s food service operation fails the sanitation inspection by receiving an unsatisfactory grade, the Government may direct the closing of the galley and secure food service operations until all discrepancies have been corrected. Alternate food service during this period of galley closure will be at the contractor’s expense. Daily and weekly cleaning of all food service operation spaces and equipment shall be done in strict accordance with CFP, ANSI and NSF standards. Provisions of COMSCINST 6000.1 (Series) and NAVMED P-5010 (Series) shall apply.
C-4.8.7 Food Handlers. All contractor personnel employed as food handlers shall meet the health and training standards set forth in NAVMED P-5010-1 and ensure they are free from any communicable diseases. All screening shall be documented in the food service employee’s onboard medical record and kept on file for all food service employees currently assigned. The contractor shall be guided by food handling instructions and precautions in accordance with COMSCINST 4000.2 (Series).
COMSCINST 6000.1 (Series) and NAVMED P-5010.
C-4.9 Provide Sanitation Services. The contractor shall maintain the ship in a sanitary condition at all times in accordance with 46 CFR 196.15-10. All living spaces, staterooms, passageways and stairwells shall be maintained in a clean and sanitary condition, and monthly inspections conducted in accordance with 46 CFR 189.33-1.
C-4.10 Provide Pest Control. The contractor shall ensure that all living spaces, recreation lounges, and work areas are free of pests at all times. The contractor shall ensure that all personnel conducted pest control measures have been properly trained. All stores shall be checked by the contractor’s personnel as appropriate, prior to loading to ensure they are rodent and pest free. The contractor shall comply with the World Health Organization. International Health Regulations (IHR) of 1969, U.S. Navy Shipboard Pest Control Manual, SECNAVINST 6210.2 (Series) Quarantine Regulations, and NAVMED P-5010, Chapter 8 for further guidance and compliance.
C-4.11 Ship Sanitation Control Exemption Certificate (SSCEC)/Ship Sanitation Control
Certificate (SSCC). The Contractor is responsible for ensuring that the ship is SSCEC or SSCC certified at all times in compliance with guidelines delineated in the World Health Organization International Health Regulations (IHR) of 2005 and BUMEDNOTE 6210. This certification is required to be completed on a recurring six (6) month basis. The contractor shall make arrangements to procure the necessary SSCEC/SSCC.
C-4.12 Provide Linen. The contractor shall provide the following laundered items to all Sponsor personnel and guests (25): sheets, fitted bottom sheets, blankets, bedspreads, pillowcases, mattress covers, bath towels (27" x 54"), hand towels, washcloths and bath mats. When replacing mattresses, the contractor shall ensure fitted sheets fit the replacement mattresses. Bed linens shall be changed once every week (twice a week if ambient interior temperature exceeds 80°F during a seven (7) day period).
Towels shall be provided twice a week. Fresh bed linens and towels shall be provided when Sponsor personnel are transferred or replaced. Tablecloths shall be changed, at a minimum, daily.
C-4.13 Mattresses and Pillows. The contractor shall replace Sponsor personnel mattresses and pillows, as required. Mattresses shall meet CFR standards and fit the existing bed-frame space. Pillows will be non-feather type. The cost of replacing mattresses and pillows is reimbursable only if mattresses and pillows are for Sponsor personnel.
C-4.14 Clean Sponsor Work Areas. The contractor shall pick up trash on a daily basis and, at a minimum, every week sweep and wipe down all dust collecting surfaces. The contractor shall, at a minimum, every two (2) weeks swab floors in unclassified and classified Sponsor work areas. Every two
(2) months floors shall be waxed in unclassified and classified Sponsor work areas. At a minimum, the contractor shall clean all carpeted areas annually.
C-4.15 Clean Sponsor Living Spaces. The contractor shall clean the Sponsor living spaces (i.e., staterooms and common areas surrounding staterooms). The SGR shall receive the same cleaning services afforded the Master or at a minimum, three (3) times a week; remaining Sponsor personnel shall receive the same cleaning services afforded the licensed officers or, at a minimum, twice a week. The contractor shall, at a minimum:
(1) Clean/disinfect commodes
(2) Clean showers and wash basins
(3) Sweep and swab decks or vacuum if carpeted
(4) Empty trash containers
(5) Make beds
(6) Change or provide clean linens
(7) Dust – wipe overheads, vents, furniture and shelving
(8) Every two (2) weeks, the contractor shall, at a minimum, wash the decks (tile only)
(9) Every two (2) months, the contractor shall, wax the decks (tiles only)
(10) On a yearly basis contractor shall clean all carpeted areas.
C-4.16 Clean Recreational Areas. The contractor shall clean all recreational lounges. These services shall include daily and weekly janitorial services. On a daily basis, the contractor shall, at a minimum:
(1) Dust rooms
(2) Empty trash containers
(3) Sweep and swab decks or vacuum if carpeted
C-4.17 Every two (2) weeks, the contractor shall, at a minimum, wash the decks (tile only). Every two
(2) months, the contractor shall, wax…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .