SOW.docx

DOCX document 27 KB Posted

Attached to
Helo Shelter Removal Federal contract opportunity
Solicitation number
N32205-17-Q-4442
Issued by
Department of the Navy Military Sealift Command

About this file

SOW

View the file

Other files for this federal contract opportunity

Other files attached to Helo Shelter Removal, newest first.
File Type Posted
Q&A__1.docx DOCX document
Wage_Rate_Determination.docx DOCX document
COMBINED_SYNOPSIS_SOLICITATION.docx DOCX document
NON_DISCLOSURE_AGREEMENT_FOR_GOVN'T_TECHNICAL_DATA_(V1.1,_2-27-14).docx DOCX document
COMBINED_SYNOPSIS_SOLICITATION.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS Comfort

( TAH 20 )

SPONSOR RELATED
CONTRACT NO. N32205-xx-x-xxxx
ITEM NO. 0706
CATEGORY "A"
2017-08-11
Helo Shelter Removal
Destree, Steve

1.0 ABSTACT

1.1 This item describes the requirement to remove the helicopter shelter in its entirety and all installed systems (i.e., fire main, electrical and lighting, sound powered and installed telephones), and to resurface and paint disturbed sections of the flight deck.

2.0 REFERENCES/ENCLOSURES

2.1ABS Rules for Building and Classing Steel Vessels (Latest Revisions)
2.2NAVSEA DWG 5980632_B Sound Powered TEL CKT 1IJ and “E” Calls ISO and ELEM WRG DIAG
2.3MSCFSC Standard Work Item 009
2.4MSC Drawing 8194117 Temporary Helo Shelter Arrangement and Details
2.5MSC Drawing 8389568 Temporary Helicopter Shelter Sound Powered Phones Mod
2.6MSC Drawing 8194118 Temporary Helo Shelter AFFF System Modification Diagram
2.7MSC Drawing 8194119 Temporary Helo Shelter Ship’s Service Air System Modification Diagram
2.8MSC Drawing 8194121 Temporary Helo Shelter Electrical Lighting Instillations
2.9MSC Drawing 8194120 Temporary Helo Shelter Deck Drains Arrangement and Details
2.10MSC Drawing 8194122 Temporary Helo Shelter Helo Maintenance Area Arrangement and Details
2.11MSC Drawing 8387472 AFFF System Diagram
2.12MSC Drawing 8387491 Firemain System Drawing

2.13 MSFSC Standard Work Item 006

2.14 MSFSC Standard Work Item 007

2.15 MSFSC Standard Work item 008

3.0 ITEM LOACTION/DESCRIPTION

3.1 Location/Quantity

3.1.1 Port Side Aft, 03 Level

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES

4.1 NONE

5.0 NOTES

5.1 The contractor and all subcontractors regardless of tier shall consult the General Technical Requirements (GTR) and the MSFSC Standard Work Items to determine applicability to this work item.

6.0 QUAILTY ASSURANCE REQUIRMENTS

6.1 All materials and work performed must be completed to satisfaction of the MSCREP.

7.0 STATEMENT OF WORK REQUIRED

7.1 Provide all the labor and material to remove the helo shelter, in its entirety, to include installed systems specified below.

7.1.1Contractor shall arrange for and provide crane services and a manlift or JLG for removing the shelter. All items landed on the flight shall be placed on wood or an acceptable hard cover to prevent damage to non-skid.
7.1.2Contractor is responsible to ensure that all required crane surveillance and certifications are met.

7.2 Remove shelter skin and turnover to Ship’s Force.

7.3 Remove and blank off all associated AFFF sprinkling piping, and return foam station # 4 to its original location indicated in 2.6.

7.3.1All piping shall be returned to original locations and runs to facilitate relocation of Foam Station #4 and Hose Reel Cabinet to their respective original locations.
7.3.2Remove 3” Shelter Sprinkling piping in its entirety from the helo shelter to isolation valve 14 on sheet 3 of reference 2.6, and install a hard blank flange with new gasket and monel hardware.

7.4 Remove all overhead lighting, electrical and electronic equipment installed and pull back the cable to the associated breaker panels. All light fixtures shall be turned over to the MSCREP. Remove all dead ended cables, wire tags, and breaker labels associated with the cables and feeder breakers. All kick pipes shall be removed and inserted with a watertight fitting.

7.5 Remove and pull back all cables and detectors associated with the fire and smoke detection system. All kick pipes shall be removed and inserted with a watertight fitting.

7.6 Completely disassemble the frame sections of the shelter, and place on pier for transportation to a facility to be determined by the MSCREP.

7.6.1 All frame structures and sub-assemblies shall be placed on pallets and banded to same. All hardware shall be removed, labeled, and kept with respective frame sections.

7.6.2 Both overhead door assemblies shall be removed and kept as in tacked as removal allows, shall be placed on pallets, banded and placed on the pier for shipment to a facility to be determined by the MSCREP.

7.7 All frames that are welded to the deck shall be removed accordingly and labeled as to facilitate possible reinstallation.

7.7.1 Close attention shall be taken so as not to disturb, with the exception of welded areas, the flight deck non-skid and markings.

7.7.2 All frame structures shall be placed on pallets, banded and placed on the pier for shipment to a facility to be determined by the MSCREP. All hardware shall be removed, labeled, and kept with respective frame sections

7.8 Repair, replace, or install all lagging disturbed with the removal of the helo shelter, frame, firemain and AFFF piping.

7.8.1Conduct a walk through with MSCREP and designated Ship’s Force representative to inspect all lagging repairs, to include any disturbed overhead panels; correct all discrepancies noted during the walk through.
7.8.2All lagging repairs and replacement shall be in accordance with MSFSC Standard Work Item 06.

7.9 Relocate, replace, or reinstall any helo tie down sockets that were eliminated in accordance with Reference 2.4. Contractor shall identify number and location during bidder’s shipcheck.

7.10Resurface the Flight Deck in accordance with reference paragraph C, section 1 of reference 2.3.
7.11Paint all other new and disturbed surfaces to match surrounding areas in accordance with MSFSC Standard Work Item 07 and 08.

7.12 Testing/Inspection

7.12.1 Upon completion of all removals and relocations, preform all required tests and inspections in the presence of and to the satisfaction of the attending ABS Surveyor, USCG Inspector, and MSCREP.

8.0 GENERAL REQUIREMENTS

8.1 NONE