N32205-16-T-4511_SOW.pdf
PDF 235 KB Posted
- Attached to
- UHF Handheld Repeater System Upgrade Federal contract opportunity
- Solicitation number
- N32205-16-T-4511
About this file
N32205-16-T-4511 SOW
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N32205-16-T-4511_Q A.pdf | ||
| N32205-16-T-4511_Combined_Synopsis_Solicitation.pdf | ||
| N32205-16-T-4511_J A_(Limited_Sources).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USNS MILLINOCKET
(T-EPF 3)
COMMUNICATION AND NAVIGATION AIDS Service Order
13 SEP 2016
SO 17-007 Category “A” MSC/N6442/LAS
INTERIOR COMMUNICATIONS - MOTOROLA UHF REPEATER SYSTEM UPGRADE
SO-17-007 - 1
1.0 ABSTRACT
This work items describes the requirement to remove one (1)
Motorola CDR-550 repeater, two (2) Motorola CDM-1250 base stations and perform the following upgrade:
1.1 Install two (2) Motorola SLR-5700 UHF Repeaters, 40
watt, 470-512MHz.
1.2 Install Motorola MOTOTRBO Capacity Plus Software in
each repeater.
1.3 Install Two (2) Motorola XPR-5350 UHF Base Stations, UHF Band 1, 1-40 Watt, Numerical Display (or equivalent)
1.4 Install one (1) equipment enclosure and
uninterruptible power supply (UPS)
1.5 Program, configure, and test two (2) Motorola SLR-5700
Repeaters w/Capacity Plus software, two (2) Motorola
XPR-5350 mobile base stations, and twenty-five (25)
Motorola XPR-7530 handheld radios.
2.0 REFERENCES/ENCLOSURES
2.1 Reference:
2.1.1 Reference: Motorola XPR-7350/7380 Non-Display
Portable User Guide.
2.1.2 Reference: Motorola XPR-5350 Mobile Base Station
Basic Service Manual – 68009515001-B.
2.1.3 Reference: Reference: Motorola SLR-5700 Series
Repeater Quick Start Guide - MN001443A01-AA
2.2 Enclosure:
2.2.1 Enclosure: Encl 405-1, Ship Drawing – General
Arrangement DWG# 601-8443364 – SHEET 3A
3.0 ITEM LOCATION/DESCRIPTION
3.1 Location/Quantity
3.1.1 Locations: #2 Damage Control Repair Station
Pilothouse (Bridge)
Mission Bay
SO-17-007 - 2
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL: None.
4.1 CONTRACTOR FURNISH MATERIAL LISTING (CFM): See below
CFM LISTING
ITEM
NO.
DESCRIPTION QUANTITY LOCATIONS
1. Repeater, MOTOTRBO SLR-5700, UHF, 40 watt, w/Capacity Plus
Software
2 EACH DC #2 Locker
(Frame 1-75-2)
2. Mobile Base Station, Motorola
XPR 5350, UHF (400-470 MHz), 64 channel, 25 watt, furnished with external speaker, microphone, bracket, external power supply, and 3 dB Omni fiberglass antenna
2 EACH DC #2 Locker
Pilothouse
3. Portable Radio, Motorola XPR-
7350 UHF, (UHF Band 1), 4
Watt, Non-Display w/ battery charger, belt clip, IMPRES
Intrinsic Safe Option
25 EACH
Various
4. Microphone, Remote Speaker, Motorola NNTN8383, PMMN4046, or equivalent
25 EACH Various
5. Multi-Unit Charger, Rapid
Rate, Motorola IMPRES
WPLN4219 or equivalent
2 EACH Various
6. Headset, Heavy Duty, Noise
Reduction 23dB, Motorola XBT
RLN6490/91 or equivalent
5 EACH Various
7. Programming Software and cable
1 EACH DC #2 Locker
(Frame 1-75-2)
8. Uninterruptible Power Supply
(UPS), APC 3000 or equivalent
1 EACH DC #2 Locker
(Frame 1-75-2)
9. Switch, Ethernet, HP ProCurve
2530‐24 1 EACH DC #2 Locker
SO-17-007 - 3
5.0 NOTES
5.1 Performance Period:
5.1.1 1 December 2016 through 19 December 2016
5.2 Performance Location:
5.2.1 Subic Bay, Philippines
5.3 Port Engineer:
5.3.1 Darren Randall
Mobile: (757) 237-2848
Email: richard.randall@navy.mil
5.4 Contact James Phillips (primary) 757-443-2924 or
Johnathan Overton (secondary) 757-443-5803, for details and requirements concerning access to an MSC vessel.
5.5 Contractor is required to submit personnel on the EPIC
spreadsheet. To gain access to MSC vessel's on the
East Coast, contractors must submit an EPIC request to
MSFSC(underscore)EPIC(underscore)EAST(at)navy(dot)mil
MSFSC_EPIC_EAST@navy.mil.
5.6 Contractors, shall allow 3 business days (5 for
NASSCO, OCONUS, & Earl NJ) for processing of all requests. EPIC will take up to 48 hrs to process, the request must be approved by EPIC before access can be sent to the facility for approval, access will not be guaranteed without approval from EPIC.
5.7 The contractor and all subcontractors, regardless of
tier must consult the General Technical Requirements
(GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTR’s.
5.8 The contractor and all subcontractors regardless of
tier are advised to review other work items under this contract, to determine their effect on the work required under this work item.
mailto:richard.randall@navy.mil
SO-17-007 - 4
5.9 The contractor and MFR REP shall follow all shipyard
and MSC safety precautions prior to entering any tanks or voids and ensure they have been declared gas free by a certified chemical engineer. Valid gas free tanks shall have signed and dated certificates on the entrance to the tank and other designated locations.
6.0 QUALITY ASSURANCE REQUIREMENTS
6.1 None additional
7.0 STATEMENT OF WORK REQUIRED
7.1 ARRANGEMENTS/OUTFITTING
7.2 STRUCTURAL: Not used
7.3 MECHANICAL: Not used
7.4 ELECTRICAL: Not used
7.5 ELECTRONICS:
7.5.1 The Contractor shall secure power to the
repeater system and refer to Ship’s Chief Engineer to tag out all equipment. The Contractor shall follow ship’s lockout/tag out procedures.
7.5.2 The Contractor shall remove one (1) Motorola
CDR-550 repeater and associated cabling from the equipment enclosure.
7.5.3 The Contractor shall remove one (2) Motorola
base station, power supply, mounting hardware, and associated cabling from the equipment enclosure.
7.5.4 The Contractor shall retrieve from ship’s crew
all existing Motorola (HT-750) handheld radios and accessories.
SO-17-007 - 5
7.5.5 The Contractor shall package and return all
removed equipment over to the MSC or vessel’s representative.
Removed equipment shall remain onboard in ship’s custody.
7.5.6 The Contractor shall install one (1) Motorola
XPR-5350 mobile base station, furnished with mounting bracket, power cable, microphone, external speaker, external power supply and antenna. Mount the first base station underneath equipment enclosure where previous Motorola CDM-1250 base station was installed. Install RF coaxial cable and mount UHF omni antenna on the bulkhead outside of #2 DC Repair Locker. Connect other end of RF cable to the output of the base station. Exact location of antenna to be determined by the MSC Representative.
7.5.7 The Contractor shall install 2 Motorola SLR-
5700 and associated hardware inside of the Equipment Enclosure.
7.5.8 The Contractor shall provide a successful means
to interface new equipment with existing 3 UHF antennas currently installed in the Mission Bay overhead.
7.5.9 The Contractor shall install and mount one (1)
Uninterruptable Power Supply (UPS). All newly installed components shall be plugged into the UPS unit. UPS will provide a minimum of 60 minutes uptime on battery power.
7.5.10 The Contractor shall install one (1) Motorola
XPR 5350 mobile base station, furnished with mounting bracket, power cable, microphone, external speaker, external power supply, and antenna. Mount base station on the Pilothouse.
Exact location to be determined by the MSC Representative.
Install UHF omni antenna in vicinity of the Pilothouse
(topside). Power for this device shall be obtained from closest available AC circuit breaker on the Pilothouse in an available circuit breaker marked “SPARE”.
7.5.11 The Contractor shall assemble, configure, and
program all SLR-5700 repeaters, Ethernet switch, XPR-5350 base stations, and twenty-five (25) XPR-7350 radios for trunking mode operation. The Contractor shall successfully demonstrate 2
SO-17-007 - 6
channel access in TDMA (dual mode only) for each SLR-5700 repeater.
7.5.12 The Contractor shall perform all
communications tests and system checks/alignments from base station and repeater on ALL SIXTEEN (16) UHF channels to handheld users throughout various shipboard locations, in accordance with reference 2.1.
7.5.13 The Contractor shall configure and test the
all Motorola equipment in accordance with Manufacturer’s specifications. ALL radios, base stations, and repeaters shall be programmed and successfully tested in both ANALOG and DIGITAL modes of operation, with DIGITAL MODE being the preferred mode of operation. Test results shall be documented and submitted to the MSC representative.
7.5.14 The Contractor shall provide a total of 4
hours of training (OJT) to shipboard personnel in programming, configuration, and operation of the SLR-5700 Repeaters, XPR-5350 mobile base stations, and XPR-7350 handheld radios. OJT shall be coordinated with the vessel’s Master and shall commence at a mutually agreeable time.
7.6 DRAWINGS:
7.6.1 The Contractor shall develop and submit to
the Port Engineer preliminary “as-built” working drawings based on conceptual guidance found in
Section 2.0. As a minimum, the drawing(s) shall clearly identify all installed equipment and show cable run for antenna, base station, repeaters, and power sources. The drawing shall include a list of power source(s) for all new electrical equipment. The working drawing shall include a materials list.
7.6.2 Final “as-built” drawings shall be
submitted to the Port Engineer on CD in AutoCAD format, and 1 (one) paper copy. Provide 1 (one)
SO-17-007 - 7
paper copy to Ship’s Commanding Officer or his designated representative.
7.6.3 Delivery of final system As-Built/Install
Drawings: NLT 20 February 2017. Deliver to
MSCREP for review/approval.
7.7 PAINTING: None.
7.8 MARKINGS:
7.8.1 The Contractor shall install new aluminum
embossed tags on all newly installed cables resulting from this work item.
7.8.2 The Contractor is to provide and install new
identification plates identifying newly installed equipment.
7.9 INSPECTION/TESTS
7.9.1 The Contactor shall perform a system
operational test of the XPR-5350 base stations, SLR-5700 repeaters, and all XPR-7350 radios in the presence of the MSC
REP in accordance with references 2.1.1, 2.1.2, and 2.1.3.
Coordinate all tests with the ship’s Master or Designated
Representative.
7.9.2 Verify operation, voice clarity, and signal
strength of base station, and handheld radios. The Contractor and Ship’s designated representative shall conduct communication
“voice” checks in various locations throughout the vessel. The
Contractor shall ensure the system provides 95 percent coverage from each repeater.
7.9.3 The Contractor shall test system power supply
for proper voltage, switching, and charging. The system shall remain powered for a minimum of 60 minutes while on battery power. Ensure all indications are consistent with MFR recommendations.
SO-17-007 - 8
7.9.4 Upon successful completion of installation, the
Contractor shall submit a final comprehensive test report to the
MSC REP detailing any system deficiencies, general observations, recommendations, alignments, adjustments, setting changes, power-up test, battery test, software version installed, and/or any system configurations changes.
7.9.5 MSC Representatives are Richard Randall, USNS
Millinocket Principle Port Engineer, (757) 237-2848, (email:
richard.randall@navy.mil), Mr. Lamont Seabron, T-EPF C4S
Electronics Execution Manager, (757)443-3004 (email:
lamont.seabron@navy.mil) and Mr. Stacy Clark, (757)443-0039
(email: stacy.clark@navy.mil).
8.0 MANUFACTURER REPRESENTATIVE:
8.1.1 Provide the services of an authorized Motorola
and HP OEM Manufacturer’s Representative to perform this installation.