Amendment_0005_RFP-_Q_ _A_16_-_23.docx

DOCX document 41 KB Posted

Attached to
USNS ARCTIC (T-AOE 8) ROH/DD Federal contract opportunity
Solicitation number
N32205-16-R-4209
Issued by
Department of the Navy Military Sealift Command

About this file

Questions and Answers 16 through 23

View the file

Other files for this federal contract opportunity

Other files attached to USNS ARCTIC (T-AOE 8) ROH/DD, newest first.
File Type Posted
N32205-16-R-4206-0003.docx DOCX document
Amendment_N32205-16-R-4209-0001.docx DOCX document
16-R-4209_Amend_002.docx DOCX document
Amendment_0004_RFP-_Q_ _A_8_-_15.docx DOCX document
RFP-_Q_ _A_5_-_7.docx DOCX document
RFP-_Q__ _A_1_-_4.docx DOCX document
Solicitation_N32205-16-R-4209_(Posting).docx DOCX document
Solicitation_No._N32205-16-R-4209.docx DOCX document
J_-_Attachments.zip ZIP file
J_-_6_CDLS.zip ZIP file
J A_N32205-16-R-4209_Combined_USNS_ARC_ROH-DD_Feb_2017_(Posting).pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MILITARY SEALIFT COMMAND

N32205-16-R-4209

QUESTIONS AND ANSWERS

The following are answers to questions received from potential offerors. The answers provide clarification only and do not constitute an amendment to the solicitation.

SPECIFICATION ITEM NO.: _0602___________

PARAGRAPH / SECTION / PART NO: 2.1, 2.3, 3.1.2, 3.2.1, 3.2.2, 3.2.3,7.3, 7.3.1, 7.5.1

QUESTION 16:

WI 602 CARGO REFRIGERATION HOLD DECK REPLACEMENT

Need clarification: 3.1.2. states approximately 800 square feet of deck renewal per storeroom, when 7.3.1. states deck plating will be in minimum of three pieces, approximately 5 feet wide and 9 feet long?

Is it your intention for new diamond tread deck plate to replace the temporarily removed grating?

Where is the new diamond tread plate to be installed?

Why is the material in 3.2.1, 3.2.2, & 3.2.3. called out there is no direction to install it?

Why are references 2.1 and 2.3 in this spec when deck covering work is not in the statement of work required?

Are the new deck plates in 7.3 to be painted IAW 7.4?

ANSWER:

The work item has been revised and the installation of the diamond plate steel has been removed. Revised WI 0602 available on request.

SPECIFICATION ITEM NO.: _915___________

PARAGRAPH / SECTION / PART NO: 7.5

QUESTION 17:

Propeller shaft Installation Preparations

Please clarify the following:

1. Do the new GFM Propeller Shafts have GFR already installed?

1. It is our interpretation that the intent of item 915, paragraph 7.5.3 is to align each pair (port and starboard) of propeller and intermediate shafts as follows:

· Verify that the radial difference between flange diameters of the two shafts does not exceed .002”.

GOVERNMENT RESPONSE:

Concur.

· Verify axial alignment between the flanges by ensuring that a .0015” feeler gage cannot be inserted between the flange faces.

GOVERNMENT RESPONSE:

Concur.

· Verify best-fit angular alignment between boltholes on the intermediate and propeller shaft mating flanges, with the #1 bolthole in the intermediate shaft aligned to the propeller shaft #1 keyway.

GOVERNMENT RESPONSE:

Initially identify the legacy propeller shaft position to intermediate shaft when the shaft line is placed in the docking position prior to removal. The new propeller shaft can be placed in an identical position (with respect to the old propeller shaft position) See answer to next question for further definition.

· It is permissible to utilize the original coupling bolts as temporary fasteners during coupling boring and fitting operations by turning down the bodies to have a slight clearance between to the holes in both mating flanges.

GOVERNMENT RESPONSE :

The government is providing new fasteners however would like to reuse any legacy fasteners wherever possible. It is recommended that the bolt holes are measured on the intermediate and new propeller shafts, and the old fasteners are measured to determine how many can be reused. The shafts can be coupled and the ship can establish a new docking position mark on the interior of the ship.

· For the sake of good order we believe the estimated level of effort of eighty (80) hours allotted in paragraph 7.5.5 is not a sufficient amount of machining time for fitting the tapered bolts.

GOVERNMENT RESPONSE.

The contractor can track machine hours and submit a condition report if the 80 hours is depleted.

See answers above.

SPECIFICATION ITEM NO.: _107__________

PARAGRAPH / SECTION / PART NO: 2.1

QUESTION 18:

CARGO TANK LEVEL INDICATION SYSTEM SENSOR INSTALLATION

Drawing 506-NAG-SK-0053 file only contains sheet 21 of 21. Contractor requests that the Government provide the entire drawing.

The government provided sheet 21 of 21 because it is the only relevant sheet to Work Item 107.

The remainder of the drawing deals with the system installation on the ARCTIC, to which NAG is being identified as the installer. If the drawings are required, they can be obtained from NAG LLC.

SPECIFICATION ITEM NO.: _407__________

PARAGRAPH / SECTION / PART NO: 4.2

QUESTION 19:

VDR Installation

The government indicates that it is providing a JRC JYC-1900 VDR. This is a full VDR that requires connections to radars, ECDIS, fire alarm, rudder order & actual, propulstion, WT doors etc. Fitting the JYC-1900 (VDR) rather than the JYC-1950 (SVDR) in place of the existing Transas S-VDR will require all the additional connections and interfaces in order for JRC to issue the APT COC.

S-VDR’s are allowed on non-passenger ships constructed prior to July 1, 2002 as an alternative to a full VDR.

Please indicate the government’s intent as to installation of the full VDR rather than an S-VDR.

As of July 1, 2014, ABS is only accepting VDRs and not S-VDRs.

The installation is for a full VDR. Any known additional connections should be included in the contractors pricing.

SPECIFICATION ITEM NO.: _901__________

PARAGRAPH / SECTION / PART NO: 2.1.1

QUESTION 20:

DRY-DOCKING AND UNDOCKING VESSEL

Contractor requests missing reference 801-6360504.

Drawing shall be provided.

SPECIFICATION ITEM NO.: _Various___________

PARAGRAPH / SECTION / PART NO: Various

QUESTION 21:

CARGO JP5 FUEL VALVE OVERHAUL

Can the government provide a potential source for an authorized OEM Tech Rep there are multiple possible OEMS for the subject valves.

Item 507 Can you please provide the following references:

261-8392997

20002298
300-8392999
20001700
541-6360558
541-8392996
300-8392998

Item 510 Can you please provide reference 2.4 – SSDG Hose List

All references available on request.

SPECIFICATION ITEM NO.: _0913 - 0915___________

PARAGRAPH / SECTION / PART NO: N/A

QUESTION 22:

Main Propulsion Shafting

Please clarify the disposition of the two (2) Propeller shafts removed from the ship. There is no requirement to preserve and package these shafts.

WI 915 Rev A and included reference material available on request.

SPECIFICATION ITEM NO.: _913__________

PARAGRAPH / SECTION / PART NO: 7.15

QUESTION 23:

Main Propulsion Shafting

Paragraph 7.15 directs contractor to transport all shafts to the shop and remove all paint and install the shafts in a lathe. The propeller shafts are being renewed. However, there is no direction as to disposition of the old propeller shafts.

Contractor recommends that the government have contractor refurbish the shafts and ship to government storage so the government will have suitable spare propellers on hand when needed.

In response to previoius question clarifying the disposition of the two (2) Propeller shafts removed from ship, the government revised WI915 to include preservation and packaging of the old propeller shafts for shipment to MSC. MSC currently doesn’t have the required liners to refurbish the propeller shafts. In addition, it is not certain that the refurbishment could be completed in the original POP.

Revised WI 915 Rev A and included reference material available on request.