Statement_of_Work.docx
DOCX document 47 KB Posted
- Attached to
- PONCE SSTG BEARING SERVICE Federal contract opportunity
- Solicitation number
- N32205-15-T-2273
About this file
Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Statement_of_Work_-_Revised_Sept_2.docx | DOCX document | |
| COMBINED_SYNOPSIS_SOLICITATION_PONCE_SSTG_CASREP_15-T-2273.doc | DOC document | |
| Memorandum_for_Sinplifies_Acquisition_Sole_or_Limited_Source_and_Justification_for_Urgent_Acquisition.PDF |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USNS PONCE
(LPD 15)
TECH REP SERVICES FOR SSTG OVERHAUL August 9, 2014
1.0 ABSTRACT
1.1 This work item describes the requirement to provide technical representative services to oversee repair to the SSTG 1A bearings.
2.0 REFERENCES:
2.1 NAVSEA Tech Manual 0961-LP-009-0010: Ship Service Turbine Generator
3.0 ITEM LOCATION/DESCRIPTION
3.1 Location/Quantity
3.1.1 Location: MMR1 (7-120-0-E)
3.1.2 Quantity/Description: SSTG 1A Turbine generator
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None.
5.0 NOTES: None additional.
6.0 QUALITY ASSURANCE REQUIREMENTS: None additional.
7.0 STATEMENT OF WORK REQUIRED
7.1 Provide the services of one (1) technical representative, acting as the subject matter expert liaison to the MSCREP; to oversee SSTGs repairs during the specified performance period. Work to be performed on the SSTGs by the attending technical rep includes:
0. Bearing and Reduction Gear Inspections
0. Rolling out of bearings for inspection
0. Replace Bearings
0. Journal inspections and cleaning
0. Inspection of Generator Drive Couplings
7.2 The technical representative shall oversee all work performed by local ktrs and ship force, and liaison with the MSCREP.
| 7.3 | TECHNICAL REPRESENTATIVE SHALL PROCURE AND PROVIDE NEW BEARINGS; BEARINGS SHALL BE OEM. KTR SHALL SHIP AND DELIVER ALL PARTS TO USS PONCE JOB SITE. |
| The Principle Port Engineer will provide shipping information after award is received by Tech Rep ktr. |
The following Contractor Furnished Material/Parts shall be procured and provided by the Ktr:
OEM Parts for Bearing Replacement; Bearings for one SSTG:
| Inlet End Complete Bearing |
| GJ-395 AL U/L |
| P/N 395-0537 |
| QTY 1,U/I: AY |
| Bearing Pad |
| GJ-395 AM |
| NSN 013624810 |
| QTY 2, U/I: SET |
| Exhaust End Complete Bearing |
| GJ-395 AN U/L |
| P/N 395-0538 |
| QTY 1, U/I: AY |
Journal Bearing
| P/N 395-0508 |
| QTY 1, U/I: AY |
Journal Bearing
| P/N 395-0507 |
| QTY 1, U/I: AY |
Journal Bearing
| P/N 395-0506 |
| QTY 1, U/I: AY |
Journal Bearing
| P/N 395-0505 |
| QTY 1, U/I: AY |
7.4 The technical representative shall oversee operational test of SSTG 1A after bearing repairs are completed.
7.5 The technical representative shall provide written report of conditions found during critical checkpoints of each generator overhaul. The report shall include recommendations to return the unit to normal operating service.
7.6 The technical representative shall provide a final report detailing all conditions found, parts replaced and readings taken. The report shall include photographs of conditions detailing as found conditions in critical areas of each generator.
201-2
File details come from the government source that posted it. Updated .