J_-_2_Category_A_Items_Rev_1-_RAINIER_ROH-DD.xls
XLS spreadsheet 57 KB Posted
- Attached to
- USNS RAINIER ROH/DD Federal contract opportunity
- Solicitation number
- N32205-15-R-2000
About this file
Revised J-2 Attachment with new WI 202
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N32205-15-R-2000-0004.doc | DOC document | |
| RFP-RFQ_QandA_2.docx | DOCX document | |
| 15-R-2000-0003.doc | DOC document | |
| N32205-15-R-2000-0002.doc | DOC document | |
| RFP-RFQ_QandA_1.docx | DOCX document | |
| N32205-15-R-2000-0001.doc | DOC document | |
| N32205-15-R-2000_USNS_RAINIER_ROH-DD.doc | DOC document | |
| RAINIER_15-R-2000_J-ATTACHMENTS.zip | ZIP file | |
| DD_Form_1423-1_SWI-011_T-AOE_Sep12.pdf | ||
| RAINIER_15-R-2000_-_CDRLs_ZIPPED.zip | ZIP file | |
| SYNOPSIS_TEMPLATE_(FAR_5.207)_(V1.1 _6-17-14).docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep / Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Price | TOTAL LABOR HOURS | TOTAL MATERIAL | TOTAL PRICE | |
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS | NSP | $ - 0 | $0 | ||||||||
| 002 | TECHNICAL AND MANUFACTURER'S REPRESENTATIVES | NSP | $ - 0 | $0 | ||||||||
| 003 | APPROACH, BERTH, AND MOORING REQUIREMENTS | NSP | $ - 0 | $0 | ||||||||
| 004 | TESTING AND QUALITY ASSURANCE | NSP | $ - 0 | $0 | ||||||||
| 005 | ELECTRICAL SAFETY PROCEDURES REQUIREMENTS | NSP | $ - 0 | $0 | ||||||||
| 006 | HEAVY WEATHER PLAN | NSP | $ - 0 | $0 | ||||||||
| 007 | COLD WEATHER PLAN | NSP | $ - 0 | $0 | ||||||||
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM (OMT) | - 0 | $ - 0 | $0 | ||||||||
| 011 | FURNISH GENERAL SERVICES | - 0 | $ - 0 | $0 | ||||||||
| 012 | TELEPHONE SERVICES | - 0 | $ - 0 | $0 | ||||||||
| 013 | PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS | - 0 | $ - 0 | $0 | ||||||||
| 014 | PREPARATION OF WEIGHT AND MOMENT REPORT | - 0 | $ - 0 | $0 | ||||||||
| 015 | INTEGRATED LOGISTICS AND GFM SUPPORT REQUIREMENTS | - 0 | $ - 0 | $0 | ||||||||
| 016 | FIRE PROTECTION AND SHIP'S SAFETY PROGRAM | - 0 | $ - 0 | $0 | ||||||||
| 017 | HANDLING SHIP'S STORES | - 0 | $ - 0 | $0 | ||||||||
| 018 | DELIVERY AND REDELIVERY OF THE VESSEL | - 0 | $ - 0 | $0 | ||||||||
| 019 | SHIPBOARD ACCESS AND SECURITY | - 0 | $ - 0 | $0 | ||||||||
| 020 | GAS FREE CERTIFICATES | - 0 | $ - 0 | $0 | ||||||||
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES | - 0 | $ - 0 | $0 | ||||||||
| 022 | DOCK TRAILS AND SEA TRIALS | - 0 | $ - 0 | $0 | ||||||||
| 023 | HAZARDOUS WASTE DISPOSAL | $250,000.00 | % | - 0 | $ 500,000.00 | $500,000 | ||||||
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY | NSP | $ - 0 | $0 | ||||||||
| 100 | HULL STRUCTURES | |||||||||||
| 101 | FLIGHT DECK NON-SKID RENEWAL | - 0 | $ - 0 | $0 | ||||||||
| 102 | AIRLOCK OVERHEAD REPLACEMENT AND WATER TIGHT HATCH REMOVAL | - 0 | $ - 0 | $0 | ||||||||
| 103 | SUPPORT FOR ABS CLOSE UP INSPECTION | - 0 | $ - 0 | $0 | ||||||||
| 200 | ||||||||||||
| 201 | LINE SHAFT BEARING INSPECTION | - 0 | $ - 0 | $0 | ||||||||
| 202 | GAS TURBINE CHANGE OUT SUPPORT | - 0 | $ - 0 | $0 | ||||||||
| 300 | ELECTRICAL | |||||||||||
| 301 | SWITCHBOARD AND LOAD CENTER CLEANING | $ - 0 | $0 | |||||||||
| 302 | STUFFING TUBE REPLACEMENT | $ - 0 | $0 | |||||||||
| 400 | COMMUNIC ATION & NAV AIDS | |||||||||||
| 401 | RADAR AND ECDIS PREVENTIVE MAINTENANCE | - 0 | $ - 0 | $0 | ||||||||
| 402 | INMARSAT B PREVENTIVE MAINTENANCE | $ - 0 | $0 | |||||||||
| 403 | GMDSS CERTIFICATION | $ - 0 | $0 | |||||||||
| 404 | SPEED LOG AND FATHOMETER PM | $ - 0 | $0 | |||||||||
| 500 | AUXILIARY MACHINERY | |||||||||||
| 501 | AUXILIARY BOILER INSPECTION (ABS) | - 0 | $ - 0 | $0 | ||||||||
| 502 | REPLACE AC SALT WATER DUPLEX STRAINER (VR14-024 | - 0 | $ - 0 | $0 | ||||||||
| 503 | #4 CARGO DFM PUMP AND MOTOR OVERHAUL (VR14-068) | - 0 | $ - 0 | $0 | ||||||||
| 504 | #4 SSDG MAJOR OVERHAUL AND CRANKSHAFT REPLACE | - 0 | $ - 0 | $0 | ||||||||
| 505 | GROOM AND WEIGHT TEST RHIB DAVIT | - 0 | $ - 0 | $0 | ||||||||
| 506 | REPLACE 100 FT OF SEAWATER PIPING | - 0 | $ - 0 | $0 | ||||||||
| 507 | LP & HP AIR SYSTEM RELIEF VALVE OVERHAUL | - 0 | $ - 0 | $0 | ||||||||
| 508 | REPAIR FUEL STORAGE TANK LEAK (VR14-066) | - 0 | $ - 0 | $0 | ||||||||
| 509 | CARGO JP5 #1 DISCHARGE PIPING REPAIR | $ - 0 | $0 | |||||||||
| 510 | REPAIR MISCELLANEOUS VALVES | $ - 0 | $0 | |||||||||
| 600 | OUTFIT, FURNISHING & HABITABILITY | |||||||||||
| 601 | LIFERAFTS CERTIFICATION | - 0 | $ - 0 | $0 | ||||||||
| 602 | GALLEY OVEN REPLACEMENT (VR14-072) | - 0 | $ - 0 | $0 | ||||||||
| 603 | GALLEY EQUIPMENT MAINTENANCE | - 0 | $ - 0 | $0 | ||||||||
| 604 | CARGO REEFER DECK REPAIRS (VR14-052) | - 0 | $ - 0 | $0 | ||||||||
| 605 | ACCOMODATION LADDER INSPECTION AND TESTING | - 0 | $ - 0 | $0 | ||||||||
| 800 | HEATING, VENTILATION, AND AIR CONDITIONING | |||||||||||
| 801 | VENTILATION SYSTEM CLEANING | - 0 | $ - 0 | $0 | ||||||||
| 802 | OVERHAUL MISCELLANEOUS FANS & MOTORS | - 0 | $ - 0 | $0 | ||||||||
| 900 | DRYDOCKING AND UNDOCKING | |||||||||||
| 901 | DRYDOCKING AND UNDOCKING VESSEL | - 0 | $ - 0 | $0 | ||||||||
| 904 | SEA SUCTION AND DISCHARGE LINES | - 0 | $ - 0 | $0 | ||||||||
| 905 | SHAFT AND RUDDER BEARING CLEARANCE (ABS) | - 0 | $ - 0 | $0 | ||||||||
| 907 | CLEAN AND POLISH PROPELLERS (ABS) | - 0 | $ - 0 | $0 | ||||||||
| 908 | RUDDERS AND STERN FRAME EXAMINATION (ABS) | - 0 | $ - 0 | $0 | ||||||||
| 909 | UNDERWATER HULL CLEANING AND PAINTING | - 0 | $ - 0 | $0 | ||||||||
| 911 | CATHODIC PROTECTION SYSTEM MAINTENANCE | - 0 | $ - 0 | $0 | ||||||||
| 913 | STRUT BEARING HOUSING REFURBISHMENT (ABS) | - 0 | $ - 0 | $0 | ||||||||
| 914 | POTABLE WATER TANKS CLEANING AND PAINTING | - 0 | $ - 0 | $0 | ||||||||
| 915 | BILGE KEEL EXAMINATION | - 0 | $ - 0 | $0 | ||||||||
| 1000 | UNREP GEAR | |||||||||||
| 1001 | SLIDING BLOCK HOIST DRIVE CHAIN REPLACEMENT | - 0 | $ - 0 | $0 | ||||||||
| 1003 | HP AIR SYSTEM RELIEF VALVE CALIBRATION | - 0 | $ - 0 | $0 | ||||||||
| 1004 | QUADRENNIAL SURVEY OF CARGO BOOMS (ABS) | - 0 | $ - 0 | $0 | ||||||||
| 1005 | RAM TENSIONER CROSSOVER PIPE REFURBISHMENT | - 0 | $ - 0 | $0 | ||||||||
| TOTAL CAT "A" | $500,000.00 |
&LUSNS RAINIER (T-AOE 7)&C&"Times New Roman,Bold"CONTRACTOR PRICE BREAKDOWN&"Times New Roman,Regular" &"Times New Roman,Bold"CATEGORY "A" ITEMS&R&"Times New Roman,Regular"N32205-15-R-2000
&CATTACHMENT J-2
File details come from the government source that posted it. Updated .