Attachment_P7_-_CLIN_Breakout_Subcontractor.xls

XLS spreadsheet 114 KB Posted

Attached to
Draft RFP for Warfare Analysis-AIR 4. 0M Federal contract opportunity
Solicitation number
N00421-15-R-0014
Issued by
Department of the Navy Naval Air Systems Command Naval Air Warfare Center

About this file

Subcontractor Cost Breakout Spreadsheet

View the file

Other files for this federal contract opportunity

Other files attached to Draft RFP for Warfare Analysis-AIR 4. 0M, newest first.
File Type Posted
Attachment_3_-_COR_Appointment_Letter.docx DOCX document
Attachment_1_-_QASP.docx DOCX document
Attachment_P6_-_CLIN_Breakout_Spreadsheet.xls XLS spreadsheet
Attachment_8_-_Scheduled_GFP_(Excel).xlsx XLSX spreadsheet
Attachment_5_-_RGFP_incorporated_pursuant_to_DFARS_245.103-72_(PDF).pdf PDF
Attachment_2_-_DD254.pdf PDF
Attachment_P5_-_Past_Performance_Questionnaire.doc DOC document
Attachment_7_-_SGFP_(PDF).pdf PDF
Attachment_P4_-_CPARS_Update_Questionaire.doc DOC document
Attachment_P8_-_Fully_Burdened_Labor_Rates.xls XLS spreadsheet
Attachment_6_-_RGFP_(XLSX).xlsx XLSX spreadsheet
Attachment_P3_-_Past_Performance_Matrix.doc DOC document
Attachment_4_-_Approved_Subcontracting_Plan.docx DOCX document
DRAFT_RFP_N00421-15-R-0014.docx DOCX document
Attachment_P1_-_Workforce_Qualifications.xls XLS spreadsheet
Attachment_P2_-_Reserved.docx DOCX document
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions
SubContractor:
1Insert the Contract Line Item Numbers (CLINs) at Cells I2, L2, O2, R2, and U2.
2On Header Tab for each worksheet, insert the proposal number. The file name should be populated.
3On Footer Tab for the worksheet, insert the firm's name after colon. Insert the RFP number after the colon, if it has not been filled-in.
4Columns I, L, O, R and U are totals for each year. A SUMMARY SHEET OF ALL PERIODS NEEDS TO BE COMPLETED AS A SEPARATE TAB.
5The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER.
6Within the work sheet any cell colored "blue" contains a formula and should not be edited, unless there is an error in the formula. It is the Contractor's responsibility to verify all formulas and to correct them, if necessary. The Government does not warrant that the formulas are correct.
7All dollar figures shall be carried out no further than two decimal places.
8The worksheet is arranged that the workforce being proposed for an entire period of performance is shown together, even though it will separated by individual CLINs in Section B. When the numbers are carried to Section B, they will be the same as shown on the worksheet SUMMARY.
9In Cell B2, enter the period of performance calendar dates. (ex: 1 Jan 09 - 31 Dec 09)
10In column A, starting at row 5 to 27, the Government Labor Categories from the Historical Information should have been inserted. In column B, the Offeror can insert the title of the labor category it will be utilizing. If it is comparable to one of the Government Labor Categories, then it should appear opposite that category. However, if it is not comparable, utilize the "not comparable" row. This applies to the Prime Contractor's section and those sections for its subcontractors. If necessary, insert additional rows--but ensure integrity of formulas. The Offeror is not required to utilize the Government's labor categories. However, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. The Offeror does not insert any subcontractor information in this section. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information.
11In column C, the Offeror should insert a "K" if the worker will be performing at the Contractor's facility or a "G" if it will be performing in Government spaces.
12In column D, for the prime contractor's own workforce, the field is colored "green" indicating no input. (This reflects that the prime contractor is proposing its own employees or contingency hires--it does not include any subcontractors.) For the subcontractors, their fields are in yellow. No input is required by the Offeror in this column. Please note if more subcontractors are needed, the contractor may add additional rows to accommodate them, but ensure integrity of formulas.
13In column E, for both the prime contractor's own workforce and that of the individual subcontractors' workforces, identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time.
14In column F, enter the name of the proposed individual for that position.
15In column G:
(a) for the prime contractor, enter the unburdened labor rate for each individual (e.g. rows 5-27)
(b) In row 32 the prime contractor should insert its fringe rate for full time, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank.
(c) In row 33 the prime contractor should insert its fringe rate for part-time, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank. If no part-time employees are proposed this should also be left blank.
(d) In row 36, the prime contractor should insert its overhead rate for work performed at the contractor's facility.
(e) In row 37, the prime contractor should insert its overhead rate for work performed at the Client/Government's facility.
(f) In row 39, the prime contractor should insert its G&A rate being applied.
(g) for the subcontractor enter the fully burden cost including fixed fee associated with individual labor category for each year.
(h) In row 61, the prime should insert the subcontractor handling charge, if any.
(i) In row 64, the prime should insert the fixed fee rate applied to its cost excluding subcontractor labor.
(j) In row 65, the prime should insert the fixed fee rate it is applying to the subcontractor labor, if any.
16In column H, and then similarly for Columns J, L, N, P, R, T, V, X and Z:
(a) for the prime contractor and the subcontractor enter the hours associated with individual labor category for CLIN XX00 (e.g., rows 5-44, 59-98, 101-140, 143-182, 185-224, 227-266, 269-308, 311-350, and 353-392). Also make sure you plug in the hours for columns J, L, N and so on.
(b) In Cell H46, the prime contractor should insert the base its fringe rate for full time is being applied to, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank.
(c) In Cell H47, the prime contractor should insert the base its fringe rate for part time is being applied to, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank.
(d) In Cell H50, the prime contractor should insert the base its overhead rate is being applied to for work performed at the contractor's facility.
(e) In Cell H51, the prime contractor should insert the base its overhead rate is being applied to for work performed at the Client/Government's facility.
(f) In Cell H53, the prime contractor should insert the base its G&A rate is being applied to.
(g) In Cell H398, the prime should insert the prime labor base its fixed fee rate is being applied to (excluding subcontractor labor).
(h) In Cell H399, the prime should insert the subcontractor labor base its fixed fee rate is being applied to, if any.
(i) Under Other Direct Costs, the prime contractor should insert the Travel, Material and NMCI by CLIN.
17Insert similar "labor base" totals in columns K,N,Q and T in appropriate cells.
18Column V should automatically calculate the total hours for all rows.
19Column AD is a summation of the costs.
20Other Direct Costs - Material and Travel estimates are supplied by the Government.
21In row 80 enter the rate for material handling if it is being applied to Travel and Material. If not, applying a material handling should be left blank.
22In row 81 enter the rate for G&A if it is being applied to Travel and Material. If not, applying a G&A should be left blank.
23When submitting this file, the instructions may be deleted.

Base Period Cost Type

DO NOT TYPE IN ANY COLORED AREASYear 1Year 2Year 3Year 4Year 5Total $
CPFFCLINCLINCLINCLINCLIN
ServicesSubContractorhrssubtotalhrssubtotalhrssubtotalhrssubtotalhrssubtotal
Government Labor CategoryProposed Categorysitesubf/pEmployee NameRateLaborRateLaborRateLaborRateLaborRateLabor
Project Manager$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
SR Warfare Analyst$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
Warfare Analyst$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
JR Warfare Analyst$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
SR Operations Analyst$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
Operations Analyst$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
JR Operations Analyst$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
SR Engineer$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
Engineer$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
JR Engineer$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
SR Computer Scientist$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
Computer Scientist$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
SR Logistics Analyst$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
Logistics Analyst$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
JR Logistics Analyst$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
SR Tactical Systems Analyst$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
Tactical Systems Analyst$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
SR Systems Administrator$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
Systems Administrator$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
Program Analyst$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
Technical Writer$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
Administrative Assistant$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
Mission Integrator$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
not comparable$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
not comparable$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
not comparable$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
subtotal0$ - 00$ - 00$ - 00$ - 00$ - 0$ - 0
fringe fulltime0.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 0$ - 0
fringe part time0.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 0$ - 0
subtotal$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Overhead
Contractor site0.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 0$ - 0
Client site0.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 0$ - 0
subtotal$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
G&A0.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 0$ - 0
COM0.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 00.00%$ - 0$ - 0$ - 0
Subtotal Labor$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Fee/Profit - subcontractor0.0%$ - 0$ - 00.0%$ - 0$ - 00.0%$ - 0$ - 00.0%$ - 0$ - 00.0%$ - 0$ - 0$ - 0
Total Subcontractor Labor Cost Plus Fee/Profit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

&LAttachment_P6_CLIN_Breakout_Spreadsheet&R(insert proposal number) &A &LKTR:(insert name)&C Source Selection Information See: FAR 2.101 & 3.104&RRFP:N00421-11-R-0045 &L&F &R(insert proposal number) &A &LKTR:(insert name)&CSource Selection Information See: FAR 3.104&RRFP:N00024-09-R-3185

File details come from the government source that posted it. Updated .