Attachment_1_-_QASP.docx
DOCX document 37 KB Posted
- Attached to
- Draft RFP for Warfare Analysis-AIR 4. 0M Federal contract opportunity
- Solicitation number
- N00421-15-R-0014
About this file
QASP
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_3_-_COR_Appointment_Letter.docx | DOCX document | |
| Attachment_P6_-_CLIN_Breakout_Spreadsheet.xls | XLS spreadsheet | |
| Attachment_P7_-_CLIN_Breakout_Subcontractor.xls | XLS spreadsheet | |
| Attachment_P5_-_Past_Performance_Questionnaire.doc | DOC document | |
| Attachment_7_-_SGFP_(PDF).pdf | ||
| Attachment_P4_-_CPARS_Update_Questionaire.doc | DOC document | |
| Attachment_P8_-_Fully_Burdened_Labor_Rates.xls | XLS spreadsheet | |
| Attachment_6_-_RGFP_(XLSX).xlsx | XLSX spreadsheet | |
| Attachment_P3_-_Past_Performance_Matrix.doc | DOC document | |
| Attachment_8_-_Scheduled_GFP_(Excel).xlsx | XLSX spreadsheet | |
| Attachment_5_-_RGFP_incorporated_pursuant_to_DFARS_245.103-72_(PDF).pdf | ||
| Attachment_2_-_DD254.pdf | ||
| Attachment_4_-_Approved_Subcontracting_Plan.docx | DOCX document | |
| DRAFT_RFP_N00421-15-R-0014.docx | DOCX document | |
| Attachment_P1_-_Workforce_Qualifications.xls | XLS spreadsheet | |
| Attachment_P2_-_Reserved.docx | DOCX document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N00421-15-R-0014 Attachment 3 Enclosure (4)
Quality Assurance Surveillance Plan (QASP) For MISSION ENGINEERING & ANALYSIS DEPARTMENT for AIR 4.0M
1. Purpose This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure the systematic quality assurance methods are used in the administration of the performance based service order under the planned contract. The intent is to ensure that the Contractor performs in accordance with the performance metrics and the Government receives the quality of services called for in the order.
Specifically, the contract requirement is for warfare analysis, engineering and technical services for Naval and Joint warfighting capability assessments and Modeling and Simulation (M&S) to supplement and enhance AIR-4.0M Government and military warfighting analytic efforts that are conducted in support of Program Executive Offices (PEOs), the Naval Aviation Enterprise (NAE), and the Office of the Chief of Naval Operations (OPNAV). The required support is multi-faceted and provides services in support of warfare analysis, M&S, software development, and analytic program requirements. Additionally, analytic efforts may be assessed relative to Joint capability requirements to provide time-phased capabilities within Joint Capability Areas (JCAs). This work will employ disciplines embracing various types of operational analysis, systems engineering, software engineering, and computer science performed at the warfare campaign, mission and / or engagement level.
The resulting vehicle will be an Indefinite Delivery Indefinite Quantity (IDIQ) single award contract. The contract will have cost-plus-fixed-fee (CPFF) and firm-fixed-price (FFP) labor CLINs and cost-reimbursable CLINs for travel and material. The IDIQ contract will include a five (5) year ordering period. A properly executed QASP will assist the Government in achieving the objectives of this procurement.
2. Authority Authority for issuance of this QASP is provided in the Contract Section E under Inspection and Acceptance heading, which provides for inspection and acceptance of the services and documentation called for in task orders, to be executed by the Contracting Officer or a duly authorized representative.
3. Scope To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan and the QASP. The Contractor, and not the Government, is responsible for management and quality control actions necessary to meet the quality standards set forth by the order.
The QASP on the other hand, is put in place to provide Government surveillance oversight of the Contractor’s efforts to assure that they are timely, effective and are delivering the results specified in the order.
4. Government Resources The following definitions for Government resources are applicable to this plan:
Contracting Officer (Procuring Contracting Officer) (PCO) or (Administrative Contracting Officer) (ACO) - A person duly appointed with the authority to enter into or administer contracts and make related determination and findings on behalf of the Government. The PCO for this contract is AIR 2.5.1.6. The ACO will be designated in the resulting contract. Contracting Officers are designated via a written warrant, which sets forth limitations of authority.
Contracting Officer’s Representative (COR) - An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract. The COR will be appointed in the resulting task order. The limitations of authority are contained in a written letter of appointment.
Technical Point of Contact (TPOC) - An individual assigned to each task order awarded under the contract to provide technical oversight of the contractor’s performance. The TPOC serves as the direct conduit to provide Government guidance and feedback to the Contractor on technical matters and serves as the Subject Matter Expert (SME).
5. Responsibilities The following Government resources shall have responsibility for the implementation of this QASP:
Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the Contractor receives impartial, fair and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
Contracting Officer’s Representative – The COR is responsible for technical administration of the contract and assures proper Government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms or conditions shall be referred to the Contracting Officer for action.
Technical Point of Contact - The TPOC is the primary resource responsible for observing, evaluating and documenting the contractor’s performance in meeting the critical performance standards identified in each task order. Once the task order is awarded, the TPOC is responsible for reviewing monthly status reports to monitor technical performance and expended costs as the task order is executed; notifying the COR immediately of any discrepancies relative to contractor performance in the execution of the order; and providing recommendations, via email, relative to acceptance of each deliverable specified. Upon delivery of the final analytic product, the TPOC is responsible for providing a final evaluation to the COR that assesses the overall quality of contractor performance under the task order. This individual is not empowered to make any contractual commitments or authorize any changes to the terms of the task order on the Government’s behalf.
| 6. | Methods of QA Surveillance |
| a. | Contractor Performance Assessment Report System (CPARS) – The market place for Program Management and Engineering support services is very competitive. As such, the successful offeror has a vested interest in the Government generated CPARS rating under this contract. Additionally, an evaluation using the CPARS format will be performed at the midpoint of each period of performance. Feedback will be requested from the TPOC of each delivery order and compiled into one CPARS report. This evaluation will be one determinant in exercising an option. The Government for this procurement will address the quality of product or service, schedule, cost control, management, and other areas. As this information may affect future source selections throughout DoD, and the continuation of the contract, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool with the QASP. |
| b. | QASP - The below listed methods of surveillance shall be used by the COR in the technical administration of this QASP. In addition to the below instructions, the form to be used for documentation of quality assurance surveillance is the Surveillance Activity Checklist provided as Enclosure (4) herein. |
| 7. | Surveillance |
Enclosures (1), (2), and (3) set forth the performance standards, incentives, and surveillance methods for the contractor and COR while enclosure (4) provides the means for the COR to document on an annual basis the results of the surveillance and shall be provided to the Contracting Officer on an annual basis.
8. Documentation In addition to providing monthly reports to the Contracting Officer in accordance with NAVAIRINST 4200.57, the COR will also maintain a complete Quality Assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function, including the originals of the Quality Assurance Checklists. All such records will be maintained for the life of the contract. The Contracting Officer will conduct an annual review of the COR’s Quality Assurance files in accordance with NAVAIRINST 4200.57. The COR shall forward these records to the Contracting Officer at termination or completion of the task order.
9. Enclosures Enclosure (1) –Engineering Support Performance Standards Enclosure (2) - Data Performance Standards Enclosure (3) - Incentives Enclosure (4) - Surveillance Activity Checklist N00421-15-R-0014 Attachment 1
ENGINEERING SUPPORT PERFORMANCE STANDARDS
Performance Objectives
| Performance Standard and Acceptable Quality Level (AQL) |
| Surveillance Method/Measure |
| Incentives |
| Provide qualified staff for key personnel labor categories in accordance with the PBSOW. |
| The Contractor shall ensure that a rapid response is given in providing qualified staff and that no key positions are open longer than 15 days. |
| 100% Inspection by COR and customer feedback. |
| See enclosure 3. |
| Maintain site accreditation documentation for all sites throughout the period of performance in accordance with the PBSOW. |
| The Contractor shall author and update certification documentation packages and maintain 95% customer satisfaction in response to required data calls. |
| 100% Inspection by COR and customer feedback. |
| See enclosure 3. |
| Warfare Analysis and Assessments |
| The Contractor shall perform warfare analysis and assessments as delineated in task orders and maintain 95% customer satisfaction in accordance with monthly status reports with task support. |
| 100% Inspection by TPOC and customer feedback. Input provided to COR for overall contract surveillance. |
| See enclosure 3. |
| Architectures Builds and Assessments |
| The Contractor shall perform research, development, and assessments related to advanced concept development and design and maintain 95% customer satisfaction in accordance with monthly status reports with task support. |
| 100% Inspection by TPOC and customer feedback. Input provided to COR for overall contract surveillance. |
| See enclosure 3. |
| Acquisition Analysis and Support |
| The Contractor shall perform at a level that provides acquisition analysis and support with 95% customer satisfaction in accordance with monthly status reports with task support. |
| 100% Inspection by TPOC and customer feedback. Input provided to COR for overall contract surveillance. |
| See enclosure 3. |
| Modeling & Simulation (M&S) |
| The Contractor shall provide qualified staff to provide Modeling and Simulation analysis with 95% customer satisfaction in accordance with monthly status reports with task support. |
| 100% Inspection by TPOC and customer feedback. Input provided to COR for overall contract surveillance. |
| See enclosure 3. |
| Decision Support |
| The Contractor shall provide qualified staff to provide Decision Support with 95% customer satisfaction in accordance with monthly status reports with task support |
| 100% Inspection by TPOC and customer feedback. Input provided to COR for overall contract surveillance. |
| See enclosure 3. |
| Fleet Support |
| The Contractor shall provide qualified staff to provide Fleet Support with 95% customer satisfaction in accordance with monthly status reports with task support |
| 100% Inspection by TPOC and customer feedback. Input provided to COR for overall contract surveillance. |
| See enclosure 3. |
| Programmatic Support |
| The Contractor shall provide qualified staff to provide programmatic analysis support and maintain 95% customer satisfaction in accordance with monthly status reports with task support. |
| 100% Inspection by TPOC and customer feedback. Input provided to COR for overall contract surveillance. |
| See enclosure 3. |
| Software Development |
| The Contractor shall perform at a level that provides information to the NAE WAE for software development efforts and maintain 95% customer satisfaction in accordance with monthly status reports with data provided. |
| 100% Inspection by TPOC and customer feedback Input provided to COR for overall contract surveillance. |
| See enclosure 3. |
| Data |
| The Contractor shall provide qualified staff to provide general research, data collection support, and materials preparation and maintain 95% customer satisfaction in accordance with monthly status reports with task support. |
| 100% Inspection by TPOC and customer feedback. Input provided to COR for overall contract surveillance. |
| See enclosure 3. |
| Naval Aviation Enterprise (NAE) Warfare Analysis Division (WAD) Laboratory Requirements |
| The Contractor shall perform build-up, installation, testing and system administration/configuration management within the NAE WAE and maintain 95% customer satisfaction in accordance with monthly status reports with task support. |
| 100% Inspection by TPOC and customer feedback. Input provided to COR for overall contract surveillance. |
| See enclosure 3. |
Enclosure (1)
DATA PERFORMANCE STANDARDS
| Task Description |
| Performance Standard |
| Acceptable Quality Level (AQL) |
| Surveillance |
Method/ Measure Incentives
| Deliverable/CDRLS* |
| Submission is in accordance with the instructions cited in the CDRL. |
| 100% provided on time 95% acceptable on first submission to Government; 100% acceptable on 2nd submission to Government |
| 100% Inspection by TPOC and COR as indicated on CDRL and sponsor feedback. |
| See enclosure 3. |
Software
CDRL A00A
Submission is in accordance with the instructions cited in the CDRL.
Meets performance requirements for software functionality.
| No deviation from functionality |
| 100% Inspection by TPOC as indicated on CDRL and sponsor feedback. Input provided to COR for overall contract surveillance. |
| See enclosure 3. |
| Source Code CDRL A00B |
| Submission is in accordance with the instructions cited in the CDRL. |
Fully executable.
| No deviation from functionality |
| 100% Inspection by TPOC as indicated on CDRL and sponsor feedback. Input provided to COR for overall contract surveillance. |
| See enclosure 3. |
Tools, Databases & Websites
CDRL A00F
| Submission is in accordance with the instructions cited in the CDRL. Meets performance requirements for functionality; content is complete, accurate and on time. |
| No deviation |
| 100% Inspection by TPOC as indicated on CDRL sponsor feedback. Input provided to COR for overall contract surveillance. |
| See enclosure 3. |
| Rough Order of Magnitude (ROM) |
| Upon submission to the Contractor, a 10 business day turn-around-time is expected. |
| No deviation |
| 100% Inspection by COR and TPOC. |
| See enclosure 3. |
| Cost Control - Labor Rates |
| Submission in accordance with NAVAIRINST 4200.61. |
| 95% within guidance. |
| 100% Inspection by COR utilizing the ROM. |
| See enclosure 3. |
*In blocks 12 and 13 of each CDRL, the TPOC is responsible for supplying the frequency and duration of the CDRL.
INCENTIVES
The following incentives shall apply to performance under this order.
| Assessment Period |
| Acceptable Performance Definition |
| How Measured |
| Incentives |
| Year 1: |
| Not more than 2 of the measurement areas rated below “Satisfactory”. None of the measurement areas are rated below “Marginal”. |
| End of assessment period (12 months) evaluation using the CPARS format covering the previous 12 months. |
| Continued performance at or above Satisfactory rating is a condition for award of new task orders |
| Year 2: |
| Not more than 2 of the measurement areas rated below “Satisfactory”. None of the measurement areas are rated below “Marginal”. |
| End of assessment period (24 months) evaluation using the CPARS format covering the previous 12 months. |
| Continued performance at or above Satisfactory rating is a condition for award of new task orders |
| Year 3: |
| Not more than 2 of the measurement areas rated below “Satisfactory”. None of the measurement areas are rated below “Marginal”. |
| End of assessment period (36 months) evaluation using the CPARS format covering the previous 12 months. |
| Continued performance at or above Satisfactory rating is a condition for award of new task orders |
| Year 4: |
| Not more than 2 of the measurement areas rated below “Satisfactory”. None of the measurement areas are rated below “Marginal”. |
| End of assessment period (48 months) evaluation using the CPARS format covering the previous 12 months. |
| Continued performance at or above Satisfactory rating is a condition for award of new task orders |
| Year 5: |
| Not more than 2 of the measurement areas rated below “Satisfactory”. None of the measurement areas are rated below “Marginal”. |
| End of assessment period (60 months) evaluation using the CPARS format covering the previous 12 months. |
| Continued performance at or above Satisfactory rating is a condition for award of new task orders |
All tasks, including sub-tasks, will be assessed focusing on the following:
Quality of Product or Service – Assess the contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives. Assess how successfully the contractor meets program requirements.
Schedule – Assess the contractor’s adherence to the required delivery schedule by assessing the contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also address significance of scheduled events, discuss causes, and assess the effectiveness of contractor corrective actions.
Cost Control – Assess the contractor’s effectiveness in forecasting, managing, and controlling contract cost. Is the contractor experiencing cost growth or underrun? If so, discuss the causes and contractor-proposed solutions for the cost overruns. For contracts where task or contract sizing is based upon contractor provided person-hour estimates, the relationship of these estimates to ultimate cost should be assessed. In addition, the extent to which the contractor demonstrates a sense of cost responsibility through the efficient use of resources in each work effort should be assessed. Assess the contractor’s compliance with establish tripwires.
Management Responsiveness – Assess the timeliness, completeness and quality of problem identification, corrective action plans, proposal submittals (especially responses to change orders, Engineering Change Proposals (ECPs), or other UCAs), the contractor's history of reasonable and cooperative behavior, effective business relations, and customer satisfaction. Consider the contractor’s responsiveness to the program as it relates to meeting contract requirements during the period covered by the report.
Utilization of Small Business – FAR Subpart 19.7 and 15 U.S.C. 637 contains statutory requirements for complying with the Small Business Subcontracting Program. Assess whether the contractor provided maximum practicable opportunity for Small Business (including Alaska Native Corporations (ANCs) and Indian Tribes) (including Small Disadvantaged Businesses (which also includes ANCs and Indian Tribes), Women Owned Small Businesses, HUBZone, Veteran Owned, Service Disabled Veteran Owned Small Business, Historically Black Colleges and Minority Institutions and ANCs and Indian Tribes that are not Small Disadvantaged Businesses or Small Businesses) to participate in contract performance consistent with efficient performance of the contract.
Other areas – Assess additional evaluation areas unique to the contract or that cannot be captured elsewhere.
The evaluation ratings are as follows:
Exceptional – Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the task and sub-task being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Very Good - Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the task and sub-task being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Satisfactory - Performance meets contractual requirements. The contractual performance of the task and sub-task contain some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal - Performance does not meet contractual requirements. The contractual performance of the task and sub-task being assessed reflect a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the task or sub-task contains a serious problem(s) for which the contractor’s actions appear or were ineffective.
N00421-15-R-0014 Attachment 3 Enclosure (2)
N00421-15-R-0014 Attachment 3 Enclosure (3)
SURVEILLANCE ACTIVITY CHECKLIST
Annual Surveillance:
The COR will perform an annual assessment of overall contract performance, for each performance objective listed in Enclosure (1), and each CDRL objective in Enclosure (2) utilizing the CPARS evaluation rating definitions listed in Enclosure (3). This annual assessment will occur near the end of each year over the five (5) year ordering period of the contract and cover the previous 12 month period.
| Description |
| Surveillance Method/ |
Measure
| Date Planned |
| Date Completed |
| Summary Rating/Results |
| Quality of Product or Service |
| Review of Annual Ratings. |
| TBD |
| Schedule |
| Review of Annual Ratings. |
| TBD |
| Cost Control |
| Review of Annual Ratings |
| TBD |
| Management Responsiveness |
| Review of Annual Ratings |
| TBD |
| Utilization of Small Business Concerns |
| Review of Annual Ratings |
| TBD |
| Other Areas |
| Review of Annual Ratings |
| TBD |
File details come from the government source that posted it. Updated .