N0040623R0009 Solicitation.pdf
PDF 698 KB Posted
- Attached to
- LPAC Repair and Maintenance Federal contract opportunity
- Solicitation number
- N0040623R0039
About this file
This is a solicitation for low pressure air compressor (LPAC) repair and maintenance services in support of the Ship Repair Facility - Joint Regional Maintenance Center (SRF-JRMC) in Yokosuka, Japan. The solicitation is expected to result in a firm fixed-price supply contract. Required services include 5000-hour maintenance for LPAC units 1, 2, and 3 in accordance with provided technical instruction guides. The period of performance is from April 1, 2023 to May 15, 2023. The place of performance is SRF-JRMC in Yokosuka. Quotes are due by 9:00 AM on January 23, 2023. Evaluation factors include technical approach, price, delivery schedule, and past performance. The government intends to make a single award for all items to the offer representing the best value.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1.2.23 N0040623R0009 JA_Redacted.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
N0040623R0009 19-Jan-2023
b. TELEPHONE NUMBER
360-476-1404
8. OFFER DUE DATE/LOCAL TIME
09:00 AM 23 Jan 2023
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
N004069. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
CHASTITY T. COWANS
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
NAVSUP FLC PUGET SOUND
467 W STREET, 2ND FLR
ATTN: CHASTITY COWANS
BREMERTON WA 98314
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
360-476-1115FAX:
TEL: 360-476-1404 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
1,250
NAICS:
336611
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF32
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
N0040623R0009
Section A - Solicitation/Contract Form
NOTICE TO OFFERORS
NOTICE TO INTERESTED PARTIES
1. This solicitation is for the procurement of Low Pressure Air Compressor (LPAC) repairs and maintenance in support of Ship Repair Facilit-Joint Regional Maintenance Center (SRF-JRMC) Yokosuka. It is anticipated that this solicitation will result in an award/order of a Firm, Fixed-Price Supply type contract.
2. The entire solicitation shall be filled out, signed, and returned as part of your quote. See block 8 on page 1 of the solicitation for the closing date and time.
3. The deadline for submission of questions regarding the solicitation’s terms, conditions, specifications, and/or the statement of work (SOW) / performance work statement (PWS) is 1 day prior to the solicitation’s closing date.
4. PWS references available upon request to contractors registered in the Joint Certification Program. Details on how to register can be found at https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/
5. Quotes will be evaluated in accordance with 52.212-2.
6. SINGLE AWARD FOR ALL ITEMS: Due to the interrelationship of supplies and/or services to be provided hereunder, the Government reserves the right to make a single award to the quoter whose quote is considered in the best interest of the government, price and other factors considered. Therefore, quoters who quote less than the entire effort specified herein may be determined to be unacceptable.
7. “EXCEPTIONS: All quoters MUST note all exceptions from the solicitation’s terms conditions, specifications, and/or the statement of work / performance work statement, if any. It will be assumed that any quote without mention of any exceptions will take no exception from all specifications, terms and conditions, clauses, or provisions within the solicitation.”
8. All questions in regards to this solicitation shall be submitted, via email, to the Contract Specialist (listed below):
Name: Chastity Cowans Email: chastity.t.cowans.civ@us.navy.mil
NOTICE TO CONTRACTORS: Information for Contractor Employees Seeking to Enter Japan
1. The following is provided for the information of contractors to the U.S. Navy whose employees need to enter Japan to perform contract requirements. The information is current as of June 2022. While the information is believed to be accurate, policies and procedures are continuing to change on a regular basis.
2. In response to the COVID-19 outbreak, the Government of Japan has restricted the entry of non-Japanese citizens into Japan who have visited a number of listed countries. The United States is one of the listed countries. See https://www.japan.travel/en/coronavirus/ for a list of the current restrictions. Notwithstanding the list, Japan is permitting individuals to enter Japan who are covered by the Status of Forces Agreement (SOFA) between the U.S.
and Japan. The SOFA covers employees of contractors to the U.S. Navy who are U.S. nationals, are not ordinarily resident in Japan, whose presence in Japan is at the official invitation of the United States Government, and who are in Japan solely for official purposes in connection with the U.S. armed forces.
3. Japan is allowing contractor employees within the scope of the SOFA to enter Japan so long as two conditions are met: First, travelers are not permitted to use public transportation from the initial point of entry to Japan, including domestic air travel. Second, the incoming traveler adhere to the most updated Restriction of Movement guidance in response to COVID-19.
4. All contractor personnel arriving in Japan should utilize the process outlined in the attached USFJ Instruction to ensure they are recognized as members of the civilian component under Article 1.b. of the SOFA. The process requires that a contractor contact the contracting officer for the contract on which its employee will perform in Japan prior to the employee traveling to Japan. Contact is made through the Synchronized Pre-deployment and Operational Tracker (SPOT) system. The contractor will provide information to the contracting officer about the traveling employee. Following review, the contracting officer will issue the contractor a Letter of Authorization (LOA). The incoming contractor employee will hand carry a copy of the LOA and show it to the Japanese immigration authority at the port of entry as evidence of SOFA status. Contractors who do not have current access to SPOT should contact their contracting officer for information about accessing SPOT.
5. It is essential that contractors carefully manage each trip into Japan by a contractor employee to ensure that both of the conditions above are fully met. It is suggested that the best way for personnel to arrive in Japan for travel to Misawa, Iwakuni/Sasebo, or Okinawa is via the PATRIOT EXPRESS. This will allow for uninterrupted travel to their final destination. If going to Sasebo or to any base in Okinawa other than Kadena AB, travel from Iwakuni or Kadena AB will need to be by private conveyance or GOV. If a traveler headed outside the Kanto Plain arrives via commercial air, they will need to use government transportation to Yokota AB or NAF Atsugi and then do onward movement by milair - or do their 14 day ROM and then travel to their final destination by commercial transport. For personnel arriving on the Kanto Plain, they can travel via PATRIOT EXPRESS or by commercial air. However, travel from the airport to their place where they will satisfy the ROM requirement will need to be by private conveyance or GOV.
6. Some travelers have had difficulty with airlines allowing the travelers to get on flights or with Japan’s Ministry of Health allowing the SOFA persons to avoid quarantine in the immediate vicinity of the airport of initial arrival in Japan. Ensuring that each contractor employee has a copy of the SPOT LOA documenting their SOFA status should minimize these issues. Japan’s Ministry of Foreign Affairs issued a letter of 1 April 2020 describing the two conditions that must be met for those covered by the SOFA to be allowed access to Japan. In addition to the LOA, it may be helpful for incoming contractor employees to bring a copy of the 1 April 2020 letter with them. The letter sets the conditions that apply for entrance but, by itself, doesn’t establish that the holder of the letter is covered by the SOFA. The separate LOA is necessary to confirm that the employee is covered by the SOFA. The letter of 1 April 2020 includes representation that US Forces Japan will provide transportation from an airport of port of entry to a US Forces japan facility. The letter should not be understood as changing the terms or conditions of any existing contract to require that the U.S. Navy or U.S. Government provide contractor employees transportation where that transportation is not otherwise addressed in the relevant contract.
7. This memo is intended to provide current information for contractors whose employees need to enter Japan to perform contract requirements. Nothing in the memo should be understood to change the terms or conditions of an existing contract. Any such changes must be made by an authorized contracting officer.
The following attachments will be provided upon request:
1. USFJI 64-100, Contract Performance in Japan (25 Oct 2019) ‘
2. Japan’s Ministry of Foreign Affairs 1 April 2020
3. Restriction of Movement Guidance in Response to COVID -19 (UPDATE XIX)
4. Public Health Order v.49
5. Mask Guidance Update X
CONTRACTOR TRAVEL REQUIREMENTS: The following are the requirements for entry into Japan as of 2 November 2020 that Contractors shall comply with. See Section 3 for Pre-departure requirements and Section 4 for procedures upon arrival in Japan.
1. IN UPDATE TO REF F, THE PURPOSE OF THIS MESSAGE IS TO
PROVIDE UPDATED POINT OF CONTACT INFORMATION TO SYSCOMS, WARFARE
CENTERS AND CONTRACTING ACTIVITIES RESPONSIBLE FOR THE COORDINATION
OF SHIP REPAIR AND MODERNIZATION EFFORTS IN JAPAN.
2. GUIDANCE ISO DOD AND INTERNATIONAL RESTRICTIONS AS A RESULT OF
COVID-19 MITIGATION ACTIONS. SRF-JRMC IS UTILIZING THE FUNCTIONALITY
OF THE REGIONAL MAINTENANCE AND MODERNIZATION COORDINATION OFFICE
(RMMCO) IDENTIFIED IN REFS (A) AND (B) TO MANAGE THESE UNIQUE TRAVEL
REQUIREMENTS.
3. ANY PERSONNEL SUPPORTING SRF-JRMC MAINTENANCE AND MODERNIZATION
SHALL COMPLY WITH THE GUIDANCE PROVIDED OR RISK DENIAL OF ENTRY TO
JAPAN AND/OR COMMANDER FLEET ACTIVITIES YOKOSUKA (CFAY) OR COMMANDER FLEET
ACTIVITIES SASEBO (CFAS). DUE TO COVID-19
RESTRICTIONS, ENTRY REQUIREMENTS TO JAPAN IN SUPPORT OF MISSION
ESSENTIAL MAINTENANCE/MODERNIZATION IN WHICH SRF-JRMC SERVES AS
THE NAVAL SUPERVISORY AUTHORITY (NSA) ARE AS FOLLOWS (PRE-DEPARTURE):
A. PERSONNEL MUST HAVE A VALID PASSPORT FOR THE INTENDED PERIOD
OF STAY IN JAPAN.
B. APPROVAL MUST BE OBTAINED THROUGH TRAVEL TRACKER INDIVIDUAL
ANTI-TERRORIST PLAN (TT/IATP) VIA THE IATP.PACOM.MIL WEBSITE. THIS
REQUIRES LEVEL 1 ANTI-TERRORIST AND SURVIVAL, EVASION, RESISTANCE,
AND ESCAPE (SERE) TRAINING BE ACCOMPLISHED VIA
JKODIRECT.JTEN.MIL/ATLAS2/PAGE/LOGIN/LOGIN.JSF WEBSITE; AND A
PERSONNEL RECOVERY MISSION SOFTWARE (PRMS) SUBMISSION THROUGH
PRMSGLOBAL.PRMS.AF.MIL.
C. APPROVAL MUST BE OBTAINED THROUGH AIRCRAFT AND PERSONNEL
AUTOMATED CLEARANCE SYSTEM (APACS) FOR ENTRY TO INDOPACOM AOR. (FOR
SRF-JRMC SPONSORED WORK, SEA21 WILL PROVIDE O7 APPROVAL. ALL OTHER
SPONSORS WILL OBTAIN O7 LEVEL APPROVAL VIA THEIR COC).
HTTPS:APACS.MILCLOUD.MIL
D. PERSONNEL MUST CONTACT THE SRF-JRMC YOKOSUKA, SASEBO AND CVN
RMMCO OFFICES AT DIST-RMMCO-YOKOSUKA(AT)SRF.NAVY.MIL,
DIST-RMMCO-SASEBO(AT)SRF.NAVY.MIL, OR
DIST-CVN76-RMMCO(AT)SRF.NAVY.MIL RESPECTIVELY, FOR ARRIVAL
PREPARATIONS AND VERIFICATION OF REQUIREMENTS.
E. FOR THOSE WITHOUT A COMMAND ACCESS CARD (CAC), BASE ACCESS
REQUESTS MUST BE THROUGH THE YOKOSUKA SECURITY OFFICER
MR. SEAEN DANYIS AT SEAEN.DANYUS(AT)SRF.NAVY.MIL OR THE SASEBO
SECURITY OFFICER MR. ANTONIO QUIJANO AT
ANTONIO.QUIJANO(AT)SRF.NAVY.MIL CONSISTING OF:
1. VISIT REQUEST LETTER ON COMPANY LETTERHEAD
2. INSTALLATION ACCESS REQUEST FORM
3. LETTER OF AUTHORIZATION (LOA) OR ORDERS
4. SECNAV 5512-1
5. COLOR COPY OF TRAVELERS PASSPORT
6. USFJ FORM 27
F. A PRE-DEPARTURE HEALTH SCREENING OF ALL TRAVELERS WILL BE
ACCOMPLISHED ICW RMMCO PRIOR TO BEING PERMITTED TO COMMENCE
TRAVEL.
G. UPON RMMCO VERIFICATION THAT ALL TRAVEL REQUIREMENTS ARE
MET, SRF-JRMC WILL ISSUE A SERIALIZED GOVERNMENT OF JAPAN (GOJ)
APPROVAL LETTER TO ACCOMPANY ALL OTHER REQUIRED DOCUMENTS, TO
INCLUDE; LETTER OF AUTHORIZATION (LOA) OR ORDERS AS PROOF OF SOFA
STATUS AND VALID PASSPORT. THESE DOCUMENTS WILL BE PRESENTED TO
JAPANESE IMMIGRATION OFFICIALS UPON ARRIVAL AT PORT OF ENTRY.
CURRENT AUTHORIZED PORT OF ENTRIES INCLUDE COMMERCIAL AIRPORTS AT
TOKYO (NRT OR HND) AND MILAIR VIA YOKOTA AND OTHER LOCATIONS
APPROVED BY C7F OR CPF.
4. UPON COMMENCING TRAVEL, THE FOLLOWING POST-DEPARTURE
REQUIREMENTS ARE IN EFFECT:
. TRAVELERS WILL BE SUBJECT TO TEST FOR COVID-19 UPON ENTERING JAPAN
AND ARE HIGHLY RECOMMENDED TO BE TESTED FOR COVID VIRUS WITHIN
72 HOURS PRIOR TO TRAVELING. TRAVELERS WHO ARE FOUND POSITIVE FOR
COVID-19 MUST BE PREPARED FOR:
1. ISOLATION DEPENDENT ON VACCINATION STATUS.
2. ROOM CLEANING CHARGE UP TO $1000.
3. CASH OR ELECTRONIC FUNDS TRANSFER TO ALLOW FOR
PURCHASING OF FOOD AND INCIDENTALS.
C. TRAVELERS WILL ADHERE TO THE RESTRICTION ON MOVEMENT (ROM) GUIDANCE IN
ACCORDANCE TO THEIR VACCINATION STATUS.
D. UPON COMPLETION OF THE APPLICABLE ROM PERIOD, THE RMMCO OFFICE
WILL COORDINATE THE BASE CHECK IN PROCESS. ENTRY ON TO
COMMANDER FLEET ACTIVITIES YOKOSUKA OR SASEBO WILL REQUIRE:
1. CAC (IF GOVERNMENT EMPLOYEE)
2. REGISTRATION IN DBIDS IS CRITICAL TO ENSURE BASE ACCESS
PRIORITY ISO MISSION ESSENTIAL TASKING IN CASE BASE HPCON LEVEL
CHANGES.
3. VISIT REQUEST VIA JPAS FOR SHIPBOARD ENTRY.
4. GOVERNMENT ORDERS (IF GOVERNMENT EMPLOYEE) OR LETTER
OF AUTHORIZATION (IF CONTRACTOR EMPLOYEE). THESE DOCUMENTS SHOULD
INDICATE MISSION ESSENTIAL NATURE OF WORK.
5. SATISFACTORY DAILY SELF HEALTH CHECK.
E. COMMENCE WORK THROUGH WORK COMPLETION PERIOD. IF APPLICABLE DAILY HEALTH
SCREENINGS WILL BE REQUIRED TO BE CONDUCTED BY EACH TRAVELER AND
REPORTED TO THEIR RESPECTIVE ONSITE LEAD OR SPONSOR, AND REPORTED TO
THE RMMCO OFFICE. ADDITIONAL SCREENINGS BY BASE OR SHIP PERSONNEL
ARE LIKELY AND MAY INCLUDE TEMPERATURE CHECKS. REGARDLESS OF VACCINATION
STATUS, PERSONNEL SHALL CARRY A MASK ON THEIR POSSESSION AT ALL TIMES. FACE MASKS
ARE TO BE WORN AS REQUIRED BY INSTALLATION AND COVID-19 COMMUNITY TRANSMISSION
LEVELS OF THE AREA, AND AT ALL TIMES OFF INSTALLATIONS.
IF AT ANY TIME A TRAVELER
SHOWS INDICATIONS OF ILI, THEY SHOULD RETURN OR REMAIN AT THEIR
TEMPORARY LODGING AND REPORT STATUS TO THEIR RESPECTIVE ONSITE
LEAD OR SPONSOR, TO BE REPORTED TO THE RMMCO OFFICE.
F. UPON COMPLETION OF WORK, TRAVELERS SHALL REPORT AND CHECKOUT
WITH THE RMMCO OFFICE TO VERIFY ANY ADDITIONAL PERMISSIONS REQUIRED
FOR EXITING JAPAN.
5. ADDITIONAL REQUIREMENTS:
A. IAW REF A, ALTERATION INSTALL TEAM (AIT)S ARE REQUIRED TO
START RMMCO CHECK-IN PROCESS PRIOR TO ARRIVAL IN JAPAN. RMMCO
YOKOSUKA POCS ARE MR. STEVEN FARRIS AND MR. RICHARD PETERS,
DSN (315)243-0994, EMAIL: DIST-RMMCO-YOKOSUKA(AT)SRF.NAVY.MIL.
RMMCO SASEBO POCS ARE MR. THOMAS BUCK AND MR. LEONARDERIC MANALO,
DSN (315)252-6602/2805, EMAIL: DIST-RMMCO-SASEBO(AT)SRF.NAVY.MIL.
RMMCO CVN POCS ARE MR. RENATO DACUMOS,
RENATO.DACUMOS(AT)SRF.NAVY.MIL, DSN (315)243-2282, AND
MS. SARAH BROWN, SARAH.BROWN.CTR(AT)SRF.NAVY.MIL, DSN (315)243-2290,
OR DIST-CVN76-RMMCO(AT)SRF.NAVY.MIL.
B. IAW REF C, COUNTRY CLEARANCE REQUESTS ARE TO BE SUBMITTED A
MINIMUM OF 30 DAYS PRIOR TO TRAVEL.
C. ANY TRAVELER ENTERING CFAY OR CFAS IS SUBJECT TO DEBARMENT
FROM BASE AND REVOCATION OF VISIT CLEARANCE IF FOUND IN VIOLATION
OF ROM AND OR LIBERTY REQUIREMENTS.
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
LPAC MAINTENANCE AND REPAIR
FFP
REPAIR AND MAINTENACE FOR LPACs 1, 2, AND 3 IAW THE PWS
TO INCLUDE TRAVEL
CFM: Antifoaming 33-FOAM1000; IAW PWS FOR LPACs 1, 2, AND 3.
FOB: Destination
PSC CD: J043
NET AMT
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT
1. GENERAL SCOPE OF WORK:
This is a supplemental performance work statement (PWS) to Task Group Instruction (TGI)’s in paragraph 2, References. This PWS is to help define the scope of the contract and identify requirements that may not be contained in the TGI’s.
Current Command Fleet Activities Yokosuka (CFAY) and SRF-JRMC policy requires personnel entering Japan to be fully vaccinated against COVID-19. Personnel entering Japan fully vaccinated and with a negative COVID-19 test may still be placed into a restriction of movement (ROM) or base holding period. Contractor will need to coordinate with the contact in paragraph 10 to determine latest requirements.
2. REFERENCES:
The following references are applicable and the contractor must comply with the references listed:
A) TGI 3876Y55104-A01 - F/O - ACCOMPLISH 5000HR MAINTENANCE FOR NO.ONE LPAC UNIT
4-174-0-E
B) TGI 3876Y55105-A01 - F/O - ACCOMPLISH 5000HR MAINTENANCE FOR NO.2 LPAC UNIT 4- 254-0-E
C) TGI 3876Y55106-A01 - F/O - ACCOMPLISH 5000HR MAINTENANCE FOR NO.3 LPAC UNIT 4- 254-0-E
D) TGI 3876Y55104-T01 – LPAC #1 (T & OP) - KTR
E) TGI 3876Y55105-T01 - LPAC #2 (T & OP) - KTR
F) TGI 3876Y55106-T01 - LPAC #3 (T & OP) - KTR
3. WORK STATEMENT ITEM:
Accomplish 5000HR maintenance and any other requirements for NR 1 LPAC, NR 2 LPAC, and NR 3 LPAC per references listed in PARA 2.
4. GOVERNMENT FURNISHED PROPERTY/SERVICES:
SRF JRMC will provide support service work IAW the following TGI’s.
A) TGI 3876Y55104-S02 - (3C1)(OC)EM02-L019 MAJOR OVERHAUL ON NR 1 LPAC
B) TGI 3876Y55105-S02 - (3C1)(OC)EM02-L020 MAJOR OVERHAUL ON NR 2 LPAC
C) TGI 3876Y55106-S03 - (3C1)(OC)EM02-L021 MAJOR OVERHAUL ON NR 3 LPAC
SRF will provide the following material.
A) 3 air ends 01-485-0856 B) Air inlet filter assembly 33-AELM1020 C) Air indicator pop up 57-9119 D) Gasket 33-AGKT1012-1 E) Gasket 33-G717751612Z F) Gasket & sight glass 204-1344 G) Injection water filter element 33-AELM1001 H) Injection water gasket 33-G707940669Z I) Heat exchanger assembly 33-AKIT1100 J) Hose assembly A33-AHSE1015-30 K) Hose assembly A33-AHSE1015-28
L) Hose assembly A33-AHSE1014-20 M) Hose assembly A33-AHSE1014-39 N) Hose assembly A33-AHSE1014-5.75 O) Hose assembly A33-AHSE1014-15 P) Hose assembly A33-AHSE1014-27 Q) Hose assembly A33-AHSE1014-16 R) Hose assembly A33-AHSE1014-57 S) Hose assembly A33-AHSE1014-22 T) Hose assembly A33-AHSE1014-21 U) Hose assembly A33-AHSE1014-23 V) Hose assembly A33-AHSE1014-25 W) Hose assembly A33-AHSE1014-32 X) Hose assembly A33-AHSE1014-10 Y) Hose assembly A33-AHSE1014-56 Z) Hose assembly A33-AHSE1014-11 AA) Hose assembly A33-AHSE1014-17 BB) Hose assembly A33-AHSE1014-13 CC) Hose assembly A33-AHSE1011-30 DD) Hose assembly A33-AHSE1012-68 EE) Hose assembly A33-AHSE1012-21.5 FF) Hose assembly A33-AHSE1012-19 GG) Hose assembly A33-AHSE1012-62 HH) Tube line 33-B5702-4 II) Tube Line 33-5702-5 JJ) Selector Switch 33-Aval1039 KK) Drain and fill pneumatic pilot valve 33-AVAL1034 LL) Drain and fill ball valve 33-AVAL1036-1 MM) Drain and fill ball valve 33-AVAL1037 NN) Drain and fill ball valve 33-AVAL1038 OO) Potable water check valve 33-AVAL1035 PP) Inlet potable water filter element 33-AELM1200 QQ) O ring 123-342-5 RR) High discharge temp switch 33-ASWT1002 SS) Oring 123-905-5 TT) Oring 33-229303U4 UU) Oring 33-228303U7A VV) Oring 33-228303U3A WW) Oring 33-228203U8A XX) Oring 33-RR42M0041 YY) Oring 33-RR171
5. CONTRACTOR FURNISHED PROPERTY:
A) The contractor shall provide all equipment and material necessary to complete the work required except those listed in Appendix M of TGI’s in paragraph 2 and in section 4 of this PWS.
6. PLACE OF PERFORMANCE:
U.S. Naval Ship Repair Facility SRF-JRMC, Yokosuka, Japan.
7. Points Of Contact (POCs)
Technical Point of Contact (TPOC):
Will be given at time of award
8. PERIOD OF PERFORMANCE:
See Section F
9. ESTIMATED WORK HOURS:
Normal working hours scheduled for SRF work is between the hours of 8:00AM to 4:45PM JST, with a 45-minute lunch break, Monday through Friday. All support service work needed from SRF-JRMC will be performed during this period.
10. TRAVEL REQUIREMENTS:
Immediately after contract award, coordinate with RMMCO for onboarding, entry into Japan and accommodations during ROM period.
DIST-RMMCO-YOKOSUKA@SRF.NAVY.MIL
11. GENERAL INFORMATION:
11.1. Nothing contained in the performance work statement shall relieve the Contractor from complying with applicable Federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits that may be required for the Contractor or Subcontractor(s) to perform a particular function, such as hazardous waste handling or disposal, or example.
11.2. Medical treatment. Government emergency vehicles and medical personnel shall only be used in emergency situations affecting contractor personnel whose life may be in danger or who are seriously injured. Government facilities may be used in these instances as the first point of treatment. Transfer to a non-Government medical treatment facility shall be made as soon as possible and as determined by attending medical authorities.
12. CONTRACTOR IN THE WORKPLACE:
12.1. Identification. All Contractor spaces/desks shall be clearly marked as contractor spaces only.
12.2. All e-mail addresses used by contractor personnel shall identify the company name.
12.3. All contractor correspondence shall be clearly marked with company name or letterhead.
12.4. Contractor personnel shall insure that when answering telephones that they identify themselves as contractor personnel.
12.5. Contractor personnel are not to handle/operate any lifting and handling equipment or other shop equipment, machines or tools without written consent from project superintendent prior to accomplishment of the task.
13. SAFETY AND ENVIRONMENTAL
13.1. Safety Requirements. The contractor shall establish, administer, and enforce safety rules that will meet the current requirements of the Occupational Safety and Health Administration (OSHA), and all applicable work item references. Work to be performed under this contract shall be accomplished using the guidelines identified Contractors and Subcontractors. When necessary, work shall be coordinated with the Safety Department to ensure all safety and health requirements are considered.
13.2. Safety Equipment. The contractor shall provide their employees with all necessary safety equipment during the performance of work on this contract. All contractor personnel shall have in their possession and shall properly wear OSHA approved personnel protective safety equipment (i.e. hard-hats, steel-toe safety shoes, safety glasses and hearing protection). If required, the Contractor shall provide all appropriate safety barricades, signs, and signal lights required to properly isolate the area of work.
13.3. Prior to commencing work, the Contractor representative(s) shall arrange with the Receiving Activity Point of Contact, to meet in conference with the customer, shop supervision, and other necessary personnel to discuss and develop mutual understandings relative to the administration of the Safety Program.
13.4. Environmental Requirements. Work performed under this contract shall be in compliance with all Japanese, Navy, Federal, State and local regulations, and all work items references, pertaining to the environment at all times. When necessary, work shall be coordinated with the Environmental Department to ensure that regulations are considered.
13.5. Responsibilities. The contractor bears sole responsibility for the safety of his her employees and compliance with environmental regulations. Naval safety personnel will monitor the safety of procedures, conduct inspections of the workplace, and perform safety related investigations, evaluations. The contractor shall conduct routine inspections of work and storage areas under his cognizance to maintain compliance with the cleanliness, material and waste management, air and water pollution controls, and provides general oversight on the environmental issues associated with this contract.
13.6. Situations that warrant corrective action will be brought to the attention of the contractor through the Contracting Officer Representative (COR). If violations could cause major damage or loss of life, Safety or Environmental personnel may contact contractor supervisory personnel on site and request corrective action or work stoppage. The COR will be notified immediately. The Commanding Officer has final authority for Station safety and environmental matters. He has delegated the Safety and Occupational Health Manager the authority to represent the Command in all safety matters and to resolve any disputes which may arise, and he has delegated the Environmental Manager the authority to represent the Command in all safety matters and to resolve any disputes, which may arise. Any interpretation of the various environmental regulations will be made by the Safety or Environmental Manager.
13.7. Accident Reporting. All accidents occurring on Station are reported to the Station Safety Department. If accidents occur after regular working hours the Command Duty Officer, shall be notified. Motor vehicle accidents occurring on Station are reported to both the Safety Department and Security Manager. In all cases, the accident scene must be preserved until the Government investigator has authorized movement of the materials and vehicles involved. Materials and equipment may be moved only as necessary to facilitate the removal of injured persons. The contractor shall forward a copy of all accident reports involving contractor employees to the COR. If Government property is involved, a copy of the accident report shall also be forwarded to the Government Property Administrator (GPA).
14. SECURITY
14.1. Admittance to The Work: Upon contract award, employees or representatives of the Contractor may require access to the Receiving Activities Operations Area (OA) or Industrial Area (IA) and shall be admitted to the work site only after they have been issued a Security Pass/ID Badge.
14.2. Notice: Persons who are currently on probation or parole from a felony conviction cannot qualify for security clearances, and will be denied access to the activity.
14.3. It shall be the Contractor's responsibility to collect and account for all identification passes issued to their personnel at the expiration of the contract or when access is no longer required.
14.4. Foreign Nationals or Affiliations - Foreign Nationals (non U.S. Citizens) or persons affiliated with, or employed by, a foreign owned company will not be granted access to a Naval Activity's OA/IA, without prior written approval from Commander, Naval Sea Systems Command.
15. PERFORMANCE REQUIREMENT STATEMENT SUMMARY
Primary Performance Standard Performance Standard/AQL Performance Assessment
Method Performance of required items Services performed meet requirements 100% of the time Review of performance by Surveillance Officer
The contractor maintained close liaison and good communications with the Government
Any problems or questions encountered by either party are addressed within 2 business days
Review of performance by Surveillance Officer
The contractor invoiced in a timely manner and in accordance with the contract
Invoices submitted with COR/Surveillance Officer signature
Review of performance by Surveillance Officer
Combating Trafficking in Persons - Using mindful observance and attentive listening the Surveillance Officer will monitor the contractor’s performance regarding trafficking in persons such that non-compliance with FAR clause 52.222-50, Combating Trafficking in Persons, is brought to the immediate attention of the contracting officer.
100% compliance with FAR 52.222-
All times the Surveillance Officer interfaces with the contractor
AQL = Acceptable Quality Level
Defense Biometric Identification System (DBIDS) for vendor base access Vendor’s requesting base access must go to the following website and register: http://dbids.dmdc.mil/#!/. Vendor’s must request for base access as soon as possible after receiving award to ensure that all employees base access request(s) are approved before the start of the contract’s period of performance.
THE FOLLOWING NAVSUP LOCAL TEXT IS HEREBY MADE PART OF THE STATEMENT OF
WORK/PERFORMANCE WORK STATE
CONTRACTOR SUPPORT THROUGH THE ABILITYONE PROGRAM
NAVSUP Fleet Logistics Center Puget Sound may utilize contractor support through the AbilityOne Program, as needed, to perform contract closeout functions for this acquisition. Information, including business sensitive/confidential or proprietary data, that the offeror provides to the Government or information already in the possession of the Government may be viewed and utilized by the AbilityOne Program support contractor personnel during the course of its contract performance. The information that may be made available to the support contractor may include, for example, pricing and technical proposals, historical contract, pricing and performance information, Commercial Asset Visibility (CAV) reporting information and similar data/information.
By submission of a proposal in response to this solicitation, the offeror and its subcontractors consent to a release of their business sensitive/confidential or proprietary data to the Government's AbilityOne Program support contractor personnel in order to perform close out services. Prior to the release of any such information to the support contractor, the support contractor will have in place with the Government a Non-Disclosure/Non-Use Agreement in accordance with the terms of the AbilityOne Program support contract. Offerors may execute their own Non- Disclosure Agreement with the AbilityOne Program (AbilityOne contact information available from the contracting point of contact). The support contractor must provide copies of the executed agreements to the Contracting Officer and the Surveillance Official for the support contract; and the offeror/contractor for this acquisition must provide copies of the executed Agreement to the Contracting Officer for this acquisition. If the offeror/contractor seeks such a Non-Disclosure Agreement with the AbilityOne Program support contractor, the Agreement must be executed no later than the date of final delivery under the resulting NAVSUP Fleet Logistics Center Puget Sound contract.
Contractor Unclassified Access to Federally Controlled Facilities, Sensitive Information, Information Technology (IT) Systems or Protected Health Information
Executive Order 13467, Reforming Processes Related to Suitability for Government Employee, Fitness for Contractor Employees and Eligibility for Access to Classified National Security Information, Homeland Security Presidential Directive (HSPD)-12, requires government agencies to develop and implement Federal security standards for Federal employees and contractors. The 5 CFR 32 Part 157 in concert with DoD Manual 1000.13, Vol 1, implements the Federal Standards.
APPLICABILITY
This text applies to all DoD sponsored individuals who require CAC eligibility (or login and P/W if acceptable per contract) for: Physical access to DoD facilities or non-DoD facilities on behalf of DoD; Logical access to information systems (whether on site or remotely); or remote access to DoD networks that use only the CAC logon for user authentication, or access to sensitive and protected information. This applies to the Office of the Secretary of Defense, the Military Departments, the Office of the Chairman of the Joint Chiefs of Staff and the Joint Staff, the Combatant Commands, the Office of the Inspector General of the DoD, the Defense Agencies, the DoD Field Activities and all other organizational entities within the DoD (hereinafter referred to collectively as the "DoD Components").
Each contractor employee providing services at a Navy Command under this contract is required to obtain a Department of Defense Common Access Card (DoD CAC). Additionally, depending on the level of computer/network access, the contract employee will require a successful investigation as detailed below.
ACCESS TO FEDERAL FACILITIES
Per HSPD-12 and implementing guidance, all contractor employees working at a federally controlled base, facility or activity under this clause will require a DoD CAC. When access to a base, facility or activity is required contractor employees shall in-process with the Command’s Security Manager upon arrival to the Command and shall out-process prior to their departure at the completion of the individual’s performance under the contract.
START-UP PERIOD
All contractor resource onboarding documents must be submitted via the prime contractor. The prime contractor shall make all necessary preparations to assume full responsibility for productive performance of the performance start date.
Definition of “productive”:
a. Visit Authorization Request (VAR)
b. Contractor Information Sheet (CIS)
c. Completed EQIP (Electronic Investigation)
d. All contractors must contact the Security Officer/Manager to start the process of submitting a VAR via Defense Information System for Security (DISS).
e. Common Access Card (CAC)
Note (1): Invoicing by the contractor will begin as of the commencement of the performance period of services and no reimbursement will be paid by the government for efforts expended during the start-up period.
Note (2): Foreign Nationals are not allowed access to the functional/system side of Enterprise Resource Planning
(ERP).
ACCESS TO DOD INFORMATION TECHNOLOGY ( IT) SYSTEMS
In accordance with (IAW) Secretary of the Navy (SECNAV) M-5510.30, contractor employees who require access to DoN or DoD networks are categorized as IT-I, IT-II, or IT-III. The IT-II level, defined in detail in SECNAV M- 5510.30, includes positions which require access to sensitive information. Sensitive information includes information protected under the Privacy Act, to include Protected Health Information (PHI). All contractor employees under this contract who require access to Privacy Act protected information are therefore categorized no lower than IT-II. IT Levels are determined by the requiring activity’s Command Information System Security Manager (ISSM)/Information Assurance Manager (IAM).
Contractor employees requiring privileged or IT-I level access, (when specified by the terms of the contract) require a Single Scope Background Investigation (SSBI) or T5 or T5R equivalent investigation , which is a higher level investigation than the National Agency Check with Law and Credit (NACLC)/T3/T3R described below. Due to the privileged system access, an investigation suitable for High Risk national security positions is required. Individuals who have access to system control, monitoring, or administration functions (e.g. system administrator, database administrator) require training and certification to Information Assurance Technical Level 1, and must be trained and certified on the Operating System or Computing Environment they are required to maintain.
Access to sensitive IT systems is contingent upon a favorably adjudicated background investigation. When access to IT systems is required for performance of the contractor employee’s duties, such employees shall in-process with the Navy Command’s CSM and ISSM/IAM upon arrival to the Navy command and shall out-process prior to their departure at the completion of the individual’s performance under the contract. Completion and approval of a System Authorization Access Request Navy (SAAR-N) form is required for all individuals accessing Navy Information Technology resources. The decision to authorize access to a government IT system/network is inherently governmental. The contractor supervisor is not authorized to sign the SAAR-N; therefore, the government employee with knowledge of the system/network access required or the COR shall sign the SAAR-N as the “supervisor”.
The SAAR-N shall be forwarded to the Command’s Security Manager at least 30 days prior to the individual’s start date. Failure to provide the required documentation at least 30 days prior to the individual’s start date may result in delaying the individual’s start date.
When required to maintain access to required IT systems or networks, the contractor shall ensure that all employees requiring access complete annual Cyber Awareness training, and maintain a current requisite background investigation. The Contractor’s Security Representative shall contact the Command Security Manager for guidance when reinvestigations are required.
INTERIM ACCESS
The Command's Security Manager may authorize issuance of a DoD CAC and interim access to a DoN or DoD unclassified computer/network upon a favorable review of the investigative questionnaire and advance favorable fingerprint results. When the results of the investigation are received and a favorable determination is not made, the contractor employee working on the contract under interim access will be denied access to the computer network and this denial will not relieve the contractor of his/her responsibility to perform.
DENIAL OR TERMINATION OF ACCESS
The potential consequences of any requirement under this clause including denial or termination of physical or system access in no way relieves the contractor from the requirement to execute performance under the contract within the timeframes specified in the contract. Contractors shall plan ahead in processing their employees and subcontractor employees. The contractor shall insert this clause in all subcontracts when the subcontractor is permitted to have unclassified access to a federally controlled facility, federally-controlled information system/network and/or to government information, meaning information not authorized for public release.
CONTRACTOR’S SECURITY REPRESENTATIVE
The contractor shall designate an employee to serve as the Contractor’s Security Representative. Within three work days after contract award, the contractor shall provide to the requiring activity’s Security Manager and the Contracting Officer, in writing, the name, title, address and phone number for the Contractor’s Security Representative. The Contractor’s Security Representative shall be the primary point of contact on any security matter. The Contractor’s Security Representative shall not be replaced or removed without prior notice to the Contracting Officer and Command Security Manager.
BACKGROUND INVESTIGATION REQUIREMENTS AND SECURITY APPROVAL PROCESS FOR
CONTRACTORS ASSIGNED TO NATIONAL SECURITY POSITIONS OR PERFORMING SENSITIVE
DUTIES
Navy security policy requires that all positions be given a sensitivity value based on level of risk factors to ensure appropriate protective measures are applied. Contractor employees under this contract are recognized as Non- Critical Sensitive [ADP/IT-II] positions when the contract scope of work require physical access to a federally controlled base, facility or activity and/or requiring access to a DoD computer/network, to perform unclassified sensitive duties. This designation is also applied to contractor employees who access Privacy Act and Protected Health Information (PHI), provide support associated with fiduciary duties, or perform duties that have been identified as National Security Positions. At a minimum, each contractor employee must be a US citizen and have a favorably completed NACLC or T3 or T3R equivalent investigation to obtain a favorable determination for assignment to a non-critical sensitive or IT-II position. The investigation consists of a standard NAC and a FBI fingerprint check plus law enforcement checks and credit check. Each contractor employee filling a non-critical sensitive or IT-II position is required to complete:
SF-86 Questionnaire for National Security Positions (or equivalent OPM investigative product) Two FD-258 Applicant Fingerprint Cards (or an electronic fingerprint submission) Original Signed Release Statements
Failure to provide the required documentation at least 30 days prior to the individual’s start date shall result in delaying the individual’s start date. Background investigations shall be reinitiated as required to ensure investigations remain current (not older than 10 years) throughout the contract performance period. The Contractor’s Security Representative shall contact the Command Security Manager for guidance when reinvestigations are required.
Regardless of their duties or IT access requirements ALL contractor employees shall in-process with the CSM upon arrival to the command and shall out-process prior to their departure at the completion of the individual’s performance under the contract. Employees requiring IT access shall also check-in and check-out with the Navy Command’s ISSM/IAM. Completion and approval of a System Authorization Access Request Navy (SAAR-N) form is required for all individuals accessing Navy Information Technology resources. The SAAR-N shall be forwarded to the Navy Command’s Security Manager at least 30 days prior to the individual’s start date. Failure to provide the required documentation at least 30 days prior to the individual’s start date shall result in delaying the individual’s start date.
The contractor shall ensure that each contract employee requiring access to IT systems or networks complete annual Cyber Awareness training, and maintain a current requisite background investigation. Contractor employees shall accurately complete the required investigative forms prior to submission to the Command Security Manager. The Command’s Security Manager will review the submitted documentation for completeness prior to submitting it to the Office of Personnel Management (OPM); Potential suitability or security issues identified may render the contractor employee ineligible for the assignment. An unfavorable determination is final (subject to SF-86 appeal procedures) and such a determination does not relieve the contractor from meeting any contractual obligation under the contract. The Command’s Security Manager will forward the required forms to OPM for processing. Once the investigation is complete, the results will be forwarded by OPM to the DoD Central Adjudication Facility (CAF) for a determination.
If the contractor employee already possesses a current favorably adjudicated investigation, the contractor shall work with the Security Officer/Manager to obtain a Visit Authorization Request (VAR) via the Defense Information System for Security (DISS) or a hard copy VAR directly from the contractor’s Security Representative. The contractor shall include the IT Position Category per SECNAV M-5510.30 for each employee designated on a VAR.
The VAR requires annual renewal for the duration of the employee’s performance under the contract.
BACKGROUND INVESTIGATION REQUIREMENTS AND SECURITY APPROVAL PROCESS FOR
CONTRACTORS ASSIGNED TO OR PERFORMING NON-SENSITIVE DUTIES
Contractor employee whose work is unclassified and non-sensitive (e.g., performing certain duties such as lawn maintenance, vendor services, etc. ...) and who require physical access to publicly accessible areas to perform those duties shall meet the following minimum requirements:
Must be either a US citizen or a US permanent resident with a minimum of 3 years of legal residency in the
United States (as required by The Deputy Secretary of Defense DTM 08-006 or its subsequent DoD instruction) and
Must have a favorably completed National Agency Check with Written Inquiries (NACI) or T1 investigation equivalent including a FBI fingerprint check prior to installation access.
To be considered for a favorable trustworthiness determination, the Contractor’s Security Representative must submit for all employees each of the following:
SF-85 Questionnaire for Non-Sensitive Positions Two FD-258 Applicant Fingerprint Cards (or an electronic fingerprint submission) Original Signed Release Statements
The contractor shall ensure each individual employee has a current favorably completed National Agency Check with Written Inquiries (NACI) or T1 equivalent investigation, or ensure successful FBI fingerprint results have been gained and investigation has been processed with OPM
Failure to provide the required documentation at least 30 days prior to the individual’s start date may result in delaying the individual’s start date.
* Consult with your CSM and ISSM/IAM for local policy when IT-III (non-sensitive) access is required for non-US citizens outside the United States.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 01-APR-2023 TO
15-MAY-2023
N/A N/A
FOB: Destination
CLAUSES INCORPORATED BY REFERENCE
52.247-34 F.O.B. Destination NOV 1991
Section G - Contract Administration Data
CLAUSES INCORPORATED BY FULL TEXT
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items—
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
N/A
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
2 IN 1
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial item financing, submit a commercial item financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
WILL BE GIVEN AT TIME OF AWARD
(4) Payment request. The Contractor shall ensure a…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .