This document contains a pre-solicitation notice and amendment for an upcoming federal contract opportunity. The Naval Undersea Warfare Center intends to issue a full and open competition solicitation for the supply of MK48 exploder motor assemblies in accordance with provided technical drawings and specifications. The anticipated contract will have a base quantity of 100 units to be awarded as firm fixed price, along with five first article units and four option quantities totaling 400 additional units. The solicitation number is N0025321R0008 and will be posted on or around August 27, 2021, with a closing date approximately 30 days later unless otherwise amended. Interested offerors must have an active Joint Certification Program certification and minimum NIST SP 800-171 "Medium" confidence level assessment no more than three years old. Drawings and technical information will be provided through the Defense Logistics Information Service system. Questions regarding this pre-solicitation notice are due no later than seven days before the closing date.

View the file

Other files for this federal contract opportunity

Other files attached to Exploder Assembly Fixture, newest first.
File Type Posted
N0025321R0008-U0006.pdf PDF
N0025321R0008-U0005.pdf PDF
CDRL.pdf PDF
N0025321R0008-U0004.pdf PDF
N0025321R0008-U0003.pdf PDF
N0025321R0008-U0002.pdf PDF
N0025321R0008-U0001.pdf PDF
N0025321R0008.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment is being issed to:

1) Provide technical questions and answ ers.

2) Extend due date from: 01/19/2022, to: 02/02/2022

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-Jan-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N0025321R0008

X 9B. DATED (SEE ITEM 11)

27-Aug-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Jan-2022

CODE

NAVAL UNDERSEA WARFARE CENTER

ATTN: JESSICA RUTH REICHARD

610 DOWELL ST C/206

KEYPORT WA 98345

N00253 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0025321R0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 19-Jan-2022 12:00 PM to 02-Feb-2022 12:00 PM.

The following have been added by full text:

TECHNICAL QUESTIONS AND ANSWER

Question 1:

Will the ultimate destination for the motor assembly will require an export license and subject to the ITAR?

Answer 1:

The required motor assemblies are required to be delivered FOB Destination to NUWC Division Keyport.

Question 2:

The drawing for the motor P/N 3242563B requires extensive qualification and sampling testing. Will the tests the contractor performs according to this drawing be sufficient for end item First Article testing requirements?

Otherwise, it would seem, the same testing would be required after assembly of the gear to the shaft.

Answer 2:

NUWC Keyport will be performing a higher-level assembly fitment and functionality check with the First Articles after the gear is installed. First Article testing is to be in accordance with the drawing/specification.

Question 3:

The solicitation references 52.215.20 Requirements for Certified Cost or Pricing Data - Is this only applicable if our response to the solicitation exceeds the TINA threshold?

Answer 3:

Certified Cost or Pricing Data is not required with proposal submittal but may be requested if needed.

Question 4:

What happens if technical proposal submittal exceed 30 pages?

Answer 4:

Per Section L, Proposal Submittal Requirements Technical proposals are limited to thirty (30) pages not including a quality management plan if submitted and the Past Performance Questionnaire. In the event a Technical proposal exceeds 30 pages, the excess pages will be removed prior to evaluation of the proposal.