N00253-17-T-0150_A0001.pdf
PDF 587 KB Posted
- Attached to
- Humidity Chambers Federal contract opportunity
- Solicitation number
- N00253-17-T-0150
About this file
Amendment for N00153-17-T-0150
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N00253-17-T-0150.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N00253-17-T-0150
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The reason for this amendment is to update the specif ications on the Statements of Work, extend the closing date to 3/15/2017 by 12:00pm
PST (3:00pm EST), and answ er attached vendor questions.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 16
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Mar-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00253-17-T-0150
X 9B. DATED (SEE ITEM 11)
02-Mar-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Mar-2017
CODE
NAVAL UNDERSEA WARFARE CENTER
ATTN: MURRAY LANCASTER
MURRAY.LANCASTER@NAVY.MIL
610 DOWELL ST, BLDG 206
KEYPORT WA 98345
N00253 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
VENDOR QUESTIONS AND ANSWERS
1) The large chamber requires a minimum of 38"w x 52"d x 38"h however the external dimensions cannot exceed 60"w x 85"d x 96"h. In trying to meet your performance specs we don't have a standard chamber design that can support both. Which spec has the most importance? Can we assume the internal workspace? If so, is there flexibility in the footprint spec?
Answer: Please meet the minimum interior dimensions of 38"w x 38"h x 52"d as stated in the SOW. Please also review the maximum external dimensions in the updated SOW, as they have been increased.
2) The small chamber requires a minimum of 20"w x 20"d x 20"h of internal workspace which equals 4.3 cf.
however the SOW states the chamber must be 5 - 8 cf. Can we assume the 20" criteria supersedes the min 5cf spec?
Answer: The minimum interior dimensions have been increased in the SOW to 20.5"w x 20.5"d x 20.5"h to match the SOW requirements of 5 - 8 cf.
3) Your humidity spec requires operation with a temp down to 5oC (41oF). Our standard humidity performance, based on psychometric limitations, is 10% to 98% RH Limited by a 45°F (7°C) minimum dew point temperature and a maximum dry bulb temperature of 190°F (88°C). Is this acceptable?
Answer: The minimum humidity range in the spec has been revised to 10% - 95% Relative Humidity between +45F and +185F for both chambers.
4) You are requesting FOB Destination however Note 7 on pg 16 allows for FOB Origin. Additional charges apply w/ destination...Will we be excluded submitting under FOB/FCA Origin?
Answer: FOB: Destination is preferred by the government, but FOB: Origin is acceptable. If quoting FOB:
Destination, include the shipping costs rolled in as part of the line item cost. If quoting FOB: Origin, then add that as an additional line for shipping, and put the cost.
5) Specs requires a 'Audible and visual alarm (strobe light mounted on top)". Please provide the make/model of preferred strobe light and specs for the 'audible alarm'.
Answer: EXAMPLE Strobe Light (EXACT MODEL NOT REQUIRED): Microstrobe 490S—120, or equal EXAMPLE Audible Alarm (EXACT MODEL NOT REQUIRED): WERMA Part# 10700077 panel mount buzzer.
80~100dB, 2.4kHz continuous tone., or equal
6) The model we're considering for the large chamber may not support leveling pads. Is this acceptable?
Answer: The requirement for adjustable leveling feet has been removed from the large chamber SOW.
7) Spec requires our humidity system use the 'Seimens IonXchanger Universal Model II demineralizer cartridge". Is there flexibility in this?
Answer: We use Siemens IonXchanger Part# 3C0600002, and APS Ultra Part# MB19H1-D cartridges. Both have the below dimensions and specs. There is a FIRM requirement to use one of these two filter cartridges to consolidate maintenance parts at our facility.
Diameter: 3.35in Body Length: 18.0in Overall Length: 19.5in Flow Rate: 7.2GPH
8) To meet your performance requirement, "compressor only", for both chamber the power specified will exceed levels stated in the SOW. Is there flexibility with this?
Answer: Please review the updated SOW. The compressor only ramp rates have been reduced, as facility power limitations are fixed. Please also note that the aluminum dead load for each chamber has been reduced.
9) The small chamber requires a minimum of 20"w x 20"d x 20"h however the external dimensions cannot exceed 40"w x 50"d x 78"h. In trying to meet your performance specs we don't have a standard chamber design that can support both. Which spec has the most importance? Can we assume the internal workspace? If so, is there flexibility in the footprint spec?
Answer: Please review the updated SOW. The maximum external dimensions in the have been increased. Also, if the humidity water tank simply will not fit in the updated external dimensions, please note that the SOW has also been updated to allow for a separate cart for the water tank. A single unit is still the preferred option, vise a separate cart with the water tank, but it is allowed if necessary.
The following have been modified:
NOTES TO VENDOR
NOTES TO VENDOR
NOTE 1: Government Point of Contact for this Solicitation / Request for Quote (RFQ) is: Murray Lancaster, Purchasing Agent, Phone: 360-315-6740, Fax: 360-396-5657
Email: murray.lancaster@navy.mil
NOTE 2: All questions regarding this solicitation should be submitted in writing as soon as practicable after receipt of solicitation. Email questions to murray.lancaster@navy.mil. Questions received after a reasonable time may not be entertained. (DO NOT include government drawings or government protected information in your reply emails unless they are digitally signed and encrypted per Federal Information Processing Standard (FIPS) Publication140-
2.)
NOTE 3: Utilize the pages in this solicitation to list all unit prices, extended prices, manufacturers and their part numbers, along with description changes (if any). Each Item No. or “CLIN” must be filled out. Company quote forms may be used, but not substituted for a completed solicitation / amendment pages.
NOTE 4: If you cannot meet the requested delivery date / Period of Performance (POP), line through and replace with your availability. All line items must state the unit price and extended price. Quote quantities as stated in this
RFQ.
NOTE 5: Company quote forms may be provided but not substituted for a completed solicitation/amendment pages. The government terms and conditions (T&C’s) listed in this solicitation are required by law through the
Federal Acquisition Regulations (FAR) and the Department of Defense FAR Supplement (DFAR). It is preferred mailto:murray.lancaster@navy.mil mailto:murray.lancaster@navy.mil that company T&C’s not be included with your quote submittal as many company T&C’s are inconsistent with federal law and unenforceable.
NOTE 6: Military Specification (MILSPEC) can be accessed on line at: http://assist.daps.dla.mil and offer electronic copies.
NOTE 7: Offers shall be FOB Destination pricing to Keyport, WA. 98345. If your pricing does not include shipping and you want to quote FOB Origin, you must state so by providing the city/state you will be shipping from, along with the estimated weight and cost of the shipment.
NOTE 8: You must supply Manufacturers information as requested in provision C.108. Supply city/state if in the
United States and/or the country of origin if outside the United States.
NOTE 9 Due to the size of this RFQ the government prefers that submission be electronically by email or fax.
NOTE 10: Failure to provide all required information from this solicitation and any subsequent amendment(s) may deem your company to be considered non-responsive.
NOTE 11: COMPLIANCE WITH SPECIFICATIONS
In order to ensure compliance with all the specification requirements, the contractor shall indicate in its offer and notify the Government in a cover letter, what specifications, if any, the offeror does not intend to meet. The offeror shall explain, in detail, how any proposed deviation/exception will nonetheless meet the Government's functional requirements. Should descriptive literature be supplied by the offeror, it will be presumed that the offeror intends to meet all of the specifications, regardless of the descriptive literature, unless the offeror specifically notes its exceptions.
It shall be the obligation of the contractor to exercise due diligence to discover and to bring to the attention of the contracting officer at the earliest possible time, in writing, any ambiguities, discrepancies, inconsistencies, or conflicts in or between the specifications and the applicable drawings or other documents incorporated by reference herein.
NOTE 12: Performance under this contract requires the contractor to adhere to certain Operations Security (OPSEC) requirements. Explanation of these requirements is detailed SECTION I of the Operations Security Guide for Defense Contractors available online at:
http://www.navsea.navy.mil/Home/WarfareCenters/NUWCKeyport/Resources.aspx.
NOTE 13: On-site contractors must comply with NUWC Division, Keyport publication “Safety Requirements for
Contractors and Subcontractors” and NUWC Division, Keyport publication “Contractor’s Guide to Environmental
Compliance”. Both documents are incorporated in full by reference and are available at the following links:
http://www.navsea.navy.mil/Home/WarfareCenters/NUWCKeyport/Resources.aspx
SOW FOR LARGE TEMP & HUMIDITY
1 SCOPE
http://assist.daps.dla.mil/ http://www.navsea.navy.mil/Home/WarfareCenters/NUWCKeyport/Resources.aspx
Large Temperature & Humidity Test Chamber The intent of this Performance Specification is to establish minimum performance and quality requirements for the system to ensure that it will meet the specialized needs of the Environmental Test Facility (ETF). This document is intended to allow for manufacturing variables, provided that the specified minimum requirements for function, capabilities, design, quality and training are met.
The contractor shall submit all documentation necessary to determine if the requirements of this specification are met. The quotation package shall include an itemized response to each of the following requirements.
2 APPLICABLE REGULATORY COMPLIANCE
The system shall meet all the Military, Federal, National Fire Protection Association (NFPA), and National Electrical Code (NEC) standards/specifications in effect on the date the quote is provided.
3 DESIGN REQUIREMENTS
3.1 General Requirements
The Temperature and Humidity Chamber shall be a complete and functional stand-alone system consisting of any necessary equipment and accessories required by this specification. The operator shall be able to easily manipulate all functions of temperature and humidity control. Alarms and safeties shall be utilized to prevent damage to chamber and unit under test in anomalous situations. Alarm and diagnostic messages shall be easily accessible. The operating noise of the chamber refrigeration shall be reduced as much as practicable with sound deadening foam or like material.
3.2 Building Integration (Available Utilities)
The Temperature and Humidity Chamber shall operate properly with the below listed facility services. Any additional site utility requirements shall be listed in the contractor’s submitted quotation.
Electrical Power at 480V 3Ø 60Hz 100 Amps (OR) 240V 3Ø 60Hz 100 Amps
Floor Water Drain
LN2 Supply, 55 PSI, ½” Flare, overhead piping
Industrial water for Humidity System (equipment must be equipped with water filtering if needed)
Cooling water, 55-60˚ F
Low pressure dry shop air, 80 PSI Max.
4 CONSTRUCTION AND WARRANTY
4.1 Materials, Processes and Parts
The System shall utilize standard commercial parts, components, wiring, and hardware wherever practical to preclude costly delays in procuring special items. All hardware and material shall be new and consist of no refurbished or salvaged items.
4.2 Hazardous Materials:
The use of any material considered to be hazardous to human health shall be properly identified and documented.
4.3 Workmanship:
The System shall be fabricated and finished in a professional manner. Particular attention shall be given to absence of blemishes, defects, burrs, and sharp edges; cleanliness; accuracy of dimensions; radii of fillets; marking of parts; appearance of soldering, brazing, welding, riveting, painting and wiring; alignment of parts; and tightness of threaded fasteners.
4.4 Paint:
All metal parts of the chamber, other than stainless steel, that are susceptible to rust or corrosion shall be painted or powder coated. Paints shall be of an epoxy base that when dry shall be stable when exposed to common solvents used in cleaners.
4.5 Warranty:
It is desired that the contractor shall provide a minimum warranty on all delivered items of 12 months from installation, checkout and final acceptance by NUWC Keyport personnel, as provided by standard commercial warranty. It is desired that the warranty include parts, labor, shipping and travel costs for a service representative. See HQ C-2-0024.
5 SAFETY
5.1 Personnel Safety
5.1.1 Electrical safety
All electrical connectors shall be protected against electrical hazards. Grounding shall be in accordance with industry standards.
Electrical cabinet interlock that prevents access to electrical cabinet while energized.
Main power circuit breaker with lockout, tag out compatibility.
Electrical system built to NEC and NEMA-1 standards.
5.1.2 Personnel hazards design:
Consideration shall be given to the adequacy of safety provisions for personnel and equipment during design, development, installation, testing, operation and maintenance. The equipment shall be constructed to protect personnel from protruding moving parts, accidental contact with energized circuit components, or other sources during normal operation and maintenance operations.
5.1.3 Equipment Safety
The System shall be protected against damage using common types of protective devices such as circuit breakers, fuses, pressure relief valves, shear bolts, loss of pressure interlocks, and over-temp protection; where appropriate, in order to prevent system damage when components or component systems fail, or when electrical power is interrupted.
6 CHAMBER PERFORMANCE REQUIREMENTS
6.1 Temperature:
The chamber shall have easily selectable temperature set points, ramp rates, and guaranteed soak times. The temperature ramp rate and cooling rate numbers provided below are with an assumed 50lb aluminum dead load.
Operating Range: -85F to 300°F minimum
Fluctuation: ±2˚F after stabilization
Heating Ramp Rate: 8°F/minute minimum, at the supply air.
Cooling Rate: 6°F/minute minimum, 8F/minute target, compressors only, from 185 to -5°F, at the supply air
6.2 Humidity:
The chamber shall have easily selectable humidity set points with the following performance envelope. If an air drier is required to obtain portion of humidity envelope, the equipment must be built into the chamber.
Minimum Required Range: 10 to 95% RH (w/o live load) from +45F to +185F.
Fluctuation: ±5 at the supply air
6.3 Airflow:
The chamber shall provide as even of airflow as practicable across the test item rack, with a minimum average airflow rate of
150 feet/minute (Measured at the center of the test area).
7 CONTROL FUNCTIONS AND DISPLAY REQUIREMENTS
7.1 User Interface:
The Chamber user interface shall include the following capabilities:
Minimum 7in screen (measured diagonal), touch operation, color display.
It is desired that the controller be mounted on side of chamber using height and/or tilt adjustable system. Example would be a vertical slider that the controller chassis could move up and down and clamp in place.
On screen tabular and graphical display of user defined programs.
Minimum four channels of PID control. (Air Temp, Item Temp, Humidity, Auxiliary)
On screen alarm log with description of each alarm and the respective system location as applicable.
Built-in timer functions for automatic startup, delayed startup, and shutdown of chamber.
Controller must display the program start time, and current program step, and real-time process information
(air temp, item temp, %RH).
7.2 Hardware Requirements, Data Recording, Storage, Transfer
If controller is Microsoft Windows based; it must be Windows 10, NOT Windows 7, Windows 7 CE, or XP.
Adequate memory for minimum 20 user-definable programs with 50 steps each (Alphabetical Sorting).
Minimum 20 digit alphanumeric profile file name accepted by controller.
Adequate memory for minimum 30 days of paperless recording of minimum 4 channels with two temperatures + one humidity channel. (Example: Temp set point, Temp process value, Humidity set point, Humidity process value).
Sampling rate shall be user selectable or minimum 1 sample per minute.
Paperless recording data must be easily transferrable via Ethernet or USB, and in a common format readable via desktop computer (.csv, .txt), (No proprietary viewing software is permitted).
Humidity measurements must be accurate at temperatures from 41F to 185 F and be made via a solid state humidity sensor.
The controller shall have the ability to access profiles/programs on a network storage location via Ethernet connectivity.
8 CHAMBER DESIGN, WORKSPACE SIZE & FOOTPRINT REQUIREMENTS
8.1 Design Features
Volume: 43 to 46 cubic feet.
Standard door on the front (swings open horizontally, hinged on the left side is preferable).
Interior Dimensions (Viewed from the front) 38” wide minimum X 38” high minimum X 52” deep minimum
Thermal break doorframe that limits exterior frosting.
Drip-tray under doorframe must have 0.5deg ~ 2.0deg slope towards drain.
Welded stainless steel interior, including all access ports.
Service panel to access interior heaters, evaporators, and fans must be bolted (or like feature) in place utilizing stainless steel fasteners. No rivets are permitted.
Refrigeration lines shall be clamped to protect from vibration induced abrasion.
Minimum one adjustable & removable stainless steel shelf with support rails (100lb capacity at center, 0.5in maximum deflection when fully loaded)
A) It is desired that the shelf include forklift channels on the bottom, such that a heavy item can first be placed on the shelf, then lifted into the chamber via forklift.
B) Alternately, a separate aluminum “pallet” designed to rest on the floor of the chamber is acceptable. The thermal mass of the pallet is included in the 75lb dead load (not an additional load to account for).
The floor of the chamber shall be capable of supporting at least 400lbs distributed over a 2ft^2 area
Chamber floor must have 0.5deg ~ 2.0deg slope towards drain.
One 6” diameter cable port on right side of chamber, Two 6” diameter cable/arm ports in front door of chamber, spaced shoulder width apart. Plugs for each port must be provided.
The front of the chamber will have a minimum 12” X 12” heated viewing window capable of withstanding the temperature range with limited frosting.
Frame shall be sufficiently rigid to allow movement via single forklift of adequate capacity.
Minimum two interior lights.
Audible and visible alarm (strobe light mounted on top of chamber) indicators.
o EXAMPLE STROBE (Exact Model NOT Required): Microstrobe 490S-12 o EXAMPLE AUDIBLE ALARM (Exact Model NOT Required): WERMA Part# 10700077 2.4kHZ tone.
User set over-heat and over chill protection limit via separate limit/safety controller. (Watlow EZ-Zone PM Express preferred to support lab standard)
Humidity system must utilize Siemens IonXchanger Univeral Model II 3C0600002, or APS Ultra Part# MB19H1-D humidity system demineralization cartridges and 2 spares shall be included with delivery.
Two spare compressor crankcase heaters (if applicable) shall be included with the delivery.
8.2 Footprint
The entire Chamber which consists of all necessary components to operate shall not exceed the maximum allowable footprint of
70” W X 95” D X 110” H (viewed from the front).
8.3 Refrigeration
For maintenance purposes, the system shall include easily visible refrigeration gauges on the high and low side of each compressor along with easy access service panels (90deg cam-locks, NOT bolts or rivets). For monitoring and trouble-shooting purposes, the system shall include measurements and the option to record historical plots of high and low stage suction/discharge pressures. This may be integrated or separate from the controller.
Acceptable refrigerants are R-507 & R-508B.
Scroll compressors are mandatory.
Automatic system protection via high/low refrigerant pressure switches.
LN2 is available to support faster boost cooling ramp rates.
Compressor run time (hour meter) desired
9 DOCUMENTATION REQUIREMENTS
The Temperature and Humidity Chamber shall be delivered with complete, comprehensive documentation on all major components, both in digital and hardcopy format. This documentation shall include but not be limited to:
Operation manuals for the chamber, detailing all user functions as well as diagnostic and troubleshooting routines.
Preventative maintenance instructions and routine maintenance intervals for the system.
Installation instructions for all delivered hardware, plus system footprint, parts layout and identification of components.
Schematic diagrams showing all electrical circuits including a complete bill of materials.
Diagrams of all plumbing (air, water).
A complete refrigeration schematic including a complete bill of materials.
10 UNIT ACCEPTANCE
10.1 Factory Acceptance
The temperature and humidity chamber shall be tested and checked for proper operations and conformance to purchase specifications prior to shipment. The manufacturer shall provide operational checkout data of the chamber as part of the deliverables. This has historically been in print form as part of the operation and maintenance manual.
10.2 Delivery, Install, and Acceptance
Associated freight costs with chamber delivery are to be covered by the manufacturer. FOB destination
(NUWC Keyport, Bangor Annex, Building 5945).
After notification by NUWC Keyport personnel that the site is prepared, the equipment located, and all utilities available, factory trained service personnel shall deliver the equipment to NUWC Keyport Building
5945. NUWC Keyport personnel will connect the equipment to utilities (water and power). Factory personnel will then put the chamber into operation.
Final acceptance will be performed after delivery and installation at NUWC Division Keyport, 610 Dowell
Street, Building 5945, Keyport, WA 98345. Operational tests shall be performed in the presence of NUWC
Division Keyport Code 224 Environmental Test personnel prior to final acceptance.
The performance levels required in Sections 6 and 8 shall be demonstrated to the satisfaction of the ETF personnel. Additional acceptance and reliability tests are expected to take 15 calendar days to complete. A total of 30 days are required for constructive acceptance.
Reliability tests will consist of simulating a mission profile environment continuously for a one week.
During the 7 day period, no changes or adjustments will be made or allowed.
The contractor representative shall provide on-site training covering all chamber operations, functions, and maintenance points for a minimum of three instrument operators. The training shall cover all pertinent user functions prior to final acceptance. Training shall be held between the hours of 7:00 AM and 4:00 PM, Monday through Thursday, exclusive of Federal Holidays.
11 GOVERNMENT PROVIDED EQUIPMENT
There is no government provided equipment.
12 GOVERNMENT PROVIDED SERVICES
The government provided services are located in Section 3.2.
13 CONTRACTOR PROVIDED INFORMATION
The Contractor shall provide the following data:
Documentation as stated in Section 9.
Documentation of applicable warranties of the Chamber and its components.
Contact information for the local service engineering representative.
All charts, recordings, and chamber checkout data shall be supplied to the purchaser at the time of unit acceptance.
SOW FOR SMALL TEMP & HUMIDITY
1 SCOPE
Small Temperature & Humidity Test Chamber The intent of this Performance Specification is to establish minimum performance and quality requirements for the system to ensure that it will meet the specialized needs of the Environmental Test Facility (ETF). This document is intended to allow for manufacturing variables, provided that the specified minimum requirements for function, capabilities, design, quality and training are met.
The contractor shall submit all documentation necessary to determine if the requirements of this specification are met. The quotation package shall include an itemized response to each of the following requirements.
2 APPLICABLE REGULATORY COMPLIANCE
The system shall meet all the Military, Federal, National Fire Protection Association (NFPA), and National Electrical Code (NEC) standards/specifications in effect on the date the quote is provided.
3 DESIGN REQUIREMENTS
3.1 General Requirements
The Temperature and Humidity Chamber shall be a complete and functional stand-alone system consisting of any necessary equipment and accessories required by this specification. The operator shall be able to easily manipulate all functions of temperature and humidity control. Alarms and safeties shall be utilized to prevent damage to chamber and unit under test in anomalous situations. Alarm and diagnostic messages shall be easily accessible. The operating noise of the chamber refrigeration shall be reduced as much as practicable with sound deadening foam or like material.
3.2 Building Integration (Available Utilities)
The Temperature and Humidity Chamber shall operate properly with the below listed facility services. Any additional site utility requirements shall be listed in the contractor’s submitted quotation.
Electrical Power at 208V 3Ø 60Hz, 30 Amps
LN2 Supply, 55 PSI, ½” Flare
Low pressure dry shop air, 80 PSI Max
4 CONSTRUCTION AND WARRANTY
4.1 Materials, Processes and Parts
The System shall utilize standard commercial parts, components, wiring, and hardware wherever practical to preclude costly delays in procuring special items. All hardware and material shall be new and consist of no refurbished or salvaged items.
4.2 Hazardous Materials:
The use of any material considered to be hazardous to human health shall be properly identified and documented.
4.3 Workmanship:
The System shall be fabricated and finished in a professional manner. Particular attention shall be given to absence of blemishes, defects, burrs, and sharp edges; cleanliness; accuracy of dimensions; radii of fillets; marking of parts; appearance of soldering, brazing, welding, riveting, painting and wiring; alignment of parts; and tightness of threaded fasteners.
4.4 Paint:
All metal parts of the chamber, other than stainless steel, that are susceptible to rust or corrosion shall be painted or powder coated. Paints shall be of an epoxy base that when dry shall be stable when exposed to common solvents used in cleaners.
4.5 Warranty:
It is desired that the contractor shall provide a minimum warranty on all delivered items of 12 months from installation, checkout and final acceptance by NUWC Keyport personnel, as provided by standard commercial warranty. It is desired that the warranty include parts, labor, shipping and travel costs for a service representative. See HQ C-2-0024.
5 SAFETY
5.1 Personnel Safety
5.1.1 Electrical safety
All electrical connectors shall be protected against electrical hazards. Grounding shall be in accordance with industry standards.
Electrical cabinet interlock that prevents access to electrical cabinet while energized.
Main power circuit breaker with lockout, tag out compatibility.
Electrical system built to NEC and NEMA-1 standards.
5.1.2 Personnel hazards design:
Consideration shall be given to the adequacy of safety provisions for personnel and equipment during design, development, installation, testing, operation and maintenance. The equipment shall be constructed to protect personnel from protruding moving parts, accidental contact with energized circuit components, or other sources during normal operation and maintenance operations.
5.1.3 Equipment Safety
The System shall be protected against damage using common types of protective devices such as circuit breakers, fuses, pressure relief valves, shear bolts, loss of pressure interlocks, and over-temp protection; where appropriate, in order to prevent system damage when components or component systems fail, or when electrical power is interrupted.
6 CHAMBER PERFORMANCE REQUIREMENTS
6.1 Temperature:
The chamber shall have easily selectable temperature set points, ramp rates, and guaranteed soak times. The temperature ramp rate and cooling rate numbers provided below are with an assumed 10lb aluminum dead load.
Operating Range: -20F to 300°F minimum.
Fluctuation: ±2˚F after stabilization.
Heating Ramp Rate: 7°F/minute minimum from -5 to 185°F, at the supply air.
Boost Heating Ramp Rate: 23°F/minute minimum, from -5 to 185°F, at the supply air.
Cooling Rate: 3°F/minute minimum, compressor only, from 185 to -5°F, at the supply air.
Boost Cooling Rate: 23°F/minute minimum, compressor + LN2 boost, from 185 to -5°F, at the supply air.
6.2 Humidity:
The chamber shall have easily selectable humidity set points with the following performance envelope. If an air drier is required to obtain portion of humidity envelope, the equipment must be built into the chamber.
Minimum Required Range: 10% to 95% RH (w/o live load) from +45F to +185F.
Fluctuation: ±5% at the supply air
6.3 Airflow:
The chamber shall provide as even of airflow as practicable across the test item rack, with a minimum average airflow rate of
100 feet/minute (Measured at the center of the test area).
7 CONTROL FUNCTIONS AND DISPLAY REQUIREMENTS
7.1 User Interface:
The Chamber user interface shall include the following capabilities:
Minimum 7in screen (measured diagonal), touch operation, 16 bit color display.
It is desired that the controller be mounted on side of chamber using height and/or tilt adjustable system. Example would be a vertical slider that the controller chassis could move up and down and clamp in place.
On screen tabular and graphical display of user defined programs.
Minimum three channels of PID control. (Air Temp, Humidity, Auxiliary)
On screen alarm log with description of each alarm and the respective system location as applicable.
Built-in timer functions for automatic startup, delayed startup, and shutdown of chamber.
Controller must display the program start time, and current program step, and real-time process information
(air temp, item temp, %RH).
7.2 Hardware & Software Requirements. Data Recording, Storage, Transfer
If controller is Microsoft Windows based; it must be Windows 10, NOT Windows 7, Windows 7 CE, or XP.
Adequate memory for minimum 20 user-definable programs with 50 steps each. (Alphabetical Sorting)
Minimum 20 digit alphanumeric profile file name accepted by controller.
Adequate memory for minimum 30 days of paperless recording of minimum 4 channels with two temperatures + one humidity channel. (Example: Temp set point, Temp process value, Humidity set point, Humidity process value).
Sampling rate shall be user selectable or minimum 1 sample per minute.
Paperless recording data must be easily transferrable via Ethernet or USB, and in a common format readable via desktop computer (.csv, .txt), (No proprietary viewing software is permitted).
Humidity measurements must be accurate at temperatures from 41F to 185 F and be made via a solid state humidity sensor.
The controller shall have the ability to access profiles/programs on a network storage location via Ethernet connectivity.
8 CHAMBER DESIGN, WORKSPACE SIZE & FOOTPRINT REQUIREMENTS
8.1 Design Features
Volume: 5 to 8 cubic feet.
Interior Dimensions (Viewed from the front) 20.5” wide min X 20.5” high min X 20.5” deep min.
Thermal break doorframe that limits exterior frosting.
Drip-tray under doorframe must have 0.5deg ~ 2.0deg slope towards drain.
Welded stainless steel interior, including all access ports.
Service panel to access interior heaters, evaporators, and fans must be bolted (or like feature) in place utilizing stainless steel fasteners. No rivets are permitted.
Refrigeration lines shall be clamped to protect from vibration induced abrasion.
Minimum one adjustable & removable stainless steel shelf with support rails (50lb capacity at center, 0.5in maximum deflection when fully loaded)
The floor of the chamber shall be capable of supporting at least 50lbs.
Chamber floor must have 0.5deg ~ 2.0deg slope towards drain.
One 6” diameter cable port on the side of the chamber. Plug must be provided for this port.
The front of the chamber will have a minimum 6” X 6” heated viewing window capable of withstanding the temperature range with limited frosting.
8.2
Entire unit shall be self-contained and on casters, including the refrigeration and humidity systems. If necessary, the water tank and filter for the humidity system may be contained on a separate wheeled cart that does not count towards the form factor listed in Section 8.2.
4in~6in rubber or polyurethane casters with foot operated lock on two minimum. Two casters fixed and two casters with 360deg rotation.
Minimum one interior light.
Audible and visible alarm (strobe light mounted on top of chamber) indicators.
o EXAMPLE STROBE (Exact Model NOT Required): Microstrobe 490S-12, or equal o EXAMPLE AUDIBLE ALARM (Exact Model NOT Required): WERMA Part# 10700077 2.4kHZ tone, or equal.
User set over-heat and over chill protection limit via separate limit/safety controller. (Watlow EZ-Zone PM Express preferred to support lab standard)
Humidity system must utilize Siemens IonXchanger Univeral Model II 3C0600002, or APS Ultra Part#
MB19H1-D humidity system demineralization cartridges and 2 spares shall be included with delivery.
Two spare compressor crankcase heaters (if applicable) shall be included with the delivery.
Footprint
The main chamber which consists of all necessary components to operate (besides the water tank and filter) shall not exceed the maximum allowable footprint of 48” W X 55” D X 105” H (viewed from the front).
If necessary due to packaging constraints, the water tank and filter for the humidity system are allowed to be contained on a separate small wheeled cart. Please provide rough dimensions and proposed interconnects as part of bid.
8.3 Refrigeration
For maintenance purposes, the system shall include easily visible refrigeration gauges on the high and low side of the compressor along with easy access service panels (90deg cam-locks, NOT bolts or rivets). For monitoring and trouble-shooting purposes, the system shall include measurements and the option to record historical plots of high and low stage suction/discharge pressures. This may be integrated or separate from the controller.
Acceptable refrigerants are R-507, R410A, R404A.
Scroll compressor is required. Single stage refrigeration system, no cascade.
Automatic system protection via high/low refrigerant pressure switches.
LN2 is available to support faster cooling ramp rates, and to reach the extreme low limit temperature.
Sight glasses at compressor sump, as well as at least three at key location for each refrigeration loop.
System must be air cooled.
Compressor run time (hour meter) desired
9 DOCUMENTATION REQUIREMENTS
The Temperature and Humidity Chamber shall be delivered with complete, comprehensive documentation on all major components, both in digital and hardcopy format. This documentation shall include but not be limited to:
Operation manuals for the Chamber, detailing all user functions as well as diagnostic and troubleshooting routines.
Preventative maintenance instructions and routine maintenance intervals for the system.
Installation instructions for all delivered hardware, plus system footprint, parts layout and identification of components.
Schematic diagrams showing all electrical circuits including bill of materials.
Diagrams of all plumbing (air, water).
A complete refrigeration schematic including bill of materials.
10 UNIT ACCEPTANCE
10.1 Factory Acceptance
The temperature and humidity chamber shall be tested and checked for proper operations and conformance to purchase specifications prior to shipment. The manufacturer shall provide operational checkout data of the chamber as part of the deliverables. This has historically been in print form as part of the operation and maintenance manual.
10.2 Delivery, Install, and Acceptance
Associated freight costs with chamber delivery are to be covered by the manufacturer. FOB destination
(NUWC Keyport, Bangor Annex, Building 5945).
After notification by NUWC Keyport personnel that the site is prepared, the equipment located, and all utilities available, factory trained service personnel shall deliver the equipment to NUWC Keyport Building
5945. NUWC Keyport personnel will connect the equipment to utilities (water and power). Factory personnel will then put the chamber into operation.
Final acceptance will be performed after delivery and installation at NUWC Division Keyport, 610 Dowell
Street, Building 5945, Keyport, WA 98345. Operational tests shall be performed in the presence of NUWC
Division Keyport Code 224 Environmental Test personnel prior to final acceptance.
The performance levels required in Sections 6 and 8 shall be demonstrated to the satisfaction of the ETF personnel. Additional acceptance and reliability tests are expected to take 15 calendar days to complete. A total of 30 days are required for constructive acceptance.
Reliability tests will consist of simulating a mission profile environment continuously for a one week.
During the 7 day period, no changes or adjustments will be made or allowed.
The contractor representative shall provide on-site training covering all chamber operations, functions, and maintenance points for a minimum of three instrument operators. The training shall cover all pertinent user functions prior to final acceptance. Training shall be held between the hours of 7:00 AM and 4:00 PM, Monday through Thursday, exclusive of Federal Holidays.
11 GOVERNMENT PROVIDED EQUIPMENT
There is no government provided equipment.
12 GOVERNMENT PROVIDED SERVICES
The government provided services are located in Section 3.2.
13 CONTRACTOR PROVIDED INFORMATION
The Contractor shall provide the following data:
Documentation as stated in Section 9.
Documentation of applicable warranties of the Chamber and its components.
Contact information for the local service engineering representative.
All charts, recordings, and chamber checkout data shall be supplied to the purchaser at the time of unit acceptance.
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 09-Mar-2017 12:00 PM to 15-Mar-2017 12:00 PM.
(End of Summary of Changes)