CDRL_A001_and_A002.doc
DOC document 124 KB Posted
- Attached to
- Leak Test Stand Controller Federal contract opportunity
- Solicitation number
- N00253-16-T-0482
About this file
CDRLs A001 and A002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N00253-16-T-0482-0004.pdf | ||
| N00253-16-T-0482-0003.pdf | ||
| N00253-16-T-0482-0002.pdf | ||
| N00253-16-T-0482-0001.pdf | ||
| 8290555R1.docx | DOCX document | |
| 8290555S.docx | DOCX document | |
| 8290555D.docx | DOCX document | |
| N00253-16-T-0482.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(2 Data Items) Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions searching existing data sources gathering and maintaining the data needed and completing the reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information including suggestions for reducing this burden, to Department of Defense, Washington DC, Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing contracting Officer for the Contract/PR No. Listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
TDP
TM
OTHER
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
MK 62 LEAK TEST STAND CONTROLL
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A001 |
| INSPECTION SYSTEM PLAN |
| TEST PROCEDURE |
| 4. AUTHORITY (Date Acquisition Document No.) |
| 5. CONTRACTING REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
| DI-NDTI-80603 |
| ALL DRAWINGS |
| NUWC DIV KEYPORT CODE 423 |
TOTAL PRICE
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
REQUIRED
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
$0
DD
| ONE TIME |
| W/IN 15 DAYS OF AWARD |
b. COPIES
| 8. APP CODE |
| DIST D AECA |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Final
| Drafts |
| Reg |
| Repro |
16.
REMARKS:
THE PLAN IS TO SPECIFY PROCESS CONTROL INSTRUCTIONS AND INSPECTION PROCEDURES NEEDED TO ENSURE PRODUCT CONFORMANCE TO DRAWINGS, SPECIFICATIONS, AND CONTRACT REQUIREMENTS IAW ANSI/ASQC Q9001-2008 OR EQUIVALENT. THE PLAN IS TO INCLUDE PRODUCTION LOT INSPECTION PROCEDURES IAW DI-NDTI-80603 ALONG WITH ALL APPLICABLE DATA ENTRY SHEETS TO BE USED TO DOCUMENT INSPECTIONS.
NUWC KPT C/423
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 15. TOTAL |
| 0 |
| 0 |
| 0 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A002 |
| PRODUCTION LOT INSPECTION REPORT |
| TEST REPORT |
| 4. AUTHORITY (Date Acquisition Document No.) |
| 5. CONTRACTING REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
| DI-NDTI-80809B |
| ALL DRAWINGS |
| NAVSEA KPT C/423 |
TOTAL PRICE
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
REQUIRED
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
DD
| PER LOT |
| PER LOT |
b. COPIES
| 8. APP CODE |
| DIST D AECA |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Final
| Drafts |
| Reg |
| Repro |
16.
REMARKS:
THE REPORT IS TO VERIFY PRODUCTION LOT CONFORMANCE TO THE APPLICABLE DRAWINGS, SPECIFICATIONS, AND CONTRACT REQUIREMENTS. THE REPORT CONSISTS OF THE PLAN (A001) CONTAINING ALL REQUIRED INSPECTION RESULTS DOCUMENTED ON THE PLAN’S DATA ENTRY SHEETS. IN ADDITION, THE REPORT IS TO INCLUDE MATERIAL CERTIFICATIONS AND ALL OTHER PERTINENT OBJECTIVE QUALITY EVIDENCE. DCMC REVIEW IS REQUIRED PRIOR TO SUBMITTAL TO NUWCDIV KEYPORT. THE REPORT MUST BE APPROVED BY NAVSEA KEYPORT BEFORE FINAL ACCEPTANCE OF THE LOT.
NUWC KPT C/423
15. TOTAL
G. PREPARED BY:
LINDA VALLEY
H. DATE
5/20/16
I. APPROVED BY
J. DATE
DD Form 1423-2, JUN 90
1059/183
| Previous editions are obsolete |
| Page |
of
Pages
File details come from the government source that posted it. Updated .