N0018923Q04100001.pdf
PDF 189 KB Posted
- Attached to
- Kaeser Compressed Air Systems - SCSTC Federal contract opportunity
- Solicitation number
- N0018923Q0410
About this file
This document is an amendment to a solicitation for the procurement and installation of eight air compressors and associated equipment within a building at the Space and Naval Warfare Systems Center Atlantic Research Center (SCSTC ATRC) in Dahlgren, Virginia. The Navy seeks to replace failing piston-driven air compressors with more reliable rotary screw compressors. The contractor will be responsible for procuring the equipment, installing new compressors and air dryers, connecting compressed air piping within the building, and completing other tasks. The period of performance is 84 calendar days after contract award. The amendment extends the response deadline from July 28, 2023 to July 31, 2023.
The solicitation number is N0018923Q0410. The Navy is the contracting agency. The work will be performed at Building 1520 of the SCSTC ATRC facility and is considered unclassified.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment I - Product Description.pdf | ||
| 4.02 N0018923Q0410.pdf | ||
| Attachment II - Workspaces.pdf | ||
| 4.04b SSJ - Air Compressors_Redacted.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3596A23RC00TA1
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to update Statement of Work sections 1 and 2.1 as detailed in the summary of changes, and to extend the required response date/time from 28-Jul-2023 06:00 PM to 31-Jul-2023 06:00 PM.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-Jul-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0018923Q0410
X 9B. DATED (SEE ITEM 11)
26-Jul-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Jul-2023
CODE
NAVSUP FLC NORFOLK CONTRACTING
NORFOLK OFFICE
ATTN: R. BABCOCK
1968 GIBLERT STREET SUITE 600
NORFOLK VA 23511-3392
N00189 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0018923Q0410
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 28-Jul-2023 06:00 PM to 31-Jul-2023 06:00 PM.
The following have been modified:
STATEMENT OF WORK
1. Scope
This Statement of Work (SOW) covers the effort associated with procurement and installation of eight (8) Personal Property Class 3 Equipment - eight (8) air compressors within building 1520 (with the appropriate air-filtration system to ensure no oil downstream in the air stream after filtration) - by a Contractor on behalf of
SCSTC ATRC.
2. Overview
2.1. The purpose of this SOW is to obtain Contractor support for the procurement and installation of eight (8) air compressors within building 1520 (with the appropriate air-filtration system to ensure no oil downstream in the air stream after filtration). The Contractor is responsible for the deliverable items identified in Section 6. SCSTC ATRC N4/N49 are designated the lead for this effort. This is replacement in kind SOW for air compressors as described herein over a period. The Period of Performance is eighty-four
(84) calendar days after contract award.
2.1.1. Building 1520
2.1.1.1. A-Wing Mechanical Room 125 (2)
2.1.1.2. B-Wing high bay Room 129A (2)
2.1.1.3. C-Wing Mechanical Room 162 (2)
2.1.1.4. D-Wing Mechanical room 107 (2)
3. Funding Authorization
The Contractor is funded to perform only the services as outlined in the SOW. All other services are considered out of the scope of this task and may not be reimbursed.
4. Background
Replacement of failing piston driven oil less air compressors with rotary screw type compressors to reduce maintenance time, increase time between failures, and ensure an overall more reliable compressed, dry air, system.
5. References
5.1. U.S. DEPARTMENT OF DEFENSE/UNIFIED FACILITIES CRITERIA (UFC):
5.1.1. UFC-3-410-01 (Change 6, 20 March 2020) Heating, Ventilating, and Air Conditioning Systems
5.1.2. UFC-3-410-02 (Change 1, 20 March 2020) Direct Digital Control for HVAC and Other Building
Control Systems
5.1.3. UFC-3-501-01 (Change 1, 20 March 2019) Interior Electrical Systems
5.1.4. UFC 3-600-01 (Change 4, 07 February 2020) Fire Protection Engineering for Facilities
5.2. NATIONAL FIRE PROTECTION ASSOCIATION:
5.2.1. NFPA 170 (2012) Standard for Fire Safety and Emergency Symbols
5.2.2. NFPA 70 (2019; TIA 19-1; TIA 19-2; TIA 19-3; TIA 19-4; ERTA 1 2019) National Electrical Code
5.2.3. NFPA 70E (2018; TIA 18-1; TIA 81-2) Standard for Electrical Safety in the Workplace
5.2.4. NFPA 90A (2018) Standard for the Installation of Air Conditioning and Ventilating Systems
5.2.5. NFPA 101 (2018; TIA 18-1; TIA 18-2; TIA 18-3) Life Safety Code
5.3. U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
5.3.1. 29 CFR 1910 Occupational Safety and Health Standards
5.3.2. 36 CFR 1191 Americans with Disabilities Act (ADA) Accessibility Guidelines for Buildings and
Facilities; Architectural Barriers Act (ABA) Accessibility Guidelines
6. Contractor Responsibilities
6.1. Assumptions/Constraints/Scope of Work
The Contractor shall provide technical services, labor, and any tools required to procure and install eight rotary screw type compressors and air dryer systems. All tasking will be accomplished in accordance with (IAW) this SOW and as discussed during the walk thru. Although the locations for the installations are in different spaces, the process will be consistent with the following:
a. NAVFAC will remove the existing air compressors and air dryers, disconnecting the electrical connections and the floor mounting systems. NAVFAC will then mount the new compressors and air dryers, and connect to building power.
b. NAVFAC will provide all necessary modifications to the facility to accommodate the new compressors and air dryer.
c. Once the new compressors are mounted, SCSTC ATRC’s ¾" copper piping existing network will be connected to the new compressors by the contractor using aluminum piping materials.
d. The contractor will run 32mm pipe up the wall to a height equal to the inlet port of the desiccant dryer. The piping will then elbow down the wall to the corner where it will then turn and connect to the desiccant dryer.
e. The Contractor will install isolation ball valves at the inlet and outlet ports on the desiccant dryer so it can be isolated for service.
f. From the outlet port of the desiccant dryer the piping will go up to a height equal to the ¾" copper pipe where the new system will be connected.
g. The piping from the desiccant dryer will then be run along the wall to this tie-in point. The piping from the desiccant dryer will be connected to the ¾" copper pipe about two feet from where the copper pipe turns and goes through the wall.
h. At this point the copper pipe will be cut and threaded fittings will be installed to allow for connection to the aluminum piping materials.
i. SCSTC ATRC is responsible for removal of any other items from the spaces to accommodate the installation, to include storage racks, shelving, and other impediments to movement within the affected spaces.
6.2. Contractor Furnished Information / equipment
The Contractor shall organize, coordinate, and control all program activities to ensure compliance with contract requirements and timely delivery of the services specified herein. The Contractor shall provide the necessary personnel, supervision, management, materials, services, testing, technical, logistics, clerical, and quality assurance support necessary to perform the tasks specified/described herein.
6.2.1. TEST AND INSPECTION: Upon completion of all work in this section, the contractor shall accomplish the following to demonstrate satisfactory accomplishment of all tasks:
6.2.1.1. Conduct a space walkthrough with the TPOC or TPOC representative to inspect cosmetic upgrades.
6.2.1.2. Conduct a final walk-thru of all installed items with the TPOC or TPOC representative to ensure all applicable drawing / plan modifications are satisfactorily completed.
6.3. Contractor Furnished Information/Equipment/Materials
The Contractor shall organize, coordinate, and control all program activities to ensure compliance with contract requirements and timely delivery of the services specified herein. The Contractor shall provide the necessary personnel, supervision, management, materials, services, testing, technical, logistics, clerical, and quality assurance support necessary to perform the tasks specified/described herein.
6.4. Overall Completion / Acceptance Criteria
This project will be considered complete when the ATRC Facilities POC inspects and accepts the deliverables.
If the Contractor believes that they have fulfilled the requirements of the overall task, they shall send written notification to the ATRC Facilities POC, indicating task completion and request concurrence.
7. Government Responsibilities
7.1. Assumptions / Constraints: NAVFAC to coordinate and support removal and installation of equipment as outlined and contained in the Work Authorization Package.
7.2. Government Furnished Information / Material
7.2.1. N/A
8. Schedule
8.1. Provide the TPOC with the Estimated Delivery Date (EDD) for materials and corresponding Project Start Date and Schedule within two weeks of award.
8.2. Software
8.3. Period of Performance
The Period of Performance for the installation shall begin eighty-four (84) calendar days after the contract award for a period of sixty (60) days unless otherwise stated and agreed upon in writing between the lead and the Contractor.
8.4. Meetings
8.4.1. Kick-Off Meeting
8.4.2. Final Walk-Through
9. Monthly Status Reports, Quality Assurance, Change Control Process
9.1. Program Management
The Contractor is responsible for the administrative, technical, and financial performance of this task. This includes physical progress, compliance with quality requirements, change requests in relation to the negotiation of changes to the SOW, schedule management, verification, and approval of all delivered products.
9.2. Communication
The contractor will supply a primary and alternate emergency contract information to the TPOC and Site Lead. Additionally, the contractor will maintain and provide a project directory including phone numbers and email addresses of all subcontractors and other stakeholders as applicable.
9.3. Miscellaneous
9.3.1. Security
9.3.1.1. Spaces: UNCLASSIFIED (escorts will be provided)
9.3.1.2. Equipment: UNCLASSIFIED
9.3.1.3. Documentation: UNCLASSIFIED
9.3.2. POCs
9.3.2.1. ATRC Facility POC: Howard Swenson (540)653-7670, howard.r.swenson.civ@us.navy.mil
9.3.2.2. Technical POC: Troy Stevens (540)284-0110, troy.a.stevens.civ@us.navy.mil
9.3.2.3. Financial POC: Eric Carter (540) 653-0315, eric.a.carter31.civ@us.navy.mil
Work performed under this SOW is unclassified, however, contractor shall be responsible for base and building access (Defense Biometric Identification System (DBIDS) or Common Access Card (CAC).
9.3.3. Work Location
SCSTC ATRC
(Naval Support Facility - Dahlgren) 5395 First St., Building 1520 Dahlgren, Va. 22448
(End of Summary of Changes)