N0018919RZ036_SOLICITATION_QUESTIONS.docx

DOCX document 30 KB Posted

Attached to
Improper Payment Elimination (IPERA) Federal contract opportunity
Solicitation number
N0018919RZ036
Issued by
Department of the Navy Naval Supply Systems Command

About this file

N0018919RZ036_SOLICITATION_QUESTIONS.docx

View the file

Other files for this federal contract opportunity

Other files attached to Improper Payment Elimination (IPERA), newest first.
File Type Posted
N0018919RZ036_IPERA_Solicitation_Amendment_1.docx DOCX document
N0018919RZ036_CDRL_Portfolio.pdf PDF
IPERA_CDRL_1.pdf PDF
IPERA_DD254.pdf PDF
IPERA_Solicitation.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions in Response to Solicitation Number: N0018919RZ036

#
RFP Section
Page #
Question/Comment
1
Attachment II: CDRLs
CDRLs
Attachment II: CDRLs provides the same CDRL (A001) document three times. Can the Government provide any additional CDRLs?

1A

PROVIDED AS ATTACHMENTS

2
SF1449
1 of 58
Block 28 of the SF1449 says that “Contractor is required to sign this document and return 2 copies to issuing office.” Do offerors need to provide two signed copies of the SF1449 with the proposal submission?

2A

UPDATED: ONLY NEED TO PROVIDE 1 COPY

3
14. Contractor Onboarding
13 of 58
Section 14 – Contractor Onboarding states that “the Contractor shall comply with CDRL A001, Tailored Qualifications and Security Template.” CDRL A001 provided with the solicitation is titled Monthly Planning Meeting Agenda/POAM. Can the Government provide the “Tailored Qualifications and Security Template”?

3A

REMOVED AND REPLACED WITH NEW SECTION

4
Pricing Pages
14 of 58
What is the distinction between Item No. 0001 and 0002 (for the base year and all options)? Does the government require separate pricing for the CDRLs in Items 0002, 1002, 2002, and 3002?

4A

CDRL CLINS ARE NOT SEPERATELY PRICED. THE GOVERNMENT DOES NOT EXPECT SEPARATE PRICING FOR THESE CLINS.

5
Delivery Information
18 of 58
If CLIN 0001 and 0002 are supposed to have the same delivery dates, should CLIN 0002 be 15-MAR-2019 to 14-MAR-2020 like CLIN 0001 (vs. 14-MAR-2019 to 15-MAR-2020)?

5A

FIXED

6
Submission and Evaluation – I. General
47 of 58
The Volume II submission requires the “solicitation cover sheet with appropriate blocks completed by the quoter.” Is the SF1449 the solicitation cover sheet? If so, confirm that only Blocks 17a, 17b, 30a, 30b, and 30c need to be completed by the quoter.

6A

YES; CONFIRMED

7
Submission and Evaluation – I. General
47 of 58
The instructions for Volume II state: “If the quoter has completed all of the representations and certifications required by this solicitation in SAM (www.sam.gov) in accordance with FAR 52.204-8 and DFARS 252.204-7007 ALT A, then the quoter need not submit the hardcopy Representations and Certifications.” Confirm that the quoter also need not submit an electronic copy of the Representations and Certifications if they are completed in SAM.

7A

CONFIRMED

8
Submission and Evaluation – II. Requirements for Quote Content
48 of 58
The solicitation states that the cover for each Volume should include “identification of original signature copies.” Since the submission is 100% electronic and only one copy of each Volume is required, what do offerors need to provide to satisfy this requirement?

8A

ORIGINAL COPIES REFERENCE REMOVED

9
Submission and Evaluation – III. Quote Content
48 of 58
In Volume I, the solicitation states that “quoters shall submit a single sheet containing the following information for up to three Past Performance (PP) references:…” Confirm that offerors can provide 1 page per PP reference (vs. including all three references on 1 page).

9A

NO, THE GOVERNMENT IS LOOKING FOR 1 SHEET WITH THE SPECIFIED CONTACT INFORMATION

10
Submission and Evaluation – III. Quote Content
48 of 58
Volume II – Price requires “the solicitation pricing pages completed by the quoter.” Confirm that the solicitation pricing pages are on solicitation pages 14-17 of 58.

10A

CONFIRMED; CDRL CLINS ARE NOT SEPERATELY PRICED

11
QASP – 3. Identification of Required Performance Standards
55 of 58
The table in QASP Section 3 – Identification of Required Performance Standards mentions Data Deliverable A002 – Monthly Planning Meeting Minutes and Data Deliverable A003 – Monthly Status Report. Those two CDRLs were not provided with the solicitation documents. Can the Government provide?

11A

PROVIDED AS ATTACHMENTS

12
QASP – 4. Methodologies to Monitor Performance
56 of 58
QASP Section 4 – Methodologies to Monitor Performance mentions a Monthly Status Report (A004) and Weekly Status Report (A005). These two CDRLs were not provided with the solicitation documents. Can the Government provide?

12A

REFERENCE TO A005 DELETED; MONTHLY STATUS REPORT IS NOW A003

I am wondering if this is a completely new requirement or is a contractor is performing this work? If the latter, are you able to provide the incumbent information: contractor name and contract number?

13A

THIS IS A FOLLOW-ON TO CONTRACT N00189-17-C-Z022; IRON ARCH TECHNOLOGY LLC IS THE CONTRACTOR

File details come from the government source that posted it.