QASP.docx
DOCX document 18 KB Posted
- Attached to
- MODULE SCREENING AND REPAIR ACTIVITY SUPPORT SERVICES Federal contract opportunity
- Solicitation number
- N0018918QG024
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N00189-18-Q-G024-0001.docx | DOCX document | |
| Attachments_18_11.docx | DOCX document | |
| N00189-18-Q-G024.docx | DOCX document | |
| DD_254.pdf | ||
| Click to Goto Solicitation | — |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE AND SURVEILLANCE PLAN (QASP)
NAVSUSBSUPPFAC NLON
MODULE SCREENING AND REPAIR ACTIVITY (MSRA)
N6831618RC013GR
1.0 PURPOSE
This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the Performance Based Service Contract (PBSC) standards included in this contract. The intent is to ensure that the Contractor performs in accordance with performance metrics set forth in the contract documents, that the Government receives the quality of services called for in the contract and that the Government only pays for the acceptable level of services received.
2.0 AUTHORITY
Authority for issuance of this QASP is provided under FAR 52.212-4(a), Inspection/Acceptance, which provides for inspections and acceptance of the articles, services, and documentation called for in the contract to be accomplished by the Contracting Officer or his duly authorized representative.
3.0 SCOPE
The Contractor, and not the Government, is responsible for management and quality control actions necessary to meet the quality standards set forth by the contract. The Quality Assurance Surveillance Plan (QASP) is put in place to provide Government surveillance oversight of the Contractor’s quality control efforts to assure that they are timely, effective and are delivering the results specified in the contract. The QASP is not a part of the contract nor is it intended to duplicate the Contractor’s Management Plan. The Government may provide the Contractor an information copy of the QASP as an Attachment to the solicitation to support the Contractor’s efforts in developing its plan for maintaining the levels of quality anticipated to be delivered under the terms of the contract.
4.0 GOVERNMENT RESOURCES
Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the Contractor receives impartial, fair, and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
Contracting Officer’s Representative (COR) - An individual designated in writing by the Contracting Officer to act as his authorized representative to assist in administering a contract. The source and authority for a COR is the Contracting Officer. COR limitations are contained in the written letter of appointment.
5.0 METHODS OF QA SURVEILLANCE
The below listed methods of surveillance shall be used in the administration of this QASP. The accompanying QASP Matrix describes the methods of surveillance that may be used to monitor the services and deliverables to be provided under the contract.
Substantiated Client Complaints – Client complaints (phone calls, personal contacts, letters, emails, etc.) of unreasonable service delays and unresponsive customer service provided by the MSRA Facility Contractor Personnel, which can be substantiated, will be investigated by the COR.
Weekly and Monthly Reports – Generated reports or work transactions to be submitted to the COR/ACOR on a regular basis. The COR will review the reports.
6.0 IDENTIFIED QA SURVEILLANCE ITEMS
The PBSC items that have been identified for surveillance are identified in the QASP Matrix.
7.0 DOCUMENTATION
The COR will maintain a complete Quality Assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function. All such records will be retained for the life of this contract. The COR shall forward these records to the Contracting Officer at termination or completion of the contract.
QUALITY ASSURANCE AND SURVEILLANCE PLAN (QASP) MATRIX
NAVSUSBSUPPFAC NLON MODULE SCREENING AND REPAIR ACTIVITY (MSRA) N6831613RC30009
Deliverable or Service Requirement
Measurement/Metric Performance Standard
| Acceptable Quality Level (AQL) |
| Method of |
Surveillance Procedures to be taken when performance standards are not met
PBSOW Paragraph
4.1 (Engineering Support) Completeness
| Troubleshooting of failed part. |
| 95% |
| Weekly/Monthly Reports. |
| FAR Clause 52.212-4(a) – Inspection/Acceptance and 52.212-4(m) – Termination for Cause |
PBSOW Paragraph
4.2 (Technical Support) Completeness
| Failed part repaired or replaced within 7 days (includes troubleshoot & issue) |
| 95% |
| Weekly/Monthly Reports. |
| FAR Clause 52.212-4(a) – Inspection/Acceptance and 52.212-4(m) – Termination for Cause |
PBSOW Paragraph
4.2 (Technical Support) Completeness
| QA of failed part repaired or replaced & government accepted for fleet use within 90 days (includes troubleshoot & issue) |
| 100% |
| Weekly/Monthly Reports. |
| FAR Clause 52.212-4(a) – Inspection/Acceptance and 52.212-4(m) – Termination for Cause |
PBSOW Paragraph
4.3 (Logistics Support) Completeness
| Spares | on-hand identified, retrieved, and issued to customer within 48 hrs. |
| 100% | |
| - Weekly/Monthly Reports. |
- Substantiated client complaints.
FAR Clause 52.212-4(a) – Inspection/Acceptance and 52.212-4(m) – Termination for Cause
File details come from the government source that posted it.