N00178-16-R-0001-0004.pdf
PDF 200 KB Posted
- Attached to
- AIRCRAFT COMPONENTS AND ACCESSORIES Federal contract opportunity
- Solicitation number
- N0017816R0001
About this file
MOD
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Att_J.2_Cost_Summary_Format_Fixed_Fee_Award_Term.xlsx | XLSX spreadsheet | |
| Attachment_J.4_Z17_RF_Amend_0004_Vendor_QA_Combined_Rev_2.xlsx | XLSX spreadsheet | |
| N00178-16-R-0001-0003.docx | DOCX document | |
| Attachment_J.4_Z17_RF_Amend_0002_Vendor_QA_Combined_Rev_1_02012016.xlsx | XLSX spreadsheet | |
| Attachment_J.4_Z17_RF_Amend_0002_Vendor_QA_Combined_011916.xlsx | XLSX spreadsheet | |
| Attachment_J.3_-_Staffing_Matrix.xlsx | XLSX spreadsheet | |
| N00178-16-R-0001_Amend_0002.docx | DOCX document | |
| Attachment_J.2_-_Cost_Summary_Format.xls | XLS spreadsheet | |
| Exhibit_A_N00178-16-R-0001_CDRLs_updated_11-17-2015.pdf | ||
| N00178-16-R-0001_Z17_SOLICITATION.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purposes of this Solicitation Amendment are to:
1) Extend the proposal due date from February 12, 2016 to February 19, 2016.
2) Replace Attachment J.2 in Section J w ith Attachment J.2 NEW, replacing original Attachment J.2 entirely.
3) Update Attachment J.4 Rev 1 in Section J w ith Attachment J.4 Rev 2, adding 4 additional questions and answ ers to the industry combined Question & Answ ers.
4) Update Section L of the Solicitation to incorporate chnages in accordance w ith the Q&A. Specif ically L.4.3 has been updated.
1. CONTRACT ID CODE PAGE OF PAGES
1 26
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Feb-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00178-16-R-0001
X 9B. DATED (SEE ITEM 11)
18-Dec-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Feb-2016
CODE
NSWCDD
ATTN: SHEILA BALLARD
CS 024
17632 DAHLGREN RD, STE 104
DAHLGREN VA 22448-5110
N00178 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N00178-16-R-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
Ddl-J10 LIST OF ATTACHMENTS
Exhibit A – Contract Data Requirements List, DD1423
Attachment J.1 – Contracting Officer’s Representative Appointment Letter
Attachment J.2 - Cost Summary Formant NEW
Attachment J.3 - Staffing Matix
Attachment J.4 – Questions and Answers Rev 2
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
SECTION L
SECTION L.1 GENERAL
CLAUSES INCORPORATED BY REFERENCE
52.215-16 FACILITIES CAPITAL COST OF MONEY (JUN 2003)
52.222-24 PREAWARD ON-SITE EQUAL OPPORTUNITY COMPLIANCE EVALUATION (FEB 1999)
52.247-6 FINANCIAL STATEMENT (APR 1984)
CLAUSES INCORPORATED BY FULL TEXT
52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY
PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)
Any contract awarded as a result of this solicitation will be a DO rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR 700), and the Contractor will be required to follow all of the requirements of this regulation.
52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2004)
(a) Definitions. As used in this provision--
“Discussions” are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer's discretion, result in the Offeror being allowed to revise its proposal.
“In writing or written” means any worded or numbered expression which can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.
“Proposal modification” is a change made to a proposal before the solicitation's closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.
“Proposal revision” is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.
“Time”, if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.
(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).
(c) Submission, modification, revision, and withdrawal of proposals. (1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and (ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the Offeror.
Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs (c) (1) (i) and (c) (1) (ii) of this provision.
(2) The first page of the proposal must show--
(i) The solicitation number;
(ii) The name, address, and telephone and facsimile numbers of the Offeror (and electronic address if available);
(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;
(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the Offeror's behalf with the Government in connection with this solicitation; and
(v) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office.
(3) Submission, modification, or revision, of proposals.
(i) Offerors are responsible for submitting proposals, and any modifications, or revisions, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.
(ii)(A) Any proposal, modification, or revision received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and--
(1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or
(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or
(3) It is the only proposal received.
(B) However, a late modification of an otherwise successful proposal that makes its terms more favorable to the Government will be considered at any time it is received and may be accepted.
(iii) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(iv) If an emergency or unanticipated event interrupts normal Government processes so that proposals cannot be received at the office designated for receipt of proposals by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(v) Proposals may be withdrawn by written notice received at any time before award. Oral proposals in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile proposals, proposals may be withdrawn via facsimile received at any time before award, subject to the conditions specified in the provision at 52.215-5, Facsimile Proposals. Proposals may be withdrawn in person by an Offeror or an authorized representative, if the identity of the person requesting withdrawal is established and the person signs a receipt for the proposal before award.
(4) Unless otherwise specified in the solicitation, the Offeror may propose to provide any item or combination of items.
(5) Offerors shall submit proposals in response to this solicitation in English, unless otherwise permitted by the solicitation, and in U.S. dollars, unless the provision at FAR 52.225-17, Evaluation of Foreign Currency Offers, is included in the solicitation.
(6) Offerors may submit modifications to their proposals at any time before the solicitation closing date and time, and may submit modifications in response to an amendment, or to correct a mistake at any time before award.
(7) Offerors may submit revised proposals only if requested or allowed by the Contracting Officer.
(8) Proposals may be withdrawn at any time before award. Withdrawals are effective upon receipt of notice by the Contracting Officer.
(d) Offer expiration date. Proposals in response to this solicitation will be valid for the number of days specified on the solicitation cover sheet (unless a different period is proposed by the Offeror).
(e) Restriction on disclosure and use of data. Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, shall--
(1) Mark the title page with the following legend: This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed--in whole or in part--for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this Offeror as a result of--or in connection with-- the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government's right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets]; and
(2) Mark each sheet of data it wishes to restrict with the following legend: Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
(f) Contract award. (1) The Government intends to award a contract or contracts resulting from this solicitation to the responsible Offeror(s) whose proposal(s) represents the best value after evaluation in accordance with the factors and sub-factors in the solicitation.
(2) The Government may reject any or all proposals if such action is in the Government's interest.
(3) The Government may waive informalities and minor irregularities in proposals received.
(4) The Government intends to evaluate proposals and award a contract without discussions with Offerors (except clarifications as described in FAR 15.306(a)). Therefore, the Offeror’s initial proposal should contain the Offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
(5) The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit cost or prices offered, unless the Offeror specifies otherwise in the proposal.
(6) The Government reserves the right to make multiple awards if, after considering the additional administrative costs, it is in the Government’s best interest to do so.
(7) Exchanges with Offerors after receipt of a proposal do not constitute a rejection or counteroffer by the Government.
(8) The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or sub-line items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.
(9) If a cost realism analysis is performed, cost realism may be considered by the source selection authority in evaluating performance or schedule risk.
(10) A written award or acceptance of proposal mailed or otherwise furnished to the successful Offeror within the time specified in the proposal shall result in a binding contract without further action by either party.
(11) If a post-award debriefing is given to requesting Offerors, the Government shall disclose the following information, if applicable:
(i) The agency's evaluation of the significant weak or deficient factors in the debriefed Offeror’s offer.
(ii) The overall evaluated cost or price and technical rating of the successful and the debriefed Offeror and past performance information on the debriefed Offeror.
(iii) The overall ranking of all Offerors, when any ranking was developed by the agency during source selection.
(iv) A summary of the rationale for award.
(v) For acquisitions of commercial items, the make and model of the item to be delivered by the successful Offeror.
(vi) Reasonable responses to relevant questions posed by the debriefed Offeror as to whether source-selection procedures set forth in the solicitation, applicable regulations, and other applicable authorities were followed by the agency.
(End of provision)
52.215-20 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER
THAN CERTIFIED COST OR PRICING DATA (OCT 2010)
(a) Exceptions from certified cost or pricing data.
(1) In lieu of submitting certified cost or pricing data, Offerors may submit a written request for exception by submitting the information described in the following subparagraphs. The Contracting Officer may require additional supporting information, but only to the extent necessary to determine whether an exception should be granted, and whether the price is fair and reasonable.
(i) Identification of the law or regulation establishing the price offered. If the price is controlled under law by periodic rulings, reviews, or similar actions of a governmental body, attach a copy of the controlling document, unless it was previously submitted to the contracting office.
(ii) Commercial item exception. For a commercial item exception, the Offeror shall submit, at minimum, information on prices at which the same item or similar items have previously been sold in the commercial market that is adequate for evaluating the reasonableness of the price for this acquisition. Such information may include –
(A) For catalog items, a copy of or identification of the catalog and its date, or the appropriate pages for the offered items, or a statement that the catalog is on file in the buying office to which the proposal is being submitted.
Provide a copy or describe current discount policies and price lists (published or unpublished), e.g., wholesale, original equipment manufacturer, or reseller. Also explain the basis of each offered price and its relationship to the established catalog price, including how the proposed price relates to the price of recent sales in quantities similar to the proposed quantities;
(B) For market-priced items, the source and date or period of the market quotation or other basis for market price, the base amount, and applicable discounts. In addition, describe the nature of the market;
(C) For items included on an active Federal Supply Service Multiple Award Schedule contract, proof that an exception has been granted for the schedule item.
(2) The Offeror grants the Contracting Officer or an authorized representative the right to examine, at any time before award, books, records, documents, or other directly pertinent records to verify any request for an exception under this provision, and the reasonableness of price. For items priced using catalog or market prices, or law or regulation, access does not extend to cost or profit information or other data relevant solely to the Offeror’s determination of the prices to be offered in the catalog or marketplace.
(b) Requirements for certified cost or pricing data. If the Offeror is not granted an exception from the requirement to submit certified cost or pricing data, the following applies:
(1) The Offeror shall prepare and submit certified cost or pricing data, and data other than certified cost or pricing data, and supporting attachments in accordance with the instructions contained in Table 15-2 of FAR 15.408, which is incorporated by reference with the same force and effect as though it were inserted here in full text. The instructions in Table 15-2 are incorporated as a mandatory format to be used in this contract, unless the Contracting Officer and the Contractor agree to a different format and change this clause to use Alternate I.
(2) As soon as practicable after agreement on price, but before contract award (except for un-priced actions such as letter contracts), the Offeror shall submit a Certificate of Current Cost or Pricing Data, as prescribed by FAR 15.406-2.
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firmed fixed Price IDIQ with Cost-Plus-Fixed-Fee (CPFF) and FFP Delivery Orders for Labor CLINs and Cost only for ODC. This order is a Level of Effort type Contract. The resultant order will have a Period of Performance of 60 Months for a total of five (5) years from April 2016 through April 2021. See Section F, Deliveries or Performance.
(End of provision)
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from Contracting Officer Amy Richards at NSWC, DAHLGREN DIVISION, 17632 DAHLGREN ROAD SUITE 157, DAHLGREN, VA 22448-5110.
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.237-10 IDENTIFICATION OF UNCOMPENSATED OVERTIME (Mar 2015)
(a) Definitions. As used in this provision -- “Adjusted hourly rate (including uncompensated overtime)” is the rate that results from multiplying the hourly rate for a 40-hour work week by 40, and then dividing by the proposed hours per week which includes uncompensated overtime hours over and above the standard 40-hour work week. For example, 45 hours proposed on a 40-hour work week basis at $20 per hour would be converted to an uncompensated overtime rate of $17.78 per hour ($20.00 x 40 divided by 45 = $17.78).
“Uncompensated overtime” means the hours worked without additional compensation in excess of an average of 40 hours per week by direct charge employees who are exempt from the Fair Labor Standards Act. Compensated personal absences such as holidays, vacations, and sick leave shall be included in the normal work week for purposes of computing uncompensated overtime hours.
(b)
(1) Whenever there is uncompensated overtime, the adjusted hourly rate (including uncompensated overtime), rather than the hourly rate, shall be applied to all proposed hours, whether regular or overtime hours.
(2) All proposed labor hours subject to the adjusted hourly rate (including uncompensated overtime) shall be identified as either regular or overtime hours, by labor categories, and described at the same level of detail. This is applicable to all proposals whether the labor hours are at the prime or subcontract level. This includes uncompensated overtime hours that are in indirect cost pools for personnel whose regular hours are normally charged direct.
(a) The Offeror’s accounting practices used to estimate uncompensated overtime must be consistent with its cost accounting practices used to accumulate and report uncompensated overtime hours.
(b) Proposals that include unrealistically low labor rates, or that do not otherwise demonstrate cost realism, will be considered in a risk assessment and will be evaluated for award in accordance with that assessment.
(c) The Offeror shall include a copy of its policy addressing uncompensated overtime with its proposal.
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The Offeror is cautioned that the listed provisions may include blocks that must be completed by the Offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the Offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address (es):
HTTP://FARSITE.HILL.AF.MIL
252.215-7008 ONLY ONE OFFER (OCT 2013)
(a) After initial submission of offers, the Offeror agrees to submit any subsequently requested additional cost or pricing data if the Contracting Officer notifies the Offeror that –
(1) Only one offer was received; and
(2) Additional cost or pricing data is required in order to determine whether the price is fair and reasonable or to comply with the statutory requirement for certified cost or pricing data (10 U.S.C. 2306a and FAR 15.403-3).
(b) Requirement for submission of additional cost or pricing data. Except as provided in paragraph (c) of this provision, the Offeror shall submit additional cost or pricing data as follows:
(1) If the Contracting Officer notifies the Offeror that additional cost or pricing data are required in accordance with paragraph (a) of this clause, the data shall be certified unless an exception applies (FAR 15.403-1(b)).
(2) Exceptions from certified cost or pricing data. In lieu of submitting certified cost or pricing data, the Offeror may submit a written request for exception by submitting the information described in the following paragraphs. The Contracting Officer may require additional supporting information, but only to the extent necessary to determine whether an exception should be granted, and whether the price is fair and reasonable.
(i) Identification of the law or regulation establishing the price offered. If the price is controlled under law by periodic rulings, reviews, or similar actions of a governmental body, attach a copy of the controlling document, unless it was previously submitted to the contracting office.
(ii) Commercial item exception. For a commercial item exception, the Offeror shall submit, at a minimum, information on prices at which the same item or/ similar items have previously been sold in the http://farsite.hill.af.mil/ commercial market that is adequate for evaluating the reasonableness of the price for this acquisition.
Such information may include—
(A) For catalog items, a copy of or identification of the catalog and its date, or the appropriate pages for the offered items, or a statement that the catalog is on file in the buying office to which the proposal is being submitted.
Provide a copy or describe current discount policies and price lists (published or unpublished), e.g., wholesale, original equipment manufacturer, or reseller. Also explain the basis of each offered price and its relationship to the established catalog price, including how the proposed price relates to the price of recent sales in quantities similar to the proposed quantities;
(B) For market-priced items, the source and date or period of the market quotation or other basis for market price, the base amount, and applicable discounts. In addition, describe the nature of the market; or
(C) For items included on an active Federal Supply Service Multiple Award Schedule contract, proof that an exception has been granted for the schedule item.
(3) The Offeror grants the Contracting Officer or an authorized representative the right to examine, at any time before award, books, records, documents, or other directly pertinent records to verify any request for an exception under this provision, and the reasonableness of price. For items priced using catalog or market prices, or law or regulation, access does not extend to cost or profit information or other data relevant solely to the Offeror’s determination of the prices to be offered in the catalog or marketplace.
(4) Requirements for certified cost or pricing data. If the Offeror is not granted an exception from the requirement to submit certified cost or pricing data, the following applies:
(i) The Offeror shall prepare and submit certified cost or pricing data and supporting attachments in accordance with the instructions contained in Table 15-2 of FAR 15.408, which is incorporated by reference with the same force and effect as though it were inserted here in full text. The instructions in Table 15-2 are incorporated as a mandatory format to be used, unless the Contracting Officer and the Offeror agree to a different format.
(ii) As soon as practicable after agreement on price, but before contract award (except for un-priced actions such as letter contracts), the Offeror shall submit a Certificate of Current Cost or Pricing Data, as prescribed by FAR 15.406-2.
(c) If the Offeror is the Canadian Commercial Corporation, certified cost or pricing data are not required. If the Contracting Officer notifies the Canadian Commercial Corporation that additional data other than certified cost or pricing data are required in accordance with 225.870-4(c), the Canadian Commercial Corporation shall obtain and provide the following:
(1) Profit rate or fee (as applicable).
(2) Analysis provided by Public Works and Government Services Canada to the Canadian Commercial Corporation to determine a fair and reasonable price (comparable to the analysis required at FAR 15.404- 1).
(3) Data other than certified cost or pricing data necessary to permit a determination by the U.S. Contracting Officer that the proposed price is fair and reasonable [U.S. Contracting Officer to provide description of the data required in accordance with FAR 15.403-3(a)(1) with the notification.
(4) As specified in FAR 15.403-3(a) (4), an Offeror who does not comply with a requirement to submit data that the U.S. Contracting Officer has deemed necessary to determine price reasonableness or cost realism is ineligible for award unless the head of the contracting activity determines that it is in the best interest of the Government to make the award to that Offeror.
(a) If negotiations are conducted, the negotiated price should not exceed the offered price.
HQ L-2-0005 NOTIFICATION OF POTENTIAL ORGANIZATIONAL CONFLICT(S) OF INTEREST
(NAVSEA) (JUN 1994)
(a) Offerors are reminded that certain existing contractual arrangements may preclude, restrict or limit participation, in whole or in part, as either a subcontractor or as a prime contractor under this competitive procurement. Of primary concern are those contractual arrangements in which the Offeror provides support to testing or evaluating devices or equipment in which the Offeror has an interest, or related laboratories (if applicable), in support of operation of the office or any of its programs. General guidance may be found in FAR 9.505; however, this guidance is not all inclusive. The Offeror's attention is directed to the "Organizational Conflict of Interest" (or similar) requirement which may be contained in current or completed contract(s) which prohibits the prime or subcontractor from providing certain supplies or services to the Government as described above during the period of the current "support" contract(s) or for a period after completion of the "support" contract(s). Notwithstanding the existence or non-existence of an Organizational Conflict of Interest (OCI) clause or similar requirement in current or completed contract(s), the Offeror shall comply with FAR 9.5 and identify whether an OCI exists and not rely solely on the presence of an OCI requirement.
(b) If a potential conflict of interest exists at any tier, each potential prime Offeror is requested to notify the Contracting Officer within 14 days of the date of this solicitation. The Offeror shall provide: (1) the contract number and name and phone number of the Contracting Officer for the contract which gives rise to a potential organizational conflict of interest; (2) a copy of the requirement; (3) the statement of work (or technical instruction) from the existing contract; (4) a brief description of the type of work to be performed by each subcontractor under the competitive procurement; and (5) any additional information the Contracting Officer should consider in making a determination of whether a conflict of interest exists. The Government may independently verify the information received from the Offeror. Notwithstanding the above, the Government reserves the right to determine whether a conflict of interest exists based on any information received from any source.
(c) The Government will notify an Offeror of any conflict of interest within 14 days of receipt of all required information. Those Offerors deemed to have a conflict of interest may be ineligible for award. Failure to provide the information in a timely manner does not waive the Government's rights to make a conflict of interest determination. The Offeror is notified that if it expends time and money on proposal preparation, such expenditure is at its own risk that the Government will not determine that an organizational conflict of interest exists.
(d) Any potential prime contractor which proposes a subcontractor later determined to have a conflict of interest and deemed ineligible to participate in the current competition, may not be granted the opportunity to revise its proposal to remove the ineligible subcontractor. The Government reserves the right to determine which Offerors remain in the competitive range through the normal source selection process.
(e) If the Offeror determines that a potential organizational conflict of interest does not exist at any tier, the Offeror shall include a statement to that effect in its response to this solicitation.
(End of Provision)
HQ L-2-0010 SUBSTITION OF PREVIOUSLY APPROVED SINGLE PROCESS INITIATIVE (NAVSEA)
(May 1998) Your proposal shall identify where you are substituting your previously approved Single Process Initiative (SPI) processes for specified requirements. In addition, Offerors should provide the information required by DFARS 252.211-7005, paragraph (c).
Ddl-L10 PROPOSAL PREPARATION REQUIREMENTS
Offerors are required to prepare their proposals in accordance with the following organization, content and format.
(a) SOLICITATION, OFFER AND AWARD DOCUMENTS (SF 33 - RFP)
(1) This document, which may be used as part of the contract award document, shall be fully executed and returned as a separate document from the technical/management and cost proposals. Special attention should be taken to accurately enter the prices required in Section B, complete the fill-ins in Section(s) [ ], complete all Representations and Certifications in Section K and ensure that an authorized person signs the offer in Block 17 of Page 1. This document shall not be embellished with any covers or binding.
(2) Offerors are encouraged not to take exceptions to this solicitation, however, any exceptions taken to the specifications, or terms and conditions of this solicitation shall be identified in a cover letter and explained in detail in the appropriate section of the technical proposal.
(b) TECHNICAL PROPOSAL
(1) The technical proposal shall not contain any reference to cost and shall be prepared in accordance with the following guidelines and the TECHNICAL PROPOSAL specific requirements below.
(2) The technical proposal should be written so that management and engineering oriented personnel can make a thorough evaluation and arrive at a sound determination as to whether the proposal meets the requirements of this solicitation. To this end, the proposal shall be as specific, detailed and complete as to clearly and fully demonstrate that the prospective contractor has a thorough understanding of the technical requirements contained in Section C of this solicitation. The technical proposal shall not exceed 70 pages in its discussion of management, technical, corporate experience, personnel and facilities, except that additional pages will be allowed for resumes and matrices (should not exceed 20 pages).
(3) Statements such as "the Offeror understands", "will comply with the statement of work," "standard procedures will be employed"; "well known techniques will be used" and general paraphrasing of the statement of work are considered inadequate. The technical proposal must provide details concerning what the contractor will do and how it will be done. This includes a full explanation of the techniques, disciplines, and procedures proposed to be followed.
(4) Unnecessarily elaborate brochures or other presentations beyond that sufficient to present a complete and effective proposal are not desired and may be construed as an indication of the Offeror's lack of cost consciousness.
Elaborate art work, expensive paper and bindings, or expensive visual and other presentation aids are neither necessary nor desired.
(5) In the event any portion of the technical proposal is written by anyone who is not a bona fide employee of the firm submitting the proposal, a certificate to this effect shall be furnished. It must be signed by a responsible officer of the Offeror and shall show the author's name, employment capacity, the name of the person's firm, the relationship of that firm to the Offeror’s, and the portion of the technical proposal he/she wrote.
(6) Technical information previously submitted, if any, may not be considered by the Government; hence, any such information should not be relied upon or incorporated in the technical proposal by reference.
(c) COST OR PRICE PROPOSAL The cost proposal shall provide full supporting detail for the prices listed in Section B of the proposal and shall be prepared in accordance with the COST PROPOSAL specific requirements listed below.
(d) MARKING OF PROPOSALS Proposals shall be submitted as separate volumes, as follows:
Original Copies Volume I, Solicitation, Offer and Award (SF 33) 1 1 Volume II, Technical Proposal 1 1 Volume III, Cost or Price Proposal 1 1
The original of each volume shall be clearly identified as the "ORIGINAL" and bear original signatures. The copies shall be complete and clearly identified as "COPY."
SECTION L.2 ORGANIZATION & MINIMUM CONTENT OF WRITTEN PROPOSAL
L.2.1 OFFER (WRITTEN)
The completion and submission to the Government of an offer shall indicate the Offeror’s unconditional agreement to the terms and conditions in this solicitation. All pages of the Written Proposal and Cost Proposal shall be numbered and a Table of Contents provided for each. The offer consists of and must include the following:
Cover Letter The proposal shall include a cover letter that identifies all enclosures being transmitted as part of the proposal. The letter shall reference the solicitation number and acknowledge that it transmits an offer in response to the solicitation. It shall state proposal validity through JUNE 6, 2016 and shall include identification of any exceptions taken to the terms and conditions of the solicitation.
Section B Offerors shall complete all pricing (including estimated cost and fee) IN WHOLE DOLLARS only (no cents). (Offerors should perform a quality check between the values entered in Section B and the values provided in their summary spreadsheets to ensure consistency between the values provided.)
At the time of award, the number of labor hours listed in Section B, 0.0 LH will be changed to coincide with the Level of Effort provided in Section H, 5252.216-9122 Level of Effort clauses and the number of hours reflected in the cost proposal of the successful Offeror. Price for NSP items shall be included in the price of Labor CLIN(s).
Offeror shall propose $0.00 for this Line Item.
Section C: The Offeror shall certify compliance with the Organizational Conflict of Interest Clause in Section C or present an acceptable plan to neutralize any actual or perceived organizational conflict of interest. The certification and/or mitigation plan shall cover all team members. If the Offeror submits an OCI Mitigation Plan, the following shall be addressed, as a minimum, as applicable: roles and responsibilities; physical, organizational and/or electronic separation; non-disclosure agreements; OCI training and debriefing statements; restrictions on personnel assigned/transfers; data/documentation separation and control; soft copy documentation control; corporate and Government reviews; records control; prime contractor flow-down policy to subcontractors/consultants; and recusal from specific tasks for specific team members.
Section H Offerors shall complete the clause 5252.216-9122 Level of Effort – Alternate 1 as instructed (a, b, and d), separately identifying compensated and uncompensated hours (inclusive of prime, subcontractors, and consultants).
Section K Offerors shall complete the Representations and Certifications as instructed in Section K- Representations, Certifications and other Statements of Offerors.
Contractor Responsibility: Per FAR 9.104, before a Contracting Officer can sign a contract, a determination must be made that the prospective contractor is responsible with respect to that contract. The Offeror shall provide documentation which supports the fact that the prospective contractor meets the following responsibility standards:
1. Adequate financial resources to perform the contract.
2. Ability to comply with required or proposed delivery schedule, taking into consideration all existing commercial and government business commitments.
3. Satisfactory performance record.
4. Satisfactory record of integrity and business ethics.
5. Necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them to perform this contract.
6. Necessary production, construction, and technical equipment and facilities or the ability to obtain them.
7. Is otherwise qualified and eligible to receive an award under applicable laws and regulations.
L.2.2 MANDATORY REQUIREMENTS
Offerors must meet all mandatory requirements or provide a written plan detailing the necessary steps and the timeline to be taken in order to meet them by time of award. In addition, mandatory requirements must be maintained throughout the life of the Task Order. The mandatory requirements are as follows:
Requirement 1: Facility Location The Offeror’s primary facility providing technical support to this contract must be located within 60 miles of Dahlgren, VA.
Requirement 2: Quality Assurance Requirements:
The Offeror must meet the Quality Assurance Requirements (QAR) as stated in Section C of the Performance Work Statement, which includes being ISO9001-2008 certified.
Ddl-L25 TECHNICAL PROPOSAL – SPECIFIC REQUIREMENTS – TECHNICAL AND
MANAGEMENT UNDERSTANDING/CAPABILITY
(a) Offerors shall demonstrate their Technical and Management understanding and capability for this requirement.
Offerors must clearly demonstrate an understanding of Navy policies and procedures and all requirements covered in the RFP. The proposal must be specific, detailed, and complete. The Offeror shall clearly demonstrate that he has a thorough comprehension of the Navy’s requirement, has the technical capability and competence to fully perform the requirements described in the statement of work, and has the management resources and expertise to successfully carry out a contract of this type. Previously submitted data or prior experience presumed to be known to the Government (e.g., previous contracts performed for the Government) should not be relied upon by the Offeror.
(b) The overall quality of the proposal will be evaluated in the context of being representative of the Offeror’s capabilities. Superfluous material or material which is not directly related to this acquisition should not be presented. The proposal must provide details concerning what the contractor will do and how it will be done. This includes a full explanation of the techniques, disciplines, resources and procedures proposed to be used and followed.
(c) Organization and Minimum Content of the Proposal – In order to facilitate evaluation, it is desired that the proposal be structured into two primary components: Technical and Management:
(1) Technical Understanding/Capability – The Offeror shall demonstrate his understanding of the requirements for and technical capability to accomplish tasking under this contract by providing his approach to the following:
(i) The methodologies and processes they would use,
(ii) The products they would produce,
(iii) The resources and personnel skill areas they would employ,
(iv) The rapid prototyping and manufacturing capabilities that would be employed and whether these capabilitities exist in-house or how these capabilities would be provided,
(v) The quality assurance processes and procedures to be used,
(vi) The manufacturing standards and processes they would employ,
(vii) Their approach to use of Government and contractor facilities to accomplish the work,
(viii) Previous experience in similar or related work areas, and
(ix) Any other information to demonstrate its ability to accomplish the tasking.
(2) Management – The Offeror shall demonstrate their management capability by presenting a Management Approach which shall include as a minimum, the following:
(i) A description of the management and administrative organization available or to be established for the supervision and assurance of expeditious and economical performance of the services required, including a sample work structure chart by job classification and code. Include an organization chart which shows the planned location of this work effort within the Offeror’s organization and the relationship to and location of the organizational unit responsible for contract/delivery order negotiation and administration.
(ii) Description of the Program Manager’s authority and responsibilities.
(iii) Names, organizational location, and individual responsibilities for managerial and key personnel proposed for liaison and contract management.
(iv) Management approach and process to ensure that the services provided under the contract remain non-personal in nature.
(v) Understanding of the progress reporting, invoicing, and delivery order proposal requirements of the solicitation including the ability to comply with the requirements. Specifically address the requirements to invoice at the sub-line item and ACRN level where multiple accounting classification citations have been provided.
(vi) Identification of the planned utilization of financial and administrative management controls and processes to manage and control resources. The proposed use of any automated tools shall be included. Direct and indirect cost containment initiatives shall be addressed.
(vii) Corporate Resources – Information as to the numbers and types of personnel currently employed on a permanent basis and available during peak load periods on a temporary basis. Identify local and corporate facility and equipment resources that will be used to support orders issued under this contract. Of specific interest are facility location and size, rapid prototyping and tooling capabilities, manufacturing and fabrication facilities, and computer hardware and software resources. Identify specific requirements for Government Furnished Equipment
(GFE).
(viii) Internal Control/QA Process – Provide a detailed description of the internal control processes to ensure the quality and timeliness of all services performed as well as CDRL items delivered and all hardware items delivered.
(ix) Transition Plan – Of specific interest are the areas of personnel and work product quality. Offerors should address their overall transition schedule; how their technical and contract administration interface with NSWCDD will be established; how they will assume responsibility for support of current programs without discontinuity of work flow or loss of integrity of the program’s current operation; and what services, support, or other items will be required from the Government to facilitate the transition. Discuss the amount of time required from notification of contract award to establish a capability of assuming complete responsibility for furnishing all services to be accomplished under the proposed contract.
(x) Subcontractor Control – If direct subcontracting is proposed, Offerors shall address their policies and practices regarding the overall management of efforts performed by subcontractors. Of specific interest are the procedures to be followed in identifying specific work areas to be subcontracted and the length of time at the delivery order level to initiate subcontractor performance. Also of interest are the Offeror’s procedures for ensuring the quality of services performed and deliverables provided by subcontractors.
L.2.3 TECHNICAL UNDERSTANDING/CAPABILITY/APPROACH (FACTOR 1)
L.2.3.1 TECHNICAL UNDERSTANDING AND APPROACH
Statement of Work (Factor 1, Sub-factor 1)
The Offeror shall address their technical approach and capability to support the requirements described in the SOW found in Section C. If subcontracting or teaming is proposed, the Offeror shall state the specific requirement portions of the SOW that each subcontractor/consultant or team member will perform and the technical reason(s) for selection of each subcontractor/team member. The Offeror shall clearly define the manufacturing standards that will be used to accomplish the SOW requirements.
Scenarios (Factor 1, Sub-factor 2)
Scenario 1:
A new requirement has been received to deliver an electronic device capable of being installed on a U.S. Navy aircraft. It must function as required and cause no degradation to the electronic equipment of the aircraft. Detail your processes as to the design, documentation, fabrication, quality control, testing, and configuration management of the product. Include discussion on any specifications, standards, and certifications required for this action.
Scenario 2:
A new Maritime Vessel Disablement (MDO) requirement has been received to deliver a vessel disablement system capable of being integrated onto a combatant craft and effective against a new vessel threat. The system must function as required and cause no loss of the multi-mission capabilities of the combatant craft.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .