Amendment 1 - N0017423Q0021.A1.pdf

PDF 376 KB Posted

Attached to
Large Rocket Motor Manipulator for Non-Destructive Testing Federal contract opportunity
Solicitation number
N0017423Q0021
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document is an amendment to a solicitation for a large rocket motor manipulator for non-destructive testing. The Naval Surface Warfare Center, Indian Head Division requires a replacement manipulator to support rocket motors of various sizes during x-ray inspection. The amendment responds to vendor questions by clarifying that while other motion control software may be considered, the vendor must provide the ability for full government access and control of the software in LabVIEW. The submission due date was also changed to May 5, 2023. The solicitation seeks a single firm-fixed-price contract for the manipulator and is open to all offerors registered in the System for Award Management under NAICS code 334517 for measuring, detecting, and navigating instruments.

View the file

Other files for this federal contract opportunity

Other files attached to Large Rocket Motor Manipulator for Non-Destructive Testing, newest first.
File Type Posted
Exhibit A. CDRLs A001-A005.pdf PDF
N0017423Q0021.pdf PDF
Attachment 1 Rocket Motor Manipulator Drawings.pdf PDF
Attachment 2PastPerformanceMatrixr.doc DOC document
Attachment-3_Past_Performance_Questionnaire.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This modif ication is being issued to respond to vendor Request for Information(RFI): The Government has provided answ ers for questions regarding the solicitation.

Solicitation Due Date corrected to match SAM.gov posting 5/5/2023. This is the correct date of the original posting and not an extension.

All other items remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-May-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N0017423Q0021

X 9B. DATED (SEE ITEM 11)

18-Apr-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-May-2023

CODE

NSWC IHD C02

4081 N. JACKSON RD

BLDG 841

INDIAN HEAD MD 20640-5116

N00174 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0017423Q0021

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 03-May-2023 02:00 PM to 05-May-2023 02:00 PM.

The following have been added by full text:

RFIS

Request for Information Question:

In reference to requirement 2.2.1. Motion control software shall be provided in Labview with all source code provided. Clarify the requirement that motion control must be done through Labview. Would NSWC consider performing motion control through other Vi3 software?

Answer:

We want the ability to have full access and control for the motion control software in order to make changes as needed. We will need to be able to adapt to new product line in the future, so having this access and control to the software allows us to be adaptable to new future demands. Other software can be used, but we would still need a version that is in Labview along with the other software provided. So the vendor would have to provide both in that case.

The following have been modified:

LIST OF ATTACHMENTS

Exhibits and Attachments:

Exhibit A:

CDRL: A001- A005

Attachments:

Attachment 1: Reference Drawings Attachment 2: Past Performance Matrix Attachment 3: Past Performance Questionairre Attachment 4: Amendment 1 – RFIs

(End of Summary of Changes)

File details come from the government source that posted it. Updated .