Solicitation CLIN list.pdf

PDF 96 KB Posted

Attached to
NetApp Storage Application Network Federal contract opportunity
Solicitation number
N00173-20-R-TL02
Issued by
Department of the Navy Secretary of the Navy Office of Naval Research

View the file

Other files for this federal contract opportunity

Other files attached to NetApp Storage Application Network, newest first.
File Type Posted
CSS N00173-20-R-TL02.pdf PDF
Redacted Brand Name J&A.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STORAGE AREA NETWORK (SAN)

Statement of Work / Specifications Page 1 of 3

BRAND NAME NETAPP PRODUCTS

CLIN MFG PART # PRODUCT DESCRIPTION QTY

NetApp AFF-A300

0001 AFF-A300-24X3.8 NETAPP ALL FLASH BUNDLE TO INCLUDE: 1

0001AA AFF-A300A-001 AFF A300 HA System, FlashBundle 2 0001AB SW-2-A300A-NVE-C SW, Data at Rest Encryption Enabled,A300A,-C 2 0001 AC SW-2-A300A-TPM-C SW, Trusted Platform Module Enabled,A300A,-C 2 0001 AD X1143A-R6-C ADPT 2-Pt UTA2,10GbE,16Gb FC BareCage SFP+,-C 2 0001 AE X2071A-C HBA,4-Port HD-miniSAS,12Gb,PCIe,-C 2 0001 AF X6566B-05-R6-C Cable, Direct Attach CU SFP+ 10G,0.5M,-C 4 0001 AG X6566B-3-R6-C Cable, Direct Attach CU SFP+ 10G,3M,-C 8 0001 AH X-SFP-H10GB-CU3M-R6-C Cable, Cisco 10GBase Copper SFP+ 3m,-C 12 0001 AI X6235-C Chassis,FAS8200,AFF-A300,AC PS,-C 1 0001 AJ DS224C-SL-3.8-24S-2P-C SSD Shelf,12G,24x3.8TB,2P,-C 1 0001 AK DOC-AFF-A300-C Documents,AFF-A300,-C 1 0001 AL X1985-R6-C 12-Node Cluster Cable Label Kit,-C 1 0001 AM X-02659-00-C Rail Kit,4-Post,Rnd/Sq-Hole,Adj,24-32,-C 2 0001 AN X800-42U-R6-C Power Cable,In-Cabinet,C13-C14,-C 8 0001 AO DATA-AT-REST-ENCRYPTION Data at Rest Encryption Capable Operating Sys 2 0001 AP ALL-FLASH-OPTIMIZED Optimized SSD Personality 1 0001 AQ X1960-R6-C Cluster Switch,Interconnect,16Pt,10Gb,-C,PTSX 2 0001 AR SW-FLASH-BUNDLE-2P-C ONTAP,Per-0.1TB,FlashBundle,Ult-Perf,2P,-C 912 0001 AS X66031A-C Cable,12Gb,Mini SAS HD,1m,-C 4 0001 AT CS-SEC-4D SE Secure,7x24,4hr Parts Delivery - 36 Months 1 0001 AU CS-NRD2-E Non Returnable Disk Plus,e - 36 Months 1 0001 AV SW-2-CL-BASE SW-2,Base,CL,Node 1

0002 AFF-A300-NRL-12X3.8 NETAPP ALL FLASH BUNDLE TO INCLUDE: 1

0002AA AFF-A300A-001 AFF A300 HA System, FlashBundle 2 0002AB SW-2-A300A-NVE-C SW, Data at Rest Encryption Enabled,A300A,-C 2 0002 AC SW-2-A300A-TPM-C SW, Trusted Platform Module Enabled,A300A,-C 2 0002 AD X1143A-R6-C ADPT 2-Pt UTA2,10GbE,16Gb FC BareCage SFP+,-C 2 0002 AE X2071A-C HBA,4-Port HD-miniSAS,12Gb,PCIe,-C 2 0002 AF X6566B-05-R6-C Cable, Direct Attach CU SFP+ 10G,0.5M,-C 4 0002 AG X6566B-3-R6-C Cable, Direct Attach CU SFP+ 10G,3M,-C 8 0002 AH X-SFP-H10GB-CU3M-R6-C Cable, Cisco 10GBase Copper SFP+ 3m,-C 12 0002 AI X66034A-C Cable,12Gb,Mini SAS HD,5m,-C 4

Statement of Work / Specifications Page 2 of 3

CLIN MFG PART # PRODUCT DESCRIPTION QTY

0002 AJ X6235-C Chassis,FAS8200,AFF-A300,AC PS,-C 1 0002 AK DOC-AFF-A300-C Documents,AFF-A300,-C 1 0002 AL X1985-R6-C 12-Node Cluster Cable Label Kit,-C 1 0002 AM X-02659-00-C Rail Kit,4-Post,Rnd/Sq-Hole,Adj,24-32,-C 2 0002 AN X800-42U-R6-C Power Cable,In-Cabinet,C13-C14,-C 8 0002 AO DATA-AT-REST-ENCRYPTION Data at Rest Encryption Capable Operating Sys 2 0002 AP ALL-FLASH-OPTIMIZED Optimized SSD Personality 1 0002 AQ X1960-R6-C Cluster Switch,Interconnect,16Pt,10Gb,-C,PTSX 2 0002 AR SW-FLASH-BUNDLE-2P-C ONTAP,Per-0.1TB,FlashBundle,Ult-Perf,2P,-C 456 0002 AS DS224C-SL-3.8-12S-2P-C SSD Shelf,12G,12x3.8TB,2P,-C 1 0002 AT CS-SEC-4D SE Secure,7x24,4hr Parts Delivery - 36 Months 1 0002 AU CS-NRD2-E Non Returnable Disk Plus,e - 36 Months 1

0003 PS-TM-CONSULT-DAY-ZA CONSULTING DAY < 10 DAYS, EXP. 1YR. FROM PO 8

CONSULTING DAYS

Existing MIS Staff resources will physically install (unbox, rack and cable) the new systems upon arrival and dispose of replaced equipment following project completion.

Consultant will guide MIS personnel through the initial software installation and configuration steps (as they cannot be granted administrative privileges once the appliances are connected to the network). To commence within 14 number of days of equipment receipt, the following schedule is to be performed in coordination with the awarded vendor:

Days 1 - 3 Configure the appliances in both the primary and COOP facilities (both on the NRL Washington DC campus). This includes updating ONTAP operating system software, configuration of aggregates, NetApp auto-support setup, storage virtual machines (SVM) creation, zoning, network configuration, and the determination to create a new or join the existing cluster.

Days 4 - 6 Create volumes, configure SnapMirror/SnapVault for data migration from existing NetApp systems. Test migration process, then perform actual data migration to the new equipment. Collaborate on optimal encryption methodology and deploy chosen solution.

Days 7 - 8 Finalize any remaining data migrations. Resolve questions or issues that have arisen during the deployment. Perform decommissioning steps.

Statement of Work / Specifications Page 3 of 3

Days 1 - 3
Days 4 - 6
Days 7 - 8

File details come from the government source that posted it. Updated .