This document summarizes the key details of a solicitation for battery testers. The solicitation is issued by the Department of the Navy Naval Sea Systems Command for the purchase of dual range 9/50-9/400V battery testers. The response date has been extended to September 8, 2023. The solicitation includes salient characteristics for 9/400V, 10V, 40V, and 5V battery test systems specifying requirements for voltage ranges, current ranges, data measurement and control capabilities, safety features, software functions, temperature control integration, training, manuals, and calibration. Supplies such as test cables, auxiliary cables, and calibration equipment are also specified.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 23Q0216_SOL_0002.pdf | ||
| 23Q0216_SOL.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to extend the solicitation deadline, and additionally, to update the specification for the requirement.
1. CONTRACT ID CODE PAGE OF PAGES
1 15
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Aug-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0016423Q0216
X 9B. DATED (SEE ITEM 11)
20-Jul-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Aug-2023
CODE
NAVAL SURFACE WARFARE CENTER CRANE DIV
B. TAYLOR (812-854-1024)
BLDG 3373
300 HWY 361
CRANE IN 47522-5001
N00164 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0016423Q0216
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SAP - SAP CONTINUATION SHEET
The required response date/time has changed from 03-Aug-2023 12:00 PM to 08-Sep-2023 12:00 PM.
CLIN 0005
The CLIN description has changed from 9-400V TESTER to DUAL RANGE 9/50-9/400V TESTER.
The CLIN extended description has changed from:
This acquisition is for the purchase of one (1) 9-400V Battery Test Stations, along with applicable accessories. This purchase shall be IAW included Salient Characteristics.Brand Name or Equal to:Arbin Model - RBT33022P/N:
452446Accelerated or Partial delivery is acceptable by Government at no extra cost.
To:
This acquisition is for the purchase of one (1) 9/50-9/400V Dual Range Battery Test Stations, along with applicable accessories. This purchase shall be IAW included Salient Characteristics.Brand Name or Equal to:Arbin Model - RBT33022P/N: 452446Accelerated or Partial delivery is acceptable by Government at no extra cost.
SUBCLIN 0005AA
The CLIN description has changed from 9-400V TESTER to DUAL RANGE 9/50-9/400V TESTER.
The following have been added by full text:
9/400V SALIENT CHARACTERISTICS
The test system shall incorporate 8 individual test stations that are able to test between 9V – 400V or from 9V ‐ 50V for both charging and discharging profiles. Charging mode is to provide at least 100A charging current in a Constant Voltage mode, 150A discharge in a regenerative power discharge mode at a 70% minimum efficiency. This allows for the test system to be used on either 270V or 28V batteries for testing while controlling accuracy.
Test system shall provide Power Output to charge and discharge Devices Under Test (DUT) and must be able to limit charge and discharge to provide either Constant Voltage, Constant Current, Constant Power, or Fixed Resistance levels to meet charging and discharging requirements.
Power output rating per channel is to exceed 52.5kW per channel between 5°C and 30°C room temperature or 150kW at any time across all 8 stations for a 45 minute duration.
Each test station shall be able to run independent tests or be combined in parallel fashion as needed to increase current requirements (parallel configurations must be in the same voltage range setting) to 1100A minimum for discharge durations not to exceed 30 seconds (Constant Voltage, Constant Power, or Fixed Resistor Discharges). Voltage limitation to prevent exceeding power dissipation levels can exist.
System response to reach the final Resistance or Voltage setting on Constant Voltage, Constant Power, or Fixed Resistor Discharges shall not exceed 20ms even when channels are combined in parallel up to 1050A.
Test system shall have automatic range limiting and switching of both charging and discharging functions to allow stability to ±1% max of voltage or current levels from the power supply mode (either 400V or 50V settings) while operating within its specification allowed current levels and power dissipation levels.
Testers to have integrated safety features that stop and abort testing when exceeding the current level or power dissipation levels of the test station. This should shut down only the individual stations with a reason clearly documented.
Testers to have integrated safety features that stop and abort testing when exceeding the current level or power dissipation levels of the entire system if system level requirements are exceeded such as 4 stations each pulling 50kW of power at the same time.
The fluctuation in current will not exceed ±2% of the programed / operating current for any charge or discharge rates for the duration of the test.
Test system shall be able to record Actual Test time, Actual date and time, step charge times, step discharge times, actual total charge times, actual total discharge times, Temperature readings, Voltage readings, and Current readings for each test station. This data is to be stored in the system and can be saved off to excel compatible data files for analysis by Engineers.
Each data reading being recorded should be programmable from 1ms to at least 10 minutes (we can accept longer durations if it is already part of the system) depending on the need and accuracy of the data being recorded
The test system will be able to bypass readings and still perform the required testing of the above inputs if they are not connected or being used for the particular test.
When tests are interrupted for any reason the tester shall remember its location in the test and be able to be resumed with the subsequent data automatically added to the original test data, with the reason for the interruption documented in the break (loss of power; Channel 3 temperature out of limit, Channel 5 voltage out of limit, etc.).
The Test System Shall require only electrical power connections to operate. No Cooling water or other items that prohibit or restrict relocation to other areas is allowed.
Power to be 3 Phase; 50 Hz– 60 Hz; 380V – 480V AC power at 250 A Maximum and 220V single phase power at 30A maximum (Target values we can discuss if needed).
The test system shall be able to be programmed with up to 300 steps of various charging and discharging functions per profile with each function having controlled limit tolerances and safety limit tolerances incorporated for test integrity. Repeat commands need to be available to run the programmed profile again up to 100,000 cycles
The test system shall be able to retain at least 200 profiles in its system memory. The ability to print out the profile in a manner that can be graphed, or the graph of the profile for simulation and verification is preferred. If this feature is currently not available, it is expected that when the feature is created for our software system in the future, that the manufacturer will provide that software revision to NSWC Crane at no cost for this system only.
The test system shall provide at least 1TB of storage. When the memory is getting full, the test system shall provide a method and command to move all test data to a NSWC Crane procured external hard drive. Specification for connection and communication rate limits should be provided in the system documentation. The system will also have the ability to store all test data on a connected server/storage device for redundant data storage.
Test system shall have programmable safety limits incorporated to suspend testing if any Temperature, Voltage, or Current reading exceeds (either high or low) the operational boundaries for the test that are entered into the test profile which could indicate a DUT failure or a tester failure.
The test system shall fit into an electronic equipment rack that meets a 46”W x 72”D x 76”H maximum space requirement and have 6 wheels to allow movement over 1.5” gaps or 0.5” bumps or thresholds without damage.
The test system shall function properly between an ambient temperature range of 28°C to 35°C at a reduced heat dissipation limit of 50.0kW per channel or 140kW across all 8 stations.
The test system shall incorporate an Emergency Stop Switch.
The test system shall incorporate a Main power disconnect switch.
The test system will have features and documentation to allow for Calibration to nationally recognized standards, a Calibration Equipment List, and any Calibration specialty items needed for calibration included.
Required: System must use latest Government regulations for forbidden materials per environmental regulations.
Required: Power outage recovery mode (resume current program either automatically or manually as instructed).
Required: 16 digital input/output ports minimum (2 per station)
Required: 8 CAN bus compatible ports minimum (1 per station)
Must communicate with temperature chambers or incorporated Thermocouples to automatically delay charging cycles from initiating outside of programmed temperature limits (can be done by programing safety limits). The list of temperature chambers controllers requested will be furnished by NSWC Crane at the time of award. The supplier will provide a response to any exceptions to that list within 45 days of award.
Required: Network compatible.
Document Warranty terms, duration, and conditions.
The following have been modified:
10V SALIENT CHARACTERISTICS
Specification for:
10V Battery Safety Test System
1.0 SCOPE
1.1 This specification describes the requirements for a rechargeable battery test systems. The system shall contain a minimum of sixty-four channels with a minimum voltage range of 10V and a minimum current range of 10A.
2.0 REQUIREMENTS
2.1 Overall Test System Requirements.
2.1.1 The system shall be capable of charging and discharging batteries simultaneously and independently of each other. If required, the contractor shall perform the final installation. All electrical and other utilities to the unit will be attached by the user.
2.1.2 All sixty-four identical 10V-channels shall be mounted in single test rack. Each rack must fit through a 36” wide door. The test system shall be portable and shall have wheels to permit movement from facility to facility. The system shall be air cooled.
2.1.3 Each channel shall be capable of reading over a voltage range of 0 to 10V DC.
Under either charge or discharge the 10V DC channels shall provide a minimum of 10A.
2.1.4 If multiple current ranges are provided the channels shall seamlessly transition between these ranges.
2.1.5 Each multichannel test rack shall permit paralleling of up to sixteen channels to allow for higher discharge and charge rates of up to 160A for the 10V tester.
2.1.6 Each channel shall be able to run a totally independent test profile. The channels shall be capable of charging and discharging different batteries to different profiles and different start and stop times.
2.1.7 Each channel shall be able to charge or discharge batteries in the following modes: constant current, constant power, constant resistance as well as perform current ramps (triangular pulses). This system shall be able to use auxiliary inputs such as cell or pack voltages and temperature for these functions such as ending charging or discharging based on any auxiliary input.
2.1.8 Each channel shall be able to change loads in 5 milliseconds (ms) or less from zero to maximum value or from maximum value to zero. During load changes the current shall not overshoot. When the current is increased during a load change the current during transition shall never (including overshoot) exceed the final current value plus the tolerance of ±0.2% of the range + 0.2% of the set point. When the current is being decreased the current value during transition shall never (including overshoot) fall below the final specified value minus the tolerance of ±0.2% of the range + 0.2% of the set point for the appropriate current range.
2.1.9 Each channel shall be able to provide a controlled current during charge or discharge over a range from 0 A to maximum current as follows. For the 10V 10A channels the current control at 10A shall be a minimum of + 5mA and at 5mA a minimum of + 2.5uA.
2.1.10 Each channel shall be able to perform constant power charge of 0 W to maximum power with an accuracy of + 0.02% FSD.
2.1.11 Each channel shall be able to perform constant resistance operation over a range of 0 Ohms to 1 Mega Ohms with an accuracy of + 0.02% FSD.
2.1.12 Each channel shall be capable of performing pulses of widths 10 ms or less during which time data shall be recorded at 1 ms rate internally.
2.1.13 All calculated control values Amp hour or watt hour capacity shall be continuously updated continually at 1 msec. interval.
2.2 Data Measurement and Control.
2.2.1 Primary measurement by the system (excluding auxiliary inputs) shall use 4 point measurements.
2.2.2 The system shall be able to measure, adjust, and control within a time period of
1 millisecond all the channels.
2.2.3 Voltage resolution for the 10V channel the resolution shall be 200 uV. The meters shall have a minimum accuracy of 0.001% FSR.
2.2.4 The current accuracy for each channel shall be at a minimum 0.02%FSD +
0.001%RDG.
2.2.5 Each channel shall be able to measure and record temperatures using K Type thermocouples.
2.2.6 The test system and rack shall be air cooled.
2.2.7 The test systems shall use Ethernet to communicate with PCs.
2.2.8 The systems shall use 240V 3 Phase power circuit.
2.2.9 Battery connections for each channel shall be a true 4-wire connection. The end user shall provide cables such that the two wires that carry the load shall be terminated at the battery terminals, and the two wires that measure the battery voltage shall be terminated at the battery terminals.
2.3 Watchdog Timer and Redundant Safety Limits
2.3.1 Each channel shall go to an open or suspend state if for any reason the channel is unable to communicate with the test computer.
2.3.2 Each channel shall be able to open or suspend testing if any of the user defined voltage or current, or temperature limits have been exceeded.
2.3.3 The system shall go to an open or suspend state if for any reason the system cannot communicate with an individual channel, or any of the critical components such as system cooling loop, test system temperature, power faults, etc.
2.3.4 Each channel shall have a current limiting device with a programmable trip in time to prevent accidental cell or battery shorting due to system failure.
2.3.5 Once the system or channel is down it will not be permitted to restart until the fault is cleared. The system shall be able to restart at the point at which it was halted automatically without having to either reenter data or advance any cycle or step indexes.
2.4 Auxiliary voltage measurements.
2.4.1 The system shall be able to read a minimum of 24 auxiliary voltage readings with a range of +10V to -10V.
2.4.2 The auxiliary voltage channels shall be able to be mapped to any combination of channels in any quantity.
2.5 Auxiliary digital inputs and outputs.
2.5.1 The system shall be provided with a minimum of 24 digital inputs and 8 digital outputs.
2.5.2 The auxiliary digital channels shall be able to be mapped to any combination of channels in any quantity.
2.6 Test control computer
2.6.1 A computer shall be provided with each test system.
2.6.2 All test control computers shall be provided with either Windows 10 Ultimate or
Windows 10 Enterprise.
2.6.3 All test control computers will have the same test system software.
2.7 Test System Software.
2.7.1 Software shall permit each channel to perform the following types of charge or discharge:
a. Constant Current.
b. Constant Voltage.
c. Constant Power.
d. Constant Resistance
e. Voltage ramps or scans
f. Perform DC Internal Resistance Measurements.
2.7.2 Each test step shall have at a minimum use the following conditions to control or end the step; volts, amps, temperature, or time but shall also be able to use integrated values (C-Rate capacity, capacity {C-Rate capacity, Ampere hours [Ah], Watt hours [Wh], Last Cycle Ah, Last Cycle Wh}, and calculated values (first and second derivatives of dV/dt, dT/dt).
2.7.3 The test system software shall be able to show the current real time status of all channels on a screen.
2.7.4 The test system software shall be able to show all the current real time test parameters of any of the channels.
2.7.5 The software shall be able to create test profiles by importing time vs. current and time vs. power data from other sources without having to create individual steps.
2.8 The company shall ensure that the system is functioning properly after shipment and installation. The systems test channel calibrations shall be verified at the site and if required calibrated on-site. After delivery and installation the system shall be certified to conform to the specifications.
2.9 The tester shall be able to control test temperatures in a minimum of two temperature chambers.
2.9.1 The tester shall be able to communicate with the following chambers or controllers; Cincinnatti sub zero EZT570S, ESPEC P300, and Watlow F4T.
2.9.2 The tester shall be able adjust temperature set points in the middle of the test program and to wait until the chamber is acclimated before performing steps.
2.10 A minimum of one full day of onsite operational training shall be provided.
2.11 A set of operating manuals shall be provided as either a paper copy or PDF.
2.12 Test System Calibration.
2.12.1 The test system shall include detailed channel calibration procedures and an easily accessible calibration program. Test system calibration shall be able to be performed by the user.
2.12.2 The calibration procedure shall be automated and shall only require a calibrated multi meter, a calibrated current shunt, and an isolated voltage source.
2.12.3 The systems shall be configured to permit the calibration of all the channels in a single system simultaneously.
2.12.4 The system shall be delivered calibrated or calibrated on site to NIST traceable standards with a calibration that is valid for a full year.
3.0 Supplies
3.1 Main Test System Cables
3.1.1 Each channel shall be provided with a 20 ft four wire test cable that connect to locking cylindrical cell holder.
3.1.2 Each cable will use one set of leads to carry current and a second set for sense lines.
3.1.3 Cables shall be designed for 10A loads.
3.1.4 Each cable shall be provided with a camlock battery holder that is adjustable.
The holder will use two connection points to cell or battery to be tested. A large one will be used for carrying the current and a smaller pointed one will be used for voltage sense. The camlock device will be able to be adjusted to handle sells or batteries up to 4” long and 1.3” in diameter.
3.2 Auxiliary Cables
3.2.1 Each individual K type thermocouple channel shall be provided with a 20 ft long
K type thermocouple cable.
3.2.2 Each auxiliary voltage or digital input or output channel shall be provided with a
20 ft cable.
3.3 Calibration supplies
3.3.1 All cabling and supplies required to interface the test system to user supplied calibrated multi meter, user supplied calibrated current shunt, and user supplied isolated voltage source shall be provided.
40V SALIENT CHARACTERISTICS
40V Battery Safety Test System
4.0 SCOPE
4.1 This specification describes the requirements for a rechargeable battery test systems. The system shall contain a minimum of sixteen channels with a minimum voltage range of 40V and a minimum current range of 20A.
5.0 REQUIREMENTS
5.1 Overall Test System Requirements.
5.1.1 The system shall be capable of charging and discharging batteries simultaneously and independently of each other. If required, the contractor shall perform the final installation. All electrical and other utilities to the unit will be attached by the user.
5.1.2 All sixteen identical 40V-channels shall be mounted in single test rack. Each rack must fit through a 36” wide door. The test system shall be portable and shall have wheels to permit movement from facility to facility. The system shall be air cooled.
5.1.3 Each channel shall be capable of reading over a voltage range of 0 to 40V DC.
Under either charge or discharge the 40V DC channels shall provide a minimum of 20A.
5.1.4 If multiple current ranges are provided the channels shall seamlessly transition between these ranges.
5.1.5 Each multichannel test rack shall permit paralleling of up to sixteen channels to allow for higher discharge and charge rates of up to 320A.
5.1.6 Each channel shall be able to run a totally independent test profile. The channels shall be capable of charging and discharging different batteries to different profiles and different start and stop times.
5.1.7 Each channel shall be able to charge or discharge batteries in the following modes: constant current, constant power, constant resistance as well as perform current ramps (triangular pulses). This system shall be able to use auxiliary inputs such as cell or pack voltages and temperature for these functions such as ending charging or discharging based on any auxiliary input.
5.1.8 Each channel shall be able to change loads in 5 milliseconds (ms) or less from zero to maximum value or from maximum value to zero. During load changes the current shall not overshoot. When the current is increased during a load change the current during transition shall never (including overshoot) exceed the final current value plus the tolerance of ±0.2% of the range + 0.2% of the set point. When the current is being decreased the current value during transition shall never (including overshoot) fall below the final specified value minus the tolerance of ±0.2% of the range + 0.2% of the set point for the appropriate current range.
5.1.9 Each channel shall be able to provide a controlled current during charge or discharge over a range from 0 A to maximum current as follows. At 20A shall be a minimum of + 10mA and at 100mA a minimum of + 50.0uA.
5.1.10 Each channel shall be able to perform constant power charge of 0 W to maximum power with an accuracy of + 0.02% FSD.
5.1.11 Each channel shall be able to perform constant resistance operation over a range of 0 Ohms to 1 Mega Ohms with an accuracy of + 0.02% FSD.
5.1.12 Each channel shall be capable of performing pulses of widths 10 ms or less during which time data shall be recorded at 1 ms rate internally.
5.1.13 All calculated control values Amp hour or watt hour capacity shall be continuously updated continually at 1 msec. interval.
5.2 Data Measurement and Control.
5.2.1 Primary measurement by the system (excluding auxiliary inputs) shall use 4 point measurements.
5.2.2 The system shall be able to measure, adjust, and control within a time period of
1 millisecond all the channels.
5.2.3 Voltage resolution for the 40V channel the resolution shall be 200 uV. The meters shall have a minimum accuracy of 0.001% FSR.
5.2.4 The current accuracy for each channel shall be at a minimum 0.02%FSD +
0.001%RDG.
5.2.5 Each channel shall be able to measure and record temperatures using K Type thermocouples.
5.2.6 The test system and rack shall be air cooled.
5.2.7 The test systems shall use Ethernet to communicate with PCs.
5.2.8 The systems shall use 240V 3 Phase power circuit.
5.2.9 Battery connections for each channel shall be a true 4-wire connection. The end user shall provide cables such that the two wires that carry the load shall be terminated at the battery terminals, and the two wires that measure the battery voltage shall be terminated at the battery terminals.
5.3 Watchdog Timer and Redundant Safety Limits
5.3.1 Each channel shall go to an open or suspend state if for any reason the channel is unable to communicate with the test computer.
5.3.2 Each channel shall be able to open or suspend testing if any of the user defined voltage or current, or temperature limits have been exceeded.
5.3.3 The system shall go to an open or suspend state if for any reason the system cannot communicate with an individual channel, or any of the critical components such as system cooling loop, test system temperature, power faults, etc.
5.3.4 Each channel shall have a current limiting device with a programmable trip in time to prevent accidental cell or battery shorting due to system failure.
5.3.5 Once the system or channel is down it will not be permitted to restart until the fault is cleared. The system shall be able to restart at the point at which it was halted automatically without having to either reenter data or advance any cycle or step indexes.
5.4 Auxiliary voltage measurements.
5.4.1 The system shall be able to read a minimum of 24 auxiliary voltage readings with a range of +10V to -10V.
5.4.2 The auxiliary voltage channels shall be able to be mapped to any combination of channels in any quantity.
5.5 Auxiliary digital inputs and outputs.
5.5.1 The system shall be provided with a minimum of 24 digital inputs and 8 digital outputs.
5.5.2 The auxiliary digital channels shall be able to be mapped to any combination of channels in any quantity.
5.6 Test control computer
5.6.1 A computer shall be provided with each test system.
5.6.2 All test control computers shall be provided with either Windows 10 Ultimate or
Windows 10 Enterprise.
5.6.3 All test control computers will have the same test system software.
5.7 Test System Software.
5.7.1 Software shall permit each channel to perform the following types of charge or discharge:
a. Constant Current.
b. Constant Voltage.
c. Constant Power.
d. Constant Resistance
e. Voltage ramps or scans
f. Perform DC Internal Resistance Measurements.
5.7.2 Each test step shall have at a minimum use the following conditions to control or end the step; volts, amps, temperature, or time but shall also be able to use integrated values (C-Rate capacity, capacity {C-Rate capacity, Ampere hours [Ah], Watt hours [Wh], Last Cycle Ah, Last Cycle Wh}, and calculated values (first and second derivatives of dV/dt, dT/dt).
5.7.3 The test system software shall be able to show the current real time status of all channels on a screen.
5.7.4 The test system software shall be able to show all the current real time test parameters of any of the channels.
5.7.5 The software shall be able to create test profiles by importing time vs. current and time vs. power data from other sources without having to create individual steps.
5.8 The company shall ensure that the system is functioning properly after shipment and installation. The systems test channel calibrations shall be verified at the site and if required calibrated on-site. After delivery and installation the system shall be certified to conform to the specifications.
5.9 The tester shall be able to control test temperatures in a minimum of two temperature chambers.
5.9.1 The tester shall be able to communicate with the following chambers or controllers; Cincinnatti sub zero EZT570S, ESPEC P300, and Watlow F4T.
5.9.2 The tester shall be able adjust temperature set points in the middle of the test program and to wait until the chamber is acclimated before performing steps.
5.10 A minimum of one full day of onsite operational training shall be provided.
5.11 A set of operating manuals shall be provided as either a paper copy or PDF.
5.12 Test System Calibration.
5.12.1 The test system shall include detailed channel calibration procedures and an easily accessible calibration program. Test system calibration shall be able to be performed by the user.
5.12.2 The calibration procedure shall be automated and shall only require a calibrated multi meter, a calibrated current shunt, and an isolated voltage source.
5.12.3 The systems shall be configured to permit the calibration of all the channels in a single system simultaneously.
5.12.4 The system shall be delivered calibrated or calibrated on site to NIST traceable standards with a calibration that is valid for a full year.
6.0 Supplies
6.1 Main Test System Cables
6.1.1 Each channel shall be provided with a 20ft four wire test cable that connect to locking cylindrical cell holder.
6.1.2 Each cable will use one set of leads to carry current and a second set for sense lines.
6.1.3 Cables shall be designed for 20A loads.
6.1.4 Each cable shall be provided with a camlock battery holder that is adjustable.
The holder will use two connection points to cell or battery to be tested. A large one will be used for carrying the current and a smaller pointed one will be used for voltage sense. The camlock device will be able to be adjusted to handle sells or batteries up to 4” long and 1.3” in diameter.
6.2 Auxiliary Cables
6.2.1 Each individual K type thermocouple channel shall be provided with a 20ft long
K type thermocouple cable.
6.2.2 Each auxiliary voltage or digital input or output channel shall be provided with a
20 ft cable.
6.3 Calibration supplies
6.3.1 All cabling and supplies required to interface the test system to user supplied
5V SALIENT CHARACTERISTICS
5V Battery Cycling Test System
7.0 SCOPE
7.1 This specification describes the requirements for a rechargeable battery test system. The system shall contain a minimum of five channels with a minimum voltage range of 5V and a minimum current range of 500A.
8.0 REQUIREMENTS
8.1 Overall Test System Requirements.
8.1.1 The system shall be capable of charging and discharging batteries simultaneously and independently of each other. If required, the contractor shall perform the final installation. All electrical and other utilities to the unit will be attached by the user.
8.1.2 All five identical 5V-channels shall be mounted in single test rack. Each rack shall be no more than 46” wide. The test system shall be portable and shall have wheels to permit movement from facility to facility. The system shall be air cooled.
8.1.3 All data acquisition devices shall have a minimum of 24-bit resolution and meet the enclosed requirements.
8.1.4 Each channel shall be capable of reading over a voltage range of 0 to 5V DC.
Under either charge or discharge the 5V DC channels shall provide a minimum of 500A.
8.1.5 If multiple current ranges are provided the channels shall seamlessly transition between these ranges.
8.1.6 Each multichannel test rack shall permit paralleling of up to five channels to allow for higher discharge and charge rates of up to 2000A for the 5V tester.
8.1.7 Each channel shall be able to run a totally independent test profile. The channels shall be capable of charging and discharging different batteries to different profiles and different start and stop times.
8.1.8 Each channel shall be able to charge or discharge batteries in the following modes: constant current, constant power, and constant voltage. This system shall be able to use auxiliary inputs such as cell or pack voltages and temperature for these functions such as ending charging or discharging based on any auxiliary input.
8.1.9 Each channel shall be able to change loads in 10 milliseconds (ms) or less from zero to maximum value or from maximum value to zero. During load changes the current shall not overshoot. When the current is increased during a load change the current during transition shall never (including overshoot) exceed the final current value plus the tolerance of ±0.2% of the range + 0.2% of the set point. When the current is being decreased the current value during transition shall never (including overshoot) fall below the final specified value minus the tolerance of ±0.2% of the range + 0.2% of the set point for the appropriate current range.
8.1.10 Each channel shall be able to provide a controlled current during charge or discharge over a range from 0 A to maximum current as follows. For the 5V 500A channels the current control at 500A shall be a minimum of + 200mA and at 500mA a minimum of + 1mA.
8.1.11 Each channel shall be able to perform constant power charge of 0 W to maximum power with an accuracy of + 0.02% FSD.
8.1.12 All calculated control values Amp hour or watt hour capacity shall be continuously updated continually at 10 msec. interval.
8.2 Data Measurement and Control.
8.2.1 The system shall be able to measure, adjust, and control within a time period of
5 millisecond all the channels.
8.2.2 Voltage resolution for the 5V channel the resolution shall be 1mV. The meters shall have a minimum accuracy of 0.02% FSR.
8.2.3 The current accuracy for each channel shall be at a minimum 0.02%FSD
8.2.4 Each channel shall be able to measure and record temperatures using K Type thermocouples.
8.2.5 The test system and rack shall be air cooled.
8.2.6 The test systems shall use Ethernet to communicate with PCs.
8.2.7 The systems shall use 208V 3 Phase power circuit.
8.2.8 Battery connections for each channel shall be a true 4-wire connection. The end user shall provide cables such that the two wires that carry the load shall be terminated at the battery terminals, and the two wires that measure the battery voltage shall be terminated at the battery terminals.
8.3 Watchdog Timer and Redundant Safety Limits
8.3.1 Each channel shall go to an open or suspend state if for any reason the channel is unable to communicate with the test computer.
8.3.2 Each channel shall be able to open or suspend testing if any of the user defined voltage or current, or temperature limits have been exceeded.
8.3.3 The system shall go to an open or suspend state if for any reason the system cannot communicate with an individual channel, or any of the critical components such as system cooling loop, test system temperature, power faults, etc.
8.3.4 Each channel shall have a current limiting device with a programmable trip in time to prevent accidental cell or battery shorting due to system failure.
8.3.5 Once the system or channel is down it will not be permitted to restart until the fault is cleared. The system shall be able to restart at the point at which it was halted automatically without having to either reenter data or advance any cycle or step indexes.
8.4 Test control computer
8.4.1 A single test control computers shall be provided with either Windows 10
Ultimate or Windows 10 Enterprise.
8.4.2 The test control computer shall be able to control up to four 5V testers at the same time.
8.5 Test System Software.
8.5.1 The test system software shall be able to show the current real time status of all channels on a screen.
8.5.2 The test system software shall be able to show all the current real time test parameters of any of the channels.
8.6 The company shall ensure that the system is functioning properly after shipment and installation. The systems test channel calibrations shall be verified at the site and if required calibrated on-site. After delivery and installation the system shall be certified to conform to the specifications.
8.7 A minimum of one full day of onsite operational training shall be provided.
8.8 A set of operating manuals shall be provided as either a paper copy or PDF.
8.9 Test System Calibration.
8.9.1 The test system shall include detailed channel calibration procedures and an easily accessible calibration program. Test system calibration shall be able to be performed by the user.
8.9.2 The calibration procedure shall be automated and shall only require a calibrated multi meter, a calibrated current shunt, and an isolated voltage source.
8.9.3 The systems shall be configured to permit the calibration of all the channels in a single system simultaneously.
8.9.4 The system shall be delivered calibrated or calibrated on site to NIST traceable standards with a calibration that is valid for a full year.
8.10 Test system voltage requirement is 208Vdc 3 Phase.
9.0 Supplies
9.1 Main Test System Cables
9.1.1 Each channel shall be provided with a 20 ft four wire test cable with ring lugs
9.1.2 Each cable will use one set of leads to carry current and a second set for sense lines.
9.1.3 Cables shall be designed for 500A loads.
9.2 Auxiliary Cables
9.2.1 Each individual K type thermocouple channel shall be provided with a 20 ft long
K type thermocouple cable.
9.3 Calibration supplies
9.3.1 All cabling and supplies required to interface the test system to user supplied
60V SALIENT CHARACTERISTICS
60V Battery Cycling Test System
10.0 SCOPE
10.1 This specification describes the requirements for a rechargeable battery test system. The system shall contain a minimum of five channels with a minimum voltage range of 60V and a minimum current range of 500A.
11.0 REQUIREMENTS
11.1 Overall Test System Requirements.
11.1.1 The system shall be capable of charging and discharging batteries simultaneously and independently of each other. If required, the contractor shall perform the final installation. All electrical and other utilities to the unit will be attached by the user.
11.1.2 All five identical 60V-channels shall be mounted in single test rack. Each rack shall be no more than 42” wide. The test system shall be portable and shall have wheels to permit movement from facility to facility. The system shall be air cooled.
11.1.3 All data acquisition devices shall have a minimum of 16-bit resolution and meet the enclosed requirements.
11.1.4 Each channel shall be capable of reading over a voltage range of 9 to 60V DC.
Under either charge or discharge the 60V DC channels shall provide a minimum continuous power output of 26000W. The multichannel test rack shall be capable of at least 60000W total power across all channels at any given point.
11.1.5 If multiple current ranges are provided the channels shall seamlessly transition between these ranges.
11.1.6 Each multichannel test rack shall permit paralleling of up to five channels to allow for higher discharge and charge rates of up to 2000A and 60000W total power for the 60V tester.
11.1.7 Up to four 60V testers shall be able to be run in parallel to allow for higher discharge and charges rates of up to 5000A and 160000W total power.
11.1.8 Each channel shall be able to run a totally independent test profile. The channels shall be capable of charging and discharging different batteries to different profiles and different start and stop times.
11.1.9 Each channel shall be able to charge or discharge batteries in the following modes: constant current, constant power, and constant voltage. This system shall be able to use auxiliary inputs such as cell or pack voltages and temperature for these functions such as ending charging or discharging based on any auxiliary input.
11.1.10 Each channel shall be able to change loads in 20 milliseconds (ms) or less from zero to maximum value or from maximum value to zero. During load changes the current shall not overshoot. When the current is increased during a load change the current during transition shall never (including overshoot) exceed the final current value plus the tolerance of ±0.5% of the range + 0.5% of the set point. When the current is being decreased the current value during transition shall never (including overshoot) fall below the final specified value minus the tolerance of ±0.5% of the range + 0.5% of the set point for the appropriate current range.
11.1.11 Each channel shall be able to provide a controlled current during charge or discharge over a range from 0 A to maximum current as follows. For the 60V 500A channels the current control at 500A shall be a minimum of +500mA and at 125A a minimum of +70mA.
11.1.12 All calculated control values Amp hour or watt hour capacity shall be continuously updated continually at 10 msec. interval.
11.1.13 Tester shall be capable of communicating with a Battery Management System (BMS) via CAN bus protocol.
11.2 Data Measurement and Control.
11.2.1 The system shall be able to measure, adjust, and control within a time period of
5 millisecond all the channels.
11.2.2 Voltage resolution for the 60V channel the resolution shall be 60mV. The meters shall have a minimum accuracy of 0.05% FSR.
11.2.3 The current accuracy for each channel shall be at a minimum 0.05%FSD
11.2.4 Each channel shall be able to measure and record temperatures using K Type thermocouples.
11.2.5 The test system and rack shall be air cooled.
11.2.6 The test systems shall use Ethernet to communicate with PCs.
11.2.7 The systems shall use 480V 3 Phase power circuit.
11.2.8 Battery connections for each channel shall be a true 4-wire connection. The end user shall provide cables such that the two wires that carry the load shall be terminated at the battery terminals, and the two wires that measure the battery voltage shall be terminated at the battery terminals.
11.3 Watchdog Timer and Redundant Safety Limits
11.3.1 Each channel shall go to an open or suspend state if for any reason the channel is unable to communicate with the test computer.
11.3.2 Each channel shall be able to open or suspend testing if any of the user defined voltage or current, or temperature limits have been exceeded.
11.3.3 The system shall go to an open or suspend state if for any reason the system cannot communicate with an individual channel, or any of the critical components such as system cooling loop, test system temperature, power faults, etc.
11.3.4 Each channel shall have a current limiting device with a programmable trip in time to prevent accidental cell or battery shorting due to system failure.
11.3.5 Once the system or channel is down it will not be permitted to restart until the fault is cleared. The system shall be able to restart at the point at which it was halted automatically without having to either reenter data or advance any cycle or step indexes.
11.4 Test control computer
11.4.1 A single test control computers shall be provided with either Windows 10
Ultimate or Windows 10 Enterprise.
11.5 Test System Software.
11.5.1 The test system software shall be able to show the current real time status of all channels on a screen.
11.5.2 The test system software shall be able to show all the current real time test parameters of any of the channels.
11.6 The company shall ensure that the system is functioning properly after shipment and installation. The systems test channel calibrations shall be verified at the site and if required calibrated on-site. After delivery and installation the system shall be certified to conform to the specifications.
11.7 A minimum of one full day of onsite operational training shall be provided.
11.8 A set of operating manuals shall be provided as either a paper copy or PDF.
11.9 Test System Calibration.
11.9.1 The test system shall include detailed channel calibration procedures and an easily accessible calibration program. Test system calibration shall be able to be performed by the user.
11.9.2 The calibration procedure shall be automated and shall only require a calibrated multi meter, a calibrated current shunt, and an isolated voltage source.
11.9.3 The systems shall be configured to permit the calibration of all the channels in a single system simultaneously.
11.9.4 The system shall be delivered calibrated or calibrated on site to NIST traceable standards with a calibration that is valid for a full year.
11.10 Test system voltage requirement is 480Vdc 3 Phase.
12.0 Supplies
12.1 Main Test System Cables
12.1.1 Each channel shall be provided with a 20 ft four wire test cable with ring lugs
12.1.2 Each cable will use one set of leads to carry current and a second set for sense lines.
12.1.3 Cables shall be designed for 500A loads.
12.2 Auxiliary Cables
12.2.1 Each individual K type thermocouple channel shall be provided with a 20 ft long
K type thermocouple cable.
12.3 Calibration supplies
12.3.1 All cabling and supplies required to interface the test system to user supplied calibrated multi meter, user supplied calibrated current shunt, and user supplied isolated voltage source shall be provided.
NOTE: The below are not Government requirements but are desired. If quoted they will not be evaluated for technical acceptance under technical evaluation factor number 1, technical approach. If quoted the cost of the items will not be excluded from the overall cost of the total effort. Again, these are desired but not required. There will be no penalty if not quoted.
- The test control computer shall be able to control up to four 60V testers at the same time.
- All 60V testers controlled by the same control computer shall be able to run in parallel.
The following have been deleted:
400V SALIENT CHARACTERISTICS