16T0175_0001.pdf
PDF 77 KB Posted
- Attached to
- CONTAINER Federal contract opportunity
- Solicitation number
- N0016416T0175
About this file
16T0175_0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 16T0175_sol.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVAL SURFACE WARFARE CENTER CRANE DIV
D. WESSEL (812-854-5242)
BLDG 3373
300 HWY 361
CRANE IN 47522-5001
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to extend the closing time of this RFQ
From: 7 September 2016 @ 2:00 p.m.
To: 9 September 2016 @ 2:00 p.m.
All ohter terms and conditions remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Sep-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00164-16-T-0175
X 9B. DATED (SEE ITEM 11)
24-Aug-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Sep-2016
CODE
NAVAL SURFACE WARFARE CENTER CRANE DIV
ANDREW B. FICKLIN
BLDG. 3373
300 HWY 361
CRANE IN 47522-5001
N00164 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE N00164
FACILITY CODECODE
andrew.ficklin@navy.milEMAIL:812-854-4477TEL:
ANDREW B. FICKLIN / CONTRACTING OFFICER
N00164-16-T-0175
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SAP - SAP CONTINUATION SHEET
The required response date/time has changed from 07-Sep-2016 05:00 PM to 09-Sep-2016 05:00 PM.
SECTION SAP PROV - SAP PROVISIONS
The following have been modified:
CNIN-SAP-022 EVALUATION CRITERIA (MAY 2005)
THE FOLLOWING BEST VALUE DETERMINATION IAW FAR 13.106 LISTED WILL BE
USED TO EVALUATE THE QUOTES USING LOW PRICE TECHNICALLY
ACCEPTABLE EVALUATION CRITERIA:
QUOTERS – PLEASE SEE THE FOLLOWING FOR EVALUATION CRITERIA
The following Best Value Factors listed will be used to evaluate the Quotes using Low Price Technically Acceptable Evaluation Criteria – GO – NO GO Critiera:
TECHNICAL APPROACH
DELIVERY
PAST PERFORMANCE
CONSTRUCTIVE ACCEPTANCE
PRICE
Technical Acceptance Factor #1: Technical Approach Quoters will need to provide product literature or a capabilities document which outlines how the vendor will provide the containers IAW the specification in the statement of work..
The product literature or capabilities document will be evaluated by the Requiring Technical Activity (RTA) in conjunction with the compliance matrix to ensure technical acceptance.
Technical Acceptance Factor #2: Delivery Quoters will need to fill out the clause 52.211-8 for evaluation by the Government. All vendors who can meet the Governments required delivery date will be deemed technically acceptable.
Technical Acceptance Factor #3: Past Performance Past performance will be evaluated based on the below questionnaire. The contractor will need to complete the questionnaire in its entirety and provide all information.
Projects listed will need to be work that had been completed by the contractor for same/similar supplies within the past three years and can be either Government or Commercial contractors.
Past performance will be based on GO / NO GO basis, evaluated strictly on the information provided on the questionnaire. An unacceptable (NO GO) equals the inability to have met any work listed on the questionnaire. A quoter with no past performance will be evaluated as neutral.
Technical Acceptance Factor #4: Constructive Acceptance Acceptance period is 15 days once the container is delivered and installed.
SEE TECHNICAL ACCEPTANCE EVALUATION MATRIX BELOW:
Quoter’s by checking a “GO” column you are certifying that your company meets technical acceptance evaluation factors. Matrix must be filled out for consideration of award.
TECHNICAL ACCEPTANCE
EVALUATION FACTOR
GO NO
GO
IF YOU CAN EXCEED ANY TECHNICAL ACCEPTANCE
EVALUATION CRITERIA PLEASE INDICATE HOW
BELOW
CONFORMANCE TO
SPECIFICATIONS
By checking GO in this box you are certifying you can provide the container required that meets all aspects outlined in the statement of work.
CONFORMANCE TO DELIVERY
By checking GO in this box you are certifying that your company meets the Governments required delivery schedule outline in 52.211-8.
CONFORMANCE TO PAST
HISTORY
By checking GO in this box you are certifying that your company meets all of the requirements.
CONFORMANCE TO
CONSTRUCTIVE ACCPETANCE
By checking GO in this box you are certifying that your company agrees to the constructive acceptance of 15days.
A RESPONSIVE QUOTE CONSISTS OF THE FOLLOWING
Signed SF 18 (ALL PAGES RETRURNED) 52.211-8 Time Of Delivery SF 1449 Delivery schedule filled out with Quoters delivery dates
All pricing must be entered on each CLIN of solicitation.
Compliance Matrix completely filled out Past Performance Questionnaire completely filled out Must be a small business manufacturer per the NAICS code or small business distributor (1,250 employees) representing a small business manufacturer.
Must be JCP certified in order to quote to the drawings that are labeled distribution statement D.
LATE QUOTE PROVISION: The solicitation closes on 9 September 2016 at 2 p.m.
est. Quotes received after the closing date / time will not be evaluated.
ADDITIONAL DOCUMENTATION WILL BE ACCEPTED HOWEVER NO
QUOTER WILL BE CONSIDERED TECHNICALLY ACCEPTABLE WITHOUT
THE ABOVE MENTIONED DOCUMENTATION.
TO BE CONSIDERED TECHNICALLY ACCEPTABLE ALL QUOTERS MUST MEET
THE ABOVECRITERIA. ONCE QUOTERS HAVE BEEN DEEMED TECHNICALLY
ACCEPTABLE, THEN AND ONLY THEN WILL PRICE BE EVALUATED.
Quotes that are non-compliant with any material requirement of this solicitation may be rejected without further consideration for award. This will be a firm fixed price contract and will be awarded utilizing Simplified Acquisition Procedures.
ATTACHMENT I EXPERIENCE QUESTIONNAIRE
EXPERIENCE QUESTIONNAIRE
Instructions: Complete by inserting information or Xing box, as indicated. If extra space is needed to complete an item, use the remarks block (indicate item number in remarks block).
1. Contractor Name, Address, and Telephone Number DUNS Number:
CAGE Code:
2. Submitted to (Office Name & Address)
– Attn: Andrew Ficklin NSWC Crane RE: Solicitation #N00164-16-T-0175
3. Business Company ��Partnership �Corporation �Individual Non-profit Organization �
4. How many years do you or your firm have in the line of work contemplated by this solicitation? ________ Years
5. How many years experience in contracting have you or your business had as a (a) prime contractor ________ and/or (b) sub-contractor ______ for same/similar services.
6. List below the projects your business has completed within the last three years (continue on separate sheet if necessary):
Contract Amount
Type of Project
Date Completed Name, Address, and Telephone No. of Owner/Person to Contract for Project Information
7. List below all of your firm’s contractual commitments running concurrently with the work contemplated by this solicitation (continue on separate sheet if necessary):
Contract Amount
Dollar Amt Of Award
Name, Address, and Telephone No. of Business/Government Agency Involved
Awarded (Units)
Percent Completed
Date Contract
Completed
8a. Have you ever failed to complete any work awarded to you? _____ Yes _____ No 8b. Has work ever been completed by performance bond? _____ Yes _____ No 8c. If “Yes” to either item 8a or 8b specify location(s) and reason(s) why (continue on separate sheet if necessary):
CERTIFICATION
I certify that all of the statements made by me are complete and correct to the best of my knowledge and that any persons named as references are authorized to furnish NSWC Crane with any information needed to verify my capability to perform this project.
9a.Certifying Official’s Name and Title
9b. Signature (Sign in Ink) 10. Date
(End of Summary of Changes)
File details come from the government source that posted it. Updated .