N0010419RK035
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION F - DELIVERIES OR PERFORMANCE
The following have been modified:
52.211-8 TIME OF DELIVERY (JUN 1997)
The Government requires delivery to be made in accordance with the following constraints. Contractors shall submit a delivery schedule which falls within the constraints. Delivery schedules outside of the delivery constraints will be considered non-responsive and rejected.
Delivery shall consist of a minimum of 7 lots or a maximum of 27 lots with LAT’s according to the following chart. A sample of the minimum 7 lot structure is included below. For additional lots the contractor is asked to use the same structure for additional lots. Lot 1 LAT date shall be no later than 365 days after date of contract or days after first article test approval. Each additional lot shall be delivered at a rate of every 30 days. The minimum lot size of deliverables is 151 EA and the maximum lot size is 1168 EA.
LATs are as follows:
CDRLs delivery schedule
| A001 (Product Baseline Index PBLI) |
| - |
| 90 DADC |
| A002 (POP) required with lot 1 only |
| - |
| Due with LAT |
| A003 (LAT Failure Report) |
| - |
| A/R |
| A004 (Radiographic Test Technique RTT) |
| - |
| Due 45 days prior to LAT |
| A005 (Radiographic Report and Film) |
| - |
| Due with LAT |
| A006 (Failure Summary & Analysis Report – FAT FAR) |
| - |
| A/R |
| A007 (Ammo Data Card, Provisional) |
| - |
| Due with LAT |
| A007 (Ammo Data Card, Final) |
| - |
| Due 5 days after Lot release |
| A008 (Packaging Kit Contents List) |
| - |
| Due 5 days prior to shipment of deliverables |
Sample of 7 lot structure.
KEY:
DADC = Days after Date of Contract DAFATA = Days after First Article Test Acceptance
7 Lot Delivery Schedule (Gov Testing)
| A001 (Product Baseline Index PBLI) |
| - |
| 90 DADC |
| A004 (Radiographic Test Technique RTT) |
| - |
| 320 DADC |
| A003 (LAT Failure Report) |
| - |
| A/R |
| 0001AB - First Article Test Samples |
| 18 EA |
| 240 DADC |
Lot 1
| A005 (Radiographic Report and Film) |
| - |
| A007 (Ammo Data Card, Provisional) |
| - |
| A007 (Ammo Data Card, Final) |
| - |
| A008 (Packaging Kit Contents List) |
| - |
| Lot 1 Deliverable Units |
| 997 EA |
Lot 2
| A005 (Radiographic Report and Film) |
| - |
| A007 (Ammo Data Card, Provisional) |
| - |
| A007 (Ammo Data Card, Final) |
| - |
| A008 (Packaging Kit Contents List) |
| - |
| Lot 2 Deliverable Units |
| 997 EA |
Lot 3
| A005 (Radiographic Report and Film) |
| - |
| A007 (Ammo Data Card, Provisional) |
| - |
| A007 (Ammo Data Card, Final) |
| - |
| A008 (Packaging Kit Contents List) |
| - |
| Lot 3 Deliverable Units |
| 997 EA |
Lot 4
| A005 (Radiographic Report and Film) |
| - |
| A007 (Ammo Data Card, Provisional) |
| - |
| A007 (Ammo Data Card, Final) |
| - |
| A008 (Packaging Kit Contents List) |
| - |
| Lot 4 Deliverable Units |
| 997 EA |
Lot 5
| A005 (Radiographic Report and Film) |
| - |
| A007 (Ammo Data Card, Provisional) |
| - |
| A007 (Ammo Data Card, Final) |
| - |
| A008 (Packaging Kit Contents List) |
| - |
| Lot 5 Deliverable Units |
| 997 EA |
Lot 6
| A005 (Radiographic Report and Film) |
| - |
| A007 (Ammo Data Card, Provisional) |
| - |
| A007 (Ammo Data Card, Final) |
| - |
| A008 (Packaging Kit Contents List) |
| - |
| Lot 6 Deliverable Units |
| 997 EA |
Lot 7
| A005 (Radiographic Report and Film) |
| - |
| A007 (Ammo Data Card, Provisional) |
| - |
| A007 (Ammo Data Card, Final) |
| - |
| A008 (Packaging Kit Contents List) |
| - |
| Lot 7 Deliverable Units |
| 1003 EA |
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term "working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.
(End of clause)
(End of Summary of Changes) image1.wmf