Amendment_4_19RK005.docx

DOCX document 45 KB Posted

Attached to
JM60 CKU-5C/A Catapult Aircraft Ejection Seat Federal contract opportunity
Solicitation number
N0010419RK005
Issued by
Department of the Navy Naval Supply Systems Command

About this file

Amendment_4_19RK005.docx

View the file

Other files for this federal contract opportunity

Other files attached to JM60 CKU-5C/A Catapult Aircraft Ejection Seat, newest first.
File Type Posted
Amendment_6_19RK005.docx DOCX document
Amendment_5_19RK005.docx DOCX document
Amendment_3_19RK005.docx DOCX document
Amendment_2_19RK005.docx DOCX document
Amendment_1_19RK005.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0010419RK005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SF30

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 11-Jul-2019 02:00 PM to 25-Jul-2019 02:00 PM.

The following have been modified:

SECTION B NOTES

SOLICITATION NOTES:

1. Faxed offers will NOT be accepted.

1. Because the Government intends to award without discussion, any exceptions to the requirements of this solicitation should be raised prior to submission of an offer.

1. This item is a CSI – Critical Safety Item.

1. Electronic submission of an offer may be accomplished by attaching your offer to an email directed to ashley.leonard@navy.mil. The size limitation of an email through the NAVSUP WSS mail server is 10 MB. All files designated as .zip files will be stripped from any email sent. Files larger than the server limitation may be segregated and sent via several emails as long as they are clearly identified as such. It is highly recommended that the Offeror request email delivery confirmation or other form of acknowledgement to verify that the proposal submission was received.

1. All vendors are required to perform First Article Testing on this requirement. Pricing should be provied in Section B including the First article testing. As the Government intends to award without discussion the unit price provided in Section B will be considered the unit price WITH FAT INCLUDED.

1. First Article Testing ONLY – REV K Motor Tubes are acceptable.

1. Solicitation Questions:

Question 1:

Q: Does the USN have a list of qualified suppliers? If a supplier is used by the USN and is qualified for CKU-5 manufacturing will this negate the requirement for 10-piece pre-production samples shown in CLIN 0003?

A: If the contractor is using previously accepted parts to manufacture their FAT units for this contract the government is willing to waive the FAT requirement for the critical parts that are outlined in the FAT clin and data to request waiver should be submitted with the offer. If the contractor uses another vendor to manufacture the production lot parts then samples of those parts from the new vendor will need to undergo dimensional and material inspection, which can be done by NSWC IHEODTD or by a third party and not the prime contractor. If the contractor uses a qualified vendor that is also used by the government then the requirement for submitting samples for inspection can be waived.

IHEODTD does not have a qualified vendor for the following parts:

- 11726650 Motor Tubes

- 512-174-0082 Subassy Tang Retainers

Question 2:

Q: Molykote 1292 bearing grease has been obsoleted by the supplier and they have recommended the alternative G-9000 or Molykote 3451. Are these acceptable alternatives.

A: Yes these are acceptable and FAT will be required.

Question 3:

Q: In regards to the requirements for Hydrostatic / Magnetic Particle / Dye Penetrant (CLIN 0003, item b2) and mechanical propoerties (CLIN 0003, item b3) which need to be done for the component parts listed in CLINs 0003 and 0004, our suppliers for the component parts have told us these tests are performed by them in accordance with the drawing and a certerificat showing these tests have been performed is supplied to the Prime contractor. Is this acceptable for a certification of analysis to fulfill the FAT requirement of b2 and b3?

A: Yes a certificate of analysis (COA) would fuflill the FAT requirement of b2 and b3.

Question 4:

Q: ECP18-0101 is referenced by the TDP (DL512-174-0068, REV K, 7/30/18). Please furnish a copy of the ECP.

A: ECP18-0101 has been included in the TDP and is available on FBO. These can be found at the following link:

https://www.fbo.gov/spg/DON/NAVSUP/N000104/N0010419RK005/packages.html

SECTION F - DELIVERIES OR PERFORMANCE

The following have been modified:

52.211-8 TIME OF DELIVERY (JUN 1997)

(a) The Government requires delivery to be made according to the following schedule or sooner at no additional cost to the Government. :

Delivery KEY:

FAT =
First Article Test
DAFATA =
Days After FAT Approval
LAT =
Lot Acceptance Test
DALATA =
Days After LAT Approval
DADC =
Days After Date of Contract
DAR-GFP =
Days After Receipt of GFP Assets
ITEM
Quantity
Days
A002 Failure Analysis (LAT Failure Report)
-
A/R
A003 Radiographic Test Technique
-
45 days prior to LAT
A006 Failure Analysis (FAT Failure Report)
-
A/R

First Article Test Lot

A004 Radiographic Report and Film
-
450 DADC
A005 Configuration Marriage Record
-
450 DADC
A007 Incoming Inspection Summary Report (FAT) Metal Parts Inspection Report
-
450 DADC
A008 Energetic Materials Analysis
-
450 DADC
A009 Provisional Ammunition Data Card (FAT)
-
450 DADC
0001AB (FAT Samples)
3 EA
450 DADC
0001AC (FAT Samples)
2 EA
450 DADC
0001AD (FAT Samples)
3 EA
450 DADC
0001AE (FAT Samples)
2 EA
450 DADC
0001AF (FAT Samples)
18 EA
450 DADC
A009 Final Ammunition Data Card (FAT)
-
575 DADC

Production Lot 1

A001 Performance Oriented Packaging Test Report
-
605 DAFATA OR 940 DADC
A004 Radiographic Report and Film
-
605 DAFATA OR 940 DADC
A005 Configuration Marriage Record
-
605 DAFATA OR 940 DADC
A007 Incoming Inspection Summary Report (LAT) Metal Parts Inspection Report
-
605 DAFATA OR 940 DADC
A008 Energetic Materials Analysis
-
605 DAFATA OR 940 DADC
A009 AMMUNITION DATA CARD (LAT Provisional)
-
605 DAFATA OR 940 DADC
0001AG (LAT Samples Lot 1)
14 EA
605 DAFATA OR 940 DADC
A009 AMMUNITION DATA CARD (LAT Final)
-
665 DAFATA OR 1000 DADC
0001AH (deliverable units)
30 EA
680 DAFATA OR 1015 DADC
0001AJ (deliverable units)
8 EA
680 DAFATA OR 1015 DADC
0001AK (deliverable units)
12 EA
680 DAFATA OR 1015 DADC
0001AL (deliverable units)
3 EA
680 DAFATA OR 1015 DADC
0001AM (deliverable units)
20 EA
680 DAFATA OR 1015 DADC
0001AN (deliverable units)
42 EA
680 DAFATA OR 1015 DADC
0001AP (deliverable units)
9 EA
680 DAFATA OR 1015 DADC
0001AQ (deliverable units)
24 EA
680 DAFATA OR 1015 DADC
0001AR (deliverable units)
13 EA
680 DAFATA OR 1015 DADC
0001AU (deliverable units)
2 EA
680 DAFATA OR 1015 DADC

Production Lot 2

A004 Radiographic Report and Film
-
665 DAFATA OR 1000 DADC
A005 Configuration Marriage Record
-
665 DAFATA OR 1000 DADC
A007 Incoming Inspection Summary Report (LAT) Metal Parts Inspection Report
-
665 DAFATA OR 1000 DADC
A008 Energetic Materials Analysis
-
665 DAFATA OR 1000 DADC
A009 AMMUNITION DATA CARD (LAT Provisional)
-
665 DAFATA OR 1000 DADC
0001AG (LAT Samples Lot 2)
14 EA
665 DAFATA OR 1000 DADC
A009 AMMUNITION DATA CARD (LAT Final)
-
725 DAFATA OR 1060 DADC
0001AS (deliverable units)
21 EA
740 DAFATA OR 1075 DADC
0001AT (deliverable units)
40 EA
740 DAFATA OR 1075 DADC
0001AV (deliverable units)
12 EA
740 DAFATA OR 1075 DADC
0001AW (deliverable units)
20 EA
740 DAFATA OR 1075 DADC
0001AX (deliverable units)
70 EA
740 DAFATA OR 1075 DADC

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

OFFEROR'S PROPOSED DELIVERY SCHEDULE

ITEM
Quantity
Days
A002 Failure Analysis (LAT Failure Report)
-
A/R
A003 Radiographic Test Technique
-
45 days prior to LAT
A006 Failure Analysis (FAT Failure Report)
-
A/R

First Article Test Lot

A004 Radiographic Report and Film
-
with FAT Samples
A005 Configuration Marriage Record
-
with FAT Samples
A007 Incoming Inspection Summary Report (FAT) Metal Parts Inspection Report
-
with FAT Samples
A008 Energetic Materials Analysis
-
with FAT Samples
A009 Provisional Ammunition Data Card (FAT)
-
with FAT Samples
0001AB (FAT Samples)
3 EA
0001AC (FAT Samples)
2 EA
0001AD (FAT Samples)
3 EA
0001AE (FAT Samples)
2 EA
0001AF (FAT Samples)
18 EA
A009 Final Ammunition Data Card (FAT)
-
125 DAFATA

Production Lot 1

A001 Performance Oriented Packaging Test Report
-
with LAT Samples Lot 1
A004 Radiographic Report and Film
-
with LAT Samples Lot 1
A005 Configuration Marriage Record
-
with LAT Samples Lot 1
A007 Incoming Inspection Summary Report (LAT) Metal Parts Inspection Report
-
with LAT Samples Lot 1
A008 Energetic Materials Analysis
-
with LAT Samples Lot 1
A009 AMMUNITION DATA CARD (LAT Provisional)
-
with LAT Samples Lot 1
0001AG (LAT Samples Lot 1)
14 EA
A009 AMMUNITION DATA CARD (LAT Final)
-
60 days after LAT
0001AH (deliverable units)
30 EA
75 days after LAT
0001AJ (deliverable units)
8 EA
75 days after LAT
0001AK (deliverable units)
12 EA
75 days after LAT
0001AL (deliverable units)
3 EA
75 days after LAT
0001AM (deliverable units)
20 EA
75 days after LAT
0001AN (deliverable units)
42 EA
75 days after LAT
0001AP (deliverable units)
9 EA
75 days after LAT
0001AQ (deliverable units)
24 EA
75 days after LAT
0001AR (deliverable units)
13 EA
75 days after LAT
0001AU (deliverable units)
2 EA
75 days after LAT

Production Lot 2

A004 Radiographic Report and Film
-
with LAT Samples Lot 2
A005 Configuration Marriage Record
-
with LAT Samples Lot 2
A007 Incoming Inspection Summary Report (LAT) Metal Parts Inspection Report
-
with LAT Samples Lot 2
A008 Energetic Materials Analysis
-
with LAT Samples Lot 2
A009 AMMUNITION DATA CARD (LAT Provisional)
-
with LAT Samples Lot 2
0001AG (LAT Samples Lot 2)
14 EA
A009 AMMUNITION DATA CARD (LAT Final)
-
60 days after LAT
0001AS (deliverable units)
21 EA
75 days after LAT
0001AT (deliverable units)
40 EA
75 days after LAT
0001AV (deliverable units)
12 EA
75 days after LAT
0001AW (deliverable units)
20 EA
75 days after LAT
0001AX (deliverable units)
70 EA
75 days after LAT

(End of clause) (End of Summary of Changes) image1.wmf