CDRLs.pdf

PDF 91 KB Posted

Attached to
Air Stabilzer MK-28 MOD 3 Federal contract opportunity
Solicitation number
N0010418RK076
Issued by
Department of the Navy Naval Supply Systems Command

About this file

This document contains four contractor data requirement lists (CDRLs) associated with a solicitation for the production of Air Stabilizer MK-28 MOD 3 systems.

The CDRLs require the contractor to submit a test procedure, pre-production and production test/inspection reports, failure analysis and corrective action reports, and monthly production line of balance status reports. Delivery of the first test procedure is due one time only. Test/inspection reports are due 15 days after first article testing and 15 days after acceptance testing of subsequent lots. Failure analysis reports are due on an as-needed basis within 10 days of a lot failure, with interim and final reports as specified. Monthly production status reports are due 30 days after the start of production and by the end of each month thereafter. All reports are to be delivered to the Naval Supply Systems Command Weapon Systems Support in Mechanicsburg, PA and Naval Supply Global Logistics Support.

The related solicitation provides additional context, seeking 737 base units and 553 option units of the Air Stabilizer MK-28 MOD 3 system. Responses are due through the Navy Electronic Commerce Online website. A technical data package will be available to support the response.

CDRLs

View the file

Other files for this federal contract opportunity

Other files attached to Air Stabilzer MK-28 MOD 3, newest first.
File Type Posted
Rk076_Amend_004.pdf PDF
RK076_Amend_0003.pdf PDF
RK076_Amend_0002.pdf PDF
N0010418Rk076_Amend_0001.pdf PDF
N0010418RK076_Final.pdf PDF
N0010418RK076_Final.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704- 0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A.CONTRACT LINE ITEM NO.

0001AA

B.EXHIBIT

C.CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

4T-1355-00-433-3214-

TA68

AIR STABILIZER, MK-28 MOD-3

E.CONTRACT/PR NO.

F.CONTRACTOR

1.DATA ITEM NO.

A001

2.TITLE OF DATA ITEM

Test Procedure

3.SUBTITLE

17.PRICE GROUP

4.AUTHORITY (Data Acquisition Document No.) 5.CONTRACT REFERENCE

6.REQUIRING OFFICE 18.ESTIMATED

TOTAL PRICE

DI-NDTI-80603A ALL DRAWINGS NUWC DIV KEYPORT CODE 423

7.DD250 REQ

DD

9.DIST STATEMENT

REQUIRED

10.FREQUENCY

ONE TIME

12.DATE OF FIRST

SUBMISSION

14.DISTRIBUTION

D

60 DAC

a. ADDRESSEE

b. COPIES

8.ADP CODE

A

11.AS OF

DATE

13.DATE OF SUBSEQUENT

Dra ft

Final

Reg Repro

16.REMARKS SEE BLOCK 16 0 1 0

THE PLAN IS TO SPECIFY PROCESS CONTROL INSTRUCTIONS AND INSPECTION

PROCEDURES NEEDED TO ENSURE PRODUCT CONFORMANCE TO DRAWINGS,

SPECIFICATIONS, AND CONTRACT REQUIREMENTS IAW ANSI/ASQC Q9000-2000 OR

EQUIVALENT. THE PLAN IS TO INCLUDE FIRST ARTICLE AND PRODUCTION LOT

QUALITY CONFORMANCE INSPECTION PROCEDURES IAW DI-NDTI-80603A ALONG

WITH ALL APPLICABLE DATA ENTRY SHEETS TO BE USED TO DOCUMENT PROCESS

INSPECTIONS.

BLK 14: DISTRIBUTION ADDRESS

N00104

COMMANDING OFFICER

NAVSUP WEAPON SYSTEMS SUPPORT

ATTN: CODE N742.13

5450 CARLISLE PIKE

P.O. BOX 2020

MECHANICSBURG, PA 17055-0788

Kirsten.barnes@navy.mil

15.TOTAL 0 1 0

G. PREPARED BY:

Margaret Bowerman

H. DATE

25 Sep 2017

I. APPROVED BY:

Jeremy Hilliker

J. DATE

25 Sep 2017

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 5 Pages mailto:Kirsten.barnes@navy.mil

The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704- 0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A.CONTRACT LINE ITEM NO.

D. SYSTEM/ITEM

4T-1355-00-433-3214-

TA68

A002

2.TITLE OF DATA ITEM

Test/Inspection Report

3.SUBTITLE

Pre-Production & Production Test

DI-NDTI-80809B ALL DRAWINGS NUWC DIV KEYPORT CODE 423

DD

REQUIRED

10.FREQUENCY

PER LOT

SEE BLOCK 16

a. ADDRESSEE

b. COPIES

8.ADP CODE

16.REMARKS SEE BLOCK 16 0 1 0

THE REPORT IS TO VERIFY PRODUCTION LOT CONFORMANCE TO THE APPLICABLE

DRAWINGS, SPECIFICATIONS, AND CONTRACT REQUIREMENTS. THE REPORT

CONSISTS OF THE PLAN (A001) CONTAINING ALL REQUIRED INSPECTION

RESULTS DOCUMENTED ON THE PLAN’S DATA ENTRY SHEETS. IN ADDITION, THE

REPORT IS TO INCLUDE MATERIAL CERTIFICATIONS AND ALL OTHER PERTINENT

OBJECTIVE QUALITY EVIDENCE. THE REPORT MUST BE APPROVED BY NAVSUP

WSS CONTRACTING OFFICER BEFORE FINAL ACCEPTANCE OF THE LOT.

BLK 12: DATE OF PRE-PRODUCTION TEST REPORT SUBMISSION – NLT 15 DAYS

AFTER FIRST ARTICLE TEST COMPLETION.

BLK 13: DATE OF SUBSEQUENT SUBMISSION – NLT 15 DAYS AFTER LOT

ACCEPTANCE TESTING OF SECOND LOT AND BEYOND.

BLK 14: DISTRIBUTION ADDRESS

N00104

COMMANDING OFFICER

NAVSUP WEAPON SYSTEMS SUPPORT

ATTN: CODE N742.13

5450 CARLISLE PIKE

P.O. BOX 2020

kirsten.barnes@navy.mil

Margaret Bowerman

H. DATE

25 Sep 2017

I. APPROVED BY:

Jeremy Hilliker

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 2 of 5 Pages mailto:kirsten.barnes@navy.mil

The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704- 0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A.CONTRACT LINE ITEM NO.

D. SYSTEM/ITEM

4T-1355-00-433-3214-

TA68

A003

2.TITLE OF DATA ITEM

Failure Analysis/Corrective Action Report

3.SUBTITLE

DI-SESS-81315B Section E NUWC DIV KEYPORT CODE 423

LT

REQUIRED

10.FREQUENCY

SEE BLOCK 16

12.DATE OF FIRST

a. ADDRESSEE

SEE BLOCK 16 Reg Repro

16.REMARKS SEE BLOCK 16 0 1 0

BLK 5: INCLUDE AND TAKE ACTION ON SECTION I IF FAT IS REQUIRED.

BLK 10: FREQUENCY - IS DETERMINED BY NUMBER OF FAT/LAT FAILURES.

BLK 12: DATE OF FIRST SUBMISSION – NLT AN INTERIM REPORT IS DUE NLT

10 DAYS AFTER NOTIFICATION OF LOT FAILURE. A FINAL REPORT IS DUE 30

DAYS AFTER NOTIFICATION OF LOT FAILURE.

BLK 13: DATE OF SUBSEQUENT SUBMISSION – NLT 10 DAYS AFTER FAT

COMPLETION OF SECOND FAILED LOT AND BEYOND.

BLK 14: DISTRIBUTION ADDRESS

N00104

COMMANDING OFFICER

NAVSUP WEAPON SYSTEMS SUPPORT

ATTN: CODE N742.13

5450 CARLISLE PIKE

P.O. BOX 2020

kirsten.barnes@navy.mil

Margaret Bowerman

H. DATE

25 Sep 2017

I. APPROVED BY:

Jeremy Hilliker

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 3 of 5 Pages

The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704- 0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A.CONTRACT LINE ITEM NO.

D. SYSTEM/ITEM

4T-1355-00-433-3214-

TA68

A004

2.TITLE OF DATA ITEM

Production Line Of Balance Status

3.SUBTITLE

Production Progress Report

DI-MGMT-80034 SEE BLOCK 16 NUWC Keyport Division Code N421

LT

REQUIRED

10.FREQUENCY

MTHLY

a. ADDRESSEE

Draf t

16.REMARKS NUWC Keyport 0 1

NAVSUP WSS 1 0

(Block 5) Contractor shall submit a monthly progress report (DD Form 375) describing the NAVSUP GLS 0 1 contractor's current progress in a graphic form by comparison of planned objectives for flow of materials and Components into manufacturer of end items as related to delivery requirements.

(Block 12) Date for First Submission: 30 days after start of production.

Report shall be submitted to:

Commanding Officer NUWC Keyport Division Attn: Code N421 610 Dowell Street Keyport, WA 98325 nicole.lerner@navy.mil

Commanding Officer NAVSUP Weapons Systems Support P.O. Box 2020 Mechanicsburg, PA 17055-0788 kirsten.barnes@navy.mil

Commanding Officer NAVSUP Global Logistics Support Attn: Code 45113 Bldg. 407N Mechanicsburg, PA 17055-0735 margaret.bowerman@navy.mil mailto:nicole.lerner@navy.mil mailto:margaret.bowerman@navy.mil

Margaret Bowerman

H. DATE

25 Sep 2017

I. APPROVED BY:

Jeremy Hilliker

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 5 of 5 Pages

CONTRACT DATA REQUIREMENTS LIST
Form Approved
B.EXHIBIT
CONTRACT DATA REQUIREMENTS LIST
Form Approved
B.EXHIBIT
CONTRACT DATA REQUIREMENTS LIST
Form Approved
B.EXHIBIT
CONTRACT DATA REQUIREMENTS LIST
Form Approved
B.EXHIBIT

File details come from the government source that posted it. Updated .