Exhibit A CDRLs
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| EC_Amendment_0001.pdf | ||
| EC_Amendment_0001_Exhibit_C_CDRLS.pdf | ||
| EC_RFP.pdf | ||
| Attachment_E_EC_Technical_Data_Selection_Form.pdf | ||
| Attachment_H_EC_DD254.pdf | ||
| Attachment_G_EC_GFI.pdf | ||
| Attachment_I_EC_Shipping_Instructions.pdf | ||
| Attachments_L-3_and_L-4_EC_Past_Performance.docx | DOCX document | |
| Attachment_D_EC_Attachment_L-2_Spares_List.xls | XLS spreadsheet | |
| Attachment_L-1_Engineering_Services_and_Support.xlsx | XLSX spreadsheet | |
| Exhibit_B_EC_ILS_CDRLs.pdf | ||
| Exhibit_C_EC_Cyber_CDRLS.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit A: EC CDRLs – Program Mgmt and Engineering N00024-18-R-4209
DD Form 1423-1, Contract Data Requirements List
(1 Data Item)
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0003
B. EXHIBIT
A
C. CATEGORY:
TDP __ TM ___ OTHER NDTI ._
D. SYSTEM/ITEM
ENGINE CONTROLLER
E. CONTRACT/PR NO.
N00024-18-R-4209
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
TEST / INSPECTION REPORT
3.SUBTITLE
TEST/INSPECTION REPORT
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80809B
5. CONTRACT REFERENCE
SECTION C: 1.6.3, 1.15.3, 1.15.4.3.15.5
6. REQUIRING OFFICE
NSWC PD C/514
7. DD 250 REQ
LT
9. DIST STATEMENT
10. FREQUENCY
AS REQUIRED
12.DATE OF FIRST
SUBMISSION
BLK 16
14. DISTRIBUTION
8. APP CODE
D
11. AS OF DATE
13. DATE OF
SUBSEQUENT
SUBMISSION
a. ADDRESSEE
b. COPIES
16. REMARKS DRAFT FINAL
Reg Repro
BLOCK 5: Options apply as exercised
BLOCK 9: Distribution Statement D: Distribution authorized to Department of Defense (DOD) and U. S. DOD contractors only. Other requests must be referred to NSWC Philadelphia.
BLOCKS 10/12/13: Submit not later than (NLT) 15 days after completion of tests/inspections performed.
BLOCK 14: Electronic format for regular copy acceptable. Format must be readable by Microsoft Office 2010 Suite or Later Version. Electronic distribution acceptable. NAVSEA 21F to receive letter of transmittal only
NSWC PD
NAVSEA 21F
(BLK 16)
15. TOTAL 0 0 1
G. PREPARED BY
Adanne Nduaka NSWC PD C/514
H. DATE
08/19/2016
I. APPROVED BY
Charles Teichert PEO SHIPS AM
J. DATE
03/20/18
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1
17. PRICE
GROUP
18.
ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0003
B. EXHIBIT
A
C. CATEGORY:
TDP _X_ TM ___ OTHER
D. SYSTEM/ITEM
ENGINE CONTROLLER
E. CONTRACT/PR NO.
N00024-18-R-4209
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
PRODUCT DRAWINGS AND ASSOCIATED LISTS
3.SUBTITLE
Engine Controller Commercial Drawings and Associated Lists
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81000E (BLK 16)
5. CONTRACT REFERENCE
SECTION C, Paragraph 1.1.2.1, 1.16.1
6. REQUIRING OFFICE
NSWC PD C/514
7. DD 250 REQ
DD
ONE/R
AD
SUBMISSION
BLOCK 4: See Attachment E.
BLOCK 5: Options apply as exercised.
BLOCK 8: Approval is for technical content only.
BLOCK 9: Distribution Statement D: Distribution authorized to Department of Defense (DOD) and U. S. DOD contractors only. Other requests must be referred to NSWC Philadelphia.
BLOCK 12: Fifteen (15) days prior to PDR Contractor to provide draft Engine Controller (EC) drawing package. Provide final tech data package fifteen (15) working days after first production (shipset) hardware delivery. Government to provide comments within forty-five
(45) days. Government comments to be incorporated within 30 Days After Receiving Comments (DARC).
BLOCK 13: Submit revised product drawings/lists 60 days after Government design change approval or concurrent with Design Change Notice. Government comments to be incorporated within 30 DARC.
BLOCK 14: NAVSEA 21F to receive letter of transmittal only.
15. TOTAL 1 2 31
I. APPROVED BY
Charles Teichert PEO SHIPS AM
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1
(1 Data Item)
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0003
B. EXHIBIT
A
C. CATEGORY:
TDP __ TM ___ OTHER X ._
D. SYSTEM/ITEM
ENGINE CONTROLLER
E. CONTRACT/PR NO.
N00024-18-R-4209
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A002A
2. TITLE OF DATA ITEM
COMMERCIAL DRAWINGS AND ASSOCIATED LISTS
3.SUBTITLE
Engine Controller Commercial Drawings and Associated Lists
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81003E (BLK 16)
5. CONTRACT REFERENCE
SECTION C, paragraph 1.1.2.1
6. REQUIRING OFFICE
NSWC PD C/514
7. DD 250 REQ
SUBMISSION
BLOCK 4: See Attachment E.
BLOCK 5: Options apply as exercised.
BLOCK 8: Approval is for technical content only.
BLOCK 9: Distribution Statement D: Distribution authorized to Department of Defense (DOD) and U. S. DOD contractors only. Other requests must be referred to NSWC Philadelphia.
BLOCK 12: Fifteen (15) days prior to PDR Contractor to provide draft Engine Controller (EC) drawing package. Provide final tech data package fifteen (15) working days after first production (shipset) hardware delivery. Government to provide comments within forty-five
(45) days. Government comments to be incorporated within 30 Days After Receiving Comments (DARC).
BLOCK 13: Submit revised product drawings/lists 60 days after Government design change approval or concurrent with Design Change Notice. Government comments to be incorporated within 30 DARC.
BLOCK 14: NAVSEA 21F to receive letter of transmittal only.
15. TOTAL 1 0 2
I. APPROVED BY
Charles Teichert PEO SHIPS AM
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1
(1 Data Item)
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0003
B. EXHIBIT
A
C. CATEGORY:
TDP __ TM ___ OTHER SDMP ._
D. SYSTEM/ITEM
ENGINE CONTROLLER
E. CONTRACT/PR NO.
N00024-18-R-4209
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
PARTS MANAGEMENT PLAN
3.SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SDMP-81748
5. CONTRACT REFERENCE
Section C, Paragraph 1.14 and 1.14.1
6. REQUIRING OFFICE
NSWC PD C/514
7. DD 250 REQ
ONE
SUBMISSION
BLOCK 4: The Contractor shall, at a minimum, address the issues set forth in the applicable SOW reference.
BLOCK 5: Options apply as exercised.
BLOCK 8: Approval for technical content only.
Reg Repro
BLOCK 9: Distribution Statement D: Distribution authorized to Department of Defense (DOD) and U. S. DOD contractors only. Other requests must be referred to NSWC Philadelphia.
BLOCK 12/13: Contractor to submit 60 Days after Contract Award (DAC). Government to provide comments within 30 days. Contractor to provide revised document 30 Days After Receipt of Comments (DARC).
BLOCK 14: Electronic format for regular copy acceptable. Format must be readable by to receive letter of transmittal only.
15. TOTAL 1 0 1
I. APPROVED BY
Charles Teichert PEO SHIPS AM
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1
(1 Data Item)
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0003
B. EXHIBIT
A
C. CATEGORY:
TDP __ TM ___ OTHER MGMT ._
D. SYSTEM/ITEM
ENGINE CONTROLLER
E. CONTRACT/PR NO.
N00024-18-R-4209
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
CONTRACTOR’S PROGRESS STATUS AND MANAGEMENT
REPORT
DI-MGMT-80227 (BLK 16)
5. CONTRACT REFERENCE
Section C, Paragraph 1.13.3
6. REQUIRING OFFICE
NSWC PD C/514
7. DD 250 REQ
MONTHLY
BLOCK 4: PARAS 10.3.F THROUGH 10.3.P DO NOT APPLY.
BLOCK 5: Options apply as exercised.
BLOCK 8: Approval for technical content only.
Reg Repro
BLOCK 9: Distribution Statement D: Distribution authorized to Department of Defense (DOD) and U. S. DOD contractors only. Other requests must be referred to NSWC Philadelphia.
BLOCKS 10/12: Submit monthly Progress Report not later than (NLT) 15th of the following month.
BLOCK 14: Electronic format for regular copy acceptable. Format must be readable by
15. TOTAL 0 0 1
I. APPROVED BY
Charles Teichert PEO SHIPS AM
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1
(1 Data Item)
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0003
B. EXHIBIT
A
C. CATEGORY:
TDP __ TM ___ OTHER X ._
D. SYSTEM/ITEM
ENGINE CONTROLLER
E. CONTRACT/PR NO.
N00024-18-R-4209
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
TECHNICAL MANUALS (EQUIPMENT/COMPONENTS) (NON-
COTS)
3.SUBTITLE
Engine Controller Technical Manual
4. AUTHORITY (Data Acquisition Document No.)
NDMS-080027-000
5. CONTRACT REFERENCE
Attachment B, PARA 3
6. REQUIRING OFFICE
NSWC PD C/514
7. DD 250 REQ
SUBMISSION
BLOCK 5: Options apply as exercised.
BLOCK 9: Distribution Statement D: Distribution authorized to Department of Defense (DOD) and U. S. DOD contractors only. Other requests must be referred to NSWC Philadelphia.
BLOCK 12/13: Tech manual outline and table of contents provided at PDR. Preliminary draft delivery will be thirty (30) days after first Factory Acceptance Test (FAcT) completion.
Government will have thirty (30) days to review preliminary draft and provide comments.
Contractor will have ninety (90) days to incorporate comments into a final draft. Government will have thirty (30) days to review final draft and provide comments. Contractor will have thirty (30) days to incorporate comments.
BLOCK 14: Two (2) printed Final Tech Manuals and one (1) CDROMs containing the Final Tech Manual in Adobe Portable Data Format (PDF 9.0 or higher) are required per each Shipset, Qualification test equipment set, and Training Site equipment set. One copy of the printed Tech Manual and one CDROM containing the electronic version of the Tech Manual are required by NSWC PD for each preliminary and final Tech Manual version produced. Format of the Tech Manual on CDROMs provided to NSWC PD shall be in Microsoft Office 2010 Suite or Later Version. All Tech Manual files & CDROMs shall be delivered with the capability to be duplicated. NAVSEA 21F to receive letter of transmittal only.
(2 ea ShipSet)
(2 ea Training Set)
(2 ea 1st Qual Set)
(2 ea LBES Set)
15. TOTAL 1 10 5
I. APPROVED BY
Charles Teichert PEO SHIPS AM
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1
(1 Data Item)
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0003
B. EXHIBIT
A
C. CATEGORY:
TDP _X_ TM ___ OTHER
D. SYSTEM/ITEM
ENGINE CONTROLLER
E. CONTRACT/PR NO.
N00024-18-R-4209
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
FAILURE MODE, EFFECTS, AND CRITICALITY ANALYSIS
REPORT
DI-ILSS-81495A
5. CONTRACT REFERENCE
Section C, Paragraph 1.8.1
6. REQUIRING OFFICE
NSWC PD C/514
7. DD 250 REQ
SUBMISSION
BLOCK 4: The contractor shall, at a minimum, address the issues set forth in the applicable SOW reference.
BLOCK 8: Approval for technical content only.
BLOCK 9: Distribution Statement D: Distribution authorized to Department of Defense (DOD) and U. S. DOD contractors only. Other requests must be referred to NSWC Philadelphia.
BLOCK 12/13: Present preliminary FMECA analysis/approach at PDR. Submit FMECA 60 days after PDR. Government to provide comments within 30 days. Contractor to provide final report 60 days after Qualification Test.
BLOCK 14: Electronic format for regular copy acceptable. Format must be readable by
15. TOTAL 1 0 1
I. APPROVED BY
Charles Teichert PEO SHIPS AM
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1
(1 Data Item)
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0003
B. EXHIBIT
A
C. CATEGORY:
TDP __ TM _ X__ OTHER
D. SYSTEM/ITEM
ENGINE CONTROLLER
E. CONTRACT/PR NO.
N00024-18-R-4209
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
COMMERCIAL OFF-THE-SHELF (COTS) MANUALS AND
ASSOCIATED SUPPLEMENTAL DATA
3.SUBTITLE
Engine Controller Software User Manuals (COTS)
4. AUTHORITY (Data Acquisition Document No.)
DI-TMSS-80527C
5. CONTRACT REFERENCE
Section C, Paragraph 1.3.2
6. REQUIRING OFFICE
NSWC PD C/514
7. DD 250 REQ
N/A
BLOCK 5: Options apply as exercised.
BLOCK 9: Distribution Statement D: Distribution authorized to Department of Defense (DOD) and U. S. DOD contractors only. Other requests must be referred to NSWC Philadelphia.
BLOCK 12: Contractor shall submit COTS software user manuals pertinent to EC with Software Product Specification delivery or with Tech Manual delivery.
BLOCK 14: Contractor format acceptable. Electronic distribution acceptable. NAVSEA 21F to receive letter of transmittal only.
15. TOTAL 0 0 1
I. APPROVED BY
Charles Teichert PEO SHIPS AM
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1
(1 Data Item)
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0003
B. EXHIBIT
A
C. CATEGORY:
TDP __ TM ___ OTHER ILSS .
D. SYSTEM/ITEM
ENGINE CONTROLLER
E. CONTRACT/PR NO.
N00024-18-R-4209
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
TRAINING MATERIALS
3.SUBTITLE
Installation & Familiarization Training For Shipboard Personnel
4. AUTHORITY (Data Acquisition Document No.)
DI-ILSS-80872
5. CONTRACT REFERENCE
ATTACHMENT B, PARA 5.
6. REQUIRING OFFICE
NSWC PD C/514
7. DD 250 REQ
BLOCK 9: Distribution Statement D: Distribution authorized to Department of Defense (DOD) and U. S. DOD contractors only. Other requests must be referred to NSWC Philadelphia.
BLOCK 12: Submit draft training materials thirty (30) days after Qualification Test production complete. Government has thirty (30) days to review. Contractor has thirty (30) days to incorporate Government comments and submit final training materials.
BLOCK 14: Electronic format for regular copy acceptable. Format must be readable by
15. TOTAL 1 0 1
I. APPROVED BY
Charles Teichert PEO SHIPS AM
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1
(1 Data Item)
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0003
B. EXHIBIT
A
C. CATEGORY:
TDP __ TM ___ OTHER SESS .
D. SYSTEM/ITEM
ENGINE CONTROLLER
E. CONTRACT/PR NO.
N00024-18-R-4209
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM
INSTALLATION AND CHECKOUT (INCO) SPARES LIST
3.SUBTITLE
Engine Controller INCO/OBRP List
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81619
5. CONTRACT REFERENCE
ATTACHMENT B, PARA 6.
6. REQUIRING OFFICE
NSWC PD C/514
7. DD 250 REQ
SUBMISSION
BLOCK 4: Contractor shall use format per Attachment D of this contract.
BLOCK 9: Distribution Statement D: Distribution authorized to Department of Defense (DOD) and U. S. DOD contractors only. Other requests must be referred to NSWC Philadelphia.
BLOCK 12: INCO list with a recommended On Board Repair Parts (OBRP) list sixty (60) days after PDR or as otherwise determined at the Post-Award Conference.
BLOCK 14: Electronic format for regular copy acceptable. Format must be readable by
15. TOTAL 0 0 1
I. APPROVED BY
Charles Teichert PEO SHIPS AM
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1
(1 Data Item)
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0003
B. EXHIBIT
A
C. CATEGORY:
TDP __ TM ___ OTHER SESS .
D. SYSTEM/ITEM
ENGINE CONTROLLER
E. CONTRACT/PR NO.
N00024-18-R-4209
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A010
2. TITLE OF DATA ITEM
COMMERCIAL DRAWINGS AND ASSOCIATED LISTS
3.SUBTITLE
Indentured/Interchangeable Parts List
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81003E
5. CONTRACT REFERENCE
Section C, Paragraph 1.14.4
6. REQUIRING OFFICE
Prime Provisioning Authority (PPA)/ Technical Support Activity (TSA)
7. DD 250 REQ
BLOCK 4: In addition to the requirements stated in the DID, the Contractor shall provide the required part lists as set forth in the applicable SOW reference.
BLOCK 5: Options apply as exercised.
BLOCK 9: Distribution Statement D: Distribution authorized to Department of Defense (DOD) and U. S. DOD contractors only. Other requests must be referred to the PPA.
BLOCK 10/12: Initial Indentured parts lists provided at time of Initial Equipment Delivery or as otherwise determined at the Post-Award Conference. Updates shall be provided bimonthly.
BLOCK 14: Electronic format for regular copy acceptable. Format must be readable by
PPA/TSA
15. TOTAL 0 0 1
I. APPROVED BY
Charles Teichert PEO SHIPS AM
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1
(1 Data Item)
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0003
B. EXHIBIT
A
C. CATEGORY:
TDP __ TM ___ OTHER MISC .
D. SYSTEM/ITEM
ENGINE CONTROLLER
E. CONTRACT/PR NO.
N00024-18-R-4209
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A011
2. TITLE OF DATA ITEM
SOURCE DATA FOR FORECASTING DIMINISHING
MANUFACTURING SOURCES AND MATERIAL SHORTAGES
(DMSMS)
3.SUBTITLE
DMSMS ALERT RESPONSE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81656
5. CONTRACT REFERENCE
Section C, Paragraph 1.14.5
6. REQUIRING OFFICE
Prime Provisioning Authority (PPA)/ Technical Support Activity (TSA)
7. DD 250 REQ
SUBMISSION
BLOCK 4: The Contractor shall, as a minimum, address the requirements set forth in the applicable SOW reference.
BLOCK 9: Distribution Statement D: Distribution authorized to Department of Defense (DOD) and U. S. DOD contractors only. Other requests for this data item shall be referred to the PPA.
BLOCK 10: As Required. The Contractor shall provide a DMSMS Alert Response not later than (NLT) 10 working days after receipt of each DMSMS Alert Notice submitted by the PPA/TSA.
The Contractor shall notify the PPA/TSA NLT14 days after discovery of any obsolescence issues with equipment delivered to the Government.
BLOCK 12/13: DMSMS alerts no later than ten (10) working days after receipt of DMSMS notice.
BLOCK 14: Electronic format for regular copy acceptable. Format must be readable by
PPA/TSA
15. TOTAL 0 0 1
I. APPROVED BY
Charles Teichert PEO SHIPS AM
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1
(1 Data Item)
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0003
B. EXHIBIT
A
C. CATEGORY:
TDP __ TM ___ OTHER IPSC .
D. SYSTEM/ITEM
ENGINE CONTROLLER
E. CONTRACT/PR NO.
N00024-18-R-4209
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A012
2. TITLE OF DATA ITEM
SOFTWARE REQUIREMENTS SPECIFICATION (SRS)
3.SUBTITLE
ENGINE CONTROLLER SRS
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81433A
5. CONTRACT REFERENCE
Section C, Paragraph 1.3.2
6. REQUIRING OFFICE
NSWC PD C/514
7. DD 250 REQ
SUBMISSION
BLOCK 5: Options apply as exercised.
Block 8: Approval for technical content only.
BLOCK 9: Distribution Statement D: Distribution authorized to Department of Defense (DOD) and U. S. DOD contractors only. Other requests must be referred to NSWC Philadelphia.
BLOCK 10/12/13: Submit draft SRS 14 Days prior to PDR, submit final SRS 14 Days prior to PDR. Government to provide comments within 30 days. Submit updates to SRS when impacted by approved software changes.
BLOCK 14: Electronic format for regular copy acceptable. Submit Requirements in DOORS
9.6 compatible file format. Also deliver export file of software requirements in Microsoft EXCEL file. NAVSEA 21F to receive letter of transmittal only.
15. TOTAL 1 0 1
I. APPROVED BY
Charles Teichert PEO SHIPS AM
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1
(1 Data Item)
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0003
B. EXHIBIT
A
C. CATEGORY:
TDP __ TM ___ OTHER IPSC .
D. SYSTEM/ITEM
ENGINE CONTROLLER
E. CONTRACT/PR NO.
N00024-18-R-4209
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A013
2. TITLE OF DATA ITEM
INTERFACE DESIGN DESCRIPTION (IDD)
3.SUBTITLE
ENGINE CONTROLLER IDD
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81436A
5. CONTRACT REFERENCE
Section C, Paragraph 1.3.2
6. REQUIRING OFFICE
NSWC PD C/514
7. DD 250 REQ
SUBMISSION
BLOCK 5: Options apply as exercised
Block 8: Approval for technical content only.
BLOCK 9: Distribution Statement D: Distribution authorized to Department of Defense (DOD) and U. S. DOD contractors only. Other requests must be referred to NSWC Philadelphia.
BLOCK 10/12/13: Submit draft IDD 14 Days prior to CDR, and submit final IDD 14 Days prior to PDR. Government to provide comments within thirty (30) days. Submit updates to IDD when impacted by approved software changes.
BLOCK 14: Electronic format for regular copy acceptable. Format must be readable by
15. TOTAL 1 0 1
I. APPROVED BY
Charles Teichert PEO SHIPS AM
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1
(1 Data Item)
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0003
B. EXHIBIT
A
C. CATEGORY:
TDP __ TM ___ OTHER IPSC .
D. SYSTEM/ITEM
ENGINE CONTROLLER
E. CONTRACT/PR NO.
N00024-18-R-4209
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A014
2. TITLE OF DATA ITEM
SOFTWARE VERSION DESCRIPTION (SVD)
3.SUBTITLE
ENGINE CONTROLLER SVD
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81442A
5. CONTRACT REFERENCE
Section C, Paragraph 1.3.2
6. REQUIRING OFFICE
NSWC PD C/514
7. DD 250 REQ
SUBMISSION
BLOCK 4: Format shall be in Contractor format.
BLOCK 5: Options apply as exercised.
BLOCK 8: Approval for technical content only
BLOCK 9: Distribution Statement D: Distribution authorized to Department of Defense (DOD) and U. S. DOD contractors only. Other requests must be referred to NSWC Philadelphia.
BLOCKS 10/12/13: Submit SVD with SPS delivery or when impacted by approved software changes.
BLOCK 14: Electronic format for regular copy acceptable. Format must be readable by
15. TOTAL 1 0 1
I. APPROVED BY
Charles Teichert PEO SHIPS AM
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1
(1 Data Item)
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0003
B. EXHIBIT
A
C. CATEGORY:
TDP __ TM ___ OTHER IPSC .
D. SYSTEM/ITEM
ENGINE CONTROLLER
E. CONTRACT/PR NO.
N00024-18-R-4209
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A015
2. TITLE OF DATA ITEM
SOFTWARE TEST PLAN (STP)
3.SUBTITLE
ENGINE CONTROLLER STP
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81438A
5. CONTRACT REFERENCE
Section C, Paragraph 1.3.2, Paragraph 1.3.9
6. REQUIRING OFFICE
NSWC PD C/514
7. DD 250 REQ
SUBMISSION
BLOCK 5: Options apply as exercised.
Block 8: Approval for technical content only
BLOCK 9: Distribution Statement D: Distribution authorized to Department of Defense (DOD) and U. S. DOD contractors only. Other requests must be referred to NSWC Philadelphia.
BLOCK 10/12/13: Submit draft fourteen (14) days prior to PDR. Government has thirty (30) days to review. Final plan thirty (30) Days After Receiving Comments (DARC).
BLOCK 14: Electronic format for regular copy acceptable. Format must be readable by
15. TOTAL 1 0 1
I. APPROVED BY
Charles Teichert PEO SHIPS AM
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1
(1 Data Item)
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0003
B. EXHIBIT
A
C. CATEGORY:
TDP __ TM ___ OTHER IPSC .
D. SYSTEM/ITEM
ENGINE CONTROLLER
E. CONTRACT/PR NO.
N00024-18-R-4209
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A016
2. TITLE OF DATA ITEM
SOFTWARE TEST DESCRIPTION (STD)
3.SUBTITLE
ENGINE CONTROLLER STD
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81439A
5. CONTRACT REFERENCE
Section C, Paragraph 1.3.2
6. REQUIRING OFFICE
NSWC PD C/514
7. DD 250 REQ
SUBMISSION
BLOCK 5: Options apply as exercised.
Block 8: Approval for technical content only.
BLOCK 9: Distribution Statement D: Distribution authorized to Department of Defense (DOD) and U. S. DOD contractors only. Other requests must be referred to NSWC Philadelphia.
BLOCK 10/12/13: Submit STD 60 days prior to initiation of each test, or when required by approved software changes. Government to provide comments within 30 days. Contractor shall provide final STD 30 Days After Receiving Comments (DARC).
BLOCK 14: Electronic format for regular copy acceptable. Format must be readable by
15. TOTAL 1 0 1
04/28/2016
I. APPROVED BY
Charles Teichert PEO SHIPS AM
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1
(1 Data Item)
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0003
B. EXHIBIT
A
C. CATEGORY:
TDP __ TM ___ OTHER IPSC .
D. SYSTEM/ITEM
ENGINE CONTROLLER
E. CONTRACT/PR NO.
N00024-18-R-4209
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A017
2. TITLE OF DATA ITEM
SOFTWARE TEST REPORT (STR)
3.SUBTITLE
ENGINE CONTROLLER STR
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81440A
5. CONTRACT REFERENCE
Section C, Paragraph 1.3.2
6. REQUIRING OFFICE
NSWC PD C/514
7. DD 250 REQ
BLOCK 5: Options apply as exercised.
BLOCK 9: Distribution Statement D: Distribution authorized to Department of Defense (DOD) and U. S. DOD contractors only. Other requests must be referred to NSWC Philadelphia.
BLOCK 10/12: Submit STR not later than (NLT) thirty (30) working days after completion of software testing.
BLOCK 14: Electronic format for regular copy acceptable. Format must be readable by
15. TOTAL 1 0 1
I. APPROVED BY
Charles Teichert PEO SHIPS AM
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1
(1 Data Item)
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0003
B. EXHIBIT
A
C. CATEGORY:
TDP __ TM ___ OTHER MISC .
D. SYSTEM/ITEM
ENGINE CONTROLLER
E. CONTRACT/PR NO.
N00024-18-R-4209
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A018
2. TITLE OF DATA ITEM
System Deficiency Report Data (SDR)
3.SUBTITLE
ENGINE CONTROLLER SDR
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-81627
5. CONTRACT REFERENCE
Section C, Paragraph 1.3.2
6. REQUIRING OFFICE
NSWC PD C/514
7. DD 250 REQ
AS REQUIRED
BLOCK 1: If no System Deficiencies exist for the system or equipment, this data deliverable shall be deleted upon notification to the Government Contract Representative.
BLOCK 4: Delete references to LCAC.
BLOCK 5: Options apply as exercised.
BLOCK 8: Approval is for technical content only.
BLOCK 9: Distribution Statement D: Distribution authorized to Department of Defense (DOD) and U. S. DOD contractors only. Other requests must be referred to NSWC Philadelphia.
Block 12: Submit SDR not later than (NLT) 15 working days after discovery of hardware or software system deficiencies.
BLOCK 14: Electronic format for regular copy acceptable. Format must be readable by
15. TOTAL 0 0 1
I. APPROVED BY
Charles Teichert PEO SHIPS AM
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1
(1 Data Item)
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0003
B. EXHIBIT
A
C. CATEGORY:
TDP __ TM ___ OTHER IPSC .
D. SYSTEM/ITEM
ENGINE CONTROLLER
E. CONTRACT/PR NO.
N00024-18-R-4209
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A019
2. TITLE OF DATA ITEM
SOFTWARE PRODUCT SPECIFICATION (SPS)
3.SUBTITLE
ENGINE CONTROLLER SPS
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81441A
5. CONTRACT REFERENCE
Section C, Paragraph 1.3.2, 1.3.3, 1.3.4, 1.3.5, and 1.3.6
6. REQUIRING OFFICE
NSWC PD C/514
7. DD 250 REQ
SUBMISSION
BLOCK 4: SPS shall contain program executable files, source files, and support information.
BLOCK 5: Options apply as exercised.
BLOCK 9: Distribution Statement D: Distribution authorized to Department of Defense (DOD) and U. S. DOD contractors only. Other requests must be referred to NSWC Philadelphia.
BLOCK 10/12/13: Submit SPS at time of delivery of equipment or as agreed to a System Requirements Review, and also with delivery of approved software changes.
BLOCK 14: Electronic format for regular copy acceptable. Format of supporting information must be readable by Microsoft Office 2010 Suite or Later Version. Executable and source code to be delivered on reproducible CDROMs. NAVSEA 21F to receive letter of transmittal only.
15. TOTAL 1 0 2
I. APPROVED BY
Charles Teichert PEO SHIPS AM
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1
(1 Data Item)
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0003
B. EXHIBIT
A
C. CATEGORY:
TDP __ TM ___ OTHER IPSC .
D. SYSTEM/ITEM
ENGINE CONTROLLER
E. CONTRACT/PR NO.
N00024-18-R-4209
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A020
2. TITLE OF DATA ITEM
SOFTWARE TRANSITION PLAN (STrP)
3.SUBTITLE
ENGINE CONTROLLER STrP
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81429A
5. CONTRACT REFERENCE
Section C, Paragraph 1.3.2
6. REQUIRING OFFICE
NSWC PD C/514
7. DD 250 REQ
BLOCK 9: Distribution Statement D: Distribution authorized to Department of Defense (DOD) and U. S. DOD contractors only. Other requests must be referred to NSWC Philadelphia.
BLOCK 10/12: Submit draft STrP fourteen (14) days prior to CDR. Government to provide comments within thirty (30) days. Contractor shall provide final STrP thirty (30) Days After Receiving Comments (DARC).
BLOCK 14: Electronic format for regular copy acceptable. Format must be readable by
15. TOTAL 1 0 1
I. APPROVED BY
Charles Teichert PEO SHIPS AM
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1
(1 Data Item)
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0003
B. EXHIBIT
A
C. CATEGORY:
TDP __ TM ___ OTHER IPSC .
D. SYSTEM/ITEM
ENGINE CONTROLLER
E. CONTRACT/PR NO.
N00024-18-R-4209
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A021
2. TITLE OF DATA ITEM
SOFTWARE USER MANUAL (SUM)
3.SUBTITLE
SOFTWARE USER MANUAL (SUM) (Non-COTS)
FOR EC
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81443A
5. CONTRACT REFERENCE
Section C, Paragraph 1.3.2
6. REQUIRING OFFICE
NSWC PD C/514
7. DD 250 REQ
SUBMISSION
BLOCK 5: Options apply as exercised.
BLOCK 9: Distribution Statement D: Distribution authorized to Department of Defense (DOD) and U. S. DOD contractors only. Other requests must be referred to NSWC Philadelphia.
BLOCK 10/12/13: Contractor shall submit preliminary draft of the Software User Manual (Non- COTS) thirty (30) days after Qualification Test production complete. Government will have thirty (30) days to review preliminary draft and provide comments. Contractor will have thirty
(30) days to incorporate comments into final draft. Government will have thirty (30) days to review final draft and provide comments. Contractor will have thirty (30) days to incorporate comments.
BLOCK 14: Electronic distribution acceptable. NAVSEA 21F to receive letter of transmittal only.
15. TOTAL 1 0 1
I. APPROVED BY
Charles Teichert PEO SHIPS AM
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1
(1 Data Item)
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0003
B. EXHIBIT
A
C. CATEGORY:
TDP __ TM ___ OTHER IPSC .
D. SYSTEM/ITEM
ENGINE CONTROLLER
E. CONTRACT/PR NO.
N00024-18-R-4209
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A022
2. TITLE OF DATA ITEM
SOFTWARE INSTALLATION PLAN (SIP)
3.SUBTITLE
ENGINE CONTROLLER SIP
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81428A
5. CONTRACT REFERENCE
Section C, Paragraph 1.3.2
6. REQUIRING OFFICE
NSWC PD C/514
7. DD 250 REQ
BLOCK 9: Distribution Statement D: Distribution authorized to Department of Defense (DOD) and U. S. DOD contractors only. Other requests must be referred to NSWC Philadelphia.
BLOCK 10/12: Submit draft SIP fourteen (14) Days prior to PDR. Government to provide comments within thirty (30) days. Contractor shall provide final SIP thirty (30) Days After Receiving Comments (DARC).
BLOCK 14: Electronic format for regular copy acceptable. Format must be readable by
15. TOTAL 1 0 1
I. APPROVED BY
Charles Teichert PEO SHIPS AM
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1
(1 Data Item)