Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
SECTION L AND M
SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
Addendum to 52.212-1: Instructions to Offerors – Commercial Items
PART A– GENERAL INSTRUCTIONS
1. GENERAL INFORMATION
This section of the Instructions to Offerors (ITO) provides general guidance for preparing proposals as well as specific instructions on the format and content of the proposal. The Offeror’s proposal must include all data and information requested by the ITO and must be submitted in accordance with these instructions. Non-conformance with the instructions provided in the ITO may result in a proposal evaluation of unacceptable.
(a) North American Industry Classification System (NAICS) code and small business size standard. The NAICS code and small business size standard for this acquisition appear in Block 10 of the solicitation cover sheet (SF 1449). However, the small business size standard for a concern which submits an offer in its own name, but which proposes to furnish an item which it did not itself manufacture, is 500 employees.
(b) Submission of offers. Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. Offers must be submitted on the SF 1449 and must be submitted as specified in “Part A – General Instructions” and “Part B – Specific Instruction” and contain the minimum information required to be considered acceptable.
(c) Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 120 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.
(d) Late submissions, modifications, revisions, and withdrawals of offers.
(1) Offerors are responsible for submitting offers, and any modifications, revisions, or withdrawals, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 2:00 p.m., local time, for the designated Government office on the date that offers or revisions are due.
(2)(i) Any offer, modification, revision, or withdrawal of an offer received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and—
(A) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of offers; or
(B) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government’s control prior to the time set for receipt of offers; or
(C) If this solicitation is a request for proposals, it was the only proposal received.
(ii) However, a late modification of an otherwise successful offer, that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(3) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the offer wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(4) If an emergency or unanticipated event interrupts normal Government processes so that offers cannot be received at the Government office designated for receipt of offers by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation or other notice of an extension of the closing date, the time specified for receipt of offers will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(5) Offers may be withdrawn by written notice received at any time before the exact time set for receipt of offers. An offer may be withdrawn in person by an offeror or its authorized representative if, before the exact time set for receipt of offers, the identity of the person requesting withdrawal is established and the person signs a receipt for the offer.
(e) Contract award. The Government intends to evaluate offers and award a contract without discussions with offerors. Therefore, the offeror’s initial offer should contain the offeror’s best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. The Government may reject any or all offers if such action is in the public interest; accept other than the lowest offer; and waive informalities and minor irregularities in offers received.
(f) Availability of requirements documents cited in the solicitation.
(1)(i) The GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29, and copies of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained for a fee by submitting a request to—
GSA Federal Supply Service Specifications Section Suite 8100 470 East L’Enfant Plaza, SW Washington, DC 20407
Telephone (202) 619-8925 Facsimile (202) 619-8978.
(2) Most unclassified Defense specifications and standards may be downloaded from the following ASSIST websites:
(i) ASSIST (http://assist.daps.dla.mil).
(ii) Quick Search (http://assist.daps.dla.mil/quicksearch).
(iii) ASSISTdocs.com (http://assistdocs.com).
(3) Documents not available from ASSIST may be ordered from the Department of Defense Single Stock Point (DoDSSP) by—
(i) Using the ASSIST Shopping Wizard (http://assist.daps.dla.mil/wizard);
(ii) Phoning the DoDSSP Customer Service Desk (215) 697-2179, Mon-Fri, 0730 to 1600 EST; or
(iii) Ordering from DoDSSP, Building 4, Section D, 700 Robbins Avenue, Philadelphia, PA 19111-5094, Telephone (215) 697-2667/2179, Facsimile (215) 697-1462.
(4) Nongovernment (voluntary) standards must be obtained from the organization responsible for their preparation, publication, or maintenance.
(g) (Data Universal Numbering System (DUNS) Number. (Applies to all offers exceeding $3,000, and offers of $3,000 or less if the solicitation requires the Contractor to be registered in the Central Contractor Registration (CCR) database.) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS+4” followed by the DUNS or DUNS+4 number that identifies the offeror’s name and address. The DUNS+4 is the DUNS number plus a 4-character suffix that may be assigned at the discretion of the offeror to establish additional CCR records for identifying alternative Electronic Funds Transfer (EFT) accounts (see FAR Subpart 32.11) for the same concern. If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one. An offeror within the United States may contact Dun and Bradstreet by calling 1-866-705-5711 or via the internet at http://fedgov.dnb.com/webform. An offeror located outside the United States must contact the local Dun and Bradstreet office for a DUNS number. The offeror should indicate that it is an offeror for a Government contract when contacting the local Dun and Bradstreet office.
(h) Central Contractor Registration. Unless exempted by an addendum to this solicitation, by submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the CCR database prior to award, during performance and through final payment of any contract resulting from this solicitation. If the Offeror does not become registered in the CCR database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror. Offerors may obtain information on registration and annual confirmation requirements via the CCR database accessed through https://www.acquisition.gov or by calling 1-888-227-2423 or 269-961-5757.
(i) Debriefing. If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:
(1) The agency’s evaluation of the significant weak or deficient factors in the debriefed offeror’s offer.
(2) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.
(3) The overall ranking of all offerors, when any ranking was developed by the agency during source selection.
(4) A summary of the rationale for award;
(5) Reasonable responses to relevant questions posed by the debriefed offeror as to whether source-selection procedures set forth in the solicitation, applicable regulations, and other applicable authorities were followed by the agency.
2. PROPOSAL FORMAT
a. Proposals must be submitted in English and formatted using no less than 12-point normal font (except for graphics and tables, in which no less than 10-point font shall be used), single spaced with 1-inch margins all around. All electronically submitted materials shall be formatted for standard 8.5 x 11 inch paper. All pages shall be numbered sequentially with volume and page numbers. Proposals submitted electronically must be fully compatible with Microsoft Office 2007 (MS Word or MS Excel) and the latest Adobe Acrobat Reader.
3. PAGE LIMITATIONS
a. Page limitations shall be treated as maximums. If exceeded the excess pages will not be read or considered in the evaluation of the proposal. Each page shall be counted except the following: Tables of content, title pages, glossary of abbreviations, acronym lists, blank pages, and photographs. The page limitations for each volume are as follows:
i. Volume I – Executive Summary: 5 Pages/Representations and Certifications: No limit
ii. Volume II – Technical Capability: 20 Pages/Small Business Plan: No Limit
iii. Volume III – Past Performance: 5 Pages
iv. Volume IV – Price: No limit
4. PROPOSAL SUBMISSION
a. The offeror shall submit three (3) hardcopies of each proposal volume as well as one (1) electronic copy on CD. Each volume shall be numbered and shall identify which copy it is.
b. Offerors shall address all packages to the Contract Specialist and deliver to the below address. The outside shipping package shall be clearly marked with the Offeror’s name, address, and point of contact for information and the RFP # N00019-13-R-3000
Naval Air Systems Command
Attn: Alexandra Laigle
47123 Buse Road
Building 2272, Room 155
Patuxent River, MD, 20670
301-757-9043
Per SF 1449, Block 8, THE OFFER MUST BE RECEIVED AT THE LOCATION INDICATED ABOVE BY 10:00 AM, EDT ON 03 June 2013
5. AMENDMENTS TO SOLICITATION
a. If this solicitation is amended, all terms and conditions that are not amended remain unchanged and in full force and effect. Offerors shall acknowledge receipt of any amendment and provide a signed copy of amendments upon submission of the Offeror’s proposal. Any unacknowledged amendments in the Offeror’s proposal will be considered as non-acceptance and may result in the proposal being found unacceptable.
b. Any changes and additional information for the solicitation will be posted to the following websites:
http://www.navair.navy.mil/doing_business/open_soliciations https://www.fbo.gov
6. Point of Contact
a. The Contract Specialist is the sole point of contact for this acquisition. Address any questions or concerns you may have to the Contract Specialist. Requests for clarification may be sent by e-mail to:
Alexandra Laigle, AIR 2.3.2.2.2
301-757-9043
Alexandra.laigle@navy.mil
PART B – SPECIFIC INSTRUCTIONS
The Offeror’s proposal shall be organized into four (4) volumes as described below. All pricing information shall be addressed ONLY in Volume IV – Price Proposal.
VOLUME I – EXECUTIVE SUMMARY
Note: This volume shall not contain any reference to cost or price aspects of the offer.
The purpose of the Executive Summary is to provide the evaluators with a concise narrative summary of the Offeror’s entire proposal, excluding cost or price. It should include the proposal’s salient points and is used by the Offeror to identify and highlight significant features of the proposal. Any summary material presented here shall not be considered as meeting the requirement for any portions of other volumes of the proposal. At a minimum, the Executive Summary MUST contain the following information:
(a) The solicitation number
(b) The time specified in the solicitation for receipt of offers
(c) The name, address, and telephone number of the offeror
(d) “Remit to” address, if different from mailing address
(e) A complete copy of the representations and certifications at FAR 52.212-3 (see FAR 52.212-3(b) for those representations and certifications that the offeror shall complete electronically) and as outlined in this solicitation;
(f) Acknowledgement of Solicitation Amendments by providing a signed copy of each amendment;
(g) In order to be considered compliant the offeror shall sign and date the SF 1449 form on Blocks 30(a) through (c). Offers that fail to furnish required representations or information, or reject the terms and conditions of the solicitation may be excluded from consideration.
(h) A clear statement that the Offeror’s proposal pricing is valid for a minimum of 120 days from date of submission.
VOLUME II – TECHNICAL PROPOSAL
Note: This volume, excluding the Small Business Plan, shall not contain any reference to cost or price aspects of the offer. The Small Business Plan shall be provided as a separate Annex, completely removable from the remainder of Volume II as either a tabbed, removable section within the Volume II binder OR in a separate binder.
The Offeror’s proposal shall provide a technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation. The proposal shall describe how the Offeror will meet all contractual requirements and demonstrate the Offeror’s proposal shall:
(a) Describe the Offeror’s capabilities to provide new or refurbished Boeing 737 commercial common spares that meet the requirement outlined in Section C and the Offeror’s approach to accomplish the requirements of this solicitation; (Note: In the event of a discrepancy between item nomenclature/description and part number, the part number shall have precedence).
(b) Describe the delivery schedule of all Boeing 737 commercial common spares for use on the Navy’s P-8A aircraft; (Note: Offerors that do not meet the delivery schedule outlined in Section F shall be considered non-compliant).
(c) Provide relevant experience that demonstrates a minimum of 5 years of aviation supply chain management experience. This experience shall describe in detail:
1. The Offeror’s experience related to the procurement and delivery of new or refurbished 737 commercial common aircraft spare parts and/or other commercial common aircraft parts from FAA approved vendors at the magnitude (i.e. range and depth) of the requirements of this solicitation;
2. The Offeror’s experience with the delivery of common aircraft spare parts to CONUS and OCONUS locations;
3. The Offeror’s experience in meeting or exceeding compressed delivery schedule requirements.
(d) Describe the Offeror’s technical approach and methodology to transport procured parts domestically and to the identified international location(s). This approach shall define expected import/export requirements and how the Offeror proposes to meet these requirements and mitigate delays and risks stemming from these requirements;
(e) Small Business (SB) Utilization Strategy: All Offerors (Large and Small Businesses) shall address their strategies for utilizing SB Concerns (small businesses, small disadvantaged businesses, women-owned small businesses, HUBZone small businesses, veteran-owned small businesses, and service disabled veteran-owned small businesses) in the performance of this contract, whether as a joint venture, teaming arrangement or subcontractor. Small Business Offerors may meet this requirement using work they perform themselves. If no subcontracting opportunities exist for this effort, a SB concern strategy is not required. However, the Offeror shall provide a detailed explanation within this section as to why no subcontracting opportunities exist for the proposed effort. This shall be provided as an annex to the technical volume and must be completely removable from the remainder of Volume II as either a tabbed, removable section within the Volume II binder OR in a separate binder.
(f) SB Subcontracting Plan: The Large Business Offerors only shall provide its SB Subcontracting Plan conforming to the requirements of FAR 19.7 and DFARS 219.7. The subcontracting plan of the successful Offeror(s) will be reviewed and approved by the PCO prior to contract award. See FAR 19.702(a)(1) Statutory Requirements regarding failure of the apparent successful Offeror to negotiate and submit a Plan acceptable to the Contracting Officer. The successful Offeror’s subcontracting plan will be incorporated into the resultant contract. This shall be provided as an annex to the technical volume and must be completely removable from the remainder of Volume II as either a tabbed, removable section within the Volume II binder OR in a separate binder.
VOLUME III – PAST PERFORMANCE
Note: This volume shall not contain any reference to cost or price aspects of the offer.
The Offeror shall provide relevant past performance information. The Offeror shall provide past performance information on no more than five (5) contracts which:
1) The offeror was required to procure 737 commercial common aircraft spare parts and/or other commercial common aircraft parts; and
2) The offeror was required to deliver common aircraft spare parts to CONUS and OCONUS locations.
No more than three years shall have passed from completion of contract performance, at the time of RFP N00019-13-R-3000 proposal due date for contracts submitted. The offeror shall provide the following information:
1. Contract Information
a. Program Title
b. Contract Number
c. Contracting Agency/Customer
d. Contract Type
e. Contract Value
f. Period of Performance
2. Points of Contact
a. Program Manager (name, phone number, and email address)
b. PCO (name, phone number, and email address)
c. ACO (name, phone number, and e-mail address)
3. Description of Effort
a. Product or service provided
b. Quantity
c. How program relates to or is related to current solicitation for aircraft spares
4. Description of Performance
a. Delivery Schedule Performance - Outline performance in regard to delivery schedule. If a delay occurred, explain the reasons for the delay and strategy imposed to minimize the delay and any systemic improvements imposed to facilitate future performance.
b. Technical Performance – outline and explain if terms and conditions of the contract were met.
c. Cost Performance – Outline performance in regard to contract cost and price. If a cost overrun occurred explain the reasons for the cost overrun, explain the reasons for the cost overrun, any strategy to minimize the cost overrun, and any systemic improvements imposed to facilitate future performance.
In addition, for each past performance contract utilized, the offeror shall submit the following:
For contracts that have CPARS Reports that are more than six months old, e.g., the completion date is more than six months before the due date for this Past Performance Volume; the Offeror will forward a copy of the CPARS Update Questionnaire (Attachment 1) to that contract customer’s Program Manager. For all contracts identified which do not have CPARS Reports the Offeror will forward a copy of the Past Performance Questionnaire (Attachment 2) to that contract customer’s PCO, Administrative Contracting Officer, and Program Manager. All questionnaires shall be forwarded within two weeks from the solicitation release date with enough lead-time so that responses can be received by the Government concurrent with the Government’s receipt of the offeror’s Past Performance information submitted. The offeror shall include instructions for the customers to send completed questionnaires within two weeks of its receipt via e-mail to Alexandra Laigle at Alexandra.laigle@navy.mil thereby allowing the customer approximately 2 weeks to complete their response. This submittal information is provided at the top of the questionnaires to facilitate the offeror’s effort in meeting these instructions. The offeror shall not conduct follow-up actions with regard to this questionnaire. The Government will ensure that the customers have received and will respond to the questionnaires. The Government may send any other questionnaires as necessary.
The Offeror shall provide written consent from their principal subcontractors and critical team members that will allow the Government to coordinate their Past Performance issue(s) with the Offeror. If the Offeror does not submit such written consent, then the Government will address any past performance issues directly with the principal subcontractor or critical team member and the Offeror will forfeit the opportunity to participate in any related discussions. Consequently, for any principal subcontractors and critical team members that do not provide such written consent, provide a point of contact (name, address, phone number, and email address) with which the Government may coordinate these issues and obtain any responses as needed.
VOLUME IV – PRICE PROPOSAL
The Offeror’s price proposal shall consist of a complete Section B of the solicitation. The Government reserves the right and intends to award this effort based on the initial proposal, as received without discussions. Therefore, Offerors are cautioned that their initial offer should contain the Offeror’s absolute best terms from a technical and price standpoint.
The Total Evaluated Price (TEP) for this acquisition will be established by the sum of the Offeror’s proposed extended prices. In order for an Offeror’s proposal to be found acceptable for award, the Offeror must provide price information for all items in Attachment 1. Offerors shall complete the spreadsheet (Attachment (1)) to include unit cost and total price. Proposed prices shall be in United States Dollars. It should be noted that NAVAIR is required to utilize ERP 1.1 for this procurement. Therefore, the successful offeror's price for each part (each and total) outlined in Attachment (1) will be SLIN'd by the Government in Section B of the final award document.
N00019-13-R-3000
Section L
Attachment (1)
CPARS UPDATE QUESTIONNAIRE
Within 2 weeks from receipt of this questionnaire return this form to Alexandra Laigle, contract specialist at alexandra.laigle@navy.mil thereby allowing the customer approximately 2 weeks to complete their response.
If the last CPAR on the subject contract was completed more than 6 months prior to the receipt of this questionnaire, please complete the questionnaire below.
1. CONTRACTOR IDENTIFICATION.
a. Contractor: _______________________
b. Program Title: _____________________
c. Contract Number: __________________
d. Date last CPAR was completed _______________
2. RESPONDENT IDENTIFICATION
a. Name ________________________________________________
b. Agency ______________________________________________
c. Position * ______________________________________________
e. Phone/Fax Number _____________________________________
f. Email Address _______________________________________
*If possible, the Program Manager should complete this questionnaire.
3. SCOPE OF WORK CHANGE
3.1 Has the scope of work significantly changed since the last CPAR? For example, during the last CPAR period, the contractor was primarily doing design work, but now the program has entered into the testing phase.
NO, CURRENT WORK IS SIMILAR TO LAST CPARS EFFORTS _____
If YES, please explain.
N00019-13-R-3000
Section L
Attachment (2)
PAST PERFORMANCE QUESTIONNAIRE
Within 2 weeks from receipt of this questionnaire return this form to Alexandra Laigle, contract specialist at alexandra.laigle@navy.mil thereby allowing the customer approximately 2 weeks to complete their response.
1.0 CONTRACTOR IDENTIFICATION
a. Contractor: _______________________
b. Program Title: _____________________
c. Contract Number: __________________
d. Type of Contract: ____________ Percent Complete: ____________
e. Award Fee (if applicable): _________ Percent of Award Fee Received: _________
Note: Whether identified or not, if you have any knowledge of other contracts for the identified contractor, you are requested to complete a questionnaire for each contract or subcontract similar to this acquisition.
2.0 RESPONDENT IDENTIFICATION
a. Name: ________________________________________________
b. Agency: _______________________________________________
c. Position: _______________________________________________
d. Relation to Program: _____________________________________
e. Phone/Fax Number/Email Address: _________________________
3.0 PROGRAM CHARACTERISTICS
3a. Please provide a short description of the subject contract.
3b. Please check those activities, which are applicable to your program:
a. Commercial Off The Shelf (COTS)/Non-Developmental Items (NDI) usage. ________
b. Aircraft Modifications. _________
c. Aircraft Field Maintenance at multiple sites in support of flight operations. __________
d. Directed subcontracts. ___________
e. Management of Government Furnished Property (GFP). ___________
f. Aircraft Heavy Maintenance to include major aircraft repairs/inspections, engine, propeller and aircraft component overhaul, repair and configuration tracking. ______
g. Operation, Development and Maintenance of Computerized Management Information Systems in support Aircraft Field and Heavy Maintenance requirements at multiple sites. __
h. Configuration Management of Aircraft and Aircraft Components. __________
i. Aircraft Flight Operations on Military sites. ___________
j. Engineering support for Field and Heavy Maintenance Activities supporting multiple aircraft sites. ___________
k. Hazmat/Environmental Program Development, Control and Management. __________
l. Flight/Industrial Safety/Quality Assurance Management and Oversight of Field and Heavy Maintenance activities. ____________
m. Corporate Oversight and Management of Aviation Maintenance Programs to include use of subcontract(s) in support of aircraft operating out of multiple sites. ________
n. Supply Support for Field and Heavy Maintenance activities supporting multiple aircraft sites. _________
o. Management of Personnel performing aircraft maintenance at multiple sites to include training, recruitment and transfer of personnel between sites. _____
p. Obtaining Customs Clearances for export/import shipment of parts and material. __________
q. Aircraft Strip and Paint _________
r. Engine Overhaul and Repair _________
s. Landing Gear Overhaul _________
t. Propeller Overhaul _________
u. Support Equipment Maintenance _________
v. Aviation Life Support Systems Maintenance and Issue _________
w. Engineering Services ________
4.0 PERFORMANCE LEVELS
4.1 PERFORMANCE GRADES (Use these grades to provide the overall rating where requested below).
Acceptable - Performance meets contractual requirements. The contractual performance may contain some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Unacceptable - Performance does not meet contractual requirements. The contractual performance contains serious problem(s) for which the contractor’s corrective actions appear to be or were ineffective.
4.2 QUESTIONS
4.2.1. TECHNICAL AND QUALITY PERFORMANCE
a. What kind of technical performance problems or strengths were experienced by the contractor?
b. What was the cause of these technical problems or strengths?
c. To what extent have corrective actions been taken to correct problem(s) identified above and to what extent have the corrective actions been effective? Describe the progress made to date. Also explain to what extent the corrective actions addressed the root cause of the problem(s) and led to systemic improvement such that similar problems would not reoccur.
d. Overall, the contractor's technical performance is rated ________________________.
4.2.2: SCHEDULE PERFORMANCE
a. What kinds of delivery/schedule problems or strengths were experienced by the contractor?
b. What was the cause of these delivery/schedule problems or strengths?
c. To what extent have corrective actions been taken to correct problem(s) identified above and to what extent have the corrective actions been effective? Describe the progress made to date. Also explain to what extent the corrective actions addressed the root cause of the problem(s) and led to systemic improvement such that similar problems would not reoccur.
d. Overall, the contractor's delivery/schedule performance is rated _________________.
4.2.3. COST PERFORMANCE
a. What kinds of Cost problems or strengths were experienced by the contractor?
b. If the contractor experienced an overrun please provide the percentage. _________
c. What was the cause of these Cost problems or strengths?
d. If available, provide earned value cost performance measures including indices for cost efficiency (CPI) and schedule efficiency (SPI). Based on this information, please provide a narrative assessment of their performance.
e. To what extent have corrective actions been taken to correct problem(s) identified above and to what extent have the corrective actions been effective? Describe the progress made to date. Also explain to what extent the corrective actions addressed the root cause of the problem(s) and led to systemic improvement such that similar problems would not reoccur.
f. Overall, the contractor's Cost performance is rated ________________________.
4.2.4
MANAGEMENT
4.2.4.1
MANAGEMENT RESPONSIVENSS
a. What was the contractor’s record of timeliness, completeness and quality of problem identification, corrective action plans, proposal submittals (especially responses to change orders, engineering change proposals, or other undefinitized contract actions), the contractor's history of reasonable and cooperative behavior, effective business relations, and customer satisfaction?
4.2.4.2
SUBCONTRACT MANAGEMENT
a. What was the contractor’s success with timely award and management of subcontracts, including whether the contractor met or exceeded small business, small disadvantaged business, small business HUBZone, veteran-owned small business, service disabled veteran owned small business, women-owned small business participation and subcontracting goals?
4.2.4.3
PROGRAM MANAGEMENT AND OTHER MANAGEMENT
a. To what extent does the contractor discharge their responsibility for integration and coordination of all activity needed to execute the contract; identify and apply resources required to meet schedule requirements; assign responsibilities for tasks/actions required by contract; and communicate appropriate information to affected program elements in a timely manner?
b. What were the contractor’s risk management practices, especially the ability to identify risks and formulate and implement risk mitigation plans?
c. If applicable, identify and provide information on any other areas that are unique to the contract, or that cannot be captured elsewhere under the Management Assessment.
4.2.4.4 Overall Management Assessment
a. Overall, the contractor's management performance is rated____________________.
4.2.5. OTHER. Is there any other information regarding this acquisition that you think would be helpful to our evaluation? If so please explain. Examples of additional information that could be helpful to our evaluation include information on (1) problems or strengths with regard to key personnel and (2) the kind of business relationship problems or strengths with regard to management of subcontracts, cooperation with business partners/customers, customer satisfaction, etc.
4.3 SUMMARY: If you had the option, knowing what you know today, would you (pick one), 1) definitely would not, 2) probably would not, 3) might, 4) might not, 5) probably would, 6) definitely would award this contract to this contractor, given the choice? Please explain.
SECTION M – EVALUATION FACTORS FOR AWARD
CLAUSES INCORPORATED BY FULL TEXT
M-1
EVALUATION FACTORS
The Government intends to award a contract resulting from this solicitation to the responsible Offeror whose offer conforming to the solicitation will be the most advantageous to the Government, price and other factors considered. The following factors will be used to evaluate offers:
Factor 1 – Technical Capability
Factor 2 – Price
Factor 3 – Past Performance
Award will be made to the responsible Offeror on the basis of the lowest evaluated price of acceptable technical proposals.
M-1.1 FACTOR 1 – TECHNICAL CAPABILITY
The Offeror’s technical proposal will be evaluated based upon the technical capability elements in paragraph M-1.1.1 of this solicitation and will be rated as either acceptable or unacceptable as defined below. Offerors must satisfy all requirements described in the solicitation. Offerors that take exception to any requirement outlined in Section C, “Statement of Work,” criteria, or any parts outlined in Attachment (1) of Section J, will be evaluated as unacceptable.
ACCEPTABLE – The proposal meets specified spares requirements contained in Section C, “Statement of Work,” under “Descriptions and Specifications” which are necessary for acceptable contract performance, and meets the delivery schedule in Section F. In addition, the proposal outlines a minimum of 5 years relevant experience that demonstrates both technical capability to deliver the range and depth of the required commercial common parts to both CONUS and OCONUS locations within the required delivery schedule and the proposal includes an executable methodology to transport parts domestically and to the identified international locations. Further, the proposal includes a Small Business Plan, if applicable.
UNACCEPTABLE – The proposal fails to meet specified spares requirements contained in Section C, Statement of Work, under Descriptions and Specifications which are necessary for acceptable contract performance, and/or fails to meet the delivery schedule in Section F, and/or fails to have a minimum of 5 years relevant experience that demonstrates both technical capability to deliver the range and depth of the required commercial common parts to both CONUS and OCONUS locations within the required delivery schedule, and/or fails to include an executable methodology to transport parts domestically and to the identified international locations and/or fails to include a Small Business Plan, if applicable. Proposals with an unacceptable rating are not awardable.
M-1.1.1 TECHNICAL CAPABILITY ELEMENTS
The Offeror’s technical proposal will be evaluated to determine whether or not the Offeror’s proposal meets the requirements contained in the solicitation. A technical proposal that meets the solicitation requirements will be considered acceptable and a technical proposal that does not meet solicitation requirements will be considered unacceptable. The Offeror’s technical proposal will be evaluated based upon the following technical capability elements:
(a) Proposed Boeing 737 commercial common spares meet the requirements contained in the solicitation;
(b) Proposed delivery schedule meets the required delivery schedule;
(c) Described relevant experience meets or exceeds the minimum 5 year requirement and demonstrates the technical capability to deliver the range and depth of the required commercial common parts to both CONUS and OCONUS locations within the required delivery schedule;
(d) The offeror proposes a well-defined and executable methodology to transport parts domestically and to the identified international locations;
(e) The Offeror’s strategy for SB concerns related to the entire contract for utilizing small businesses, small disadvantaged businesses, women-owned small businesses, HUBZone small businesses, veteran-owned small businesses, and service disabled veteran-owned small businesses as well as its consistency with the Small Business Subcontracting Plan.
An unacceptable rating on any one of these elements will be cause to remove the offeror from further consideration.
M-1.2
FACTOR 2 – PRICE
All Offerors whose proposals are technically acceptable will be placed in the potential award pool and the Total Evaluated Price (TEP) for the proposal will be calculated. The Total Evaluated Price (TEP) for P-8A Spares consists of the sum of an Offeror’s proposed extended prices for each item for which the offeror is required to submit a firm fixed price proposal (this includes ALL parts outlined in Attachment (1)).
Each Offeror’s price proposal shall be evaluated to determine if it is complete and consistent with the offeror’s technical approach, reflects a clear understanding of the solicitation requirements and contains no material imbalances. Price proposals evaluated to be imbalanced and/or incomplete may be found unacceptable and rejected without further evaluation, deliberation, or discussion.
M-1.3 FACTOR 3 – PAST PERFORMANCE
The Offeror in the potential award pool with acceptable technical capability whose TEP is lowest will be the potential awardee and evaluated for past performance.
The Government will evaluate the offeror’s demonstrated successful completion of contract requirements (or whether it is meeting the terms of ongoing contracts) on contracts where the offeror was required to:
1) Procure commercial aircraft spares
2) Deliver commercial aircraft spares to both CONUS and OCONUS locations
Past performance information will be used to assess the Offeror's track record during the performance of similar or like efforts. This evaluation will be based on information submitted by the Offeror and other available sources. Offerors who have no relevant performance history will not be evaluated favorably or unfavorably for past performance. The Government will evaluate past performance using the information provided by each Offeror, other customers known to the Government, consumer protection organizations, available Contract Performance Assessment Reports (CPARs), and others who may have useful and relevant information. This evaluation will address:
How successful the Offeror's and (if applicable) its principal subcontractors' and critical team members' have performed / delivered similar efforts under prior contracts, including but not limited to, the Offeror's ability to meet technical, cost and schedule requirements, and small business performance relative to their goals. Problems not addressed by the Offeror will be considered as still existing issues.
Past performance will be evaluated as either acceptable, unacceptable, or neutral as defined below:
ACCEPTABLE: Successful performance on at least half of the evaluated contracts. The past performance evaluation assesses the offeror’s ability to meet technical, cost, and schedule requirements.
NEUTRAL – No relevant past performance record identifiable. For purposes of this evaluation, “neutral” is evaluated as acceptable.
UNACCEPTABLE – Failure to successfully perform on at least half of submitted contracts. The past performance evaluation assesses the offeror’s ability to meet technical, cost, and schedule requirements.
If the potential awardee is evaluated to have a past performance risk rating of unacceptable, the offeror’s proposal will be found unacceptable and removed from the potential award pool. The offeror in the potential award pool with the next lowest TEP will them become the potential awardee and their past performance will be evaluated.
M-2
BASIS FOR AWARD
The proposal with acceptable technical capability, acceptable past performance (including “neutral” for having no past performance information), and lowest TEP, will be subject to the requirements of FAR Subpart 9.1 as part of the Contracting Officer’s responsibility determination.
If the potential awardee is determined by the Contracting Officer to not be responsible, the offeror’s proposal will be found unacceptable and removed from the potential award pool. The offeror in the potential award pool with acceptable technical capability with the next lowest TEP will then become the potential awardee and their past performance will be evaluated. Contract award for the Boeing 737 Commercial Common Spares will be made to the responsible Offeror proposing the lowest price, technically acceptable offer for all CLINs meeting the requirements of the solicitation.
A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful Offeror within the time for acceptance of an offer, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
M-3
DISCUSSIONS
It is the Government’s intent to award without discussions; therefore it is imperative that Offerors submit their best offer initially. However, if it is determined to be in the best interest of the Government to hold discussions the Offeror’s responses Evaluation Notices (EN), and the final proposal revision will be considered in making the source selection decision. If discussions are determined to be in the interest of the Government, they will be held in written format.
M-4
SOLICITATION REQUIREMENTS, TERMS AND CONDITIONS
Offerors are required to meet all solicitation requirements, such as complete terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors. Failure to meet a requirement may result in an offer being evaluated as unacceptable and ineligible for award.
(End of Summary of Changes)