MDCR_Bid_Docs_3rd_St._N_Sanitary_Sewer_Reconstruction.pdf
PDF 2 MB Posted
- Attached to
- BID-PW-3rd St N Sanitary Sewer Reconstruction State and local contract opportunity
- Solicitation number
- 0000004091
- Issued by
- Hennepin County, Minnesota
About this file
Summary
This bid document package is issued by the City of Minneapolis Department of Civil Rights for the 3rd Street North Sanitary Sewer Reconstruction project in Minnesota. The project involves water and sewer line and related structures construction, as well as highway, street, and bridge construction services. The bid documents establish procedural requirements for formal bids advertised on or after December 1, 2018, and mandate that all bidders submit signed documentation including a Bidders, Solicitation, and SUBP Commitment List with their initial bid. Within 5 pm on the first business day following bid opening, bidders must submit a Final SUBP Commitment Form, Letters of Intent for each SUBP firm, and good faith efforts documentation if applicable. The document package includes a comprehensive SUBP (Small and Underutilized Business Program) report listing certified minority-owned business enterprises (MBEs) and women-owned business enterprises (WBEs) available in relevant construction classifications, including water and sewer line construction, highway and street construction, and surveying and mapping services.
The contract is subject to a 3 percent combined MBE/WBE goal for this project, and only firms certified as Disadvantaged Business Enterprises (DBEs) through the Minnesota Unified Certification Program (MnUCP) and located within specified Minnesota and Wisconsin counties are eligible to count toward this goal. Contractors must comply with Minneapolis Code of Ordinances Title 7 civil rights provisions, prevailing wage requirements per the Minnesota wage determination (effective January 2, 2026), and HUD Section 3 requirements where applicable. Construction wage rates range from $30.04 to $61.28 per hour depending on labor classification. Failure to meet SUBP commitments or comply with documented good faith efforts can result in bid rejection, contract non-award, or post-award penalties including payment withholding, contract suspension or debarment, and fines up to $10,000 per violation. All contractors and subcontractors must maintain certified payroll records and may be monitored through the Contract Compliance Information Management System (CCIMS)/B2Gnow software.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Call_for_Bids_Event_4091.pdf | ||
| Bid_Form_Event_4091.xlsx | XLSX spreadsheet | |
| MnUCP_Report.xlsx | XLSX spreadsheet | |
| BID-PW-3rd_St_N_Sanitary_Sewer_Reconstruction.pdf | ||
| Prevailing_Wage_Determination.pdf | ||
| Bidders,_Solicitation___SUBP_List_-_FILLABLE.pdf | ||
| Virtual_Pre-Bid_Meeting_Information_Event_4091.pdf | ||
| Responsible_Contractor_A1_A2_combined.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Memorandum to Bidders and Proposers Related to changes with required bid documents
There are important changes to City bidding procedures that are effective for all formal bids advertised on or after December 1st, 2018. All bidders must review the bid documents carefully and follow all instructions therein.
Bidders will be required to submit a signed Bidders, Solicitation, and SUBP Commitment List with the bid. Bidders must then submit the Final SUBP Commitment Form and a Letter of Intent to subcontract for each SUBP firm the bidder is committing to utilize on the contract by 5 pm on the day after bid opening. Bidders that do not commit to meeting the SUBP goal(s) must also submit documentation demonstrating good faith efforts no later than 5 pm on the day after bid opening.
Please note that all bidders, including bidders who are not the apparent low bidder, are required to submit documentation by 5 pm on the first business day following bid opening. If the apparent low bidder is not awarded the contract for any reason, only bidders who have submitted their documentation by 5 pm on the first business day following the bid opening will be considered.
Failure to adhere to this deadline may result in bid rejection.
Instructions for completion and submission of these documents are detailed in the City’s bid publication. Please refer to these documents for more details.
Notice of Civil Rights Rules and Regulations
This notice advises City of Minneapolis contractors of their commitments under Minneapolis Code of Ordinances section 139.50. All contractors must comply with all provisions of Minneapolis Code of Ordinances Title 7 and with all rules and regulations issued by the Minneapolis Department of Civil Rights (“MDCR”) director. Contractors will be subject to a pre-award compliance review. Failure to cooperate may result in denial of contract award.
1. Non-Discrimination:1 The contractor will not discriminate against any employee or applicant for employment because of race, color, creed, religion, ancestry, national origin, sex, sexual orientation, gender identity, disability, age (over the age of 18), marital status, familial status, or status with regard to a public assistance program. The contractor will take affirmative action to ensure that all employment practices are free of such discrimination. Such employment practices include but are not limited to the following: Hiring, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff, termination, rates of pay or other forms of compensation, and selection for training, including apprenticeship.
2. Equal Employment Opportunity/Affirmative Action Employer: The contractor will, in all solicitations or advertisements for employees placed by or on behalf of the contractor, state that it is an equal opportunity or affirmative action employer.
3. Affirmative Action Plan: The contractor must have an Affirmative Action Plan approved by MDCR before it may enter into a contract over $100,000 with the City.
4. Small and Underutilized Business Program (SUBP): When applicable, the contractor must comply with the SUBP program, including, but not limited to, making a good faith effort to meet the Minority-Owned Business Enterprises and Women-Owned Business Enterprises goals established on City construction and development projects.
5. Employment Goals:2 The contractor should make a good faith effort to meet the City’s aspirational construction workforce goals of 20% female participation and 32% minority participation.
6. Prevailing Wage:3 When applicable, the contractor must comply with prevailing wage laws on City construction and development projects. For contracts greater than or equal to $50,000, contractors and subcontractors may be required to submit Certified Payroll Reports, via any software systems specified by
MDCR.
7. HUD Section 3:4 When applicable, the contractor must comply with Section 3 of the Housing and Urban Development Act of 1968, as amended. Contractors must incorporate the Section 3 Clause into all subcontracts and to the greatest extent feasible, ensure that employment and other economic activities be directed to low income persons.
8. Posting Requirement: The contractor must provide this notice to its trade and labor union or representative of workers and must post the notice in conspicuous places available to employees and applicants for employment.
9. Reporting: Reporting may be required in accordance with any of the above-mentioned programs via any software systems specified by MDCR.
1 Acts of discrimination are defined in the Minneapolis Code of Ordinances, Chapter 139.
2 See Request for City Council Committee Action, Adopted September 21, 2017; incorporated into section 139.50 as a rule issued by the MDCR director.
3 See Minneapolis Code of Ordinances section 24.220, CPED Prevailing Wage Policy (adopted by City Council June 8, 2004), and Davis-Bacon and Related
Acts; enforcement authority has been delegated to MDCR.
4 See 24 CFR Section 135.38; enforcement authority has been delegated to MDCR.
Revised 1/29/2020
Department of Civil Rights 350 S. Fifth St. - Room 239
Minneapolis, MN 55415
TEL 612.673.3000
Rev. July 2021
City of Minneapolis Small and Underutilized Business Enterprise Program
Special Provisions - City Bidded Projects
I. Overview The City of Minneapolis policy is to provide equal opportunities to all businesses, with an effort to redress discrimination in the City’s marketplace and in public contracting against minority-owned business enterprises (“MBEs”) and women-owned business enterprises (“WBEs”). This is accomplished through the Small and Underutilized Business Program (“SUBP”) as detailed in the Minneapolis Code of Ordinances Chapter 423. SUBP applies to any construction, service, or purchase contract over $175,000. SUBP goals are set on projects based on the project scope, subcontracting opportunities and availability of eligible MBEs/WBEs.
The City has set the following SUBP goal to facilitate participation of eligible MBEs and WBEs (MBEs/WBEs) on this contract:
3% MBE/WBE (combined)*
* This project has a combined MBE/WBE goal. The SUBP goal may be met by utilizing either an MBE firm or a WBE firm, or by a combination of both MBE and WBE firms.
Only eligible MBEs/WBEs count towards the SUBP goal. A MBE/WBE is eligible if they are:
1. Certified as a Disadvantaged Business Enterprise (DBE). This is the only MBE/WBE certification accepted by the SUBP.
2. DBE-certified within in the scope of work that they will perform.
3. Performing a commercially useful function. An MBE/WBE performs a commercially useful function when it executes a distinct element of work and carries out its responsibilities by actually performing, managing, and supervising the work involved.
4. Located1 within the City’s marketplace, which includes only the Minnesota Counties of Anoka, Carver, Chisago, Dakota, Hennepin, Isanti, Le Sueur, Mille Lacs, Ramsey, Scott, Sherburne, Sibley, Washington, and Wright; and the Wisconsin Counties of Pierce and St. Croix.
Bidders should search for DBE-certified MBE and WBE firms using the Minnesota Unified Certification Program (MnUCP) directory, here: (http://mnucp.metc.state.mn.us/).2
II. Good Faith Efforts Evaluation The bidder must either meet the goal listed above, or demonstrate a Good Faith Effort to do so. A Good Faith Effort means that the bidder made every necessary and reasonable effort to subcontract with eligible MBEs/WBEs.
1 The firm’s principal place of business must be located within the City’s marketplace at the time of bid opening or solicitation. Principal place of business means the primary physical location at which or from which a business performs, is maintained, or operates.
2 A firm’s DBE certification, and business location, should be verified by checking in the online MnUCP Directory. A firm’s current profile in that directory is evidence of current DBE certification. If a bidder identifies a business that is not yet certified, but may qualify for certification as MBE/WBE, the bidder should encourage the business to immediately begin the application process for certification with the MNUCP. The bidder should include this in their Good Faith Efforts documentation.
http://mnucp.metc.state.mn.us/ woyeelx0 Highlight
To determine if the bidder demonstrated good faith efforts to meet the SUBP goal, the following list of factors may be considered:
1. Soliciting through all reasonable and available means (attendance at pre-bid meetings, advertising and/or written notices) the interest of all eligible MBEs/WBEs certified in the scopes of work of the contract. The bidder must solicit MBEs/WBEs in sufficient time prior to bid opening to allow MBEs/WBEs time to respond to solicitations. The bidder must determine with reasonable certainty if the MBEs/WBEs are interested by taking appropriate steps to follow up on initial solicitations.
2. Selecting portions of the work to be performed by eligible MBEs/WBEs in order to increase the likelihood that the SUBP goal will be achieved. This includes, where appropriate, breaking out contract work into smaller units to facilitate MBE/WBE participation, even when a bidder might otherwise prefer to perform these work items with its own forces.
3. Providing interested eligible MBEs/WBEs with adequate information about the plans, specifications, and requirements of the contract in a timely manner to assist them in responding to a solicitation.
4. The bidder must negotiate in good faith with interested eligible MBEs/WBEs and provide written documentation of such negotiation with each such business.
5. A bidder should consider a number of factors in negotiating with potential MBE/WBE subcontractors, and should take into consideration an eligible MBE or WBE’s price and capabilities and scheduling as well as established contract goal. However, the fact that there may be some additional costs involved in finding and using eligible MBE’s/WBE’s is not in itself sufficient reason for a bidder's failure to meet the established MBE/WBE goal, as long as such costs are reasonable.
The ability or desire to perform the work of a contract with its own organization does not relieve the bidder of the responsibility to make good faith efforts. Bidders are not, however, required to accept higher quotes from eligible MBE’s/WBE’s if the price difference is excessive or unreasonable.
6. The bidder or proposer must offer information regarding, and make reasonable efforts to assist, solicited eligible MBEs/WBEs in obtaining bonding, lines of credit or insurance as required by the city or by the bidder or proposer; provided that the bidder or proposer need not provide financial assistance toward this effort.
7. Effectively using the services of minority/woman community organizations; minority/woman contractors’ groups; local, state and federal business assistance offices; and other organizations as allowed on a case-by-case basis to provide assistance in the solicitation and placement of MBEs/WBEs.
8. Whether the apparent successful bidder met or exceeded the average eligible MBE/WBE participation obtained by other bidders responding to the same City bid.
III. Required Documentation
1. The bidder must thoroughly document its efforts to solicit and incorporate eligible MBE/WBE participation to meet the SUBP goal. The following must be submitted with the bid, prior to the time set for the City’s bid opening:
a. Bidders, Solicitation, and SUBP Commitment List: Must include ALL contractors (including your firm), sub-contractors/consultants, suppliers, and service providers that were:
i. solicited to submit a bid/quote for this project;
ii. that submitted a bid/quote to your firm without being solicited; OR
iii. that will be used on the project.
This completed form should show a complete picture of the prime bidder’s solicitation efforts for this bid submittal, including but not limited to MBE and WBE firms that were solicited to meet the SUBP goal. The prime bidder must also list the MBE and WBE participation percentage commitments.
2. No later than 5 pm on the first business day after bid opening, the bidder must submit a Final SUBP Commitment Form, listing all contractors, sub-consultants, suppliers, and service providers that will be used on the project. This completed form will be used to determine whether the bidder is committing to meeting the SUBP goal. The commitments listed by the bidder on this form are a material condition of contract award, and constitute minimum commitments on this contract.
3. No later than 5 pm on the first business day after the City bid opening, the bidder must submit one completed Letter of Intent for each of the SUBP-eligible MBE and WBE firms listed in the Final SUBP Commitment Form. Each Letter of Intent must be fully completed, and must be signed by both the bidder and the SUBP-eligible MBE or WBE. If the bidder is unable to obtain a signature from each firm prior to the submission deadline, the bidder must submit a quote from the MBE or WBE firm that matches the amount of the bidder’s commitment to each firm.
4. If the Final SUBP Commitment Form does not demonstrate verifiable MBE/WBE participation sufficient to meet the SUBP goal, then the bidder must submit documentation demonstrating that the bidder made sufficient good faith efforts (GFE) to meet the SUBP goal. This GFE documentation will be due no later than 5 pm on the first business day after the City’s bid opening. This GFE documentation includes:
a. Good Faith Efforts Checklist: A checklist based on the factors that may be considered in determining whether a bidder made good faith efforts to meet the SUBP goal. The bidder must use the checklist during subcontractor bid solicitation to document the efforts the bidder made.
b. Supporting Documentation to Demonstrate Good Faith Efforts: The bidder must submit documentation evidencing the efforts taken to achieve the SUBP goal. The documentation may include, but is not limited to, copies of solicitation emails, bids received, faxes, and phone call logs. Any such documentation of solicitations to MBE/WBE firms must clearly include the identification of the recipient firm(s).
5. The Final SUBP Commitment Form, each Letter of Intent, and the bidder’s GFE documentation, may be submitted:
a. Via email to SUBPsubmissions@minneapolismn.gov (preferred); OR
b. To make other arrangements to submit this documentation please email the Division at:
contractcompliance@minneapolismn.gov.
6. If the City determines that bidder made a good faith effort to meet the SUBP goal, a Pre-
Construction Book must be submitted prior to contract approval by MDCR.
a. Pre-Construction Book: Collects information related to subcontracts, minority and female employment participation, construction schedules, and required wages.
7. The contract may be monitored through the Contract Compliance Information Management
System (CCIMS)/B2Gnow software, or other method specified by MDCR. If specified by MDCR, the prime contractor and its subcontractors and suppliers will be responsible for entering information into the specified software. Such information will include, but may not be limited to, payment amounts made to the prime contractor and payment amounts made to MBE and WBE subcontractors and suppliers. The prime contractor and its subcontractors and suppliers will also be responsible for maintaining the appropriate records to document their compliance and for producing such records if audited.
IV. Post-Award Substitutions A contractor shall not substitute, reduce participation of, or eliminate MBE/WBE subcontractors listed in the Final SUBP Commitment Form without prior written approval of the Minneapolis Department of Civil Rights. A contractor who substitutes, reduces participation of, or removes an MBE/WBE subcontractor listed in the Final SUBP Commitment Form without prior written approval shall be subject to a fine of up to $10,000 per violation, or any of the penalties listed below. The contractor must make good faith efforts to replace an MBE/WBE subcontractor that is unable to perform with another MBE/WBE to perform the same scope of work.
mailto:SUBPsubmissions@minneapolismn.gov mailto:contractcompliance@minneapolismn.gov
V. Penalties for Non-Compliance Compliance with SUBP is a material condition of the contract. The City may take the following actions wholly, partly, or in any combination:
a) Temporarily withhold cash payments pending correction of the deficiency.
b) Permanently withhold payment for all or part of the activity not in compliance with this chapter if the deficiency cannot be corrected, or the entity refuses to correct the deficiency.
c) Suspend or debar the noncompliant contractor, subcontractor, supplier or vendor as ineligible for all current or potential contracts with the City or supported by City funds.
d) Designate the noncompliant contractor, subcontractor, supplier or vendor as high-risk for future contracts and require of the contractor, subcontractor, supplier or vendor increased reporting requirements, mandatory audits and similar measures.
The City will monitor compliance with the SUBP throughout the contract. Compliance with the MBE/WBE goals and other SUBP requirements will be a material condition of the contract and failure to comply may be deemed a breach of contract. Please review Minneapolis Code of Ordinances Chapter 423 for more information or contact the City of Minneapolis Department of Civil Rights at (612) 673-3012 or contractcompliance@minneapolismn.gov.
THIS FORM IS DUE BY 5 PM ON THE FIRST BUSINESS DAY AFTER THE CITY BID OPENING.
Rev. August 2025
CITY OF MINNEAPOLIS – DEPARTMENT OF CIVIL RIGHTS
FINAL SUBP1 COMMITMENT FORM
INSTRUCTIONS:
• List all contractors (including your company), sub-consultants, suppliers, and service providers that will be used on the project.
• Make additional copies of this form as necessary.
• This completed form should show how the prime bidder intends to include minority-owned and women-owned business enterprises (MBEs and
WBEs) to meet the SUBP goal(s). By completing this form, you are committing to using the MBE and WBE firms listed for at least the dollar amounts that you listed in this form. The bidder must submit one completed Letter of Intent for each of the SUBP-eligible MBE and WBE firms listed in this Final SUBP Commitment Form.
• A contractor shall not substitute, reduce participation of, or eliminate MBE/WBE subcontractors listed in this form without prior written approval of the Minneapolis Department of Civil Rights. A contractor who substitutes or removes an MBE/WBE subcontractor listed in this form without prior written approval shall be subject to a fine of up to $10,000 per violation, or other penalties listed in ordinance §423.120.
• Only MBEs and WBEs certified as Disadvantaged Business Enterprise (DBE)2 count toward the SUBP goal(s). Place a mark “x” in the appropriate column below if a firm is DBE-certified as an MBE or WBE.
o To count toward the SUBP goal(s), the MBE/WBE must be DBE certified in the scope of work it will perform, and the MBE/WBE must have its principal place of business located within the Minnesota counties of Anoka, Carver, Chisago, Dakota, Hennepin, Isanti, Le Sueur, Mille Lacs, Ramsey, Scott, Sherburne, Sibley, Washington, and Wright, and the Wisconsin counties of Pierce and St. Croix.
• If an MBE/WBE subcontracts work to a non-MBE/WBE, the value of that work will not count toward the SUBP goal(s).
• An MBE/WBE must perform a commercially useful function to count toward the SUBP goals. An MBE/WBE performs a commercially useful function when it executes a distinct element of work and carries out its responsibilities by performing, managing, and supervising the work.
• This form is due no later than 5 pm on the first business day after the City bid opening. This form may be submitted via email to
SUBPsubmissions@minneapolismn.gov; OR to make other arrangements email the Division at: contractcompliance@minneapolismn.gov.
• Failing to properly complete, sign, and submit this form, or indicating “not applicable,” may result in rejection of your bid.
1 For more information about the Small and Underutilized Business Program (SUBP) goals, see the SUBP Special Provisions published with this bid, and review Minneapolis Ordinances Chapter 423.
2 A firm’s DBE certification, and business location, should be verified by checking in the online MnUCP Directory: http://mnucp.metc.state.mn.us/. A firm’s current profile in that directory is evidence of current DBE certification.
mailto:SUBPsubmissions@minneapolismn.gov http://mnucp.metc.state.mn.us/
CITY OF MINNEAPOLIS – DEPARTMENT OF CIVIL RIGHTS
FINAL SUBP COMMITMENT FORM
Company Name City, State Phone & Email
Contact Method
(fax, phone, email)
Date of Solicitation Scope of Work Bid/Quote
Amount
MNUCP
MBE
MNUCP
WBE
YOUR
FIRM
HERE >
Company Name City, State Phone & Email
Contact Method
(fax, phone, email)
Date of Solicitation Scope of Work Bid/Quote
Amount
MNUCP
MBE
MNUCP
WBE
Check here if your company intends to self-perform all work and DOES NOT intend to subcontract out any work for this project:
If your company is not DBE-certified, checking this box means that your company will need to demonstrate good faith efforts (GFE) to meet the SUBP goal(s), in order to be awarded the contract. All GFE documents and supporting evidence will be due no later than 5 pm on the first business day after the City’s bid opening date.
The bidder certifies that the foregoing is correct, and that all contractors (including your company), sub-contractors, sub-consultants, suppliers, and service providers that will be used on the project are listed herein.
Failure to properly complete, sign, and submit this form may result in rejection of your bid.
Bidder Company Name Contact Name & Title Phone & Email Date Signature
THIS FORM IS DUE NO LATER THAN 5 PM ON THE FIRST BUSINESS DAY AFTER THE CITY BID OPENING.
Bidder must submit one completed Letter of Intent for each of the SUBP-eligible MBE and WBE firms listed in the Final SUBP Commitment Form.
Rev. October 2018
CITY OF MINNEAPOLIS – DEPARTMENT OF CIVIL RIGHTS
LETTER OF INTENT
SUBP Firm Name: ____________________________________________Phone:__________________________________________
Address: _____________________________________________City:____________________________ State:_____ Zip:________
Participating as: ___ Prime Contractor ___Subcontractor ___Supplier/Manufacturer
Work to be performed by SUBP firm:
Description SUBP Bid Amount Dollar Amount for SUBP Credit
1. This is a letter of intent between the bidder on this project and an SUBP firm to perform subcontract work on this project.
2. By signing below, the bidder is committing to utilize the above-named SUBP firm to perform the work described above.
3. By signing below, the above-named SUBP firm is committing to perform the work described above.1
Affirmation: I hereby affirm that the information above is true and correct.
Bidder Representative Name: ____________________________________________Title:________________________Date:__________ Bidder Representative Signature: _________________________________________
SUBP Firm Representative Name: _________________________________________Title:________________________Date:__________ SUBP Firm Representative Signature: ______________________________________
1 If a bidder is unable to obtain the SUBP firm’s signature, it may submit a copy of the accepted SUBP firm quote in lieu of this document. The quote must match the bidder’s commitment to the SUBP firm.
Bidder: Event Number: Project Name:
Rev. October 2018
CITY OF MINNEAPOLIS
SMALL AND UNDERUTILIZED BUSINESS PROGRAM (SUBP)
GOOD FAITH EFFORTS CHECKLIST
If the SUBP goal(s) for the project have not been met, then a Good Faith Efforts Review will be conducted by the Department of Civil Rights Contract Compliance Division (CCD) prior to contract award. The following checklist should be used during bid solicitation to document the efforts that were made to meet the SUBP goal(s). This checklist must be submitted to CCD if the Final SUBP Commitment Form does not demonstrate verifiable MBE/WBE participation sufficient to meet the SUBP goal(s). This checklist is due no later than 5 pm on the first business day after the City’s bid opening.
This checklist may be submitted:
• Via email to SUBPsubmissions@minneapolismn.gov (preferred);
• Via fax to 612-673-2427; OR
• In person at the City of Minneapolis Department of Civil Rights:
350 South 5th St. (City Hall), room 239, Minneapolis, MN 55415.
Date:
Company Name:
Completed By:
Title:
Signature:
Checklist Instructions:
• All factors listed below may be considered.1 Some factors may not be applicable to all projects or situations.
• Check all actions that were taken and enter comments for each factor explaining the actions taken. Submit supporting documentation as instructed in each factor.
• Along with this form, the bidder must submit documentation evidencing the efforts taken to achieve the SUBP goals. The documentation may include, but is not limited to, copies of solicitation emails, bids received, faxes, and phone call logs. Any such documentation of solicitations to MBE/WBE firms must clearly include the identification of the recipient MBE/WBE firm(s).
• Use additional sheets if necessary to supplement the responses and attach them to this form.
1. Solicited through all Reasonable and Available Means: As stated in City ordinance §423.90(c)(1), the department may consider whether the bidder or proposer solicited through all reasonable and available means (attendance at pre-bid meetings, advertising and/or written notices) the interest of all eligible MBEs/WBEs certified in the scopes of work of the contract. The bidder or proposer must solicit MBEs/WBEs in sufficient time prior to bid opening or the proposal deadline to allow MBEs/WBEs to respond to solicitations. The bidder or proposer must determine with reasonable certainty if the MBEs/WBEs are interested by taking appropriate steps to follow up on initial solicitations.
Solicited to all firms listed on the MnUCP report provided by CCD that listed MBEs/WBEs certified in scopes of work related to the project. (Submit copies of phone logs, emails, fax sheets, etc.) If no, please explain here:
Utilized the Online MnUCP Directory2 to identify additional MBEs/WBEs that have the capability to perform the work of the contract.
Attended Pre-Bid Meeting to learn about the project and SUBP goals. Date attended: __________
1 Per City ordinance (Chapter 423), there are eight factors that may be considered to determine whether or not the bidder or proposer made good faith efforts to meet the contract goals.
2 Link to MnUCP Online Directory: http://mnucp.metc.state.mn.us/ mailto:SUBPsubmissions@minneapolismn.gov
Rev. October 2018
Reviewed bid documents or RFP for SUBP goals and policies regarding solicitation and utilization of MBEs/WBEs.
Solicited MBEs/WBEs in sufficient time prior to bid opening or proposal due date to allow MBEs/WBEs to respond to the bid solicitation (CCD recommends 2 weeks prior to bid opening). Date solicited: __________ Followed up with the MnUCP certified MBEs/WBEs to confirm interest in participation.
(Submit log of follow-up activities.)
Other: ______________________________________________________________________________________
Comments:_______________________________________________________________________________
2. Broke the Contract Work into Smaller Units: As stated in §423.90(c)(2), the department may consider whether the bidder or proposer selected portions of the work to be performed by eligible MBEs/WBEs in order to increase the likelihood that the contract goals will be achieved. This includes, where appropriate, breaking out contract work into smaller units to facilitate MBE/WBE participation, even when a contractor might otherwise prefer to perform these work items with its own forces.
Broke the contract into smaller, economically feasible units of work in order to facilitate MBE/WBE participation.
Please list the scopes that were broken into smaller units:
Subcontracted/solicited scopes of work that could have been self-performed. Please list these scopes:
Other: ______________________________________________________________________________________
Comments:_______________________________________________________________________________
3. Provided MBEs/WBEs with Adequate Information: As stated in §423.90(c)(3), the department may consider whether the bidder or proposer provided interested eligible MBEs/WBEs with adequate information about the plans, specifications, and requirements of the contract in a timely manner to assist them in responding to a solicitation.
Bid invitations/advertisement included adequate information about the scope of work, contract requirements, deadline to submit a bid, etc. (Submit copy of invite/advertisement.)
Provided MBEs/WBEs adequate project information and access to the plans and specifications.
Other: ______________________________________________________________________________________
Comments:_______________________________________________________________________________
4. Negotiated in Good Faith: As stated in §423.90(c)(4), the department may consider whether the bidder or proposer negotiated in good faith with interested eligible MBEs/WBEs and provide(d) written documentation of such negotiation with each such business.
Negotiations with MBEs/WBEs are conducted fairly.
Communication to MBEs/WBEs regarding pricing, scheduling and capability requirements are consistent with project plans and requirements. Communications and project information provided is the same to all potential bidders.
Rev. October 2018
It is the bidder’s responsibility to make a portion of the work available to DBE subcontractors and suppliers and to select those portions of the work or material needs consistent with the available DBE subcontractors and suppliers, so as to facilitate DBE participation. The bidder must submit evidence of this.
o Evidence of such negotiation may include the names, addresses and telephone numbers of DBEs that were considered; a description of the information provided regarding the plans and specifications for the work selected for subcontracting; and evidence as to why additional agreements could not be reached for DBEs to perform the work.
Bidder did not reject MBEs/WBEs as being unqualified without sound reasons based on a thorough investigation of their capabilities.
o Were there any MBE/WBE firms that bid to you that you did not consider qualified to perform the work?
If yes, explain here:
MBE/WBE bids were rejected. Identify the rejected MBE/WBE(s)* and explain the reasons why here:
* If any MBEs/WBEs were rejected, the prime bidder should submit a copy of those MBE/WBE quotes along with the prime bidder’s supporting GFE documentation. If a non-M/WBE firm was awarded the same scope of work that a rejected M/WBE quoted, the prime bidder should also submit a copy of that non-M/WBE firm’s quote.
Other:______________________________________________________________________________________
5. Rejected each quote from MBE/WBE firms only after determining that the cost of using the firms was unreasonable: As stated in §423.90(c)(5), A bidder or proposer should consider a number of factors in negotiating with potential MBE/WBE subcontractors, and should take into consideration an eligible MBE or WBE’s price and capabilities and scheduling as well as established contract goals. However, the fact that there may be some additional costs involved in finding and using eligible MBE’s/WBE’s is not in itself sufficient reason for a bidder or proposer's failure to meet the established MBE/WBE goals, as long as such costs are reasonable. The ability or desire to perform the work of a contract with its own organization does not relieve the bidder or proposer of the responsibility to make good faith efforts. Bidders or proposers are not, however, required to accept higher quotes from eligible MBE’s/WBE’s if the price difference is excessive or unreasonable.
The prime bidder is not required to accept higher quotes from MBEs/WBEs if the price difference is excessive or unreasonable.
o If the bidder makes such a determination it should provide a written explanation for this conclusion, along with copies of any accepted non-M/WBE quotes, and copies of any M/WBE quotes that were higher for that same scope of work.
Rev. October 2018
6. Provided MBEs/WBEs with Assistance in Meeting City Contracting Requirements: As stated in §423.90(c)(6), the bidder or proposer must offer information regarding, and make reasonable efforts to assist, solicited eligible MBEs/WBEs in obtaining bonding, lines of credit or insurance as required by the city or by the bidder or proposer;
provided that the bidder or proposer need not provide financial assistance toward this effort.
Provided reasonable assistance to help MBEs/WBEs obtain bonds, lines of credit, or insurance that is required by the City.
Made and documented efforts to assist interested MBEs/WBEs in obtaining necessary equipment, supplies, materials, or related assistance or services.
Referred MBEs/WBEs in need of financial or technical assistance to City’s Business and Technical Assistance Program (B-TAP). For more information on B-TAP please visit: http://www.minneapolismn.gov/business/B-TAP.
Other: ______________________________________________________________________________________
Comments:_______________________________________________________________________________
7. Effectively Used Community Organizations: As stated in §423.90(c)(7), effectively using the services of minority/woman community organizations; minority/woman contractors' groups; local, state and federal business assistance offices; and other organizations as allowed on a case-by-case basis to provide assistance in the solicitation and placement of MBEs/WBEs.
Used services of minority/women community organizations.
Used services of minority/women professional organizations.
Other: ______________________________________________________________________________________
Please list the organizations that were used:
8. Other Good Faith Efforts Provide a statement of the prime bidder’s overall plan for obtaining MBE/WBE participation, noting barriers or challenges the bidder encountered in obtaining MBE/WBE participation. Include an explanation of any other good faith efforts made by your company not included above. Specifically, detail all necessary and reasonable steps taken to achieve the MBE/WBE goal or other requirements which, by their scope, intensity, and appropriateness to the objective of achieving the MBE/WBE goal, could reasonably be expected to obtain sufficient MBE/WBE participation – even if the bidder was not successful. Examples may include: identifying firms eligible to become MnUCP certified MBEs/WBEs; hosting open houses or networking events; and participation in trainings related to equity and inclusion.
http://www.minneapolismn.gov/business/B-TAP
City of Minneapolis Small and Underutilized Business Program (SUBP)
Report Effective Date:
This report lists MBEs and WBEs that have been certified by the Minnesota Uniform Certification Program (MnUCP) in scopes of services relevant to this project. If additional scopes of services are identified, the MnUCP online directory (http://mnucp.metc.state.mn.us/) should be utilized to find additional certified MBEs and WBEs in those scopes.
The scopes of services are categorized using the North American Industry Classification System (NAICS). For definitions and more information about NAICS Codes visit the U.S. Census Bureau (http://www.census.gov/eos/www/naics/).
NAICS CODE:
Contact MBECompany Email FaxPhone WBE
NAICS CODE: 237110 Water and Sewer Line and Related Structures Construction
Contact MBECompany Email FaxPhone WBE
BARBARA JOHNSON 952-496-1060 952-496-1348AMAHOWALD@BKJ-AJT.COM YesNoBKJ LAND COMPANY II DBA BKJ EXCAVATING
KARVONEN, BARBARA 763-291-7728 763-445-2107BARB@BLACKSTONECONTRACTORSLLC.COM YesNoBLACKSTONE CONTRACTORS LLC
CASTREJON, MONICA 763-450-2055 763-450-2056BERT@CASTREJONINC.COM NoYesCASTREJON INCORPORATED
ACOSTA, JUAN 763-232-8533 763-444-0388Reyna@FR-Utilityservices.com NoYesF&R UTILITY SERVICES LLC
BOOGREN, APRIL 612-910-7659APRIL@HUSKYCONST.COM YesNoHUSKY CONSTRUCTION INC
THEIS, JAMIE 952-492-3888 952-492-3007JAMIE@JLTHEIS.COM YesNoJL THEIS INC
FORSTNER, RICH 651-289-8468 715-392-2308gretl.pineda@asrcindustrial.com NoYesMAVO CONCRETE SAWING SERVICES INC
SCHILLEWAERT, LYNNETTE 320-743-2400 320-743-5487MIDWESTBORES@GMAIL.COM YesNoMIDWEST BORINGS INC
NADEAU, SHONNA 651-438-8692 651-438-2963shonna@nadeaucompanies.com YesNoNADEAU COMPANIES LLC
BELICH, NATALIE 218-590-6737NATALIE@NS-UNDERGROUND.COM YesNoNORTH STARZ UNDERGROUND
LEROY MEYER, JR 612-789-6162 612-789-6542LMEYER@PETESWS.COM NoYesPWS INC
ENNENGA, ELIZABETH 612-462-0629 952-242-0689ELIZABETH.ENNENGA@QUADECOMPANIES.CO
M
YesNoQUAD E COMPANIES INC
SCHERBER, MISSY 952-300-5876MISSY@TSCHERBER.COM YesYesSCHERBER ROLL-OFFS DBA T.SCHERBER
DEMOLITION & EXCAVATING
PEREZ, ANGEL 763-218-9385 763-262-1151ANGELPEPPY1@IZOOM.NET NoYesUNIQUE CONTRACTING SERVICES CORP
MONGO, RICHARD 612-886-2938 651-330-3458RMONGO@USAFRIK.COM NoYesUSAFRIK INC
IMKER, TIFFANY 612-385-7529 763-287-0514USSIMN@GMAIL.COM YesNoUTILITY SALES AND SUPPLY INC
NAICS CODE: 237310 Highway, Street, and Bridge Construction
Contact MBECompany Email FaxPhone WBE
JAY, MARY ANN 651-462-7232 651-784-3609INFO@APCWBE.COM YesNoALL PHASE CONTRACTING
KANE, ABOUBEKRINE (BOCAR) 952-495-4492BOCAR@AMKASAFETY.COM NoYesAMKA GLOBAL LLC
KARVONEN, BARBARA 763-291-7728 763-445-2107BARB@BLACKSTONECONTRACTORSLLC.COM YesNoBLACKSTONE CONTRACTORS LLC
GRUWELL, CARMEN 651-399-5708CCMCONCRETE75@GMAIL.COM YesYesCARMEN'S CONCRETE AND MASONRY LLC
SHERYL CLAFLIN 715-861-5226 715-861-5228sclaflin@cbssquaredinc.com YesNoCBS SQUARED INC
DOERING, TANYA 320-743-2001 320-743-2002TANYA@CMSAWING.COM YesNoCENTRAL MINNESOTA SAWING LLC
JOHNSON, KARI 763-478-6878 763-478-2329KARI@DMJASPHALT.COM YesNoDMJ ASPHALT INC
MISKAVIGE, ELIZABETH 763-755-6942 763-755-6945LMISKAVIGE@EJREBAR.COM YesNoE&J REBAR INC
TOUSIGNANT, RICHARD 651-452-1183 651-688-7820DICKT@ECONPLACER.COM NoYesE-CON-PLACER INC
GARCIA, MARTIN 763-300-9382MARTINGARCIA_07@YAHOO.COM NoYesFOUR BROTHERS CONSTRUCTION LLC
HANSON, JOELYNNE 651-982-1032 651-982-1354JOELYNNE@HCCIROCKS.COM YesNoHANSON CUSTOM CRUSHING INC
JEROME PERRY 612-817-3310 715-549-6162jeromeperry@highwaysolutionsinc.com NoYesHIGHWAY SOLUTIONS INC
BOOGREN, APRIL 612-910-7659APRIL@HUSKYCONST.COM YesNoHUSKY CONSTRUCTION INC
KRON, KENDRA 651-968-4554 651-968-4466KKRON@INSITEMN.COM YesNoINSITE CONTRACTING INC
JUNKER, STACY 651-439-7706SENGER@INVISIONSERVICES.NET YesNoINVISION SERVICES LLC
BOYER, GERI 618-233-5877 618-233-5977BBOYER@KASKASKIAENG.COM YesNoKASKASKIA ENGINEERING GROUP DBA KEG
BUILD
NGUYEN, CONRAD P 732-801-6215CONRAD@KORTECH.COM NoYesKORTECH CONSULTING INC
FORSTNER, RICH 651-289-8468 715-392-2308gretl.pineda@asrcindustrial.com NoYesMAVO CONCRETE SAWING SERVICES INC
MCKENZIE, EDNA 612-207-4986EDNA@MIDWESTSELECTCONTRACTING.COM YesYesMIDWEST SELECT CONTRACTING LLC
TIMOTHY MILLER 763-732-9871MILLERSTRIPINGLLC@GMAIL.COM NoYesMILLER MANAGEMENT AND STRIPING SERVICES
LLC
BUCKNER, PATRICK 612-685-8388 763-432-7988PATRICK.BUCKNER@MOLTRONBUILDERS.COM YesYesMOLTRON BUILDERS INC
NADEAU, SHONNA 651-438-8692 651-438-2963shonna@nadeaucompanies.com YesNoNADEAU COMPANIES LLC
PRIDE, JOHN D 612-306-3901JD@PRIDECLEANUP.COM NoYesPRIDE CLEANUP LLC DBA LOOKOUT FLAGGING
SERVICES
LEROY MEYER, JR 612-789-6162 612-789-6542LMEYER@PETESWS.COM NoYesPWS INC
ENNENGA, ELIZABETH 612-462-0629 952-242-0689ELIZABETH.ENNENGA@QUADECOMPANIES.CO
M
YesNoQUAD E COMPANIES INC
DIRKSEN, MATTHEW 320-260-1202MATTHEWD@RCSMN.COM NoYesRESTORATION & CONSTRUCTION SERVICES LLC
ARVIDSON, BRENDA 952-402-9202 952-403-6803BRENDA@STONEBROOKEENGINEERING.COM YesNoSTONEBROOKE ENGINEERING INC
MORALES, JOSE 763-300-7112 651-388-5303SURESEALRESTORATION@GMAIL.COM NoYesSURESEAL RESTORATION LLC
LLOYD, THERESA 612-366-6210THERESA@LAWNSAREUS.COM YesNoTHERESA'S CONSTRUCTION SERVICES INC
PEREZ, ANGEL 763-218-9385 763-262-1151ANGELPEPPY1@IZOOM.NET NoYesUNIQUE CONTRACTING SERVICES CORP
MONGO, RICHARD 612-886-2938 651-330-3458RMONGO@USAFRIK.COM NoYesUSAFRIK INC
NAICS CODE: 541370 Surveying and Mapping (except Geophysical) Services
Contact MBECompany Email FaxPhone WBE
SCHWARTZ, ANNA 612-568-3227ANNA@ACSTEAM.COM YesYesASSOCIATED CONSULTING SERVICES LLC DBA
ACS
PEICHEL, JEREMY 612-492-1369JEREMY@CIVICINTELL.COM NoYesCIVIC INTELLIGENCE LLC
DAWNA JEAN BERNHAGEN 218-330-8540DAWNA@BERNHAGENRW.COM YesNoDAWNA JEAN BERNHAGEN DBA BERNHAGEN
RIGHT OF WAY
VLADIMIR SIVRIVER 763-545-2800 763-545-2801vsivriver@edsmn.com NoYesENGINEERING DESIGN & SURVEYING DBA EDS
INC
MARTINEZ, STEPHEN J 651-686-8424 651-686-8389JOHN@MTZGEO.COM NoYesMARTINEZ GEOSPATIAL INC
MCKENZIE, EDNA 612-207-4986EDNA@MIDWESTSELECTCONTRACTING.COM YesYesMIDWEST SELECT CONTRACTING LLC
PEGGY JOHNSON 651-481-6980 651-481-6981PJOHNSON@POINTMAP.COM YesNoPOINTMAP INCORPORATED
CARLETON, STEVEN 612-455-9394 612-455-3321STEVEN.CARLETON@RANIENG.COM NoYesRANI ENGINEERING LLC
ISLAM, TARIQ 651-300-9070tariq@sltaeronautics.com NoYesSLT AERONAUTICS LLC
SWANSON, LUIS 612-387-5547LUISSWANSON1@GMAIL.COM NoYesSPACIAL INTELLIGENCE CONSULTING LLC
SWANSON, LUIS 612-387-5541LUISSWANSON1@GMAIL.COM NoYesSPATIAL INTELLIGENCE CONSULTING LLC
ARVIDSON, BRENDA 952-402-9202 952-403-6803BRENDA@STONEBROOKEENGINEERING.COM YesNoSTONEBROOKE ENGINEERING INC
"General Decision Number: MN20260239 01/02/2026
Superseded General Decision Number: MN20250239
State: Minnesota
Construction Types: Heavy and Highway
Counties: Anoka, Carver, Chisago, Dakota, Hennepin, Ramsey, Scott and Washington Counties in Minnesota.
Heavy and Highway Construction Projects
Please refer to Minnesota Rules 5200.1100, 5200.1101, and
5200.1102 for definitions of labor classifications on this wage determination, and direct any questions regarding such classifications to the Branch of Construction Wage Determinations.
Modification Number Publication Date 0 01/02/2026
SAMN2024-009 11/18/2024
Rates Fringes
ARTICULATED HAULER...............$ 44.67 26.90
ASBESTOS ABATEMENT WORKER........$ 39.86 24.11
BLASTER..........................$ 22.08 6.87
BOILERMAKER......................$ 48.35 31.93
BOOM TRUCK.......................$ 47.25 26.90
BRICKLAYER.......................$ 48.23 26.53
CARPENTER........................$ 49.82 29.92
CEMENT MASON.....................$ 51.23 26.22
ELECTRICIAN......................$ 60.40 34.39
FLAG PERSON......................$ 44.00 26.12
GROUND PERSON....................$ 37.77 20.38
HEATING AND FROST INSULATORS.....$ 47.10 24.40
IRONWORKER.......................$ 44.85 35.72
LABORER: Common or General
(GENERAL LABOR WORK).............$ 44.00 26.12
LABORER: Landscape
(GARDENER, SOD LAYER AND
NURSERY OPERATOR)................$ 30.04 21.16
LABORER: Skilled (ASSISTING
SKILLED CRAFT JOURNEYMAN)........$ 44.00 26.12
1/7/26, 11:54 AM SAM.gov https://sam.gov/wage-determination/MN20260239/0 1/7
LANDSCAPING EQUIPMENT
(INCLUDES HYDRO SEEDER OR
MULCHER, SOD ROLLER, FARM
TRACTOR WITH ATTACHMENT
SPECIFICALLY SEEDING,
SODDING, OR PLANT, AND
TWO-FRAMED FORKLIFT
(EXCLUDING FRONT,
POSIT-TRACK, AND SKID STEER
LOADERS), NO EARTHWORK OR
GRADING FOR ELEVATIONS)..........$ 30.04 21.16
LINEMAN..........................$ 50.86 23.57
MILLWRIGHT.......................$ 43.44 33.37
OFF-ROAD TRUCK...................$ 44.67 26.90
PAINTER (INCLUDING HAND
BRUSHED, HAND SPRAYED, AND
THE TAPING OF PAVEMENT
MARKINGS)........................$ 45.50 27.69
PAVEMENT MARKING OR MARKING
REMOVAL EQUIPMENT ((ONE OR
TWO PERSON OPERATORS);
SELF-PROPELLED TRUCK OR
TRAILER MOUNTED UNITS)...........$ 38.90 23.49
Piledriver (INCLUDING
VIBRATORY DRIVER OR EXTRACTOR
FOR PILING AND SHEETING
OPERATIONS)......................$ 49.46 30.23
PIPEFITTER/STEAMFITTER...........$ 55.94 34.50
PIPELAYER (WATER, SEWER AND
GAS).............................$ 47.50 26.12
PLUMBER..........................$ 61.28 31.52
POWER EQUIPMENT OPERATOR:
(Highway/Heavy Group 2)..........$ 45.61 26.90
HELICOPTER PILOT; CONCRETE PUMP; ALL CRANES WITH OVER 135-FOOT
BOOM, EXCLUDING JIB; DRAGLINE, CRAWLER, HYDRAULIC BACKHOE
(TRACK OR WHEEL MOUNTED) AND/OR OTHER SIMILAR EQUIPMENT WITH
SHOVEL-TYPE CONTROLS THREE CUBIC YARDS AND OVER MANUFACTURER.S
RATED CAPACITY INCLUDING ALL ATTACHMENTS; GRADER OR MOTOR
PATROL; PILE DRIVING; TUGBOAT 100 H.P. AND OVER WHEN LICENSE
REQUIRED
POWER EQUIPMENT OPERATOR:
(Highway/Heavy Group 3)..........$ 45.01 26.90
ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; CONCRETE MIXER,
STATIONARY PLANT; DERRICK (GUY OR STIFFLEG)(POWER)(SKIDS OR
STATIONARY); DRAGLINE, CRAWLER, HYDRAULIC BACKHOE (TRACK OR
WHEEL MOUNTED) AND/OR SIMILAR EQUIPMENT WITH SHOVEL-TYPE
CONTROLS, UP TO THREE CUBIC YARDS MANUFACTURER.S RATED
CAPACITY INCLUDING ALL ATTACHMENTS; DREDGE OR ENGINEERS,
DREDGE (POWER) AND ENGINEER; FRONT END LOADER, FIVE CUBIC
YARDS AND OVER INCLUDING ATTACHMENTS; LOCOMOTIVE CRANE
OPERATOR; MIXER (PAVING) CONCRETE PAVING, ROAD MOLE, INCLUDING
MUCKING OPERATIONS, CONWAY OR SIMILAR TYPE; MECHANIC ON POWER
EQUIPMENT; TRACTOR, BOOM TYPE; TANDEM SCRAPER; TRUCK CRANE,
CRAWLER CRANE; TUGBOAT 100 H.P AND OVER
https://sam.gov/wage-determination/MN20260239/0 2/7
POWER EQUIPMENT OPERATOR:
(Highway/Heavy Group 4)..........$ 44.67 26.90
AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE (CMI OR SIMILAR);
BACKFILLER OPERATOR; CONCRETE BATCH PLANT OPERATOR; BITUMINOUS
ROLLERS, RUBBER TIRED OR STEEL DRUMMED (EIGHT TONS AND OVER);
BITUMINOUS SPREADER AND FINISHING MACHINES (POWER), INCLUDING
PAVERS, MACRO SURFACING AND MICRO SURFACING, OR SIMILAR TYPES
(OPERATOR AND SCREED PERSON); BROKK OR R.T.C. REMOTE CONTROL
OR SIMILAR TYPE WITH ALL ATTACHMENTS; CAT CHALLENGER TRACTORS
OR SIMILAR TYPES PULLING ROCK WAGONS, BULLDOZERS AND SCRAPERS;
CHIP HARVESTER AND TREE CUTTER; CONCRETE DISTRIBUTOR AND
SPREADER FINISHING MACHINE, LONGITUDINAL FLOAT, JOINT MACHINE,
AND SPRAY MACHINE; CONCRETE MIXER ON JOBSITE; CONCRETE MOBIL;
CRUSHING PLANT (GRAVEL AND STONE) OR GRAVEL WASHING, CRUSHING
AND SCREENING PLANT; CURB MACHINE; DIRECTIONAL BORING MACHINE;
DOPE MACHINE (PIPELINE); DRILL RIGS, HEAVY ROTARY OR CHURN OR
CABLE DRILL; DUAL TRACTOR; ELEVATING GRADER; FORK LIFT OR
STRADDLE CARRIER; FORK LIFT OR LUMBER STACKER; FRONT END, SKID
STEER OVER 1 TO 5 C YD; GPS REMOTE OPERATING OF EQUIPMENT;
HOIST ENGINEER (POWER); HYDRAULIC TREE PLANTER; LAUNCHER
PERSON (TANKER PERSON OR PILOT LICENSE); LOCOMOTIVE; MILLING,
GRINDING, PLANNING, FINE GRADE, OR TRIMMER MACHINE; MULTIPLE
MACHINES, SUCH AS AIR COMPRESSORS, WELDING MACHINES,
GENERATORS, PUMPS; PAVEMENT BREAKER OR TAMPING MACHINE (POWER
DRIVEN) MIGHTY MITE OR SIMILAR TYPE; PICKUP SWEEPER, ONE CUBIC
YARD AND OVER HOPPER CAPACITY; PIPELINE WRAPPING, CLEANING OR
BENDING MACHINE; POWER PLANT ENGINEER, 100 KWH AND OVER; POWER
ACTUATED HORIZONTAL BORING MACHINE, OVER SIX INCHES; PUGMILL;
PUMPCRETE; RUBBER-TIRED FARM TRACTOR WITH BACKHOE INCLUDING
ATTACHMENTS; SCRAPER; SELF-PROPELLED SOIL STABILIZER; SLIP
FORM (POWER DRIVEN) (PAVING); TIE TAMPER AND BALLAST MACHINE;
TRACTOR, BULLDOZER; TRACTOR, WHEEL TYPE, OVER 50 H.P. WITH PTO
UNRELATED TO LANDSCAPING; TRENCHING MACHINE (SEWER, WATER,
GAS) EXCLUDES WALK BEHIND TRENCHER; TUB GRINDER, MORBARK, OR
SIMILAR TYPE; WELL POINT DISMANTLING OR INSTALLATION
POWER EQUIPMENT OPERATOR:
(Highway/Heavy Group 5)..........$ 41.36 26.90
AIR COMPRESSOR, 600 CFM OR OVER; BITUMINOUS ROLLER (UNDER
EIGHT TONS); CONCRETE SAW (MULTIPLE BLADE) (POWER OPERATED);
FORM TRENCH DIGGER (POWER); FRONT END, SKID STEER UP TO 1C YD;
GUNITE GUNALL; HYDRAULIC LOG SPLITTER; LOADER (BARBER GREENE
OR SIMILAR TYPE); POST HOLE DRIVING MACHINE/POST HOLE AUGER;
POWER ACTUATED AUGER AND BORING MACHINE; POWER ACTUATED JACK;
PUMP; SELF-PROPELLED CHIP SPREADER (FLAHERTY OR SIMILAR);
SHEEP FOOT COMPACTOR WITH BLADE . 200 H.P. AND OVER;
SHOULDERING MACHINE (POWER) APSCO OR SIMILAR TYPE INCLUDING
SELF-PROPELLED SAND AND CHIP SPREADER; STUMP CHIPPER AND TREE
CHIPPER; TREE FARMER (MACHINE)
POWER EQUIPMENT OPERATOR:
(Highway/Heavy Group 6)..........$ 40.02 26.90
CAT, CHALLENGER, OR SIMILAR TYPE OF TRACTORS, WHEN PULLING
DISK OR ROLLER; CONVEYOR; DREDGE DECK HAND; FIRE PERSON OR
TANK CAR HEATER; GRAVEL SCREENING PLANT (PORTABLE NOT CRUSHING
OR WASHING); GREASER (TRACTOR); LEVER PERSON; OILER (POWER
SHOVEL, CRANE, TRUCK CRANE, DRAGLINE, CRUSHERS, AND MILLING
MACHINES, OR OTHER SIMILAR HEAVY EQUIPMENT); POWER SWEEPER;
SHEEP FOOT ROLLER AND ROLLERS ON GRAVEL COMPACTION, INCLUDING
VIBRATING ROLLERS; TRACTOR, WHEEL TYPE, OVER 50 H.P.,
UNRELATED TO LANDSCAPING
SHEET METAL WORKER...............$ 57.96 34.57
https://sam.gov/wage-determination/MN20260239/0 3/7
Survey Field Technician
(OPERATE TOTAL STATION, GPS
RECEIVER, LEVEL, ROD OR RANGE
POLES, STEEL TAPE
MEASUREMENT; MARK AND DRIVE
STAKES; HAND OR POWER DIGGING
FOR AND IDENTIFICATION OF
MARKERS OR MONUMENTS; PERFORM
AND CHECK CALCULATIONS;
REVIEW AND UNDERSTAND
CONSTRUCTION PLANS AND LAND
SURVEY MATERIALS)................$ 44.00 26.12
TILE SETTER......................$ 34.76 23.29
TRAFFIC CONTROL PERSON
(TEMPORARY SIGNAGE)..............$ 44.00 26.12
TRUCK DRIVER (Group 1)...........$ 41.35 24.70
MECHANIC; TRACTOR TRAILER DRIVER; TRUCK DRIVER (HAULING
MACHINERY INCLUDING OPERATION OF HAND AND POWER OPERATED
WINCHES)
TRUCK DRIVER (Group 2)...........$ 34.70 21.75
FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCK
TRUCK DRIVER (Group 3)...........$ 34.60 21.76
BITUMINOUS DISTRIBUTOR DRIVER; BITUMINOUS DISTRIBUTOR (ONE
PERSON OPERATION); THREE AXLE UNITS
TRUCK DRIVER (Group 4)...........$ 37.54 21.76
BITUMINOUS DISTRIBUTOR SPRAY OPERATOR (REAR AND OILER); DUMP
PERSON; GREASER; PILOT CAR DRIVER; RUBBER-TIRED, SELF-
PROPELLED PACKER UNDER 8 TONS; TWO AXLE UNIT; SLURRY OPERATOR;
TANK TRUCK HELPER (GAS, OIL, ROAD OIL, AND WATER); TRACTOR
OPERATOR, UNDER 50 H.P.
Tunnel Miner.....................$ 45.50 26.12
UNDERGROUND AND OPEN DITCH
LABORER (EIGHT FEET BELOW
STARTING GRADE LEVEL)............$ 45.50 26.12
WIRING SYSTEM TECHNICIAN.........$ 47.73 22.24
WIRING SYSTEMS INSTALLER.........$ 33.44 17.82
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO)…