M95494-18-R-0017_NexLog.pdf
PDF 436 KB Posted
- Attached to
- Logistics Innovation Support Services Federal contract opportunity
- Solicitation number
- M95494-18-R-0017
- Issued by
- United States Marine Corps
About this file
NexLog RFP
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| M95494-18-R-0017_NexLog_Q&A.pdf | ||
| Attachment_B_-_DD254.pdf | ||
| Attachment_A-0001_-_Pricing_Sheet.xlsx | XLSX spreadsheet | |
| M95494-18-R-0017-0001.pdf | ||
| Exhibit_D_-_Challenge.pdf | ||
| Exhibit_C_-_EABO.pdf | ||
| Exhibit_B_-_MCOC.pdf | ||
| Attachment_A_-_Pricing_Sheet.xlsx | XLSX spreadsheet | |
| Exhibit_A_-_MCILR.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
M9549418R0017 21-Mar-2018
b. TELEPHONE NUMBER
1-703-604-3236
8. OFFER DUE DATE/LOCAL TIME
01:00 PM 04 Apr 2018
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
M954949. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
FRANCIS P. LIRIO
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
MCICOM HQ
3000 MARINE CORPS PENTAGON
WASHINGTON DC 20350-3000
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$15,000,000
NAICS:
541614
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
M9549418R0017
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 12 Months Project Management
FFP
FOB: Destination
NET AMT
0002 12 Months Technological Innovation Advocacy
0003 12 Months Logistics Innovation Challenge
0004 12 Months Future Capability Development
0005 20 Each OPTION Future Capabilities Training
0006 12 Months Project Coordination and Info Management
0007 12 Months Innovation Engagement Events
0008 Lot Travel
COST
ESTIMATED COST
0009 Lot Other Direct Costs
1001 12 Months OPTION Project Management
1002 12 Months OPTION Technological Innovation Advocacy
1003 12 Months OPTION Logistics Innovation Challenge
1004 12 Months OPTION Future Capability Development
1005 20 Each OPTION Future Capabilities Training
1006 12 Months OPTION Project Coordination and Info Management
1007 12 Months OPTION Innovation Engagement Events
1008 Lot OPTION Travel
1009 Lot OPTION Other Direct Costs
2001 12 Months OPTION Project Management
2002 12 Months OPTION Technological Innovation Advocacy
2003 12 Months OPTION Logistics Innovation Challenge
2004 12 Months OPTION Future Capability Development
2005 20 Each OPTION Future Capabilities Training
2006 12 Months OPTION Project Coordination and Info Management
2007 12 Months OPTION Innovation Engagement Events
2008 Lot OPTION Travel
2009 Lot OPTION Other Direct Costs
3001 12 Months OPTION Project Management
3002 12 Months OPTION Technological Innovation Advocacy
3003 12 Months OPTION Logistics Innovation Challenge
3004 12 Months OPTION Future Capability Development
3005 20 Each OPTION Future Capabilities Training
3006 12 Months OPTION Project Coordination and Info Management
3007 12 Months OPTION Innovation Engagement Events
3008 Lot OPTION Travel
3009 Lot OPTION Other Direct Costs
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 0007 Destination Government Destination Government 0008 Destination Government Destination Government
0009 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 1003 Destination Government Destination Government 1004 Destination Government Destination Government 1005 Destination Government Destination Government 1006 Destination Government Destination Government 1007 Destination Government Destination Government 1008 Destination Government Destination Government 1009 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 2003 Destination Government Destination Government 2004 Destination Government Destination Government 2005 Destination Government Destination Government 2006 Destination Government Destination Government 2007 Destination Government Destination Government 2008 Destination Government Destination Government 2009 Destination Government Destination Government 3001 Destination Government Destination Government 3002 Destination Government Destination Government 3003 Destination Government Destination Government 3004 Destination Government Destination Government 3005 Destination Government Destination Government 3006 Destination Government Destination Government 3007 Destination Government Destination Government 3008 Destination Government Destination Government 3009 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 01-MAY-2018 TO
30-APR-2019
N/A N/A
0002 POP 01-MAY-2018 TO
30-APR-2019
0003 POP 01-MAY-2018 TO
0004 POP 01-MAY-2018 TO
0005 POP 01-MAY-2018 TO
0006 POP 01-MAY-2018 TO
0007 POP 01-MAY-2018 TO
0008 POP 01-MAY-2018 TO
0009 POP 01-MAY-2018 TO
1001 POP 01-MAY-2019 TO
30-APR-2020
1002 POP 01-MAY-2019 TO
1003 POP 01-MAY-2019 TO
1004 POP 01-MAY-2019 TO
1005 POP 01-MAY-2019 TO
1006 POP 01-MAY-2019 TO
1007 POP 01-MAY-2019 TO
1008 POP 01-MAY-2019 TO
1009 POP 01-MAY-2019 TO
2001 POP 01-MAY-2020 TO
30-APR-2021
2002 POP 01-MAY-2020 TO
2003 POP 01-MAY-2020 TO
2004 POP 01-MAY-2020 TO
2005 POP 01-MAY-2020 TO
2006 POP 01-MAY-2020 TO
2007 POP 01-MAY-2020 TO
2008 POP 01-MAY-2020 TO
2009 POP 01-MAY-2020 TO
3001 POP 01-MAY-2021 TO
30-APR-2022
3002 POP 01-MAY-2021 TO
3003 POP 01-MAY-2021 TO
3004 POP 01-MAY-2021 TO
3005 POP 01-MAY-2021 TO
3006 POP 01-MAY-2021 TO
3007 POP 01-MAY-2021 TO
3008 POP 01-MAY-2021 TO
3009 POP 01-MAY-2021 TO
PERFORMANCE WORK STATEMENT
1.0 Background
The Logistics Plans, Policies, and Strategic Mobility Division (LP) under Headquarters, United States Marine Corps (USMC), Installations and Logistics (I&L) is responsible for maintaining logistical capabilities and systems management oversight to support evolving future Marine Corps operational concepts. LP performs process management activities leading toward better business practices and workflow methodologies. LP is comprised of several branches, each with their own unique function and mission.
This requirement is in support of the Logistics Innovation/Next Generation Logistics Cell (NexLog) of the Logistics Vision and Strategy Branch (LPV). This branch provides the vision and sets the framework and conditions for the development and transition of future logistics in order to improve service logistics that impacts and directs change inside and outside the Marine Air-Ground Task Force (MAGTF). NexLog’s mission is to explore and exploit emerging opportunities in order to rapidly transition relevant logistics capabilities to the warfighter along the following lines of effort, acceleration of measurable transition outcomes, growth of a logistics innovation network, promotion of warfighter-driven logistics innovation, and the formalization of innovation skillsets.
2.0 Scope
The purpose of this requirement is to establish and maintain a portfolio of logistics technologies and implementation guidance with consideration to the operational strategy of the Marine Corps Installations and Logistics Roadmap (MCILR) and the Marine Corps Operating Concept (MOC) with respect to the following fields:
• Additive Manufacturing
• Unmanned Logistics Systems o Bulk Liquid Throughput
• Smart Logistics o Machine Learning o Big Data Analytics Logistics Software o Condition Based Maintenance Review
• Expeditionary Medicine
• Marine Corps Innovation
3.0 Tasks
The Contractor must perform the following tasks:
3.1 Project Management – The Contractor must establish and coordinate services and allocate staffing resources to fulfill the requirements of this Contract to include the following:
• Kick-Off Meeting – The Contractor must schedule and coordinate a Kick-Off Meeting within five (5) days after contract award at a location approved by the Government. The Government shall provide the Contractor with the Meeting Agenda. The Contracting Officers Representative (COR) shall ensure all identified participants are notified in advance of the meeting. The Contractor must develop and, after Government approval, distribute the kick-off meeting minutes in accordance with the delivery schedule specified in Table 1. Meeting minutes must include a list of attendees, action items, and other pertinent information discussed in the meeting.
• Plan of Action & Milestones – The Contractor must develop a Plan of Action & Milestones (POA&M) that identifies the tasks, deliverables, events, and timelines under this Contract.
• In Process Reviews – The Contractor must prepare and present four (4) In Process Reviews in accordance with Table 1. The In Process Reviews must include program, project management, and quality control plans that are tailored to emerging customer priorities under this Contract. The COR shall provide due dates for each review no later than thirty (30) days prior to the required presentation.
• Quality Control – The Contractor must ensure the consistent quality delivery of the deliverables outlined in the PWS and in the execution of defined tasks. The work shall be accomplished with adequate internal controls and review procedures that will eliminate conflicts, errors and omissions, and ensure technical accuracy of deliverables.
• NexLog Portfolio – The Contractor must develop and maintain a portfolio that summarizes metrics, events, and milestones achieved under this contract.
3.2 Technological Innovation Advocacy – The Contractor must identify opportunities to incorporate modern logistics technologies such as additive manufacturing, unmanned logistics systems, smart logistics software, machine learning, and big data analytics logistics software into the Marine Corps’ operating forces with consideration to strategic documents, roadmaps, and priorities, to include the Marine Corps Installations and Logistics Roadmap (Exhibit A), the Marine Corps Operating Concept (Exhibit B), and Expeditionary Advanced Base Operations (Exhibit C). The Contractor must provide a report that summarizes viable opportunities and includes details regarding implementation procedures, risks, advantages, and other critical details, as follows:
• The Contractor must attend Marine Corps, DoD, and commercial events listed under Section 12.0. These events include Additive Manufacturing, Unmanned Logistics Systems, Smart Logistics, Expeditionary Medicine, and Marine Corps Innovation. The Contractor must submit an After Action Report within ten
(10) business days after the conclusion of each event.
• The Contractor must assist in drafting NexLog strategic documents, roadmaps, and briefs such as: Concepts of Employment; After Action Reports for major events involving NexLog; and Weekly Activity Reports.
3.3 Logistics Innovation Challenge – The Contractor must develop and plan one (1) annual Logistics Innovation Challenge. The purpose of this challenge is to solicit ideas from Marines, Sailors, and civilians from across the Marine Corps in order to improve the overall delivery of logistics support. The Contractor must create a schedule, submission procedures, and evaluation criteria, which will be reviewed and approved by the Contracting Officer’s Representative (COR). The Contractor must evaluate each entry received for the Logistics Innovation Challenge and develop summary reports to be presented to the COR and NexLog stakeholders. The COR will select ten (10) entries for production by the Contractor. The Contractor must research each entry and provide a detailed report that includes implementation procedures, risks, advantages, and other critical details. For more information on the challenge, see MARADMIN 459/17 (Exhibit D), which details the challenge conducted in 2017.
3.4 Future Capabilities Development – The Contractor must provide advocacy-led support for exploring, assessing, and transitioning future logistics capabilities into capability development processes. Processes include concepts, experimentation, programming, requirements development, and fielding integration, as follows:
• The Contractor must draft and provide reports for NexLog to advocate for key capabilities to be integrated into the Joint Capabilities and Integration Development System (JCIDS). The Contractor must provide up to five (5), 10-20 page reports per year and ten (10) Power Point Presentations per year that addresses the fields identified under Section 2.0.
• Future Capabilities Training – This is an optional task that may be unilaterally exercised by the Government. The Government shall identify which NexLog capabilities will be promulgated at the enterprise level. The Contractor must recommend candidates within the LP community to receive training.
The Contractor must oversee and evaluate up to twenty (20) training sessions and provide a summary report on results and areas of improvement. Training sessions may be located overseas (see Section 12.0).
3.5 Project Coordination and Information Management – The Contract must facilitate information sharing and collaboration across a broad spectrum of public and private sector organizations. Specifically, the Contractor must establish and maintain NexLog information sharing portal(s), such as MilSuite, for communications and collaboration efforts across NexLog initiatives. The portal should be accessible to authorized users to include Government and non-Government personnel. The portal should include document sharing, calendar events, task management, digital workflows, and in-progress project collaboration.
3.6 Innovation Engagement Events – The Contractor must coordinate and manage up to four (4) innovation engagement events annually. These events are independent from the Innovation Challenge detailed above.
Events include logistics innovation sessions with members of the operating forces and innovation display opportunities to increase awareness of NexLog’s efforts throughout the operating forces.
4.0 Deliverables
The Contractor shall submit the following deliverables to the Contracting Officer’s Representative (COR) as described in Table 1 below:
Table 1 – Deliverables Deliverable Format Due Date
Kick-Off Meeting In person or Teleconference Within 5 Business Days After Award Kick-Off Meeting Minutes Microsoft Word Within 5 Business Days After Meeting
Plan of Action & Milestones Microsoft Excel Within 5 Business Days After Meeting;
Monthly for any revisions
In-Process Review Microsoft Word Quarterly Additive Manufacturing Report Microsoft Word, PowerPoint IAW POA&M Unmanned Logistics Vehicles Report
- Bulk Liquid Throughput Microsoft Word, PowerPoint IAW POA&M
Smart Logistics Report
- Machine Learning
- Big Data Analytics Logistics Software
- Condition Based Maintenance
Microsoft Word, PowerPoint IAW POA&M
Expeditionary Medicine Report Microsoft Word, PowerPoint IAW POA&M Marine Corps Innovation Report Microsoft Word, PowerPoint IAW POA&M Logistics Innovation Challenge Microsoft Word, PowerPoint IAW POA&M Future Capabilities Development Reports Microsoft Word, PowerPoint IAW POA&M Future Capabilities Training Report (optional) Microsoft Word, PowerPoint IAW POA&M NexLog Portfolio Review Microsoft Word, PowerPoint IAW POA&M
5.0 Performance Requirements Summary
The Performance Requirements Summary (PRS) set forth in Table 2 corresponds to the material content cited in the PWS. Corresponding ratings will be generated for each of the performance areas and aggregated monthly. The COR will track performance using a moving average and reconcile performance with the Task Leads and/or other designated stakeholders. This information will also be shared with the Contracting Officer and included in Contractor Performance Assessment Reporting System (CPAR) reports and any past performance assistance requests.
Table 2 – Performance Requirements Summary
Service Standard Acceptable Quality Level
Surveillance Method
Incentive/ Penalty
Timeliness of Deliverables required by the Contract
Deliverables shall be submitted in accordance with the delivery requirements required by the PWS.
100% of the deliverables submitted on time.
Continuous Monitoring and Inspection
1% deduction in monthly invoice for not meeting AQL.
CPARS
Accuracy of Deliverables required by the Contract
Deliverables are submitted in full and in accordance with the delivery requirements required by the PWS.
Less than 2% of final deliverables submitted require rework from first time submission.
Continuous Monitoring and Inspection
1% deduction in monthly invoice for not meeting AQL.
CPARS
Overall management of tasks
Provide suitable technical and analytical expertise to ensure technical management, coordinate task activities and provide overall expertise for successful completion of each task area.
Meets all requirements.
Problems encountered are minor and resolved in a satisfactory manner.
COR Review CPARS
Efficiency & Effectiveness of performance
Perform contract requirements ensuring an unconstrained flow of information to effectively and efficiently complete requirements within the specified cost and schedule.
Meets all requirements.
Problems encountered are minor and resolved in a satisfactory manner
COR Review CPARS
Responsiveness
Provide services that allow for a rapid response supporting the Marine Corps LPV mission to develop the logistics vision and strategy that support the Marine Air Ground Task Force (MAGTF).
Meets all requirements.
Problems encountered are minor and resolved in a satisfactory manner.
COR Review CPARS
6.0 Periods of Performance
The periods of performance under this contract are described in Table 3 below:
Table 3 – Periods of Performance Period Dates Base 01 May 2018 – 30 April 2019
Option One 01 May 2019 – 30 April 2020 Option Two 01 May 2020 – 30 April 2021 Option Three 01 May 2021 – 30 April 2022
7.0 Place of Performance
Work under this contract will be performed at both the Contractor’s facility and at the Pentagon in Arlington, VA.
All meetings and reviews shall be held at either the COR’s office, the Contractor’s office, or at any other site within the National Capital Region mutually agreed upon by the COR and the Contractor. Additional travel requirements to include Future Capabilities Training events are listed under Section 12.0.
8.0 Key Personnel
The personnel specified below are considered to be essential to the work being performed under this contract. All personnel assigned to this contract shall meet the minimum requirements specified for that labor category.
8.1 Project Manager – The Project Manager (PM) shall perform project management oversight for all tasks and key personnel and will be the Contractor’s primary point of contact under this requirement. The PM shall address emergent issues and collaborate with the COR in order to fulfill the requirements herein. The PM shall allocate resources to best meet all the tasks and deliverables specified in the PWS.
8.1.1 Knowledge, Skills, and Abilities:
• Demonstrates ability to lead diverse teams in a dynamic Military Service environment.
• Demonstrates expertise with the Defense Transportation System (DTS) and global mobilization of freight.
• Demonstrates expertise with material logistics to include financial matters
• Demonstrates expertise with the Defense Personal Property Program including household goods consolidation and standardization efforts.
8.1.2 Minimum Education and Experience
• Bachelor’s Degree in Logistics, Industrial Engineering, or an equivalent field.
• Minimum 5 years of experience with transportation and logistics issues.
• Minimum 5 years of experience with a logistics portfolio, logistics advocacy, strategic communications, and other logistics modernization initiatives.
• Project Manager Professional (PMP) certified
8.2 Functional Lead – The Functional Lead shall be responsible for fulfilling the requirements of the tasks to include draft revisions and deliverable submission. The Functional Lead shall report to the Program Manager and must meet the respective qualifications below:
8.2.1 Knowledge, Skills, and Abilities:
• Demonstrates ability to lead diverse teams in a dynamic Military Service environment.
• Demonstrates understanding of military logistics portfolios, data management, logistics advocacy, strategic communications, and other logistics modernization initiatives.
• Demonstrates expertise in managing DoD projects and programs related to logistics initiatives and/or technology development/integration.
8.2.2 Minimum Education and Experience:
• Minimum 5 years of military tactical and operational logistics experience.
8.3 Data Engineer – The Data Engineer shall be responsible for fulfilling the requirements of the tasks to include innovation engagement management and information management. The Data Engineer shall report to the Program Manager and must meet the respective qualifications below:
8.3.1 Knowledge, Skills, and Abilities:
• Demonstrates experience with operational procedures and factors that impact the implementation of innovative concepts within the DoD.
• Demonstrates experience with DoD projects and programs related to logistics initiatives and/or technology development/integration.
8.3.2 Minimum Education and Experience:
• Minimum 3 years of military tactical and operational logistics/engineering experience.
9.0 Substitution of Personnel
9.1 General Provision – The Contractor agrees to assign to this contract those persons identified as personnel whose resumes were submitted with this proposal and who are necessary to fulfill the requirements of this contract. No substitutions of personnel shall be made except in accordance with this clause.
9.2 Guidance on Substitutions – During the first ninety (90) days of the contract performance period no personnel substitutions by the Contractor will be made unless substitutions are necessitated by an individual's sudden illness, death, or termination of employment. In any of these events, the Contractor shall promptly notify the Contracting Officer and provide the information required by Section 9.3 below. After the initial ninety (90) day period, all proposed substitutions must be submitted, in writing, at least two (2) weeks in advance of the proposed substitutions to the Contracting Officer and provide information required by Section 13.3 below.
There shall be no more than a 10 calendar day gap in support due to a key personnel replacement issue.
9.3 Request for Substitution – All requests for substitutions must provide a detailed explanation of the circumstances necessitating the proposed substitution, a resume for the proposed substitute, and any other information requested by the Contracting Officer. All proposed substitutes must have qualifications equal to or higher than the qualifications of the person being replaced. The Contracting Officer or his/her authorized representative will evaluate such requests and promptly notify the Contractor of his/her approval or disapproval thereof.
10.0 Government Furnished Information (GFI), Services, and Equipment
The Contractor shall be responsible for providing all material, hardware, and supplies necessary for execution of all work under this PWS. The Contractor shall provide its own computers. The Government will provide the following:
• Common Access Card (CAC) and Pentagon Access Badges as required.
• Access to documents required to support execution of this PWS.
• Access to on-site work spaces.
• Access to systems required.
11.0 Contracting Officer’s Representative (COR)
The Contracting Officer has designated the person named below as the authorized COR for this Contract:
Name: TO BE PROVIDED AT AWARD Code:
Telephone:
E-mail:
The COR will represent the Contracting Officer in the administration of technical details within the scope of this contract and will perform inspection and acceptance of all deliverables. The COR is not otherwise authorized to make any representations or commitments of any kind on behalf of the Contracting Officer or the Government. The COR does not have the authority to alter the Contractor's obligations or change the specifications in the contract. If, as a result of technical discussions, it is desirable to alter contract obligations or statements of work, a modification must be issued in writing and signed by the Contracting Officer. The COR is responsible for reviewing the invoices submitted by the Contractor and informing the Contracting Officer of areas where exceptions are to be taken. The COR authority is non-delegable. The COR may be personally liable for unauthorized acts.
12.0 Travel
The travel schedule shall be specified by the COR and mutually agreed to by the Contractor prior to travel. The anticipated travel schedule is described in Table 4 below:
Table 4 – Travel Event Location Trips
SAE World Detroit, MI 1 CES Las Vegas, NV 1
USMC LOGCOM Albany, GA 4 NAVY FAC Norfolk, VA 2
Modern Day Marine East Coast MCB, Camp Lejeune, NC 3 HLS, RIMPAC, West Marine, ITX West Coast MCB, Camp Pendleton, CA 4 4th MLG Commander’s Conference Marine Forces Reserve HQ, New Orleans, LA 1
MIT Labs Boston, MA 2 DoD Maintenance Symposium Tampa Bay, FL 1
NPS Monterey, CA 1
Travel for Future Capabilities Training may include the following locations:
Region Marine Corps Installation HQMC Pentagon, Washington, DC
MCI-NCR Marine Corps Base Quantico, VA Marine Barracks Washington DC (8th & I)
MCI-EAST
MCI East (Region) Camp Lejeune, NC Marine Corps Support Facility Blount Island, FL
Marine Corps Logistics Base Albany, GA Marine Corps Air Station Cherry Point, NC Marine Corps Air Station New River, NC Marine Corps Base Camp Lejeune, NC Marine Corps Air Station Beaufort, SC
Marine Corps Recruit Depot Parris Island, SC
MCI-WEST
MCI-West (Region) Camp Pendleton, CA Marine Corps Air Station Yuma, AZ
Marine Corps Air Ground Combat Center 29 Palms, CA Marine Corps Air Station Miramar, CA
Marine Corps Base Camp Pendleton, CA Marine Corps Air Station Camp Pendleton, CA
Marine Corps Logistics Base Barstow, CA Marine Corps Recruit Depot San Diego, SC
Mountain Warfare Training Center Bridgeport, CA
MCI-PAC
MCI-Pac (Region) Okinawa, Japan Marine Corps Base Hawaii
Combined Arms Training Center Camp Fuji Marine Corps Air Station Futenma, Okinawa, Japan
Camp Mujuk, Korea Marine Corps Air Station Iwakuni, Yamaguchi, Japan
Marine Corps Base Camp Butler, Okinawa, Japan Marine Corps Base Camp Foster, Okinawa, Japan
MARFOREUR Panzer Kaserne, Böblingen, Germany NATO HQ, Brussels, Belgium https://en.wikipedia.org/wiki/Panzer_Kaserne https://en.wikipedia.org/wiki/B%C3%B6blingen https://en.wikipedia.org/wiki/Germany
All travel shall be coordinated and approved by the COR prior to incurring any travel expense. The Contractor shall adhere to the following travel regulations (see FAR 31.205-46):
• Federal Travel Regulations (FTR) – Prescribed by the General Services Administration, for travel in the contiguous United States.
• Joint Travel Regulations (JTR), Volume 2, DoD Civilian Personnel, Appendix A. Prescribed by the
Department of Defense for travel in Alaska, Hawaii, and outlying areas of the United States.
• Department of State Standardized Regulations (DSSR) (Government Civilians, Foreign Areas), Section 925, "Maximum Travel Per Diem Allowances for Foreign Areas," prescribed by the Department of State for travel in areas not covered in the FTR or JTR.
The Contractor shall use only the minimum number of travelers and rental cars needed to accomplish the task(s).
Travel shall be scheduled during normal duty hours whenever possible.
Travel Reimbursement. The Contractor shall be reimbursed for the reasonable actual cost of transportation, lodging, meals and incidental expenses. However, actual costs shall be considered reasonable, allowable, and reimbursable only to the extent that they do not exceed on a daily basis the maximum per diem rate in effect at the time of travel as set forth in the DOD Joint Travel Regulations located at http://www.defensetravel.dod.mil/. Actual cost does not include handling charges, general and administrative cost, overhead, profit or any other indirect cost.
The Contractor shall use the allowable Government personnel rates for transportation and lodging. Reimbursement for airfare shall not exceed the lowest customary standard, coach, or equivalent airfare quoted during normal business hours. The Contractor will not be reimbursed for travel expenses unless audited records for transportation contain evidence, such as original receipts, substantiating actual expenses incurred for travel. In no event will reimbursement exceed the published rates of common carriers. Expenses for lodging, meals and incidental expenses shall be reimbursed to the Contractor, provided that the overnight stay was documented as necessary.
The contract includes a not-to-exceed funding limitation for travel costs. When the Contractor expects total funding expended for reimbursable travel to reach 85 percent of the total funds available on the travel CLIN, the Contractor shall notify the Contracting Officer and the COR and any other Government official identified by the Contracting Officer. The notice shall state the estimated amount of additional funds required to continue performance for the period specified in the task order. The Contractor shall not exceed or incur costs that exceed the amount of funding stated on the reimbursable travel CLIN.
The Government is not obligated to reimburse the Contractor for otherwise reimbursable travel in excess of the funded amount stated on the reimbursable travel CLIN.
The Contractor is not obligated to continue performance of any reimbursable work under this Contract or otherwise incur costs for reimbursable travel in excess of the funded amount stated on the reimbursable travel CLIN unless the Contracting Officer notifies the Contractor in writing that the funded amount stated under the applicable reimbursable travel CLIN has been increased. In the event notification is made orally, such notification shall be followed up in writing within two (2) business days.
No notice, communication, or representation from any person other than the Contracting Officer shall affect the Government’s obligation to reimburse the Contractor.
Change orders shall not be considered an authorization to exceed the funded amount stated under the reimbursable travel CLIN unless they contain a statement expressly increasing the funded amount of that reimbursable CLIN by a sufficient amount to cover the change order.
13.0 Other Direct Costs (ODC)
In the event that additional or specialized equipment, services, and/or supplies are required, the Government will reimburse the Contractor only for the actual price paid for such services, equipment, or supplies that are expressly identified as reimbursable items by this contract or any order issued thereunder. Actual Price paid by the Contractor includes tax paid, if any, and reduced by any and all credits and rebates, whether accrued or realized, associated with the supplies and services provided. Actual Price does not include material handling charges, overhead, general and administrative costs, profit, or any other indirect cost that is in any way associated with the Contractor’s purchase or provision of additional or specialized equipment, services, and/or supplies. The parties expressly agree that the Government’s minimum commitment provides adequate consideration for all costs incurred or paid by the Contractor, including, but not limited to, material handling charges, overhead, general and administrative costs, or profit, that are in any way associated with the Contractor’s purchase or provision of additional or specialized equipment, services, and/or supplies and are not included in the Actual Price.
The Contracting Officer may reduce the reimbursement by any amount above that the Contracting Officer finds, in his/her sole discretion, is greater than that which is fair and reasonable for the supplies or services provided, giving due consideration to the facts and circumstances prevailing at the time that the Contractor procured the supplies and services. Disputes as to the amount by which any reimbursement is reduced shall be resolved in accordance with the Disputes clause of the contract. It shall be the Contractor’s burden to demonstrate that the price it paid for reimbursable supplies and services were fair and reasonable.
Each order that requires additional or specialized equipment, services, and/or supplies will include an estimated funding limitation for ODCs. When the Contractor expects total funding expended for reimbursable ODCs to reach 85 percent of the total funds available on the ODC CLIN, the Contractor shall notify the Contracting Officer and the COR and any other Government official identified by the Contracting Officer. The notice shall state the estimated amount of additional funds required to continue performance for the period specified in the order. The Contractor shall not exceed or incur costs that exceed the amount of funding stated on an order’s reimbursable ODC CLIN.
The Contractor shall not exceed or incur costs that exceed the amount of funding stated on a reimbursable CLIN at the time a reimbursable item is ordered.
The Government is not obligated to reimburse the Contractor for an otherwise reimbursable ODC in excess of the funded amount stated on a reimbursable CLIN.
The Contractor is not obligated to continue performance of any reimbursable work under this Contract or otherwise incur costs for reimbursable ODCs in excess of the funded amount stated on a reimbursable CLIN unless the Contracting Officer notifies the Contractor that the funded amount stated on the reimbursable CLIN has been increased. Notification shall be in writing. In the event notification is made orally, such notification shall be followed up in writing within two (2) business days.
No notice, communication, or representation from any person other than the Contracting Officer shall affect the Government’s obligation to reimburse the Contractor.
Changes to the contract or an order shall not be considered an authorization to exceed the funded amount stated on a reimbursable CLIN unless the change contains a statement expressly increasing the funded amount of the reimbursable CLIN by a sufficient amount to cover the change.
14.0 Security Requirements
14.1 Work performed under this requirement will be at the UNCLASSIFIED-FOUO level.
14.2 As required, personnel performing tasks under this contract must be eligible for, and obtain, a DoD Common
Access Card (CAC) and associated DoD PKI certificates for identity verification and encryption of transmitted correspondence.
14.3 Access to Government buildings will be granted to Contractor staff, when needed. The Contractor is required to wear site-access badges at all times while on-site. Contractor personnel shall follow procedures established at each site for ensuring the security of the building, equipment, materials and personnel who are working in and around facilities.
14.4 Working on a Government Installation: Contractor employees must be clearly identifiable while on
Government property by wearing appropriate badges at all times. The Contractor shall provide each employee with an identification badge, which identifies, by photograph, the individual as an employee of the Contractor. These badges shall be worn at all times and presented for examination upon request from the Contracting Officer, COR, Military Police, or any other Government Official with a need to see the badge.
The Contractor and its employees shall be subject to all traffic, security, and registration regulations for personnel and vehicles.
15.0 Type of Contract
This is a firm-fixed price contract.
16.0 Authorized Changes Only By the Contracting Officer
Except as specified in paragraph (b) below, no order, statement, or conduct of Government personnel who visit the Contractor’s facilities or in any other manner communicates with Contractor personnel during the performance of this contract shall constitute a change under the Changes clause of this contract.
a. The Contractor shall not comply with any order, direction, or request of Government personnel unless it is issued in writing and signed by the Contracting Officer or is pursuant to specific authority otherwise included as a part of this contract.
b. The Contracting Officer is the only person authorized to approve changes in any of the requirements of this contract and notwithstanding provisions contained elsewhere in this contract, said authority remains solely the Contracting Officer’s. In the event the Contractor effects any change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase incurred as a result thereof. The address and telephone number of the Contracting Officer is:
Name: F. Paul Lirio Telephone: 703.604.3236 E-mail: francis.lirio@usmc.mil
17.0 Data, Software and Intellectual Property Rights
17.1 All reports, materials, data, information, and all electronic/digital files and other items described herein, and any other items, (hereinafter referred to individually or collectively as the Work or Works), and all intellectual property rights in or to such Works, in whatever form, created, generated, produced or provided under, or as a result of, this contract/effort shall become the property of the U.S. Government/Marine Corps, i.e., the U.S. Government/Marine Corps shall be the owner of all of these Works and all intellectual property rights in or to these Works. Therefore, any restricted data rights, information, software, materials and/or other items including, the Contractor's or a Third-Party's Proprietary data, information, software, materials and/or items must not be used under this contract without the specific written approval by the COR prior to start of any work.
mailto:francis.lirio@usmc.mil
17.2 Use of Works: Except as provided in writing by the COR, no Work (as defined in the Intellectual Property Rights paragraph above) material and/or other item created, generated, produced or provided under, or as a result of, this PWS/Contract/effort shall be used by the Contractor or any of its employees/agents, subcontractors and/or representatives, for any purpose other than for the support and performance of this PWS/Contract/effort. Therefore, the Contractor is obligated to protect the Works from unauthorized use and shall incorporate this paragraph in each of its contracts/subcontracts associated with the goods and/or services provided under this PWS/Contract/effort.
17.3 The Contractor must comply with DFARS 252.227-7020, Rights in Special Works.
18.0 Enterprise-Wide Contractor Manpower Reporting Application (ECMRA)
The Contractor shall report Contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the logistics support services to establish and maintain a portfolio of logistics technologies and implementation guidance via a secure data collection site. Contracted services excluded from reporting are based on Product Service Codes (PSCs). The excluded PSCs are:
W, Lease/Rental of Equipment;
X, Lease/Rental of Facilities;
Y, Construction of Structures and Facilities;
S, Utilities ONLY; V, Freight and Shipping ONLY.
The Contractor is required to completely fill in all required data fields using the following web address https://www.ecmra.mil/
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs 01 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year. Contractors may direct questions to the help desk, linked at https://www.ecmra.mil/
19.0 List of Exhibits
A) Marine Corps Installations and Logistics Roadmap B) Marine Corps Operating Concept C) Expeditionary Advanced Base Operations D) MARADMIN 459/17 2017 Logistics Innovation Challenge
ATTACHMENTS
List of Attachments:
A) Pricing Spreadsheet for M95494-18-R-0017
52.212-1 ADDENDUM
https://www.ecmra.mil/ https://www.ecmra.mil/
This is a FAR Part 12 procurement that uses FAR Subpart 13.5, Simplified Procedures for Certain Commercial Items.
After receipt of proposals, the Government may, with or without notice, negotiate with and, if desired, seek proposal revisions from as many or as few Offerors as it, in its discretion, deems appropriate.
Offers are solicited on an “all or none” basis. Failure to submit an offer for all requirements of the PWS shall be the cause for rejection of the offer. Non-compliance with any of the provisions herein may lead the Government to determine that a proposal is non-compliant and may result in removal from the evaluation.
Proposals shall be submitted electronically using Microsoft Word (*.docx), Microsoft Excel (*.xlsx), and/or Adobe (*.pdf) format to Mr. F. Paul Lirio (francis.lirio@usmc.mil). Offerors are advised that the Government may be unable to receive other types of electronic files (e.g., *.xls and *.zip files) or files in excess of eight (8) megabytes. It is the Offeror’s responsibility to ensure that their proposal is received by the date and time listed on the SF1449. No oral presentations will be requested or considered.
The proposal must demonstrate an understanding of and ability to meet all of the requirements set forth in the RFP’s performance work statement (PWS). The Offeror shall provide sufficient detail to substantiate the validity of all statements. The Offeror shall demonstrate that the proposal is in compliance with the requirements, terms, and conditions of the RFP. Comprehensive responses to the requirements of the RFP are required to enable the Government to evaluate the Offeror’s understanding of and capability to accomplish the requirements of the PWS.
General statements that the Offeror can or will comply with the requirements, that standard procedures will be used, that well known techniques will be used, or paraphrasing the solicitation’s requirements in whole or in part, will NOT constitute compliance. Failure to conform to any of the requirements of the solicitation may form the basis for rejection of the proposal.
Brochuremanship is not desired. Clarity, completeness, and conciseness are essential and the overall quality of the proposal will be evaluated in the context of being representative of the Offeror’s services. An Offeror’s proposal is presumed to represent the best efforts to respond to the solicitation.
Since only the proposal submitted in response to this solicitation will be evaluated, Offerors should make certain that their proposal is complete with regard to the information provided. Data previously submitted or presumed to be known, e.g., previous projects performed for the Government, will not be considered in the evaluation unless that information is physically contained in the proposal.
PROPOSAL SUBMISSION INFORMATION
Proposals shall be presented in three (3) separate volumes:
• Volume I – Technical
• Volume II – Past Performance
• Volume III – Price and Solicitation Documents
VOLUME I MUST NOT CONTAIN ANY PRICING DATA
Proposal format requirements:
• 8.5 x 11 inch paper
• Single-spaced typed lines
• 1 inch margins on all sides
• No smaller than 12 point font, Times New Roman
• Graphs and drawings must be clear and legible
• No photographs or hyperlinks are permitted
• Microsoft Office compatible files are required o Microsoft Excel documents must be in *.xlsx format
Each volume of the proposal shall be clearly marked as to the volume number, the solicitation number, and the Contractor’s name. Pages shall be numbered consecutively within each volume showing volume and page. For example, page 9 of Volume I would be numbered I-9 and page 10 of Volume II would be numbered II-10.
Offerors are advised that the Government may selectively verify any information provided in the proposal. Offerors are cautioned that they are responsible to ensure that material that they desire to have evaluated for a particular section is contained in that specific section.
VOLUME I: TECHNICAL
The Offeror's technical volume submission shall include all relevant supporting information required or specified in the Solicitation. This Volume shall be limited to fifteen (15) pages, not including exhibits and attachments.
Individual resumes shall not exceed two (2) pages per resume. All supplemental documentation to the technical proposal, such as foldouts, charts, figures, tables, or resumes, are not included in the fifteen (15) page limit and shall be included as an Appendix. Cover pages, table of contents, and other front matter are not included in the page limit. All material in excess of the page limits will neither be read nor evaluated.
Factor 1 – Technical Capabilities:
Offerors shall:
a. Describe the technical approach towards completing the PWS requirements. The technical approach needs to demonstrate knowledge and understanding of the technical and programmatic requirements in the PWS and needs to articulate the offeror’s capability to provide continuous quality support to the NexLog requirement.
b. Demonstrate the capacity and skills to support the identified mission areas, an understanding of the priorities and emerging issues within those areas, and the capabilities to execute a comprehensive approach that ensures quality performance and use of resources to meet the objectives.
c. Submit resumes demonstrating the Key Personnel meet the minimum qualifications set forth in the PWS.
VOLUME II: PAST PERFORMANCE
Factor 2 – Past Performance:
Offerors are requested to provide information on up to two (2) previous Government contracts whose effort is recent and relevant to the effort required by this solicitation. If the Offeror does not have recent and relevant past performance experience, then the Offeror must make an affirmative statement to this effect.
a. “Recent” is defined as a contract in-progress or completed within the last five (5) years. If the offeror has not had two (2) Government contracts within the last five (5) years, information on recent and relevant subcontracts and/or commercial contracts may be submitted.
b. “Relevant” is defined as a contract that is of similar scope, magnitude, complexity to the requirements as set forth in this solicitation.
i. Scope: Experience in the areas defined in the PWS.
ii. Magnitude: The measure of the similarity of the volume, dollar value and/or duration of the work actually performed under the offeror’s submitted contracts to the PWS.
iii. Complexity: The measure of the similarity of technical difficulty, managerial intricacy and/or required coordination of efforts and disciplines performed by the offeror in its submitted contracts to the PWS. For complexity, not only will the tasks performed by the offeror be considered, but also the offeror’s ability to coordinate tasks (e.g., concurrent performance requirements).
For each of the past performance experience identified, the Offeror shall:
a. Describe how the work was/is similar to NexLog’s requirement in terms of the scope, magnitude, and complexity.
b. Identify a Point of Contact (POC) (e.g. Contracting Officer, Contracting Officer’s Representative, Contracting
Officer’s Technical Representative, or Government Program Manager), the name of the contracting agency, agency representative, telephone…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.