Questions_and_Answers_(Q A)_1.docx

DOCX document 13 KB Posted

Attached to
Dynamometers Federal contract opportunity
Solicitation number
M67854-15-Q-5013
Issued by
United States Marine Corps

About this file

Questions and Answers

View the file

Other files for this federal contract opportunity

Other files attached to Dynamometers, newest first.
File Type Posted
Revised_Commercial_Item_Description.doc DOC document
Q A_2.docx DOCX document
Dynamometers_Commercial_Item_Description_3.18.2015.doc DOC document
GFP_Dyno_3.18.2015.pdf PDF
Warranty_Tracking_Information_Attachment_E.docx DOCX document
Dyno_Section_B_3.18.2015.docx DOCX document
Dyno_SOW_3.19.2015.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question: “Is it acceptable to revise the schedule to move delivery from 90 days ARO to 180 days ARO?”

Answer: This is a time-sensitive acquisition. A delay of this degree is not acceptable and will significantly degrade the effectiveness of the solution.

Question: “Is it acceptable to revise the schedule to move delivery of follow-on units from 30 days after previous delivery to 60 days after previous delivery?”

Answer: This is a time-sensitive acquisition. A delay of this degree is not acceptable and will significantly degrade the effectiveness of the solution.

Question: “Is it acceptable to revise the SOW to remove the requirement to provide installation? Would supervision of local trades be acceptable?”

Answer: Installation is a requirement. It is acceptable for the prime awardee of this contract to sub-contract the local installation of each unit to local trades. The prime contractor is contractually responsible for successful performance of all requirements. The exact method of the installation is up to the prime contractor.

Question: “Would you like us to quote the air cooled eddy current dynamometer solution or the AC dynamometer solution for the transmission stands?”

Answer: The Government cannot provide advice on a solution to meet the requirements. Vendors' solutions should satisfy the solicitation's requirements at the lowest price to the Government.

Question: “Will [AC dynamometers at the output of the transmission] be an acceptable alternative [to air cooled power absorbers]?”

Answer: Yes, AC dynamometers at the output of the transmission will be acceptable for meeting the requirement in 1.3.6 assuming they are air cooled and meet the other requirements.