M67399-18-Q-0004 PWS

View the file

Other files for this federal contract opportunity

Other files attached to Generator Lease for JLTV, newest first.
File Type Posted
M67399-18-Q-0004_Site_Map.pdf PDF
M6739918Q00040002_Amendment.pdf PDF
DOC.PDF PDF
M6739918Q0004.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

PROVIDE AND MAINTAIN GENERATOR POWER TO MODULAR BUILDINGS AT CAMP WILSON

1.0 Scope.

1.1 Introduction. This PWS defines the contractor requirements in support of the Joint Light Tactical Vehicle (JLTV) test and evaluation (T and E). The Marine Corps Regional Contracting Office Northwest(RCO-NW) is procuring maintenance, service, and Generator Support Power for 18 modular buildings located at Camp Wilson for the JLTV T and E.

1.2 Background. The JLTV program is a joint effort between the United States Marine Corps and United States Army. Testing is to occur at the Marine Corps Air Ground Combat Center (MCAGCC) and a subordinate command of Marine Air Ground Task Force Training Command (MAGTFTC), Twentynine Palms, CA.

1.3 General. The contractor shall provide all management, supervision, labor, materials, supplies and equipment to provide generator supported power for the modular buildings. The contractor does NOT need to provide fuel. The contractor shall provide qualified, trained, and skilled personnel for delivery, installation, safety, maintenance and removal of generators/power supplies as set forth in this contract.

The Contractor must ensure continuous, safe, and satisfactory operation of all generators, their parts and components per manufacture specifications and guidelines. The contractor shall schedule routine maintenance to include all tasks herein described.

The contractor shall inventory, supply, repair and replace all parts that have become unsafe due to wear and tear. The contractor shall use genuine manufacturer’s parts or approved or equal (to be approved by COR) for all replacements. The contractor shall only use new fluids recommended by the generator manufacturer.

The contractor shall provide the appropriate tools and testing equipment for scheduled maintenance as required by this contract. The contractor shall provide all of the necessary repair parts, materials and supplies to maintain the generators as required by this contract.

The period of performance is 8 January 2018 through 4 May 2018.

There are a total of 18 modular buildings. Of the 18 modulars, there are 10 doublewides and 8 triplewides. Each double-wide (24'x60') building -minimum of 150A @ 208V single phase power (rated max amperage for 24x60 building is 250A). Each triple-wide (36'x60') building - minimum of 225A @ 208V single phase power (rated max amperage for 36x60 building is 375A). Double-wide trailers have two (2) sub-panels each. Triple-wide trailers have three (3) sub-panels each Each sub-panel rated at 125A 208V single phase power. Minimum recommended amperage per unit/panel is 75A (due to the heavy start up amperage of the HVAC units).

Must include on site, back-up generator.

Must include scheduled maintenance and service.

Must include Delivery, Set-up (Hook-up/disconnect from Trailers), and Pick-Up.

Must include spill containment kit.

Must be California CARB Tier IV compliant. Any notices of Violation from the Mojave Air Desert Air Quality Management District will be reimbursable at the contractors expense.

The contractor shall provide all labor, management, supervision, supplies, materials, equipment, training, and tools, to perform the non-personal services required to support the powering of the modular buildings.

1.4 Government Personnel. The Contracting Officer (KO) is the individual executing this contract on behalf of the government and is responsible for the overall administration of the contract. The KO is the only person authorized to make any changes in the prices, terms or other conditions of the contract.

The Contracting Officer Representative (COR) is responsible for giving the contractor any special technical instruction or guidance necessary to ensure contract execution. The COR has NO authority to alter the terms and conditions of the contract. The COR will be appointed after the contract award.

1.5 Contractor Personnel. The contractor shall have a competent representative authorized to act on behalf of the contractor, available to the COR and/or KO to receive instructions or information regarding work under the contract. The representative shall be available 24 hours per day. The on-site representative must be able to fluently speak and understand English.

The contractor shall furnish adequate supervision at the premises to ensure that work is performed in a satisfactory manner. It is the responsibility of the contractor to maintain close surveillance over personnel employed to perform work on the contract.

1.6 List of Employees. Contractor shall furnish names of all personnel, drivers license number and last four of the social security number, who will be performing work on this contract no later than 1 calendar days after award. No unidentified or unauthorized personnel are permitted on the work site.

1.7 Work Schedule. Contractor personnel will be allowed to work at any time.

Contractor employees will check-in and out with the COR every time they are on site during performance of the contract.

1.8 Safety. A safety plan is required to be submitted to the COR and/or KO within 3 days after contract award. The COR’s approval of the plan is required prior to the commencement of work.

The contractor shall perform services under the contract in compliance with the safety requirements defined in all applicable Federal, State and local laws, regulations and ordinances, including the latest effective standards promulgated by the Department of Labor, Occupational Safety and Health Administration.

2.0 Tasks. The contractor shall provide continuous generator supported power to the modular buildings. The contractor shall provide qualified, trained, skilled personnel for the maintenance and operation of the generators and peripherals.

The installation, maintenance and operation services provided by the contractor shall be performed at Camp Wilson, Twentynine Palms, California.

Performance Requirements Summary

Task #
Task Description
Performance Indicator
Required Performance Measurements
1
Clean Air Conditioner Air Filter.
State Of Cleanliness
Air Conditioner Air Filter Free Of All Visible Dirt And Debris.
2
Check Engine Oil And Coolant Level.
Contents
Oil And Coolant Levels Are Topped Off (Full).
3
Check Fuel Filter.
Contents
Fuel Filter Is Serviceable, Not Damaged, And Functioning.
4
Check Air Filter Dust Unloader Valve And Restriction Indicator Gauge.
State Of Cleanliness/ Functionality
Air Filter Dust Unloader Valve And Restriction Indicator Gauge Free Of All Visible Dirt And Debris. Fully Functional.
5
Check For Loose, Frayed, Broken, Or Missing Fan/Alternator Belt.
Fully Functional/ Operational
Fan/Alternator Belt Not Frayed, Broken, Or Missing.
6
Check Engine Valve Clearance.
Fully Functional/ Operational
Valve Clearance Is Not Excessive.
7
Check Generator For Damage. Check For Loose Or Disconnected Wires. Check Intake And Exhaust Air Screens.
Generator Availability/ State Of Cleanliness
Generator Is Not Damaged And Fully Functional. Wires Are Not Damaged Or Disconnected. Intake Exhaust Screens Are Clean And Free Of Debris.
8
Check Instrument Panel For Damaged Instruments. Check Gauges To Ensure System Components Are Working Properly.
Instrument And Gauge Component Operational
Instruments Are Not Damaged Or Illegible. System Components Are Working Properly.
9
Check Governor Control For Damage. Check If Wires Are Damaged, Loose Or Disconnected.
Fully Functional/ Operational
Governor Control Is Not Damaged. Wires Are Not Damaged, Loose, Or Disconnected.
10
Check Circuit Breaker Panel For Damage. Check That Breakers Are Working Properly.
Fully Functional/ Operational
Breaker Panel Is Not Damaged And Is Working Properly.
11
Check ECU For Damage. Check Condenser Coils And Filters. Check Fans And Motor Bearing. Check Mounting Hardware And Wiring Terminations. Check Contacts For Severe Burning Or Pitting
Fully Functional/ Operational
ECU Is Not Damaged. Condenser Coils And Filters Are Clean And Free Of Debris. Fans Move Freely And Motor Bearing Is Not Worn. Mounting Hardware And Wiring Terminations Are Tight. Contacts Have No Severe Burning Or Pitting.
12
Check The Battery Cable For Security, Deposits Around The Terminals, Fluid Around Battery And Frayed Cables. Check For Damage To Battery
State Of Cleanliness/ Fully Functional/ Operational
Battery Cables Are Tight. Battery Terminals Are Not Corroded. Cables Not Worn Or Damaged. Battery Not Leaking. Battery Not Damaged.
13
Check Load Bank For Damage. Check If Wires Are Damaged, Loose Or Disconnected. Check Radiator Cooling Fan.
Fully Functional/ Operational
Load Bank Is Not Damaged. Wires Are Not Damaged, Loose, Or Disconnected. Radiator Cooling Fan Is Functioning Properly And Not Damaged.
14
Change Fuel Filter
Timeliness
Per The Manufacture’s Manual, Change Fuel Filters Every 250 Hours. Fuel Filter Fully Functional And Operating As Designed.
15
Change Oil And Filter
Timeliness/Contents
Per The Manufacture’s Manual, Change Oil And Filter Every 250 Hours. Oil And Filters Clean And Free Of Dirt And Debris.
16
Change Air Filter
Timeliness/State Of Cleanliness
Per The Manufacture’s Manual, Change Air Filter Every 250 Hours. Air Filters Free Of Dirt And Debris.
17
Check Fan And Alternator Belt
Timeliness
Per The Manufacture’s Manual, Check The Fan And Alternator Belt Every 250 Hours. Fan Or Alternator Belt Not Damaged Or Degraded.
18
Check Engine Mounts
Timeliness
Per The Manufacture’s Manual, Check The Engine Mounts Every 250 Hours. Engine Mounts Not Damaged Or Degraded.
19
Clean Crankcase Vent Tube
Timeliness/State Of Cleanliness
Per The Manufacture’s Manual, Clean Crankcase Vent Tube Every 500 Hours. Crankcase Vent Tube Free Of Dirt And Debris.
20
Check Air Intake Hoses, Connection And System
Timeliness/Fully Functional/Operational
Per The Manufacture’s Manual, Check Air Intake Hoses, Connection And System Every 500 Hours. Air Intake Hoses Free Of Dirt, Debris, And Our Not Damaged Or Degraded. Connection Is Secure And System Is Operating Properly/As Designed.
21
Change Fuel Filter And Bleed System
Timeliness/Fully Functional/Operational/Contents
Per The Manufacture’s Manual, Change Fuel Filter And Bleed System Every 500 Hours. Fuel Filter Is Functioning And Operational.
22
Check Cooling System
Timeliness/ Contents
Per The Manufacture’s Manual, Check The Cooling System Every 500 Hours. Cooling System Is Fully Operational.
23
Check Engine Speed
Timeliness/ Engine Availability
Per The Manufacture’s Manual, Check The Engine Speed Every 500 Hours. Engine Not Damaged And Running Efficiently.
24
Flush And Refill Cooling System
Timeliness/ Contents
Per The Manufacture’s Manual, Flush And Refill The Cooling System Every 2000 Hours. Cooling System Fully Functional And Operational.
25
Test Thermostats
Timeliness
Per The Manufacture’s Manual, Test The Thermostats Every 2000 Hours. Thermostats Reading Correct Temperature And Operating Correctly.
26
Check Fuses
Fully Functional/Operational
Fuses Are Not Damaged Or Out. Fuses Are Functioning Correctly.
27
Check And Adjust Valve Clearance
Timeliness
Per The Manufacture’s Manual, Adjust The Valve Clearance Every 1200 Hours. Valves Fully Functional.
28
Clean Exterior Of GETT And Radiator
State Of Cleanliness
GETT And Radiator Free Of Dirt And Debris.
29
Clean Turbocharger Impeller Casing And Turbocharger Compressor Casing
State Of Cleanliness
Per The Manufacture’s Manual, The Turbocharger Impeller And Compressor Casing Shall Be Cleaned Every 1000 Hours. Turbocharger Impeller And Compressor Casing Free Of Dirt And Debris.
30
Provide continuous generator support power.
Timeliness
Per the PWS
31
Have a back up generator on site.
Timeliness
Per the PWS
32
Have a transfer switch installed to automatically switch to standby generator
Timeliness
Per industry standards.
33
Provide a single point of contact for customer support.
Timeliness
Per the PWS
34
Provide a list of employees that will be performing on the contract.
Timeliness
Per the PWS

3.0 Disposal of Removed Materials and Equipment. The contractor shall be responsible for the off-site disposal of all removed materials and equipment. The contractor shall not allow debris to accumulate. The contractor shall ensure the work place is cleaned at the end of each day. No materials or debris shall be burned or buried on the site. The contractor shall follow all applicable local environmental disposal laws and regulations. If the contractor so desires, they may turn in used oil, antifreeze, etc. for recycling to NREA-HWMB, Building 2095 Rifle Range Road, Twentynine Palms, CA. Hours of operations are 0730 to 1500. If turned in for recycling or disposal, fluids must be in separate containers. Do not mix the items together.

4.0 Insurance Requirements.

Personal Injury, Property Loss or Damage (Liability). The contractor assumes absolute responsibility and liability for any and all personal injuries or death and property damage or losses suffered due to negligence of the contractor’s personnel in the performance of this contract.

The contractor’s assumption of absolute liability is independent of any insurance policies.

4.1 Insurance. The contractor, at its own expense, shall provide and maintain insurance during the entire period of performance of this contract, whatever insurance is legally necessary.

4.2 Time for Submission of Evidence of Insurance. The contractor shall provide evidence of the insurance required under contract within 3 days after contract award. The government may rescind or terminate the contract if the contractor fails to timely submit insurance certificates.

4.3 Worker’s Compensation Insurance. The contractor agrees to provide all employees with worker’s compensation benefits as required by law.

5.0 Accidents and Injury. The contractor and his employees shall comply with all OSHA regulations. The treatment of injuries sustained by the contractor’s employees shall be the responsibility of the contractor.

6.0 Government Furnished Property/Utility. The Government will not provide any Government Furnished Property.

7.0 Performance Objective. Provide continuous generator supported power as set forth in the performance work statement (PWS).

7.1 Performance Threshold. Generator supported power is continuously provided throughout the period of performance.

7.2 Surveillance. The COR will receive and document all complaints from government personnel regarding the service provided. If appropriate the COR will send the complaints to the contractor for corrective action. The COR shall notify the Contracting Officer of the complaint so that the Contracting Officer may take appropriate action.

8.0 Invoicing. The contractor shall submit all invoices and receiving reports directly to Wide Area WorkFlow (WAWF), in accordance with the instructions included in the contract. The COR will validate the invoice to ensure that it is in accordance with the contract.