Amendment 0001 for 21Q0001.pdf

PDF 828 KB Posted

Attached to
2D MAW Aviation Logistics Support Services Federal contract opportunity
Solicitation number
M6700121Q0001
Issued by
United States Marine Corps

About this file

This solicitation requests quotes for aviation logistics support services for the Second Marine Aircraft Wing. The government will award a firm-fixed-price contract for a base year and two option years to support aviation logistics tasks including supply procedures, programming, planning, and data analytics. Quotes are due by December 2nd, 2020 and must include separate volumes for technical information, past performance, and pricing. The requirement is set aside for small businesses with a NAICS code of 541614. The incumbent contractor is AVMAC LLC under contract M6700118P0004. The solicitation includes a performance work statement outlining required labor categories, labor distribution, reporting requirements, security clearances, and place of performance.

View the file

Other files for this federal contract opportunity

Other files attached to 2D MAW Aviation Logistics Support Services, newest first.
File Type Posted
DD254 ALSS updated signed.pdf PDF
PAST PERFORMANCE QUESTIONNAIRE_ATTACHMENT 1.docx DOCX document
M6700121Q0001 ALSS RFQ.pdf PDF
DD254.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provi ded herei n, all t erms and condit ions of t he document refere nced in Item 9A or 10A, as heretofore change d, remai ns unchanged and in ful l force and effect .

15A. NAME AND TIT LE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

ST ANDARD FORM 30 (Rev. 10-83) Prescr ibed by GSA

FAR (48 CFR) 53.243

Amendment issued to answ er questions in response to this solicitation and to provide the updated DD254. The deadline for questions has passed. See Summary of Changes and "Questions and Answ ers" for details as some items have changed in the Performance Work Statement.

1. CO NTRACT ID CODE P AGE OF P AGES

1 30

16A. NAME AND T ITLE OF CONTRACTING OFFICER (Type or print)

16C. DAT E SIGNED

BY 20-Nov-2020

16B. UNITED ST AT ES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contract ing Officer )(Signature of person authorized t o sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, Count y, Stat e and Zip Code) X M6700121Q0001

X 9B. DAT ED (SEE IT EM 11)

02-Nov-2020

10B. DAT ED (SEE IT EM 13)

9A. AMENDMENT OF SOLICITAT ION NO.

11. THIS IT EM ONLY APPLIES T O AMENDMENT S OF SOLICITATIONS

X The above numbered soli cit ati on i s amended as set forth in It em 14. The hour and date specified for rece ipt of Offer is ext ended, X is not extended.

Offer must acknowl edge rece ipt of t his amendment pri or to the hour and date specified in the sol ici tat ion or as amended by one of t he fol lowing methods:

(a) By compl eti ng Items 8 and 15, and returning 1 copi es of the amendment ; (b) By acknowledgi ng recei pt of thi s a mendment on each copy of t he offer submit ted;

or (c) By s epara te let ter or t elegram whi ch i ncludes a refe rence t o t he s olic ita tion and amendment numbers . FA ILURE OF YOU R A CKNOWLEDGMENT TO BE RECEIVED AT TH E P LACE D ESIGNATED FOR TH E RECEIPT OF OFFERS P RIO R TO THE HOUR AN D DATE SP ECIFIED MA Y RESULT IN

REJECTIO N OF YOUR OFFER. If by vir tue of thi s amendment you desire t o change an offer already submit ted, s uch c hange ma y be made by t ele gram or let ter, provided each t elegram or l ett er makes reference to the sol ici tat ion and this amendment , and is re ceived prior to the openi ng hour and dat e speci fi ed.

12. ACCOUNTING AND APPROPRIATION DAT A (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORT H IN ITEM 14 ARE MADE IN THE

CONT RACT ORDER NO. IN ITEM 10A.

B. T HE ABOVE NUMBERED CONT RACT /ORDER IS MODIFIED T O REFLECT THE ADMINIST RATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORT H IN ITEM 14, PURSUANT TO T HE AUTHORITY OF FAR 43.103(B).

C. T HIS SUPPLEMENT AL AGREEMENT IS ENT ERED INTO PURSUANT TO AUTHORITY OF:

D. OT HER (Specify type of modification and authorit y)

E. IMPORTANT: Contract or is not, is required to sign this document and return copies t o the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/cont ract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/ MODIFICATION NO. 5. P ROJECT NO .(If appli cable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Nov-2020

CODE

M67001MARINE CORPS FIELD CONTRACTING SYS

CONTRACTING DEPARTM ENT

MCIEAST

308 HOLCOMB BOULEVARD

CAM P LEJEUNE NC 28547- 8368

M67001 7. AD MINISTERED BY (If other t han item 6)

4. REQUISITION/PU RCHASE REQ. NO.

CODE

See I tem 6

FACILITY CODECODE

EMAIL:TEL:

M6700121Q0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 02-Dec-2020 11:00 PM to 02-Dec-2020 11:00 AM.

The following have been added by full text:

QUESTIONS AND ANSWERS

1. With reference to page 17; REQUIRED EXPERIENCE AND TRAINING. Question: Will the government accept experience equivalent in lieu of a Bachelor’s degree in the event incumbent personnel do not possess the requisite education levels?

Answer: We will revise it to read “ Bachelor’s Degree Desired.”

2. With reference to page 35; Company Experience – Factor 2, “The vendor shall demonstrate experience as a Prime Contractor in performing Aviation Logistics Support in a high tempo environment” Question: Will the government accept legitimate subcontractor experience performing Aviation Logistics Support in a high tempo environment as part of a Best Value solution?

Answer: Please submit your company experience in accordance with Factor 2. It will be evaluated based on Trade Off/Best Value.

3. With reference to page 36; Price Factor 4 INSTRUCTIONS FOR PREPARATION OF QUOTES: “Quoters shall submit two (2) copies of technical volume. One (1) Copy shall be a redacted version. Also, one each of past performance and pricing”. Question: Will the government provide specifics regarding what information should be redacted?

Answer: Company identifying information in technical volume must be redacted.

4. With reference to page 36; Past Performance – Factor 3, “For all contracts identified that do not have a CPARS, The vendor shall forward a copy of Past Performance Questionnaire (Attachment 1) to that contract’s Procuring Contracting Office (PCO), Administrative Contracting Officer (ACO), and Program Manager (PM)” Question: In the case where an Offeror has similar past performance as a subcontractor, will the Government accept a questionnaire from a Prime contractor that includes the contract number and Offeror’s subcontract number on the questionnaire?

Answer: Please refer to Past Performance Factor in RFQ. If you meet the prime subcontractor definition, your prime contractor status entered on the questionnaire and can be verified, yes.

5. With reference to page 37; “Format requirements” Question: Will the government allow tables, resumes, and organizational charts to be in 10 point font, Times New Roman?

Answer: Yes.

6. With reference to page 11 paragraph 3.1 “The complements mixture shall be balanced in a manner to adequately support 22,368 annual hours of Aviation Logistics support.” Question: There are 261 available work days in each Period of Performance vice 260 (base, OPY1, OPY2) which would equate to a full time equivalent man-year of 1872 hours vice 1864 hours, the calculation that the government used in the solicitation to arrive at 22,368 annual hours. Would the government consider revising the calculation to 22,464 hours of annual support or advise how the Offeror should account for the additional workday?

Answer: 2080 hrs./per year – 80 hrs./holidays-80 hrs./leave-56 hrs./sick leave= 1,864 hrs. per employees per year. Annual hours will not be revised.

7. With reference to Section 1449 ITEM NO 0001AA “Support services to entail the (10) labor categories identified in Performance Work Statement Tasks 3.1 through 3.4.3 and 3.6.”, ITEM NO 0002AA “Support services to entail the (2) labor categories identified in Performance Work Statement Tasks 3.5 and 3.6.” and Paragraph 4.0 LABOR DISTRIBUTION / MANAGEMENT AND STAFFING, Table there are inconsistencies, which may adversely affect CLIN pricing. Question: Will the Government clarify if CLIN 0001AA should include 10 FTE vice 10 Labor Categories or should it include 8 FTE; and similarly clarify if CLIN 0002AA should include 4 FTE vice 4 Labor Categories or should it include 2 FTE?

Answer: The 2 System Analyst III positions at MALS-26 and MALS-31 should be under CLIN 0001AA. So the answer to the question is 10 FTEs for CLIN 0001AA and 2 FTEs for CLIN 0002AA.

8. With regards to RFQ, page 38, "Volume 3: Price and Solicitation documents" the government did not provide the same attachment 2 as in the previous 2017 solicitation (see attached), yet Section SF 1449 - CONTINUATION SHEET CLIN 0001AC and 0002AC require overtime rates. Question: Where does the Government want to see these rates captured (i.e. within the narrative of the Cost Volume)?

Answer: Please include them in your Pricing Volume

9. Is there an incumbent currently performing on this effort?

Answer: Yes

10. If there is an incumbent, what is their associated contract number?

Answer: M6700118P0004

11. If there is an incumbent, is the scope of work for their requirement equal to the scope of work for this requirement?

Answer: There are some minor changes

12. If there is an incumbent, does their workforce match the labor distribution proposed in PWS section 4.0?

Answer: There are some minor changes

13. For scheduled travel CLINs, it is noted that "Vendor shall submit travel rates for CONUS and OCONUS with their proposals. Do not price this CLIN. The Government will provide not to exceed amount at the time of award." Can the Government provide clarification on what is to be provided (hourly rates for only travel hours?) if utilization of JTR is required?

Answer: Please provide hourly rate for each labor category as requested for the CLIN

14. Is the only OCONUS location Norway?

15. Is there an Incumbent Contractor, if so, who and what is the incumbent Contract Number?

Answer: Yes. AVMAC LLC. M6700118P0004

16. Factor 2, Company Experience; In addressing experience and identifying contract numbers and dates, can the offeror go beyond the 3-year limit imposed on Factor 3 so as to provided detailed experience on Aviation Logistics for Factor 2.

Answer: Factor 2 and Factor 3 are not the same and each one will be evaluated independently. Please refer to Factor 2 and Factor 3 in the RFQ and follow the instructions.

17. Instructions for Preparation of Quotes: The Government states that one copy of technical volume shall be a

“Redacted Version”. What information or what portion of the volume is to be redacted, please clarify.

Answer: Company identifying information in technical volume must be redacted.

18. Resumes: Are Letters of Commitment required for proposed personnel who are offeror’s current employees?

Answer: Yes.

19. Attachment 1, Past Performance Questionnaires: For Reference Contracts in which CPARS have been issued, can the offeror submit CPARS with the quote in lieu of submitting the questionnaire to the POC, since many POCs are less likely to complete questionnaires once CPARS have been issued on the contract?

Answer: Please follow the instructions for Factor 3.

20. The DD Form 254 (DD254) issued with the RFP identifies the Level of Facility Security Clearance (FCL) in

Block 1.a. as Secret. However, paragraph 9.0 of the RFQ states that those performing Task 6 shall be eligible for a Top Secret (TS) clearance and upgraded to receive a TS-SCI, if requested. Additionally, Block 13 of the DD254 states, “The contractor will need access to … TOP SECRET/SCI information relating to Marine Corps Aviation units and DOD logistics pipelines on a regular basis. Some contractor employees will create, modify, and disseminate information up to and including Top Secret/SCI classification…” Without the requirement for a Top Secret FCL in Block 1.a. of the DD254, neither the prime contractor nor any subcontractors may initiate or hold a TS clearance for employees under this contract. Will the government issue a new DD254 with the TS FCL requirement in Block 1.a. of the DD254?

Answer: Updated DD-254 will be posted

21. Instructions for Preparation of Quotes: Quoters shall submit two (2) copies of technical volume. One (1)

Copy shall be a redacted version. What information is to be redacted from one copy of the technical volume?

Answer: Company identifying information in technical volume must be redacted

22. Paragraph 10.1 of the Performance Work Statement states “Travel expenses incurred by the contractor for the contractor’s employees to reach the embarkation point, MCAS, Cherry Point NC for OCONUS support will be reimbursed by the government under CLIN 0001AB OR 0002AB.” Does this mean that Military Aircraft will be used for OCONUS travel?

Answer: The travel for Norway is commercial air

23. Subfactor C states Submit resumes and any other information for personnel, that demonstrate their experience and qualifications to perform the duties of this contract as stated in the PWS. Page 37 of the RFQ states: All supplemental documentation to the technical proposal, such as foldouts, charts, figures, tables, or resumes, is not included in the 10 page limit and shall be included as an Appendix. Question: Are resumes included as a separate Appendix to Volume I?

Answer: The only resume requirement is for the Project Manager I listed as key personnel. It may be included in the appendix.

24. Paragraph 4.2, Substitution or Addition of Personnel states: “The Contractor agrees to assign to the contract those persons who resumes, personnel data forms, or personnel qualification statements were submitted as required by paragraph 4.0 to fill the requirements of the contract.” The only resume mentioned in Paragraph 4.0 is part of the Labor Category Description for the Project Manager I and it states: “Resume required with quote.” Questions:

a. Is the Project Manager I the only resume to be submitted?

Answer: The only resume requirement is for the Project Manager I listed as key personnel

b. If not, what resumes are required?

c. Can the Government confirm that the Project Manager I is the only Key Labor Category?

d. Can bidders provide personnel qualification statements or personnel data forms in lieu of resumes for non-key personnel as an Appendix to Volume I?

Answer: PQS or resumes are not required for non-key personnel.

25. The Evaluation section for Past Performance – Factor 3 (p. 36 of 76) states: “Only the following entities will be used in the past performance evaluation: (a) the prime contractor; and (b) entities that perform at least 30% of the proposed total price for the contract, also referred to as principal subcontractors and other principal entities” (emphasis added). Question:

a. Can a subcontractor that performs less than 30 percent of the proposed total price for the contract, yet considered critical to its successful performance, be considered a principal entity and therefore be used in the past performance evaluation?

Answer: It may be.

b. Is there any other criteria a subcontractor must meet to be considered a principal entity?

Answer: No

26. Is this a new effort? If not, will the government provide the name of the incumbent and the current contract number?

Answer: No. See Question #15.

27. Can graphs and drawings use font smaller than 12 point, so long as they are clear and legible?

28. Other than as noted in the Evaluation section for Past Performance – Factor 3 (p. 36 of 76) as noted above, is there any limitation on the number of past performance contract references that can be cited by the prime contractor and qualifying subcontractors?

Answer: No. But please follow the instructions provided in the RFQ in order to have your past performance evaluated.

29. Since it states “The contractor shall quote manning and management strategies to meet the performance requirements, but the following distribution of personnel is consistent with existing workload as directed by AC/S ALD and is provided as a point of reference”, is the intent to maintain the 12 FTEs on this contract.

Answer: The intent is to maintain 12 FTEs. I do not see how the job could be done with less, as most positions as laid out in the PWS are one-of-one positions.

30. On Page 3, CLIN 0001 AA states “Support services to entail the (10) labor categories identified in PWS

Tasks 3.1 through 3.4.3 and 3.6 …) On Page 5, CLIN 0002 AA states “Support services to entail the (2) labor categories identified in PWS Tasks 3.5 and 3.6. However, the chart on page 16 identifies the current workload as having (8) FTE’s under CLIN 0001 AA and (4) FTEs under CLIN 0002 AA.

Can you please confirm which configuration you would like us to use for pricing the CLINs?

Answer: The 2 System Analyst III positions at MALS-26 and MALS-31 should be under CLIN 0001AA. So the answer to the question is 10 FTEs for CLIN 0001AA and 2 FTEs for CLIN 0002AA.

31. In the instructions there is no mention as to what content is to be included in Vol II, except for reference to the attachments (the questionnaires). However, the evaluation sections states “For this volume, The vendor shall identify relevant contracts, or those portions of a relevant contract, whose performance is within three years of the proposal due date and contains efforts similar to those efforts (e.g., service, type effort, contract tasks, contract type, contract dollar value, etc.), required by this solicitation.”

Is there a page limit to Volume II Past Performance?

Answer: No. But please follow the instructions provided in the RFQ in order to have your past performance evaluated.

32. Can the Government increase the page limit for Volume I to 20 pages? This will allow offerors to provide expanded explanation as requested by the Government in the areas of understanding, management plan, organization structure, and corporate experience.

Answer: Yes.

33. Is there any page limit to Volume 2: Past Performance? Can offerors provide a brief narrative for the past performance volume?

Answer: Please follow the instructions provided in the RFQ in order to have your past performance evaluated.

34. The requirement to submit all resumes creates an unfair advantage for the current incumbent company performing on this contract. Can the Government remove the requirement for all resumes to be submitted?

35. Given that the due date is right after the Thanksgiving holiday, kindly provide at least a week's extension to the due date for all businesses to provide a technically sound and competitive proposal.

Answer: We do not consider an extension at this time.

36. On the DD 254, it has a requirement for storing Classified material at the Contractor Facility (block 1b).

Can you confirm this is a requirement, we are not local and do not see a requirement for a work location in the area to support this requirement?

Answer: All classified material will be stored on site at 2D MAW. DD254 has been updated

37. Para 9 gives mention that personnel supporting PWS Task 6 shall be eligible for a TS Clearance. Can you confirm that as long as the contractor is eligible for a TS that the government would sponsor the Facility upgrade?

Answer: Government will sponsor the upgrade to TS for eligible contractor. TS facilities are on site at 2D MAW HQ

38. Were any requirements added since the start/award of the original contract that would have affected the annual value of the contract?

Answer: Information regarding to contract administration is not available to the general public.

39. CLIN 0001AC – Overtime rates. This CLIN doesn’t get priced, but asks for us to submit the overtime rate in the Proposal and the pricing volume doesn’t ask for any rates, only FFP. Can you confirm how you wish this to be presented and the historical overtime conducted?

Answer: Please include your overtime rates in your proposal.

The historical overtime is not available.

40. Do you anticipate growth or a shift in the workload for this contract?

41. Since the proposal requires resumes and letters of commitment for all 12 positions, can you confirm there is no opportunity for right of first refusal.

42. If we do not include any information that needs to be redacted, can we submit only 1 technical volume?

43. Do we have to provide all 12 resumes with commitment letters now?

Answer: The only resume requirement is for the Project Manager I listed as key personnel. The Government may give higher consideration if commitment letters or pre-employments agreements are included. Just a reminder, proposals will be evaluated based on trade off/best vlaue.

44. Can the government clarify the labor categories or is the government looking for blended rates?

Answer: Please refer to Performance Work Statement

45. How many days after the award does the government intend to speak with the awardee since the contract starts weeks out after the award?

Answer: The Government will be available same day it’s awarded.

46. There does not appear to be enough information to price CONUS and OCONUS travel. Will the government provide:

a. Destination City/State/Country for each trip.

b. Number of trips per destination per year?

c. Number of contractor personnel per trip?

d. Duration of each trip?

Without this information, it is unclear how pricing might be developed.

Answer: This information is not available at this time. You are not required to price the travel CLINs. Please follow the instructions written in the CLIN and provide rates as requested.

WAGE DETERMINATION

(a) The contractor is advised that this procurement is subject to the requirements of the Service Contract Labor Standards.

(b) The contractor agrees to furnish the Contracting Officer a copy of any collective bargaining agreement applicable to employees under this contract.

(c) The labor category and wage rate applicable to this requirement is: Occupational Title(s) and hourly rate – To be determined by vendor.

Salaries paid to employees must be in compliance with this labor category and wage determination or collectiving bargaining agreement.

(d) Wage Determination No. 2015-5781 Revision No.11 date 05/29/2020 can be found at https://beta.sam.gov/

The following have been modified:

NMCARS 5237.102-90 EMCRA

(a) DOD contracting activities awarding or administering contracts shall incorporate the following standard language into all contracts which include services, provided the organization that is receiving or benefiting from the contracted service is a Department of Defense organization, including reimbursable appropriated funding sources from non-DOD executive agencies where the Defense Component requiring activity is the executive agent for the function performed. The reporting requirement does not apply to situations where a Defense Component is merely a contracting agent for another executive agency. Contracted services excluded from reporting are based on Product Service Codes (PSCs) and below the micro-purchase threshold. The excluded PSCs are:

(1) W, Lease/Rental of Equipment;

(2) X, Lease/Rental of Facilities;

(3) Y, Construction of Structures and Facilities;

(4) D, Automatic Data Processing and Telecommunications, IT and Telecom- Telecommunications Transmission (D304) and Internet (D322) ONLY;

(5) S, Utilities ONLY;

(6) V, Freight and Shipping ONLY.

The DON is aware of the conflict between the latest issued guidance on the sam.gov website and what is above. An update will be issued once OSD provides the details.

The contractor is required to completely fill in all required data fields using the following web address: https://sam.gov/SAM/.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://sam.gov/SAM/.

PERFORMANCE WORK STATEMENT

1.0 BACKGROUND

Commander, U.S. Marine Corps Forces, serves as a principal adviser to the Commander in Chief of U.S. Joint Forces Command on Marine Corps matters. Marine Corps Forces Command (MARFORCOM) is responsible for command, control, and coordination of all Marines’ air, ground, and logistical operations. The warfighting arm of MARFORCOM is the II Marine Expeditionary Force (II MEF). II MEF is composed of personnel from the 2D Marine Division, 2D Marine Logistics Group, and 2D Marine Aircraft Wing.

2.0 SCOPE

The aviation component, 2D Marine Aircraft Wing (2D MAW), has identified a requirement for contractor aviation logistics support services. The contractor shall accomplish 2D MAW objectives in support of Aviation Logistics Department (ALD) in the areas of procedures, administration, IT, supply procedures, programming, and planning.

The contractor shall accomplish the functions outlined in the below specific task descriptions.

3.0 SPECIFIC TASKS

3.1 Aviation Logistics Department (ALD) Procedures

Provide support to the Assistant Chief of Staff (AC/S) ALD and all division heads in the preparation of studies, estimates, plans, orders, instructions, and reports pertaining to aviation logistics within the MEF, MAW, Marine Expeditionary Unit (MEU), Marine Aircraft Group (MAG), Marine Aviation Logistics Squadron (MALS), and any other location as designated by the AC/S ALD.

The complements mixture shall be balanced in a manner to adequately support 22,368 annual hours of Aviation Logistics support.

Due to the urgent and continuous nature of this requirement, the government requires the contractor to maintain the proposed workforce at 100% manning. As such, the contractor is expected to develop a manning plan to fill any planned or unplanned vacancies on an expedited basis. Any vacancies that occur in the contractor’s proposed manning should be filled within 14 calendar days. Any manning vacancies that remain unfilled after 14 days will have an invoice offset calculated using the total proposed daily cost (including profit and overhead) for the position left vacant (based on a 30 day month) times the number of vacant days in the billing cycle plus an additional 10% of the cost calculated.

a. Regular review of current operational and supporting plans, applicable orders/instructions, and Naval correspondence, and providing the AC/S ALD with supplementary information as required.

b. Regular review of current policy and programs impacting the mission of aviation logistics.

3.2 ALD Aviation Supply Division

Provide aviation supply expertise to support the following tasks:

a. Advise AC/S ALD on all aviation supply and integrated logistics matters.

b. Implementation and coordination of aviation supply policy.

c. Liaise between 2D MAW ALD, MALS, and higher headquarters on aviation supply and integrated logistics matters.

d. Analyze supply, inventory, and financial management performance.

e. Assess aviation supply operations within 2D MAW ALD.

f. Review and update publications related to Aviation Supply Matters.

g. Function as a liaison for Aviation Supply Desktop Procedures (ASDTP) policies.

h. Provide training to improve deficiencies identified by ALD-C. Develop necessary training aids and/or documents.

3.3 ALD Plans Division

Provide aviation supply and maintenance expertise to support the following tasks:

a. Review and update policies and programs impacting the mission of 2D MAW ALD.

b. Evaluation of ALD support and participation requirements for planned 2D MAW, II MEF, and MARFORCOM exercises.

c. Actively participate in deployment planning and execution.

d. Review and update publications.

e. Evaluate equipment requirements and coordinate AGSE and/or Table of Basic Allowance (TBA) deliveries to Norway to be pre-positioned in the MCPP-N.

f. Coordinate lift requirements for deploying aviation logistic units.

g. Assist in withdrawal and return of equipment from/to MCPP-N storage.

3.4 Technical Development Group (TDG)

3.4.1 Data Analytics Support

Provide personnel with expertise in data science analytics methodologies, and a deep understanding of database and analytics tools and concepts in support of aviation supply and maintenance logistics operations.

Such support shall include but is not limited to the following:

a. Develop methodologies, using business intelligence application techniques, principles and processes required for exploring and analyzing large volumes of complex data.

b. Communicate results to drive decision-making through supportive analytics and visualization options for the 2D MAW ALD organizations.

c. Utilize data analysis and modeling techniques to understand and identify data relationships, trends, patterns, gaps, relationships among large data sets for classification and prediction to support business and customer needs.

d. Conduct root cause analysis on both internal and external data and processes to address questions posed by the business, offering recommendations and viable solutions.

e. Provide reporting solutions that best present the information to the end user and executive leadership.

f. Research and develop Artificial Intelligence (AI) and neural networks initiatives, including learning approaches in functional areas that A.I. systems for the Department of Navy information systems in support of aviation supply and maintenance logistics operations.

g. Serve as the 2D MAW ALD Subject Matter Expert (SME) on Machine Learning (ML) research theories and methodologies and common algorithm types to further asses how aviation I.T. systems work for further analysis into data mining.

h. Identify data analytics principles and methodologies in support of NOBEL/NOSS/NAMS/NMRO systems.

3.4.2 Software Development Expertise

Provide personnel with aviation logistics, aviation financial management, and software development expertise to assist AC/S ALD and AC/S Comptroller with gathering and portraying statistical performance information on the 2D MAW ALD Intranet. The WDG will provide software development and programming expertise to develop and maintain local software in support of ALD and Comptroller missions. Such support shall include but is not limited to the following:

a. Develop and maintain software that contains a centralized repository of 2D MAW ALD proposed and actual DLR carcass charge information.

b. Develop and maintain software that collects end-of-month (EOM) data generated and submitted by subordinate units. Convert data collected into charts/graphs depicting inventory and financial management performance.

c. Collect and consolidate daily High Priority (HiPri) Requisition Report data.

d. Develop and maintain the Detailed Operating Target (OPTAR) Listing and Reporting System (DOLARS) financial management software to track funding grants, financial obligations, and flying hour data in support of the 2D MAW Flying Hour Program (FHP).

e. Convert Annual Price Change (APC) data into an Aviation Storekeeper Information Tracking System (ASKIT) usable format for updating prices in the ASKIT database.

f. Develop and maintain SAMMS software for interactive use by Aviation Supply Officers in deployed environments.

g. On-Site diagnosis and repair of 2D MAW aviation allowance computer equipment, LAN/WAN connectivity, operating systems, and equipment assigned to ALIMS.

h. Technical IT support and continuity to the ALIMS Department to ensure a standard baseline of hardware\software computer network connectivity.

i. Ensures Aviation systems are IA compliant to reduce vulnerabilities and threats that will impact operational readiness within 2MAW, to include network devices.

j. Maintains current Cyber Security credentials and certificates required by DOD and the Defense Information System Agencies (DISA).

k. Provides direct IT support to Navy/Marine Corps agencies, such as PMW-150, SPAWAR, Base/Station Information Assurance Managers (IAM) pertaining Aviation System.

l. Provides support to Aviation servers and clients to allow maintenance personnel access to the Optimized Organizational Maintenance Activity (OOMA) information in a Virtual Environment (VE).

m. Provides support to Aviation servers and clients to allow maintenance personnel access to the Optimized Organizational Maintenance Activity (OOMA) information in a Virtual Environment (VE).

n. Coordinates and implements automated data processing enhancements, modifications, and replacements as needed.

o. Creates and maintains indexed, comprehensive and searchable help files associated with all developed software.

p. Provides helpdesk end user support for all developed software to include but not limited to phone, email, and over the shoulder support and training.

q. Assists ALD Staff with comprehensive implementation and utilization of commonly used software to include but not limited to database, spreadsheet, presentation and word processing.

r. Provide training and troubleshooting on the configuration and management of the Linux operating system in support of the NTCSS hardware suite.

3.4.3 Technical Engineering Support Expertise

Provide expertise for on-site assistance in the diagnosis and repair of Marine Aviation Logistic Squadron (MALS) MAG ISNS network, aviation allowance computer equipment, Local Area Networks, Wide Area Network connectivity, operating systems, and gear assigned to Aviation Logistics Information Management System Department (ALIMS) for maintenance and will provide on the job training of military personnel as required by the ALIMS Officer/Chief in the operation and servicing of the equipment.

a. Examine overall system performance and make recommendations to the ALIMS Chief.

b. Effect on the job training in support of repair of supported equipment by ALIMS personnel during the primary period of maintenance (PPM). Incorporate structured training on a monthly basis or as required by the ALIMS Officer/Chief.

c. Work in conjunction with ALIMS personnel to isolate and effect repair of any problems found with the equipment outside the PPM, after the 2nd MAW ALD-IT Chief or the site ALIMS Chief has invoked proper permissions.

d. The technical engineering support personnel will be trained and familiar with the current supported NTCSS equipment list.

e. The technical engineering support personnel shall act as a technical advisor for ALIMS as required.

f. The technical engineering support personnel shall provide a report summary of all technical assistance/training performed to the MALS ALIMS Chief monthly. This summary shall include, at a minimum, reports reflecting PPM/Non-PPM hours worked, down/malfunctioning equipment list including cause of delay, and training conducted during the period.

g. Provide SME technical support on the employment and management of the ISNS network onboard the TAVB vessel.

h. Train personal on the configuration and use of the Integrated Barcode System (IBS), and Expeditionary Packup Kit (EPUK).

i. Test and maintain the INMARSAT SATCOM system for deployed environments.

j. Coordinate, manage and schedule classified and non-classified, Teleconference and VTC system conferences globally in support of 2d MAW operations.

k. Provide Wi-Fi network engineering consulting, across the Marine Corps flight lines assigned to 2d MAW.

l. Troubleshoot, manage and maintain, classified laptop workstations/printer in classified vaults.

3.5 Aviation Ground Supply and Transportation

The Logistics Analyst assists with policy development, oversight, and broad management planning for monitoring the maintenance and equipment readiness. The Supply Maintenance Analysis Team (SMAT) conducts its responsibilities via audits, virtual oversight, targeted problem solving, and assist visits. Coordinates with subordinate commands on all matters pertaining to operational and tactical level maintenance and maintenance management.

Assists in the development, coordination, and implementation of policy pertaining to Maintenance operations.

Provides guidance and assistance to subordinate commands regarding maintenance and maintenance management policy and procedures. Provides the 2nd MAW G4 situational awareness regarding Supply and Maintenance issues as they relate to command readiness. Oversees the development of data, estimates, statistics, suggestions, and other information useful to higher level managers in determining which goals and objectives, and in determining other management strategies.

Analyzes current and future supply chain, distribution, and maintenance procedures as related to GCSS-MC requirements. Assists in planning and implementing procedures for the sustainment of ground equipment programs that optimizes the readiness and availability of equipment throughout the 2D Marine Aircraft Wing. Uniquely versed in the primary maintenance management programs and policies and understands how they correlate to supply programs.

Coordinates the planning and induction of ground equipment into the Corrosion Control Program and the Enterprise Lifecycle Maintenance Program. Advise units on the proper usage of Global Combat Support Systems – Marine Corps (GCSS-MC). Member of II MEF GCSS-MC implementation team, post cutover assistance team and GCSS- MC sustainment team. Assist units with all aspects of Supply and Maintenance matters utilizing Total Force Structure Management System (TFSMS), CRANE, Marine Corps Equipment Readiness Tool (MERIT), and Total Life Cycle Management – Operational Support Tool (TLCM –OST).

a. Provides Global Combat Support Systems-Marine Corps (GCSS-MC) training to 2d MAW Units.

b. Provides Total Life Cycle Management System (TLCM) assistance and training to 2d MAW Units.

c. Develop, monitor, and recommends correction of supply property account database.

d. Reviews personnel and equipment allowances in Total Force Structure Management System (TFSMS).

e. Analyze automated management logistical systems and provides results to 2nd MAW G4 staff.

f. Advise 2nd MAW G4 staff on matters pertaining to supply and maintenance.

g. Provide maintenance briefs and supporting documentation utilizing automated systems GCSS-MC TLCM, and

TFSMS.

h. Review policies and directives and ensure compliance.

i. Assist with supply and maintenance reports provided to higher headquarters.

j. Assist 2nd MAW units with supply and maintenance procedural issues.

k. Schedule and provide supply and maintenance training to supported units.

l. Reconcile and process property account and readiness reports to the 2nd MAW G4 staff.

m. Track supply and maintenance actionable items for the 2nd MAW G4.

n. Assists in the management of the 2d MAW Corrosion Control Program.

o. Monitors and inputs information into the automated HQMC Corrosion Control data base.

p. Assists in the management of the 2d MAW Administrative Storage Program.

3.6 OCONUS Support

Provide the following expertise in support of the following tasks:

a. Assist the 2D MAW MALS in obtaining aviation material in support of aircraft readiness.

b. Analyze supply inventory and financial management performance.

c. Assess aviation supply operations within 2D MAW.

d. Implement and coordinate automated data processing enhancements, modifications, and replacements.

e. Coordinate aviation financial issues.

f. Process material issues in SAMMS in a deployed environment.

Additional objectives/tasks may be required in support of OCONUS operations during the performance of this task.

4.0 LABOR DISTRIBUTION / MANAGEMENT AND STAFFING.

The contractor shall manage the total work effort associated with this contract for satisfactory and timely completion of logistics services in support of the Aviation Logistics Department (ALD). The contractor shall provide an adequate staff of employees with the necessary expertise and training to ensure the performance of the work in accordance with sound and efficient management practices.

The personnel complement shall include an adequate mixture of labor categories to meet the contract requirements, and at a minimum shall include the following mixture of labor categories at the stated staffing levels.

The contractor shall quote manning and management strategies to meet the performance requirements, but the following distribution of personnel is consistent with existing workload as directed by AC/S ALD and is provided as a point of reference:

Labor Category AC/S ALD MALS-14 MALS-26 MALS-29 MALS-31 Total Project Manager I

(CLIN 0001AA)

KEY PERSONNEL 1

Functional Analyst III

(CLIN 0001AA) 4

Systems Analyst I

(CLIN 0001AA) 2

Systems Analyst II

(CLIN 0001AA) 1 1

Systems Analyst III

(CLIN 0002AA) 1 1 2

(CLIN 0002AA) 2 2

Total 9 1 1 0 1 12

MCAS

Cherry Point

MCAS

New River

MCAS

Beaufort 10 1 1

Likewise, the following assignment of emploees within the MALS is consistent with existing workload and is provided as a point of reference:

AC/S ALD

PWS TASK 3.0/3.1/3.2/3.5 2D MAW Lead (1) Project Manager I PWS TASK 3.3 ALD Operations and Plans (1) Functional Analyst III PWS TASK 3.4.1 Data Analysis (1) Functional Analyst III PWS TASK 3. 4.1/3.4.2/3.4.3 IT Coordinator (2) Functional Analyst III PWS TASK 3.4/3.4.2 Software Development (2) Systems Analyst I PWS TASK 3. 5 Aviation Ground Supply and Transportation (2) Functional Analyst III

MALS-14

PWS TASK 3.4.3 Aviation Logistics Information Management System (ALIMS): (1) System Analyst II (MALS-14 Cherry Point)

MALS-26/29 MCAS New River PWS TASK 3.4.3 Aviation Logistics Information Management System (ALIMS): (1) System Analyst III (MALS- 26/29 New River)

MALS-31 MCAS Beaufort PWS TASK 3.4.3 Aviation Logistics Information Management System (ALIMS): (1) System Analyst III (MALS-31 Beaufort, SC)

Additional guidance and functions are provided in this performance work statement (PWS). The contractor shall perform the tasks described in this PWS. Contractor personnel are employess of the contractor and under their administrative control and supervision.

The contractor is responsible for maintaining the required minimum staffing level. The contractor alone shall approve and administer leave and holidays for its employees. The contractor shall be responsible for tasking its employees in accordance with the contract work required. The contractor shall perform all supervision, evaluation, and disciplinary actions for its employees.

4.1 REQUIRED EXPERIENCE AND TRAINING:

Labor Category Descriptions, Desired Education Level and Experience Project Manager I

The candidate will have both technical and management experience, from inception to deployment, of two or more large-scale complex projects. Specialized Experience includes complete project development from inception to deployment in work similar to what is described in the RFP. Demonstrated ability to provide guidance and direction in multiple tasks across several functional areas and including the use of different technologies; proven expertise in

Labor Category Years of

Experience Desired Education level

Project Manager I 6 minimum With Bachelor’s Functional Analyst III 8 minimum With Bachelor’s Systems Analyst I 2 minimum With Bachelor’s Systems Analyst II 5 minimum With Bachelor’s Systems Analyst III 8 minimum With Bachelor’s the management and control of funds and resources, demonstrated capability in managing multi-task contracts.

General experience includes increasing responsibilities in work similar to what is defined in the RFQ. Considered key personnel. Resume required with quote.

Desired Educational Requirement: Bachelor’s degree

Minimum Experience Requirement:

Level Years of Experience General Specific I 6 3

Education/Experience Alternates:

Level No Degree Associate’s Master’s Ph.D.

Gen Spec Gen Spec Gen Spec Gen Spec I 9 6 7 4 4 2 3 1

Specialized Experience includes demonstrated experience functional knowledge of task order specific requirements, or developing functional requirements for small to mid-size projects or specific tasks in one or more of the following areas: Supply and Value Chain Management; Acquisition Logistics, Distribution and Transportation Logistics Services, Deployment Logistics, Logistics Training Services, and Material and Engineering Management. General experience includes demonstrated exceptional written and oral communications skills, including project plans, white papers, proposals and formal presentations.

III 8 5

III 12 9 10 7 6 3 4 1

Systems Analyst I, II, III Specialized Experience includes the analysis and design of business applications on complex, large-scale systems, including experience in data base management concepts. Knowledge of state-of-the-art storage and retrieval methods is required, as well as the ability to formulate specifications for computer programmers to use in coding, testing, and debugging of computer programs. Systems analysis experience designing technical applications on computer systems. General experience includes increasing responsibilities in assignments of a technical nature.

Proven ability to work independently or under only general direction on complex application problems involving all phase of systems analysis is required.

I 2 1

II 5 3

III 8 5

I 4 2 3 1 1 1 1 1

II 9 6 7 4 3 2 2 1

III 12 9 10 7 6 3 4 1

4.2 SUBSTITUTION OR ADDITION OF PERSONNEL

a. The Contractor agrees to assign to the contract those persons who resumes, personnel data forms, or personnel qualification statements were submitted as required by paragraph 4.0 to fill the requirements of the contract. No substitution or addition of personnel shall be made except in accordance with this clause.

b. The Contractor agrees that during the first 60 days of the contract performance period no personnel substitutions will be permitted unless such substitutions are necessitated by an individual’s sudden illness, death or termination of employment. In any of these events, the Contractor shall promptly notify the Contracting Officer and provide the information required by paragraph d. below.

c. If personnel for whatever reason become unavailable for work under the contract for a continuous period exceeding 30 working days, or are expected to devote substantially less effort to the work than indicated in the proposal, the Contractor shall propose a substitution of such personnel, in accordance with paragraph d below.

d. All proposed substitutions shall be, in writing, to the Contracting Officer at least 15 days (30 days if a security clearance must be obtained) prior to the proposed substitution. Each request shall provide a detailed explanation of the circumstances necessitating the proposed substitution, a complete resume for the proposed substitute and any other information required by the Contracting Officer to approve or disapprove the proposed substitution. All proposed substitutes (no matter when they are proposed during the performance period) shall have qualifications that are equal to or higher than the qualifications of the person being replaced.

e. In the event a requirement to increase the specified level of effort for a designated labor category, but not the overall level of effort of the contract occurs, the Contractor shall submit to the Contracting Officer a written request for approval to add personnel to the designated labor category. The information required is the same as that required in paragraph d. above. The additional personnel shall have qualifications greater than or equal to at least one (1) of the individuals proposed for the designated labor category.

f. The Contracting Officer shall evaluate requests for substitution and addition of personnel and promptly notify the Contractor, in writing, of whether the request is approved or disapproved.

g. If the Contracting Officer determines that suitable and timely replacement of personnel who have been reassigned, terminated or have otherwise become unavailable to perform under the contract is not reasonably forthcoming or that the resultant reduction of productive effort would impair the successful completion of the contract or the delivery order, the contract may be terminated by the Contracting Officer for default or for the convenience of the Government, as appropriate. Alternatively, at the Contracting Officer’s discretion, if the Contracting Officer finds the Contractor to be at fault for the condition, he may equitable adjust (downward) the contract price or fixed fee to compensate the Government for any delay, loss or damage as a result of the Contractor’s action.

5.0 DELIVERABLES AND REPORTING REQUIREMENTS

The contractor shall provide the Contracting Officer’s Representative (COR) with the following deliverables.

Each report shall be submitted electronically and in hard copy signed and dated by the Project Manager.

a. . Cumulative Monthly Cost Report itemized by labor, travel, and material

b. End of Task Reports

c. . Documentation for Trip Reports

d. Cost Avoidance / Return on Investment (CA/ROI) Report

e. Training/Assist Roster

f. Training/Assist Visit Feedback Report

g. Plan of Actions and Milestones (POA&M) for system/database development (CLIN 0001)

Examples of some of the reports are included at Attachment 1. These are examples only. Following contract award the Contractor shall meet with the COR prior to submission of the initial reports to get approval on the format for each report.

6.0 HOURS OF OPERATION AND PERFORMANCE SCHEDULE

Normal duty hours run five days per week, eight hours per day, Monday through Friday, except recognized holidays.

The contractor is not required to provide services on the following federal holidays: New Year’s Day; Martin Luther King Day; President’s Day; Memorial Day; Independence Day; Labor Day; Columbus Day; Veteran’s Day;

Thanksgiving Day; and Christmas Day. Any of the above holidays falling on a Saturday or Sunday shall be observed on the date designated by the Federal Government. Overtime may be required for OCONUS locations.

6.1 Work Schedule Adjustments Due to Emergency Installation Closures. Contractor personnel shall be expected to provide limited designated services in event of a closure due to emergency situations or inclement weather emergencies; applicable notifications shall be provided by television/radio announcements, telephone, text, email, verbal means, or MCB information systems (MCB Camp Lejeune Information Systems telephone number for reporting instructions is 910-451-1717). Once the Installation has returned to normal operations, Contractor personnel shall resume full services under normal work hours.

Under emergencies in which the Installation remains open under reduced but required services, Contractor personnel shall maximize staffing levels of essential personnel based on Government notification, telework may be authorized for non classified work and communication regarding assessment of safety and practicality of situation.

Considerations shall include employee/family member injuries, extensive home damages (to include transportation assets), mass power outages, inaccessible travel routes, school/daycare closures, pandemics etc.

7.0 PLACE OF PERFORMANCE

Telework on unclassified systems may be authorized for emergency situations on government provided assets.

The place of performance will be government facilities located at:

a. Marine Corps Air Station Cherry Point, NC b.. Marine Corps Air Station New River, NC

c.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .