15-Q-0155_Questions_and_Responses_-_FINAL.pdf

PDF 241 KB Posted

Attached to
BEQ Softgoods Federal contract opportunity
Solicitation number
M67001-15-Q-0155
Issued by
United States Marine Corps

About this file

Questions Responses

View the file

Other files for this federal contract opportunity

Other files attached to BEQ Softgoods, newest first.
File Type Posted
M67001-15-Q-0155-0002.pdf PDF
15-Q-0155_Questions_and_Responses_ATTACHMENT.pdf PDF
M67001-15-Q-0155-0001.pdf PDF
M67001-15-Q-0155.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M67001-15-Q-0155 Solicitation Questions and Responses

1. Regarding Item #0001 Ripplefold Drapery - solicitation recommends Wolf Gordon Dim out fabric

On page 19 under Installation - item 5c says “upholstered cornice 10” high with stationary panel drapery, 3-pass blackout lined….

a. Please confirm that these are to be blackout lined.

THE DRAPERY PANELS ARE BLACKOUT LINED

b. Please clarify the comment about stationary panel as we understand the drapes to be baton drawn.

COMMENT SHOULD READ:

OUTSIDE MOUNT UPHOLSTERED CORNICE 10” HIGH WITH STATIONARY

FUNCTIONAL (ABLE TO OPEN AND CLOSE) PANEL DRAPES, 3 PASS BLACKOUT

LINED. RIPPLE FOLD 80% FULLNESS.

c. Is there a preferred drop and/or draw distance; should we proceed with drape standards of approximately 4” overlap of window in all directions?

FOR ESTIMATION PURPOSES, PLEASE PROCEED WITH INDUSTRY STANDARDS.

d. Shall these be one-way, or 2-way draw?

OPEN AND CLOSE

e. Please confirm window size, or see Question 3 below.

SEE WINDOW TREATMENT, DRAPERY ATTACHMENT

2. Regarding Item #0004 and 0005 Solar Shade –

a. Are these to be mounted inside window casing, or wall mounted?

INSIDE MOUNT

b. Please confirm window size, or see Question 3 below.

SEE SOLAR SHADE ATTACHMENT

3. In preparation for field measures / installation quote -

a. Is this a 3-story building?

YES

b. Occupied or non-occupied?

NON-OCCUPIED

c. Is there active construction/renovation going on at the building?

YES

d. If so, is it to a level at which we can get true measurements at this time?

YES

e. Who would be the POC for site access?

POC WILL BE PROVIDED AT THE TIME OF AWARD. VENDORS ARE TO USE THE DIMMENSION ESTIMATE PROVIDED WITH THIS RESPONSE TO QUESTIONS AS THE BASIS OF THEIR QUOTE. NO SITE VISIT WILL BE CONDUCTED PRIOR TO AWARD NOR WILL A MODIFICATION BE APPROVED TO INCREASE PRICES AS A

RESULT.

4. Provide a dimension of the draperies needed.

SEE WINDOW TREATMENT, DRAPERY ATTACHMENT