M24-036 Tensile Tester_SOW.pdf

PDF 447 KB Posted

Attached to
Tensile Tester Upgrade Federal contract opportunity
Solicitation number
FA813924Q0024
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This document is a Statement of Work (SOW) for the purchase of one (1) Tensile Tester Upgrade with Peripherals for Tinker Air Force Base. The key requirements include:

The contractor shall deliver the tensile tester upgrade, provide delivery, offloading, installation, performance verification, calibration, and training. The upgrade must meet specific technical requirements outlined in the SOW, including replacement of the existing PC controller system, installation of new DragonFly UTM software, and addition of test templates and loadcell verification. The installation and training must be completed within five business days of delivery. The contractor shall comply with all applicable environmental, safety, and security requirements for work performed on the Tinker Air Force Base premises.

The related Federal Contract Opportunity is for the procurement of the 300KN Tensile Tester Upgrade in accordance with the SOW. The solicitation number is FA813924Q0024, and the contracting agency is the Department of the Air Force Materiel Command Air Force Sustainment Center.

View the file

Other files for this federal contract opportunity

Other files attached to Tensile Tester Upgrade, newest first.
File Type Posted
FA8139-24-Q-0024.pdf PDF
M24-036 300KN Tensile Tester Upgrade SSJ_redacted.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PREAMBLE

Commander’s Safety Intent

The safety of everyone on Tinker AFB is our top priority. All Individuals must accept personal responsibility for safety and seek opportunities for improving the safety of our work environment. Everyone working on Tinker AFB is challenged to find, fix (if able) and report all hazards and near-misses. It is our shared duty to take every reasonable step and precaution to prevent accidents and preserve the health/safety of each Contractor and Government employee.

1 SCOPE. This Statement of Work (SOW) defines the effort required for the purchase of one

(1) each Tensile Tester Upgrade with Peripherals to include Installation, Performance Verification and Training in Building 3001 at Tinker Air Force Base OK.

2 REQUIREMENTS

2.1 General. Installation, Performance Verification and Training shall be accomplished within five (5) business days of delivery. The Contractor shall provide to the Government Point of Contact (GPOC) the date that the Delivery, Installation, Performance Verification, and Training will begin five (5) business days prior to installation beginning. The Contractor shall be responsible for ensuring all services, parts and components provided under this contract are in IAW the terms and conditions outlined in this SOW.

2.2 Item Description. Tensile Tester Computer System Upgrade shall meet the specifications as defined below:

A. One (1) each P/N: UDPKG-DF-DFM-STD DragonFly UTM Upgrade for the United tensile tester computer system in Building 3001 meeting the following requirements:

• Replacement of existing PC controller (DATUM5I) system with current Windows PC/monitor system with current required specifications.

• New DragonFly UTM software suite - factory installed on the included Win10 PC.

• Three (3) pre-installed DragonFly Test Method Templates- must be defined/confirmed by end-user prior to time of order. Also supports conversion of up to three (3) existing DATUM5i test templates can be provided or converted/imported at additional cost.

• DAQC4 DragonFly USB Controller Existing UTM/DATUM controller-UTM interface cables can be retained and used for DragonFly. New/replacement cables can be quoted separately if needed or wanted.

• TSC-10 remote support contract for up to 10 hours of remote technical support and consultation.

• SETUP-UPGRD – On-site set-up, validation, and basic operational training on DragonFly UTM controller/software, system standardization. Additional system calibrations (ie.extensometers) can be purchased separately and must be ordered in advance of the SETUP site visit.

B. Four (4) each P/N: TP-DF-S DragonFly Template Creation (Standard) to include:

• Addition of one (1) ASTM, ISO or similar test template for DragonFly UTS software.

• A "standard" template is built with existing capabilities of DragonFly UTS software.

• Template is delivered electronically after set-up and installation of the software by qualified Industrial Physics technician.

• Special modifications to DragonFly report templates are NOT included.

• Standard DragonFly report templates must be used.

• Submission of MCR/Non-Standard form or the Upgrade

Inventory Form detailing the test procedures is required.

• DragonFly upgrades include the addition of three (3) test templates from Datum5i.

• Additional templates beyond the three (3) that are included are quoted separately.

C. Four (4) each P/N: CAL-UTS-UTM-ADD-LC-30K/150KN Verify Additional United

Loadcell (5k-34k) to include:

• Verify Additional United Loadcell to 5k-34k (22kN - 150kN)

D. Four (4) each P/N: CAL-UTS-UTM-ADD-LC-5K/22KN Verify Additional United Loadcell (Up to5k) to include:

• Verify Additional United Loadcell up to 5k (20kN)

E. Two (2) each P/N: CAL-UTS-UTM-STRAIN-1IN/25MM Verify UTS Extensometer up to 1"

F. One (1) each P/N: CAL-UTS-TEMP-SURVEY Environmental Chamber Survey-Field

• Contractor shall provide installation, training, and performance verification IAW this SOW.

2.3 Contractor Requirements

• The contractor shall deliver one (1) Tensile Tester Upgrade and Peripherals.

• The contractor shall provide Delivery, Offloading, Installation, Performance Verification, calibration, and Training.

• The Contractor shall make all necessary adjustments to the Tensile Tester Upgrade and

Peripherals until the item is fully operational in accordance with (IAW) the Original Equipment Manufacturer (OEM) specifications and to what is stated in this Statement of Work (SOW).

2.4 Installation

2.4.1 The Contractor shall be responsible for equipment delivery to Building 3001 at Tinker AFB, OK 73145. The Contractor shall be responsible for offloading equipment and moving equipment to installation area (Building 3001, Post I-63). The government shall provide power to the area that the Tensile Tester Upgrade will be installed. The Contractor shall provide the Tensile Tester Upgrade that is IAW the OEM’s specifications. The contractor shall be responsible for moving the Tensile Tester Upgrade to the work area.

2.4.2 The government shall provide power within 20 feet of the Tensile Tester Upgrade. The tensile tester upgrade shall be secured to the floor, connected to the existing Tensile Tester, and connected to government provided power by the contractor.

2.5 Tensile Tester Upgrade Performance Verification

After installation, the contractor shall demonstrate that Tensile Tester Upgrade meets or exceeds all OEM specifications and the requirements listed in section 2.2 of this SOW. Contractor shall be present for entirety of acceptance testing. The length of time for Acceptance testing should not exceed one (1) day.

2.6 Training The contractor shall provide training on-site Tinker Air Force Base for no less than six (6) operators. Training shall be for one day, for eight (8) hours per day and shall be specified in the contractor’s proposal.

2.7 Hours of Operation: The Contractor shall perform the work required under this contract during the following days and hours: Monday through Friday, 0600 - 1600. If work hours are required outside the hours stated, the Contractor shall contact the Government POC for approval from the CO. Upon approval from the CO, the SME or GPOC escort Contractor personnel at all times.

2.7.1 These dates and hours exclude Federal Holidays, base closures due to inclement weather, and furlough days, as applicable.

3.0 On-Base Requirements

3.1 Environmental Protection & Safety: The Contractor shall be knowledgeable of and comply with all applicable federal, state and local laws, regulations, instructions and requirements regarding environmental protection and occupational safety and health. The Contractor shall comply with any laws, instructions or regulation changes during the term of this contract.

3.1.1 Contractors shall be compliant Tinker Air Force Base (TAFB) Supplement to Air Force Manual (AFMAN) 32-7002, “Environmental Compliance and Pollution Prevention”, Tinker AFB procedures per Tinker Air Force Base Hazardous Waste Management Plan (TAFB HWMP), and Complex procedures per Oklahoma City Air Logistics Complex (OC-ALC) Supplement to AFMAN 32-7002, “Environmental Compliance and Pollution Prevention” and OC-ALCI 32-101 “Air Quality Record Keeping Procedure”. Publications are available digitally on e-Publishing website at www.e-publishing.af.mil for downloading or ordering.”

3.2 Hazardous Material (HAZMAT): If no HAZMAT will be brought on base or used in performance on this contract, the contractor shall certify “No HAZMAT will be brought on base” or “No HAZMAT Usage” by official correspondence. This certification shall be provided to the COR within ten (10) days after award. Upon COR receipt of the certification, the requirements of this section no longer apply. Appropriate penalties for the contractor shall be assessed if found in violation of above certification.

3.2.1 The Contractor shall comply with applicable federal and military procurement policies IAW OC-ALC Supplement to AFMAN 32-7002, “Environmental Compliance and Pollution Prevention”. The Contractor shall obtain access to the standardized Air Force HAZMAT tracking system and manage HAZMAT within the system or have a government designated HAZMART comply. The Contractor shall establish and reconcile the inventory, print the standardized Air Force HAZMAT tracking system bar code labels, and apply the labels to containers of HAZMAT so that the Occupational Safety and Health Administration (OSHA) compliant labels are not covered. Any failure to comply with proper HAZMAT management procedures shall be reported to the CO and COR who will notify 76 MXSG/MXDEU, OC-ALC Environmental Compliance.

3.3 Safety Data Sheet (SDS) and Labeling: Upon COR receipt of the “No HAZMAT Usage” certification, the requirements of this section no longer apply.

The Contractor shall not transport, ship or use any chemical, material or substance used in the performance of this PWS on Tinker AFB before written approval is provided by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). The Contractor shall submit to the COR, ten (10) calendar days after contract award date all Safety Data Sheets (SDSs). The Contractor shall receive approval from the COR prior to shipping any chemical, material or substance to Tinker AFB. A copy of the manufacturer SDS shall accompany the shipment.

Contractor shall comply with the effective dates for SDS requirements IAW the Occupational Safety and Health Administrations (OSHA) Hazardous Communication Standard, Title 29, Code of Federal Regulation (CFR) Part 1910.1200. The Contractor shall ensure containers of hazardous chemicals are labeled with the following information, prior to shipping to Tinker AFB IAW OSHA Hazardous Communication Standard, Title 29, CFR Part 1910.1200 (2012): product identifier; signal word; hazard statement(s); precautionary statement(s); pictogram(s); and name, address and telephone number of the chemical manufacturer, importer, or other responsible party. The COR will forward all SDS submittals to 72 ABW/CEIE for approval. A current manufacturer SDS shall be submitted to the COR if the Contractor changes manufacturer or vendor for any chemicals that were prior approved. The Contractor shall maintain copies of manufacturer SDSs for all chemicals and SDSs shall be readily accessible at all times by Contractor personnel as well as government employees.

3.4 Air Quality Recordkeeping: Upon COR receipt of the “No HAZMAT Usage” certification, the requirements of this section no longer apply.

The Contractor shall be responsible for specific recordkeeping and reporting requirements, when applicable, mandated by Tinker Air Force Base Facility-Wide Operating Permit IAW OC-ALCI 32-101. The COR will contact the UEC for environmental requirements. The Contractor shall submit all applicable records on a monthly basis to the COR no later than the third (3rd) day of the month following the reporting period. If the third (3rd) day of the month is a weekend or holiday, the logs are required by the last business day 'PRIOR' to the (third) 3rd. The COR will forward the records to the UEC no later than the fourth (4th) day of the following month or the first subsequent business day. Contractor shall maintain a signed copy of the form(s) required per OC-ALCI 32-101 on site for one (1) year.

3.5 Hazardous Waste: If no HAZWASTE will be generated during performance of this contract, the contractor may certify “NO Hazardous Waste Generation” by official correspondence. This certification shall be provided to the COR within ten (10) days after award. Upon COR receipt of the “No Hazardous Waste Generation” certification, the requirements of this section no longer apply. Appropriate penalties for the contractor shall be assessed if found in violation of above certification.

The Contractor shall dispose of contaminated solid waste, spent or processed chemical solutions, used rags and hazardous waste in government furnished waste containers IAW TAFB HWMP.

3.5.1 The Contractor shall be responsible for the Initial Accumulation Point (IAP) within the Contractor assigned space. The IAP shall be under the direct control of the Contractor who generates the waste. Before accumulation begins, the Contractor shall ensure appropriate hazard labels are affixed to government furnished waste containers as specified in 49 Code of Federal Regulation (CFR) 172.400. Management procedures for IAPs include written weekly inspections and reporting. When the container has been filled, the Contractor shall seal the container, mark the Certified Filled Date on the container label using an indelible pen, place the container at a designated pick up location, and call the Hazardous Waste Management Facility (HWMF) at 734-3285 for pick-up service. The Contractor shall ensure the HWMF picks up the container within three (3) calendar days after the Certified Filled Date. If container is not picked up within three (3) calendar days, Contractor shall notify the COR who will notify 76 MXSG/MXDEU, OC-ALC Environmental Engineering Section.

3.5.2 The Contractor shall perform written weekly inspections using Tinker AFB IMT Form 487, Initial Accumulation Point Management Aid. Weekly denotes once per working week. The Contractor shall submit Tinker AFB IMT Form 487 on a monthly basis to the COR no later than the third (3rd) day of the month following the reporting period. If the third (3rd) day of the month is a weekend or holiday, the logs are required by the last business day 'PRIOR' to the third (3rd). The COR will forward the form(s) to the UEC no later than the fourth (4th) day of the following month or the first (1st) subsequent business day. Contractor shall maintain a signed copy of the form(s) on site for one (1) year.

3.6 Discharges: Any discharges into Tinker’s industrial waste treatment plant (IWTP) or sanitary sewer shall be approved and done IAW Tinker Industrial Waste Water Discharge Permit as instructed by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). Notice of intent documentation shall be provided to the COR within ten (10) days after award. The COR will submit the required notice of intent documentation to the UEC for 72 ABW/CEIE approval. The Contractor shall not discharge into IWTP and sanitary sewer prior to approval issued by 72 ABW/CEIE. The Contractor shall maintain records of written approval issued by 72 ABW/CEIE for discharges into IWTP and sanitary sewer.

3.7 Spills: Upon occurrence of any spill that could enter the storm system or cause any harmful environment effects, the Contractor shall immediately call 911 to report the incident. When possible, the Contractor shall use a base telephone to receive help from Tinker AFB 911. If using a cell phone, the Contractor shall request Tinker AFB 911. The Contractor shall immediately report all environmental violations to the COR and UEC. The Contractor shall provide five (5) copies of a typed or written report about the incident within four (4) clock hours as follows:

One (1) copy to the CO, two (2) copies to the COR, a copy for UEC and one (1) copy for record. The format of the report shall be left up to the Contractor, but the report shall contain the following information:

1.) Name and contact number of person reporting the spill 2.) Date and time of incident 3.) Location and source of spill 4.) Substance or pollutant spilled 5.) Amount spilled and rate of discharge 6.) Any damages or injuries involved 7.) Extent of area impacted 8.) Potential hazards 9.) Actions taken 10.) Organizations contacted 11.) Remarks Section - that addresses the cause of the spill (e.g. human error, equipment, etc.) and whether 911 was called and which agencies responded.

3.8 Environmental Training: Upon COR receipt of the “No Hazardous Waste Generation” certification, the requirements of this section no longer apply.

Contractor personnel performing duties in the service of this PWS shall have training that acquaints the person with the details of Resource Conservation Recovery Act (RCRA) regulations in 40 CFR 260 through 279; applicable State Laws and regulations; DoD, Air Force and local requirements and an annual refresher classes, updates the person on changes to those rules. This training can be obtained through creditable training institutions or companies. All training will be approved by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). RCRA training is available at http://www.natlenvtrainers.com/RCRA-hazardous-waste.htm, http://www.skillsoft.com/catalog/detail.asp?CourseCode=esh_sah_a34_sh_enus000000, and http://www.lion.com/Storing-Hazardous-Waste-for-LQGs at the Contractor’s expense. Prior to obtaining training, the Contractor shall provide the name of the training institution or company and course description to the COR for approval within ten (10) calendar days after contract award date. Once written approval is received from the COR, the Contractor shall provide the environmental training certificates for employees performing duties in the service of this PWS to the COR within thirty (30) calendar days after contract award date. Annual refresher training certificates for the supervisor and employees managing the initial accumulations points (IAPs) shall be provided to the COR, within ten (10) calendar days after each option year renewal. The COR will forward a copy of the certificates to the UEC.

3.9 OC-ALC Security and OPSEC briefing: All Contractor personnel working on base in the OC-ALC shall be required to read the OC-ALC Security and OPSEC briefings. The GPOC will ensure the Security and OPSEC briefings are available for review by the Contractor. The Contractor shall provide the GPOC with a report within five (5) business days after receiving the briefings. The report shall contain the employee’s name and the date of review. These requirements are IAW AFI 16-1404, “Information Security”, Chapter 6, Paragraph 6.2-6.2.3, 6.4-6.4.4.; DoDI 5220.22 “Industrial Security”, Section 9, Paragraph 9.2(6).; AFI 10-701, “Operations Security”, Chapter 4, Paragraph 4.4. and OC-ALC 16-1404, “OC-ALC Security”, Paragraph 7.

3.10 Housekeeping: The Contractor shall keep the work areas clean and neat IAW industry standards, OSHA, fire and safety standards, and this SOW.

accomplished prior to commencement of work and refreshed daily during performance, IAW Contractor’s Site Safety Plan.

3.18 Safety and Health Plan: The Contractor shall be responsible for compliance with the OSHA Public Law 91-596. The Contractor shall submit a Safety and Health Plan (SHP) and corresponding site safety checklist to the CO and the GPOC (see Appendix C).

3.19 Combating Trafficking in Persons: IAW DFARS PGI 222.17, the COR shall pursue, as appropriate, the following methods of monitoring the Contractor’s performance regarding trafficking in persons such that non-compliances with FAR clause 52.222-50 are brought to the immediate attention of the Contracting Officer:

a. Keep the lines of communication open with the Contractor. At the Post-Award conference, remind the Contractor of his contractual responsibilities to notify the government if the Contractor receives notification of any alleged violations to this policy or if actions have been taken against the Contractor employees, subcontractor’s or subcontractor employees pursuant to the clause.

b. When appropriate, encourage Contractor to complete Human Trafficking Awareness Training.

c. Encourage the Contractor to take steps to investigate and eliminate slavery and human trafficking in their supply chains and to publish information for consumer awareness.

d. Periodically access the Department of State’s Trafficking in Person (TIP) website for updates and to view the latest reports. http://www.state.gov/g/tip

3.20 Speak Up for Safety: Safety surety is an integral part of our overall goal of establishing a world class safety and health program. Our “Speak Out for Safety” initiative ensures a partnership with contractors and government employees to further enhance safety to ensure we are looking out for all our partners and empowers all employees to actively participate in each other’s safety.

A safe workplace is everyone's business. As part of the contract team, military, civilian and contractor personnel are empowered to Speak Out for Safety (S.O.S.) when they observe an unsafe act.

Government personnel are empowered to intercede in events that pose imminent danger to personnel or catastrophic damage to property.

3.21 Emergency Procedures: The Contractor personnel shall follow the direction of the Government personnel with regard to emergency procedures, such as fire, tornado, active shooter, bomb threats, or other emergency. It is the responsibility of the Contractor to provide guidance and to establish procedures for its employees to respond to an emergency. It is the Contractor’s responsibility to account for their employees following an emergency evacuation.

The Contractor personnel shall participate with the Government personnel in all fire and tornado drills at no additional cost to the Government.