Q&As.docx
DOCX document 12 KB Posted
- Attached to
- Inflatable Wall Training System Federal contract opportunity
- Solicitation number
- M00264-18-R-0013
- Issued by
- United States Marine Corps
About this file
Government Answers to Industry Questions
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Synopsis_and_Solicitation_Amendment_1.docx | DOCX document | |
| Synopsis_Solicitation_Inflatable_Training_System.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Question #1: The solicitation asks for inflatable walls of a certain dimension, but does not speak to application. Is there a performance requirement for the walls, i.e. they must be certified to withstand the impact of less than lethal ammunition, they must withstand a hot barrel of a training weapon, be free standing etc.
Government Response #1: The solicitation has been amended to incorporate section 1.0 to identify all requisite performance requirements and specifications.
Contractor Question #2: The solicitation calls for ‘petrol’ blowers. Is it the governments intent to only use the wall system outdoors, or if indoor use is a possibility should there be a mix of petrol and electric blowers.
Government Response #2: The walls are planned to be used indoors as well as outdoors. As a result, a new line item has been incorporated for electric blowers. There is now a need for 2 petrol blowers and 2 electric blowers.
File details come from the government source that posted it.