GreenSpring__RFQ_13th_June_2017_CJ.docx
DOCX document 163 KB Posted
- Attached to
- GreenSpring Security Maintenance Federal contract opportunity
- Solicitation number
- M00264-17-R-0045
- Issued by
- United States Marine Corps
About this file
GreenSpring RFQ
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_00002_GreenSpring_RFQ_30th_June_2017.docx | DOCX document | |
| Amendment_GreenSpring__RFQ_21st_June_2017_CJ.docx | DOCX document | |
| 21_June_2017_Greenspring_Security_Layout.pdf | ||
| Attachment_2_Greenspring_Security_Layout.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNITED STATES MARINE CORPS
MARINE CORPS INSTALLATIONS NATIONAL CAPITAL REGION
MARINE CORPS BASE QUANTICO
3250 CATLIN AVENUE
QUANTICO VIRGINIA 22134 5001
| IN REPLY REFER TO: | |
| M00264 | |
| 14 Jun 17 |
| From: | Contracting Specialist, Regional Contracting Office Northeast, National Capital Region |
| Subject: | Request for Quote # M00264-17-R-0045 Security Maintenance |
| Date: | 14 Jun 2017 |
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This is a Request for Quotation (RFQ) for a one (1) base year and four (4) one-year option periods for technical and management support services. The Government intends to award a single contract as a result of this solicitation. This acquisition will be conducted in accordance with Federal Acquisition Regulation (FAR) Subpart 13, Simplified Acquisition Procedures as supplemented with additional information included in this notice.
This RFQ document and all incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2005-95, published 19 Jan 2017.
This acquisition is a 100% small business set-aside under NAICS code 561621, size standard of $19,000,000. .
Request for Quotation on the following supply / service:
| CLIN |
| Item Description |
| Unit |
| Qty |
| Unit Price |
| Extended Total |
| 0001 |
| Security System Materials (Base Year); Period of Performance (POP) 01 August 17 – 31 July 18 |
Contractor shall provide all the supplies & services required to deliver all materials to satisfy this requirement in accordance with the attached Performance Work Statement (PWS)
| EA |
| 1 |
| 0002 |
| Security Installation (Base Year); Period of Performance (POP) 01 August 17 – 31 July 18. |
Contractor shall provide execution of the Design Layout, Project Management, clean up and furnish supplies and services to complete all required tasks in accordance with the Performance Work Statement (PWS)
| EA |
| 1 |
| 0003 |
| Sys. Monitoring &Maintenance (Base Year); Period of Performance POP 01 August 17 – 31 July 18. |
The contractor shall provide all supplies and services required to complete tasks as outlined in the attached Performance Work Statement (PWS)
| Months |
| 12 |
| 1001 |
| Sys. Monitoring &Maintenance (Option 1); Period of Performance POP 01 August 18 – 31 July 19. |
The contractor shall provide all supplies and services required to complete tasks as outlined in the attached Performance Work Statement (PWS)
| Months |
| 12 |
| 2001 |
| Sys. Monitoring &Maintenance (Option 2); Period of Performance POP 01 August 19 – 31 July 20. |
The contractor shall provide all supplies and services required to complete tasks as outlined in the attached Performance Work Statement (PWS)
| Months |
| 12 |
| 3001 |
| Sys. Monitoring &Maintenance (Option 3); Period of Performance POP 01 August 20 – 31 July 21. |
The contractor shall provide all supplies and services required to complete tasks as outlined in the attached Performance Work Statement (PWS)
| Months |
| 12 |
| 4001 |
| Sys. Monitoring &Maintenance (Option 4); Period of Performance POP 01 August 21 – 31 July 22. |
The contractor shall provide all supplies and services required to complete tasks as outlined in the attached Performance Work Statement (PWS)
| Months |
| 12 |
| 5001 |
| Sys. Monitoring &Maintenance (Six (6) month option period if FAR 52.217-8 “Option to Extend Services” is invoked.) |
The contractor shall provide all supplies and services required to complete tasks as outlined in the attached Performance Work Statement (PWS)
| Months |
| 6 |
Please provide FOB Destination pricing and a delivery schedule (with your offer) for the following address:
A site visit is scheduled for all interested vendors on 21 June 2017 at 09:00 AM EST. The site visit will be held at 20 GREENSPRING DR. SUITE 103 STAFFORD, VIRGINIA 22554. All contractors shall inspect the site locations to satisfy themselves regarding all general and technical conditions that may affect the price of the contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site visit constitute grounds for a claim after contract award. RSVP with the government point of contact by 12:00 PM EST on 20 June 2017. All sub-contractors must identify whether they are large or small businesses when submitting an RSVP and when signing the attendance sheet the day of the site visit.
Questions identified during the site visit are due to the government point of contact by 23 June 2017 at 12:00 PM EST. Responses to the questions will be returned to the interested vendors no later than 30 June 2017 at 11:00 AM EST. The closing date and time for quote submission is 4:00 PM EST 11 July 2017. Offers received after this date and time will be considered non-responsive and will not be given further consideration. Please provide all submissions to Government Point of Contact: Carol Johnson at (703) 784-1936 or email at carol.johnson@usmc.mil.
All contractors must comply with the requirement listed above for this request. Failure to comply may result in disqualification. This will be a Firm Fixed Price (FFP) contract.
This acquisition will utilize Lowest Price Technically Acceptable (LPTA) procedures in accordance with FAR 15.101-2. Technical tradeoff will not be made and no additional credit will be given for exceeding acceptability. Award will be made to the acceptable Offeror with the lowest evaluated price, which is deemed responsible in accordance with the Federal Acquisition Regulation and whose quote conforms to the solicitation requirements. The solicitation requirements include all stated terms, conditions, representation and certifications, and other information required by this solicitation. The Government reserves the right to award without discussions. Therefore, each initial offer should contain the Offeror’s best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if determined necessary by the Contracting Officer.
The Government may reject any quote that is evaluated to be unrealistic in terms of requirements, contract terms and conditions, or an unrealistically high or low price when compared to Government estimates, such that the quote is deemed to reflect an inherent lack of competence or failure to comprehend the complexity and risk of the program.
Technical acceptability will be evaluated on all quotes. Only those quotes determined to be technically acceptable, either initially or as a result of discussions, will be considered for award. Then, price will be evaluated and the quotes will be listed from lowest to highest price based on the total evaluated price and technical acceptability. Award will be made to the lowest evaluated priced quote meeting the acceptability standards for the non-priced factors.
TECHNICAL EVALUATION STANDARD:
The contractor shall address the following two factors:
1. Factor 1 – Technical Capability – Offeror shall clearly demonstrate its approach to technical ability to meet the requirements of CLIN/Line Items based on meeting the requirements of the Request for Quote, quantity, quality and timeliness of delivery.
2. Factor 2 – Price – The Offeror shall complete CLIN pricing on page one (1) of this solicitation. In addition to the completed CLIN pricing on page one (1), the Offeror shall provide sufficient price information to allow the contracting officer to determine the completeness and reasonableness of the Offerors prices.
DISCUSSIONS: If during the evaluation period it is determined to be in the best interest of the Government to hold discussions, Offeror responses to clarifications/discussion notices will be considered in making the source selection decision.
AWARD DECISION: The award decisions will be made as follows:
1. Step One – Determine Technical Acceptability. The technical evaluation, Factor 1, stated above, will assess the Offerors capability to satisfy the Government’s requirement. The Government will evaluate all technical capability quotes received by the required date/time. The Technical Capability factor will receive a rating of acceptable and unacceptable. If any factor is rated “unacceptable”, the entire quote is rendered technically unacceptable, and the quote will be removed from the competitive range. Only quotes deemed technically acceptable (either initially or as the result of discussions) will be considered for award. The ratings are defined in the following table.
| Rating |
| Description |
| Acceptable |
| Quote clearly meets the minimum requirements of the solicitation. Only those quotes determined acceptable, either initially or as a result of discussion will be considered for award. Once deemed acceptable, all technical quotes are considered to be equal. |
| Unacceptable |
| Quote does not clearly meet the minimum requirements of the solicitation. Quotes with an unacceptable rating will not be considered for award. |
Table A-1
1. Step Two – Evaluate Price. The Offeror’s Price quote will be evaluated, for award purposes, based upon the total price proposed as annotated under Factor 2 – Price.
1. Step Three – Award Decision. Award will be made the lowest priced, technically acceptable Offeror, subject to a positive responsibility determination in accordance with FAR Part 9 and conformance of the Offeror’s quote to the terms and conditions of the solicitation.
DISCLAIMER:
This is a request for the submission of a quote and does not constitute a contract or authorization to begin work. Nor does an Offeror’s submission of a quote constitute a contract or authorize the individual or company to being work.
The Contracting Officer is the only person who can legally modify a resulting contract or obligate the Government for expenditure of funds. Costs shall be incurred by recipients of the solicitation in anticipation of receiving direct reimbursement from the Government.
Only the Contracting Officer has the authority to authorize deviations from the terms and conditions of any resulting contract, including deviations from specifications and requirements. In the event the Contractor does deviate, without written approval of the Contracting Officer, such deviations shall be at the risk of, and any cost related thereto shall be borne by the Contractor. Any matter concerning a change to the scope, prices, costs, terms or conditions of this contract shall be referred to the Contracting Officer.
PERFORMANCE WORK STATEMENT FOR
DATED: FEBRUARY 14, 2017
1.0 Scope. The Marine Corps Cyberspace Operations Group (MCCOG) directs global network operations and defense of the Marine Corps Enterprise Network (MCEN) and provides technical leadership to facilitate seamless information exchange in support of Marine and Joint Forces operating worldwide. MCCOG arms the Marine Corps for success on the network-centric battlefield by enabling secure, global information exchange across the full spectrum of operations.
Integral to the execution of the above mentioned functions is the ability to accommodate increased MCCOG staff that supports the growing operational mission. This requirement will provide support to all mission requirements through the layout design, delivery, install and cleanup of furniture within a Government lease space, thus enabling the proper operation and defense capabilities for the MCEN.
2.0 Background. The MCCOG operates its mission support efforts from Quantico, Virginia, with a satellite alternate branch at Camp Pendleton, CA. The MCCOG is an operational and staff organization supporting the global Marine Corps Enterprise Network (MCEN) Command and Control (C2) capabilities for Fleet Marine Forces and garrison forces stationed around the world. The MCCOG provides technical expertise, personnel, logistics, management, and facilities necessary to operate and defend the critical world-wide communications services, engineering services, operations services, hardware and software enhancements and upgrades, in support of mission essential systems used throughout the Marine Corps. The MCCOG executes policies and procedures under the administrative control of Headquarters Marine Corps and operations under the operational control of USCYBERCOM.
3.0 General Requirements. The Contractor shall provide support for Marine Corps Cyberspace Operations Group lease facility aligned with the percentage of effort stipulated below:
| Activity – Anticipated Percentage |
| Para |
| Metric |
| Design Layout Support |
| 10% |
| 3.1.1 |
| Ref: QASP/Att 1 |
| Project Management |
| 15% |
| 3.1.2 |
| Ref: QASP/Att 1 |
| Security Installation |
| 60% |
| 3.1.3 |
| Ref: QASP/Att 1 |
| Material and Installation clean up |
| 5% |
| 3.1.4 |
| Ref: QASP/Att 1 |
| Material Delivery |
| 5% |
| 3.1.5 |
| Ref: QASP/Att 1 |
| Monitoring and Maintenance |
| 5% |
| 3.1.6 |
| Ref: QASP/Att 1 |
The scope of work associated with each of these tasks may vary by precedent and volume throughout the performance period, although not substantially. The contractor is responsible for providing suitable technical and management support to maintain ongoing responsibilities delineated by activity, as well as slight variances in the scope of activities. The contractor shall also appoint a Project Manager to coordinate task activities and to serve as the overall expert for successful completion of all PWS tasks, as well as to serve as the primary interface with the MCCOG representative responsible for the lease facility activities. Performance metrics associated with PWS provisions are provided in the Quality Assurance Surveillance Plan (QASP) as Attachment 1.
3.1 Performance Requirements. The following lists the performance requirements of the Government for this effort. The contractor shall adhere to the below Performance Requirements and to the QASP listed as Attachment 1 to this PWS. Where the contractor seeks to improve upon the standard, this should be clearly annotated in their response. Where the contractor is non-compliant with a performance standard, this shall be clearly identified and the rationale clearly articulated.
3.1.1 Design Layout includes the submission by the Contractor of a design layout proposal due to the Government within 72 hours after the site survey has been conducted. Acceptable submission formats are AutoCAD, VISIO or PDF. Contractor is encouraged to propose an innovative solution to meet the Government needs. Design layout includes Main entry door, Emergency exit door, Supply Entrance door, Entry/Exit card readers for Exterior doors, Card readers for interior rooms, Motion Detection for interior office spaces, Alarm Monitors for windows, Aiphone system, CCTV system for building surveillance, LCD Monitors located in Security office, Access Enrollment station, 24 hour monitoring, and Battery backup. Request readers be compatible with Government Common Access Card (CAC). See attached floor plan at Attachment 2.
3.1.2 Project Management includes the management and oversight of all activities performed by contractor personnel to satisfy the requirements identified in the PWS. The Project Manager shall perform all activities necessary to ensure the accomplishment of timely and effective support by implementing productivity and management methods. Successful project management includes performing on time and with active and accurate communication with Government representatives. Any and all project concerns must be coordinate with the Contracting Officer Representative (COR) as identified during the period of performance. The Project Manager shall be the primary interface with the Government staff and is responsible for all operational, reporting and quality control issues. This includes establishing a management framework that ensures the objectives of this effort is executed within program constraints compliant with the quality provisions set forth in the QASP. Cardinal changes to the requirements set forth in this PWS that depart from the contractor’s accepted proposal represent willful action on the part of the contractor and shall not be grounds for consideration after the fact. Substantive changes that require modification of the contractor’s proposed solution shall be accomplished through formal, bi-lateral agreement with the government PCO. The contractor may also offer changes in the scope and nature of the services provided that will improve upon current standards, or otherwise create value and benefits in the execution of the overall MCCOG mission.
3.1.3 Security Installation includes activities related to the installation of all subject Security Systems to satisfy the requirements identified in the PWS. All installation must be performed with a clear focus on the safety of onsite personnel and in a best effort to preserve the quality of all installed furniture. Security equipment must be securely installed and meet the daily inspection of the Government representative. Installation work must be accomplished during the hours of 0800 (8:00 AM) to 1600 (4:00pm), Monday through Friday (except federal holidays). The Government will need to escort and supervise installation crews as work is being performed. The Project Manager must be on site during all installation efforts to supervise and interface with the Government representative.
3.1.4 Material and installation clean up includes all activities related to the clean up of materials from efforts performed to support this PWS. Material disposal shall not occur at the Government site. The contractor shall remove the debris from the site and dispose of it as necessary. Routine cleanup shall be performed on a daily basis to keep the facility free from debris. A final clean up of all materials is required within 2 business days of the end of the installation efforts and final Government inspection.
3.1.5 Material delivery includes product delivery within the necessary timeframes to meet the Government requirement. The use of on-hand assets is encouraged to expedite the execution of the requirement. Within 2 days of design layout acceptance, contractor must coordinate with Government representative to advise of the delivery schedule. Expedited delivery is desired.
3.1.6 Monitoring and Maintenance includes remote monitoring of Government facility 24 hours a day, 365 days a year. The contractor shall respond within 30 minutes with a phone call once the Government representative has placed a service call for inoperable equipment.
4.0 Security, Travel, ODCs, GFE.
4.1 Contractor Responsibilities and Compliance.
Security. The Government requires the contractor supply personnel with at least Secret clearance to perform installation of the security system.
Travel. The Government does not anticipate any travel while performing the subject tasks.
Other Direct Costs (ODC). The Government does not anticipate the use of any ODCs while in performing the subject tasks.
Government Furnished Equipment (GFE). The Government will not furnish any equipment or materials to perform under this PWS. The contractor will be required to supply all materials needed to perform under the subject PWS. Contractors should provide all electrical connectors that will be needed to power system furniture. Specific materials will be determined by the contractor, depending on the layout design accepted by the Government.
ATTACHMENT 1
QUALITY ASSURANCE SURVEILLANCE PLAN
1. Objective. This Quality Assurance Surveillance Plan (QASP) serves as the principal basis for assessing overall performance quality associated with this Lease Space task effort. This document will be used by the Government to assess the effectiveness of the Contractor’s management and technical services. This QASP provides the methodology by which the Contractor's performance will be monitored to determine compliance with established performance objectives and to establish performance benchmarks that ensure a quantifiable basis for measuring effectiveness. The plan is designed so that surveillance is limited to that which is necessary to verify the Contractor is performing management and technical services satisfactorily and relates directly to performance objectives of the performance objectives delineated in the PWS.
Government Surveillance. The MCCOG has identified an individual to function as the Technical Representative (COR) for this task, and her/his authority will be limited to administering specific technical aspects of the task order. The Technical Representative will not provide direction that is outside the scope of responsibilities delineated under this task order and will defer any conditional interpretations of performance to the Contracting Officer. The Technical Representative will:
· Maintain a detailed knowledge of the technical requirements of the contract;
· Document Contractor performance in accordance with the QASP;
· Identify and immediately forward notifications of deficient, or non-compliant performance to the Contracting Officer;
· Approve priorities of support, resources, and associated schedules.
3. Surveillance Methods. Surveillance of contractor performance is the method used by the Government to determine whether the contractor is effectively and efficiently complying with all terms and conditions of the task order. In addition to statistical analysis, the functional expertise of the Technical Representative plays a critical role in adequately evaluating contractor performance. The below listed methods of surveillance shall be used in the administration of this QASP and the standards are delineated in the Performance Requirements Survey (PRS) table (Enclosure 1)
Demonstration - A qualification method that is carried out by operation and relies on observable functional operation. It does not require the use of instrumentation or special test equipment;
Analysis. A qualification method that is carried out by examining and assessing the application of techniques in order to determine if they are appropriate and sufficient. The quality of performance can be determined from government or contractor task-based or Management Information System (MIS) reports, contractor ISO 9000 techniques and procedures, or from government observation of completed tasks. In some instances, reports may be available in the form of information on a contractor's performance against contract requirements. Reports generally provide information regarding various characteristics of tasks and can, therefore, be used to determine acceptability of a contractor's performance.
Inspections: A qualitative inspection can be accomplished through one of the following techniques:
Random or Stratified Sampling: With random sampling, services are sampled to determine if the level of performance is acceptable. Random sampling works best when the number of instances of the services being performed is very large and a statistically valid sample can be obtained. Stratified sampling focuses on selected parts of total contractor output for sampling. Computer programs may be available to assist in establishing sampling procedures.
Periodic Inspection, Judgmental Inspection or Planned Sampling: This method, sometimes called "planned sampling" consists of the evaluation of tasks selected on other than a 100% or random basis.
4. Performance Requirements. The performance requirements set forth in this section correspond to the PWS paragraphs delineated in the table. Enclosure (1) of this document provides standards for performance for specific requirements:
Design Layout Support. The contractor will be evaluated on the quality and accuracy of their overall design; ability to identify solutions to maximize the space and preclude problems or resolve issues; ability to provide layouts in necessary format.
Project Management. The contractor will be evaluated on the quality and accuracy of their management of tasks; ability to resolve issues and pose solutions; ability to handle staff and communicate with Government representatives; ability to ensure PWS compliance.
Security Installation. The contractor will be evaluated on the quality and accuracy of their installation; ability to maintain the integrity of materials during tasks; ability to remain on task and meet installation deadlines
Material and installation clean up. The contractor will be evaluated on the quality and accuracy of their disposal efforts; ability to maintain a clean workspace; ability to ensure final clean up of all debris at project closeout.
Material Delivery. The contractor will be evaluated on the quality of material; ability to meet delivery timeline; ability to coordinate delivery with Government representative.
ENCLOSURE (1)
PERFORMANCE REQUIREMENTS SURVEY (PRS)
| Design Layout Support |
| PWS |
3.1.1
| Acceptable performance has been met when the design efforts reveal a solution to maximize space and accommodate the standards of the Government requirement as outlined in the PWS. |
| Excellent |
Acceptable Poor Inspection Analysis Demonstration
| Project Management |
| PWS |
3.1.2
| Acceptable performance has been met when all tasks are performed and managed with minimal impact to Government representative and in a professional manner. |
| Excellent |
Acceptable Poor Inspection Analysis Demonstration
| Security Installation |
| PWS |
3.1.3
| Acceptable performance has been met when the install efforts are on track and conducted in a safe manner. |
| Excellent |
Acceptable Poor Inspection Analysis Demonstration
| Material and installation clean- up |
| PWS |
3.1.4
| Acceptable performance has been met when the facility free of debris from work efforts at the conclusion of all work efforts. |
| Excellent |
Acceptable Poor Inspection Analysis Demonstration
| Material Delivery |
| PWS |
3.1.5
| Acceptable performance has been met when the material deliveries are properly coordinated with Government representative and delivered as planned. |
| Excellent |
Acceptable Poor Inspection Analysis Demonstration
ENCLOSURE (1)
PERFORMANCE REQUIREMENTS SURVEY (PRS)
| Design Layout Support |
| PWS |
3.1.1
| Acceptable performance has been met when the design efforts reveal a solution to maximize space and accommodate the standards of the Government requirement as outlined in the PWS. |
| Excellent |
Acceptable Poor Inspection Analysis Demonstration
| Project Management |
| PWS |
3.1.2
| Acceptable performance has been met when all tasks are performed and managed with minimal impact to Government representative and in a professional manner. |
| Excellent |
Acceptable Poor Inspection Analysis Demonstration
| Security Installation |
| PWS |
3.1.3
| Acceptable performance has been met when the install efforts are on track and conducted in a safe manner. |
| Excellent |
Acceptable Poor Inspection Analysis Demonstration
| Material and installation clean- up |
| PWS |
3.1.4
| Acceptable performance has been met when the facility free of debris from work efforts at the conclusion of all work efforts. |
| Excellent |
Acceptable Poor Inspection Analysis Demonstration
| Material Delivery |
| PWS |
3.1.5
| Acceptable performance has been met when the material deliveries are properly coordinated with Government representative and delivered as planned. |
| Excellent |
Acceptable Poor Inspection Analysis Demonstration
Please Provide the Following:
1. Tax Identification Number: _____________________
2. Company Registered in WAWF-RA (Wide Area Workflow):_______________
If Not, Will Your Company Register? ________________
3. Company Registered In System for Award Management (SAM):_______________
If Yes, What Is Your DUNS# and/or Cage Code: _______________
If No, Will You Register: ________________
4. Company Considered Small or a Large Business under the NAICS Code of 561621.
5. Delivery Time of Requested Items: ____________ Please show earliest delivery date possible.
6. FOB Cost If Applicable:_______________
A. NOTE: Is Freight (Fob) Included In Price? If Not, Please Indicate Price and Where It’s Being Originated From: _______________
Discount Terms: ___________
Company Name and Address: ______________________________________________________________________________
Company Point of Contact: _______________________________________________________
Company Telephone: __________________
Company Facsimile: ___________________
GSA Contract Number & expiration date:_________________________
Quoted price(s) submitted that are open market shall be marked “commercial pricing”.
The following FAR clauses and provisions apply to this acquisition and can be viewed at http://www.acquisition.gov/far:
Clauses By Reference:
52.204-13 SAM
52.212-4 Contract Terms and Conditions-Commercial Items 52.237-2 Protection Of Government Buildings, Equipment And Vegetation 52.252-1 Solicitation Provisions Incorporated by Reference 52.252-2 Clauses Incorporated By Reference 252.203-7000 Requirements Relating to Compensation of Former DOD Officials 252.203-7002 Requirement to Inform Employees of Whistleblower Rights.
252.204-7012 Safeguarding of Unclassified Controlled Technical Information 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports 252.232-7006 Wide Area Workflow 252.232-7010 Levies on Contract Payments 252.243-7001 Pricing of Contract Modifications 252.243-7002 Requests for Equitable Adjustment 252.247-7023 Transportation of Supplies by Sea
Clauses By Full Text:
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS--COMMERCIAL ITEMS (DEC 2015)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)
(1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).
____ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).
____ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
(4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2015) (Pub. L. 109-282) (31 U.S.C. 6101 note).
___ (5) [Reserved]
___ (6) 52.204-14, Service Contract Reporting Requirements (JAN 2014) (Pub. L. 111-117, section 743 of Div. C).
___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (JAN 2014) (Pub. L. 111-117, section 743 of Div. C).
(8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Oct 2015) (31 U.S.C. 6101 note).
(9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (July 2013) (41 U.S.C. 2313).
____ (10) [Reserved]
____ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).
____ (ii) Alternate I (NOV 2011) of 52.219-3.
____ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
____ (ii) Alternate I (JAN 2011) of 52.219-4.
____ (13) [Reserved] x (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644).
____ (ii) Alternate I (NOV 2011).
____ (iii) Alternate II (NOV 2011).
____ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).
____ (ii) Alternate I (Oct 1995) of 52.219-7.
____ (iii) Alternate II (Mar 2004) of 52.219-7.
____ (16) 52.219-8, Utilization of Small Business Concerns (OCT 2014) (15 U.S.C. 637(d)(2) and (3)).
____ (17)(i) 52.219-9, Small Business Subcontracting Plan (Oct 2015) (15 U.S.C. 637(d)(4)).
____ (ii) Alternate I (Oct 2001) of 52.219-9.
____ (iii) Alternate II (Oct 2001) of 52.219-9.
____ (iv) Alternate III (Oct 2015) of 52.219-9.
____ (18) 52.219-13, Notice of Set-Aside of Orders (NOV 2011) (15 U.S.C. 644(r)).
(19) 52.219-14, Limitations on Subcontracting (NOV 2011) (15 U.S.C. 637(a)(14)).
____ (20) 52.219-16, Liquidated Damages—Subcon-tracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).
____ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (NOV 2011) (15 U.S.C. 657f).
____ (22) 52.219-28, Post Award Small Business Program Rerepresentation (July 2013) (15 U.S.C. 632(a)(2)).
____ (23) 52.219-29, Notice of Set-Aside for Economically Disadvantaged Women-Owned Small Business (EDWOSB) Concerns (July 2013) (15 U.S.C. 637(m)).
____ (24) 52.219-30, Notice of Set-Aside for Women-Owned Small Business (WOSB) Concerns Eligible Under the WOSB Program (July 2013) (15 U.S.C. 637(m)).
x (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).
x (26) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (JAN 2014) (E.O. 3126).
x (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
x (28) 52.222-26, Equal Opportunity (Apr 2015) (E.O. 11246).
(29) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).
(30) 52.222-36, Equal Opportunity for Workers with Disabilities (July 2014) (29 U.S.C. 793).
(31) 52.222-37, Employment Reports on Veterans (Oct 2015) (38 U.S.C. 4212).
(32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).
x (33)(i) 52.222-50, Combating Trafficking in Persons (March 2, 2015) (22 U.S.C. chapter 78 and E.O. 13627).
____ (ii) Alternate I (March 2, 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
____ (34) 52.222-54, Employment Eligibility Verification (Oct 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
____ (35)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
____ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
____ (36) (i) 52.223-13, Acquisition of EPEAT® Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and 13514).
____ (ii) Alternate I (OCT 2015) of 52.223-13.
____ (37)(i) 52.223-14, Acquisition of EPEAT® Registered Televisions (Jun 2014) (E.O.s 13423 and 13514).
____ (ii) Alternate I (Jun 2014) of 52.223-14.
____ (38) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).
____ (39)(i) 52.223-16, Acquisition of EPEAT[supreg]-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).
____ (ii) Alternate I (Jun 2014) of 52.223-16.
x (40) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) (E.O. 13513).
____ (41) 52.225-1, Buy American--Supplies (May 2014) (41 U.S.C. chapter 83).
____(42) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (May 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L.
103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
____ (ii) Alternate I (May 2014) of 52.225-3.
____ (iii) Alternate II (May 2014) of 52.225-3.
____ (iv) Alternate III (May 2014) of 52.225-3.
____ (43) 52.225-5, Trade Agreements (Nov 2013) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
x (44) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
____ (45) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Jul 2013) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
____ (46) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150
(47) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).
x (48) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
____ (49) 52.232-30, Installment Payments for Commercial Items (Oct 1995) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
(50) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (July 2013) (31 U.S.C. 3332).
____ (51) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (July 2013) (31 U.S.C. 3332).
____ (52) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).
(53) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).
____ (54)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).
____ (ii) Alternate I (Apr 2003) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)
_____(1) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495).
_____ (2) 52.222-41, Service Contract Labor Standards (MAY 2014) (41 U.S.C. chapter 67).
_____ (3) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
_____ (4) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (Multiple Year and Option Contracts) (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
_____ (5) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (MAY 2014) (29 U.S.C 206 and 41 U.S.C. chapter 67).
_____ (6) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (MAY 2014) (41 U.S.C. chapter 67).
_____ (7) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (MAY 2014) (41 U.S.C. chapter 67).
_____ (8) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2015) (E.O. 13658).
_____ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (MAY 2014) (42 U.S.C. 1792).
_____ (10) 52.237-11, Accepting and Dispensing of $1 Coin (Sept 2008) (31 U.S.C. 5112(p)(1)).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records--Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1)in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).
(ii) 52.219-8, Utilization of Small Business Concerns (OCT 2014) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $700,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(iii) 52.222-17, Nondisplacement of Qualified Workers (MAY 2014) (E.O. 13495). Flow down required in accordance with paragraph (l) of FAR clause 52.222-17.
(iv) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
(v) 52.222-26, Equal Opportunity (APR 2015) (E.O. 11246).
(vi) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).
(vii) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).
(viii) 52.222-37, Employment Reports on Veterans (Oct 2015) (38 U.S.C. 4212).
(ix) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.
(x) 52.222-41, Service Contract Labor Standards (May 2014), (41 U.S.C. chapter 67).
(xi) _____ (A) 52.222-50, Combating Trafficking in Persons (March 2, 2015) (22 U.S.C. chapter 78 and E.O. 13627).
_____ (B) Alternate I (March 2, 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
(xii) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (May 2014) (41 U.S.C. chapter 67.)
(xiii) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (May 2014) (41 U.S.C. chapter 67)
(xiv) 52.222-54, Employment Eligibility Verification (Oct 2015) (E. O. 12989).
(xv)52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2015) (E.O. 13658).
(xvi) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Jul 2013) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
(xvii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (May 2014) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.
(xviii) 52.247-64, Preference for Privately-Owned U.S. Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.
(2) While not required, the contractor May include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.
(End of clause)
52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30 days.
(End of clause)
52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 60 months.
(End of clause)
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/ www.acquisition.gov/far
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause--
Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
“2 in 1”
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
Government
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC Issue By DoDAAC Admin DoDAAC Inspect By DoDAAC Ship To Code Ship From Code Mark For Code Service Approver (DoDAAC) Service Acceptor (DoDAAC) Accept at Other DoDAAC LPO DoDAAC DCAA Auditor DoDAAC Other DoDAAC(s)
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.
Name:
E-mail Address:
PH:
(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
Name:
E-mail Address:
PH:
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
U3 DD 250 Receiving Report Submission Through Wide Area Workflow – Receipt and Acceptance (WAWF-RA)
** Special Invoicing Instructions: Wide Area Work Flow – Receipt and Acceptance (WAWF-RA) **
WAWF-RA is the only method authorized by the United States Marine Corps to electronically process payment requests. Compliance with WAWF-RA is mandatory. Include in each offer a statement acknowledging that you are WAWF-RA compliant. In order to get registered with WAWF-RA, visit https://wawf.eb.mil/. In order to WAWF-RA you must designate an Electronic Business Point of Contact (EB-POC) to serve as the group administrator within you company.