M00264-16-R-0057 _MCIA_Physical_Security_Maintenance.pdf
PDF 913 KB Posted
- Attached to
- MCIA Physical Security Support Services Federal contract opportunity
- Solicitation number
- M00264-16-R-0057
- Issued by
- United States Marine Corps
About this file
MCIA Physical Security
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| M00264-16-R-0057_Amendment_of_Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
M00264-16-R-0057 18-Aug-2016
b. TELEPHONE NUMBER
703-432-1084
8. OFFER DUE DATE/LOCAL TIME
12:00 AM 31 Aug 2016
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
M002649. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
DAYNA M. CHATMAN
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
M0008316SU5HL02
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
MCINCR - RCO
2010 HENDERSON RD
DAYNA CHATMAN
QUANTICO VA 22134
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: 703-432-1084
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$20,500,000
NAICS:
561621
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF54
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
M00264-16-R-0057
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 12 Months LifeCycle Replacement and Upgrade
FFP
In accordance with Section 5.1.1 of the attached PWS
FOB: Destination
MILSTRIP: M0008316SU5HL02
PURCHASE REQUEST NUMBER: M0008316SU5HL02
NET AMT
0002 12 Months Preventative Maintenance Requirements
FFP
In accordance with Section 5.1.2 of the attached PWS
FOB: Destination
0003 12 Months Service Calls and Reporting Requirements
FFP
In accordance with Section 6.1 of the attached PWS
FOB: Destination
0004 Cost Other Direct Cost
COST
Section 7.0 Task 3: Provide material, equipment, and parts for required expansion.
This is a not to exceed (NTE) Cost Reimbursable, non-fee bearing line item.
FOB: Destination
ESTIMATED COST
1001 12 Months OPTION LifeCycle Replacement and Upgrade
FFP
In accordance with Section 5.1.1 of the attached PWS
FOB: Destination
1002 12 Months OPTION Preventative Maintenance Requirements
FFP
In accordance with Section 5.1.2 of the attached PWS
FOB: Destination
1003 12 Months OPTION Service Calls and Reporting Requirements
FFP
In accordance with Section 6.1 of the attached PWS
FOB: Destination
1004 Cost OPTION Other Direct Cost
COST
Section 7.0 Task 3: Provide material, equipment, and parts for required expansion.
This is a not to exceed (NTE) Cost Reimbursable, non-fee bearing line item.
FOB: Destination
2001 12 Months OPTION LifeCycle Replacement and Upgrade
FFP
In accordance with Section 5.1.1 of the attached PWS
2002 12 Months OPTION Preventative Maintenance Requirements
FFP
In accordance with Section 5.1.2 of the attached PWS
2003 12 Months OPTION Service Calls and Reporting Requirements
FFP
In accordance with Section 6.1 of the attached PWS
2004 Cost OPTION Other Direct Cost
COST
Section 7.0 Task 3: Provide material, equipment, and parts for required expansion.
This is a not to exceed (NTE) Cost Reimbursable, non-fee bearing line item.
3001 12 Months OPTION LifeCycle Replacement and Upgrade
FFP
In accordance with Section 5.1.1 of the attached PWS
3002 12 Months OPTION Preventative Maintenance Requirements
FFP
In accordance with Section 5.1.2 of the attached PWS
3003 12 Months OPTION Service Calls and Reporting Requirements
FFP
In accordance with Section 6.1 of the attached PWS
3004 Cost OPTION Other Direct Cost
COST
Section 7.0 Task 3: Provide material, equipment, and parts for required expansion.
This is a not to exceed (NTE) Cost Reimbursable, non-fee bearing line item.
4001 12 Months OPTION LifeCycle Replacement and Upgrade
FFP
In accordance with Section 5.1 of the attached PWS
4002 12 Months OPTION Preventative Maintenance Requirements
FFP
In accordance with Section 5.1.2 of the attached PWS
4003 12 Months OPTION Service Calls and Reporting Requirements
FFP
In accordance with Section 6.1 of the attached PWS
4004 Cost OPTION Other Direct Cost
COST
Section 7.0 Task 3: Provide material, equipment, and parts for required expansion.
This is a not to exceed (NTE) Cost Reimbursable, non-fee bearing line item.
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT (PWS)
COMMAND SECURITY SYSTEM ANNUAL MAINTENANCE AND SYSTEM UPGRADE
1. SCOPE
This Performance Work Statement (PWS) is for annual maintenance and physical security system upgrades for the
Marine Corps Intelligence Activity (MCIA). MCIA’s requirement for support services is as follows: annual repair, lifecycle replacement, preventative maintenance, future facilities relocation and/or installation and configuration services, Quintron’s access control (updates/patches), power sources, bi-annual preventive maintenance calls, emergency/routine repairs services, etc. as required to maintain a fully functional system.
Lifecycle replacement of all high security paper/media shredders (all MCIA locations) will be split between two (2) years - half replaced on the fourth (4 th
) year and the remainder replaced on the fifth (5 th
) year. Lifecycle replacement will have a schedule that will replace badge printers on the fourth (4 th
) year.
MCIA's physical security system entails:
Access control and Intrusion Detection System (IDS): Quintron’s AccessNSite;
Door locks and hardware;
Closed Circuit Television (CCTV); to include analog and digital security cameras, DVR’s, NVR’s and network switches and equipment.
X-Ray machine;
Walk-through magnetometer;
Disintegrator and evacuation system;
Equipment components; and
Other related electronic security equipment.
The Contractor shall conduct upgrades to the Intelligence Community Badge Interoperability Program (ICBIP) and replication of Five Eyes (FVEYs) database efforts for relocation to a separate location and other security related equipment. All follow-on annual maintenance for the present and newly installed equipment is included in the scope of the maintenance efforts under this PWS.
2. BACKGROUND
MCIA’s administrative building is constructed and secured as a Department of Defense (DoD) Sensitive
Compartmented Information Facility (SCIF). The over-arching regulation is Intelligence Community
Directive/Standard (ICD/ICS) 705 and IC Tech Spec-for ICD/ICS 705. These directives will be the minimum standard used in securing the facility. Additional standards may be applied by MCIA, based on local directives and policies.
3. APPLICABLE DOCUMENTS: Documents applicable to this requirement can be found as attachments.
Intelligence Community Directive (ICD) 705
Intelligence Community Standard (ICS) 705
IC Tech Spec-for ICD/ICS 705
Unified Facilities Criteria (UFC) 4-022-02
4. GENERAL REQUIREMENTS
4.1 Contractor Personnel Requirements
4.1.1 Contract Program Manager (PM)
The Contractor shall designate a PM who shall be responsible for the performance of the work. The PM shall have full authority to act on behalf of the Contractor for all issues pertaining to contract administration for subject contract.
4.1.2 Security Clearance
The Contractor shall take all necessary steps to ensure that Contractor and any subcontractor personnel performing under this contract are persons of professional and personal integrity and trust and meet all other requirements stipulated in this PWS.
The Contractor shall be responsible for ensuring all contract personnel are U.S. citizens who possess an in-scope, favorable, Single Scope Background Investigation (SSBI) adjudicated for Sensitive Compartmented Information
(SCI) eligibility without conditions, exceptions, or waivers at the time of award and prior to performance under this contract.
The Contractor shall ensure it and any subcontractors have completed all DD254 requirements prior to commencing any work under this contract.
4.1.3 Personnel Qualifications
The Contractor shall ensure employees have the required knowledge, skills and ability including any certifications prior to performing under this contract. This includes, but is not limited to, having Quintron certified technicians assigned to support the contract.
4.1.4 Non-Disclosure Agreements (NDAs)
All Contractor personnel receiving access to Government data or data from another Contractor through this effort must provide a signed non-disclosure agreement prior to start of work. This agreement shall be submitted to the Contracting
Officer (KO) and the Contracting Officer’s Representative (COR). All non-disclosure agreements shall be signed by all
Contractor personnel involved in this effort and returned within five (5) business days after receipt of award. If the contractor hires new employees to support this effort a NDA must be signed within 5 days of employment.
4.1.5 Staffing
The Contractor shall maintain continuous staffing levels to ensure the work performed under this contract and the deliverables are accurate, timely and complete.
4.1.6 Meetings
The Contractor shall brief the COR or assigned government representative at the conclusion of each initial service call. The oral report must outline the problem and the solution used to deliver positive results. Following each service call a written After Action report shall be provided within ten (10) business days.
4.1.7 Quality Control Program
The Contractor shall maintain a complete Quality Control Plan (QCP) to ensure the services performed conform to this requirement. The QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction and other performance requirements in the PWS.
The Contractor shall maintain and update their QCP throughout the performance of this contract. The initial QCP is due to the COR within ten (10) days after start of contract. The COR will notify the Contractor of acceptance or required modifications to the QCP. The Contractor shall make appropriate modifications to the QCP at no additional cost to the Government and obtain acceptance of any modifications to the QCP by the COR within 30 days of the changes. The Contractor shall re-evaluate and submit an updated QCP to the COR for approval six (6) months after contract award, assuming the benefit of lessons learned over the initial six (6) month period, for approval.
Thereafter, the plan shall be reviewed, updated and submitted annually, or as changes occur, for acceptance by the
Government. The QCP shall describe the inspection system for the requested services listed in the PWS and shall include the following:
A description of the Contractor's quality control system. The system shall cover all services, specify work to be inspected on either a scheduled or unscheduled basis, the frequency of inspections and describe how inspections will be conducted;
The name(s) and qualifications of individual(s) responsible for performing quality control inspections and the extent of their authority;
A description of the methods used to record the quality control inspection and corrective actions taken.
Corrective action reports shall be provided to the COR no more than ten (10) business day from completion of the action;
A description of the methods used for identifying and preventing defects in the quality of service performed; and
The approach for filling vacancies in a timely manner, providing qualified personnel and maintaining an ongoing training program to ensure Contractor employees have or acquire the knowledge and skills necessary for new/emerging technology, managing changes in workload requirements and providing timely and accurate invoices.
Additionally, the Contractor shall maintain a complete record of all scheduled and performed Quality Control inspections, inspection results and dates and details of corrective actions.
4.2 Contract Program Management Requirements
4.2.1 Annual/Semi-Annual Review
The Contractor shall coordinate and provide information to support the COR for annual/semi-annual contract review meetings. The Government will use this time to disseminate information and discuss any contract or operational issues including contract activity. These reviews will be at a time and location of the Government's choice. The
Contractor shall submit any agenda item information, task specific documentation, project data to support developing the presentation to the COR no later than five (5) days prior to the scheduled contract review.
4.2.2 Monthly Project Status Report
The Contractor shall provide to the COR, on or before the tenth day of each month, a Monthly Project Status Report to include but not limited to, scheduled, completed and outstanding tasks. A template of the Monthly Project Status
Report will be provided to the Contractor at the Kickoff meeting.
4.2.3 Place of Performance
Contract performance will take place at the following locations:
Marine Corps Intelligence Activity
Hochmuth Hall (HH) / Swain Annex (SA) / Parking Garage
2033 Barnett Avenue
Quantico, VA 22134
Marine Corps Intelligence Activity West
27402 MCB-1 Road
Marine Corps Intelligence Activity
General Ray Davis Building, Suite 124
3300 Russell Road
Commandant Marine Corps*
Intelligence Department
Room 1A262B
3000 Navy Pentagon
Washington DC 20350-3000
* Performance at this location is restricted to the Quintron AccessNSite system in conjunction with the Intelligence
Community Badge Interoperability Program (ICBIP).
4.3 Inspection and Acceptance
The COR shall monitor the Contractor's performance in accordance with the Quality Assurance Surveillance Plan
(QASP).
The Government's Quality Assurance Surveillance Plan is not a substitute for Quality Control Plan by the
Contractor. All findings of unsatisfactory or non-performed work will be resolved in accordance with the QASP.
4.4 Government/Contractor Relationship
The services to be delivered by the Contractor to the Government are not personal services. No employer-employee relationship will exist between the Government and the Contractor and/or between the Government and the
Contractor's employees.
4.5 Transition-Out Plan
In the event any follow-on work is required for these services, a transition may occur between the contractor
(incumbent) and the new contractor. If this occurs, the transition-out period will be the last 30 days of the period of performance of this contract. If follow-on services are not pursued, or the current contractor is the successor contractor, the contractor will maintain full services during the last 30 days of the contract.
The Transition-Out Plan shall facilitate a seamless transition from the incumbent to the successor and Government personnel at the expiration of this contract.
The Contractor shall provide a Transition-Out Plan NLT 90 calendar days prior to expiration of this contract. The
Contractor shall be fully responsible for performance during the initial 15 days of the transition-out period and responsibility for performance will gradually transition to the incoming Contractor during the final 15 days of the transition-out period. This transition-out plan shall include, but not be limited to, digital and hard copies of the following:
Documentation, operating procedures and other resources and items, including, but not limited to, devices, equipment, databases and database related items, systems under MCIA's responsibility as related to this
PWS to any incoming Contractor or the Government.
A training program to be conducted with the incoming vendor and a date for transferring responsibilities for each division.
A plan for working closely with the follow-on Contractor or the Government to assure uninterrupted contract support, which provides:.
o Points of Contact o Schedules and Milestones o Actions required of the Government
Recommended changes based on performance experience and lessons learned which would provide more effective operations and/or eliminate unnecessary costs. This information shall be provided to the COR in a report no less than three (3) months before end of award.
At the conclusion of the tranistion out period, the Contractor shall provide written confirmation to the COR via email that it and all its employees have transferred and are no longer in possession of any U.S. Government Data and Information including, but not limited to, all copies, portions, data files and other related information, materials and items, created or generated by the Contractor under this effort or provided by MCIA.
4.6 Post Award Kick-Off Meeting
In coordination with the Contractor, the Government shall schedule and coordinate a Post Award Kick-Off Meeting to occur within seven (7) calendar days of Contract award at the Government's primary site at Marine Corps Base
Quantico, VA. The meeting will provide an introduction between Government and Contractor personnel who will be involved with this Contract. The meeting will provide the opportunity to discuss technical, management, security issues and reporting procedures. At a minimum, the attendees shall include key Contractor personnel, representatives from the directorates, other relevant Government personnel and the COR.
4.7 Personnel Management Requirements
4.7.1 Hours of Operations
The Contractor shall provide non-emergency on-call, on-site, and/or telephonic trouble support during normal business hours (0730 – 1600). The Contractor shall provide emergency on-call, on-site, and/or telephonic repair support when required, within 4-hours of notification.
All on-site work performed outside of the normal operating hours will be approved by the COR prior to commencing the work.
4.7.2 Legal Holidays and Center Closures
The Contractor shall not be required to work on holidays except for in the event of an emergency. Government holidays include:
New Year's Day
Martin Luther King's birthday
Presidents Day
Memorial Day
Independence Day
Labor Day
Columbus Day
Veteran's Day
Thanksgiving Day
Christmas Day
The Contractor shall not work on any other holiday designated by Federal statute, executive order, or presidential proclamation. Local determinations relating to adverse weather conditions, national emergencies, energy conservation, MCIA/Organizational determinations, etc., may require the work location to close. However, in the event these should occur, the contractor shall be available for support in the event of an emergency.
4.7.3 Travel
The Contractor is not required or authorized to travel in support of this requirement.
4.7.4 Physical Security
The Contractor shall safeguard all Government property and information provided in performance of this contract.
At the close of each work period, the Contractor is responsible for ensuring Government facilities, equipment and materials are secured. Contractor employees will be subject to all MCIA security procedures and any other applicable installation access and security regulations.
4.7.4.1 Facility Clearance
The contractor shall have an active Top Secret Facility Clearance (access to COMSEC and NATO) without any
Special Limitations that restrict access.
4.7.4.2 Subcontracting
Before any subcontracting can take place, approval from the government is required. A DD254 is required.
5. TECHNICAL REQUIREMENTS
5.1 TASK 1
5.1.1 Lifecycle replacement and Upgrade
The Contractor shall provide lifecycle replacement and upgrade of any security equipment onsite which is beyond its end of life or is operationally defective. This includes any equipment that the government deems inadequate to provide the best security for the command.
The contractor shall maintain all other security related equipment that evolves within MCIA, to include, wiring, tamper switches, and other consumables; as well as those items provided in list of material/components listed in
PWS.
The Contractor shall provide lifecycle and upgrade to MCIA door intercom, camera, intercom and paging system within the first 12 months after award. This will include a new system install at Suite 124. The equipment for the upgrade will need to meet the following minimum specifications:
The unit will have a central command unit installed in the SOC. This Unit will have the ability to receive calls from Hochmuth Hall front and rear entrance and Swain Warehouse roll up door.
The central command unit will have the capability to unlock the Hochmuth Hall front and rear entrance.
The unit must have line filter and security technology that will prevent audio from being heard at exterior locations, unless a button is pushed on the interior to answer the call and talk.
All call stations will have high visibility cameras.
System at Suite 124 will consist of one exterior call station with high visibility camera. This system will talk to a master unit located in Suite 124 SOC.
Suite 124 master unit will have the ability to unlock the exterior door and the internal catch door.
The Contractor shall install an under the desk push button Duress System within 12 months after award that notifies the SOC and PMO. This system contains numerous buttons throughout the command which will be installed in the
CO’s Office and at the Executive Assistant’s desk. Buttons that notify PMO will be located at the HH SOC, MCIA
West and Suite 124 security offices. The equipment for the Duress install will need to meet the following minimum specifications:
Duress buttons that notify the SOC will need to communicate with Quintron’s AccessNsite;
Duress buttons that notify PMO will automatically dial PMO and play a recorded message indicating a duress situation; and
All duress buttons, once pushed, will have to be reset from the location before the alarm can be cleared.
The Contractor shall upgrade the 1MC PA system within 12 months after award by installing two (2) additional broadcasting locations one (1) in the Global Network Operations Center (GNOC) and one (1) in the Enterprise
Operations Center (EOC). The equipment for the PA upgrade must meet the following minimum specifications:
System must be compatible with existing system and/or existing system must be upgraded to accept additional broadcasting zones.
The Contractor shall install an additional Intrusion Detection System zone at MCIA West for exterior ISO containers within the first 12 months after award. The system must meet the following minimum specifications:
Must be compatible with the existing Quintron AccessNSite system;
Must have the capability to arm/disarm from the ISO container as well as remotely from the SOC;
Installation will include one high security switch and one Passive Infrared (PIR);
System must have its own Premise Control Unit (PCU); and
System must include additional tamper switches to monitor exterior Hoffman boxes.
The Contractor shall install a K12 rated vehicle barrier arm in accordance with UFC 4-022-02 across the Swain
Annex Loading dock access road during the first (1 st ) year of award. The K12 vehicle barrier will need to meet the following minimum specifications:
Must be K12 rated by the US Department of State;
Barrier width must be no less than 24ft;
Barrier must be hydraulic;
All functioning parts must be above ground, with maintenance covers for easy maintenance and servicing;
Controls to operate gate will be installed inside Swain Warehouse;
Unit must have internal heater to keep hydraulics at normal operating temperature during periods of extreme cold;
Unit must have battery back-up capable of raising the arm a minimum of 2 times;
Unit must have the ability to close without power;
Unit must have intergraded emergency hand pump to raise unit in the case of prolonged power outages;
Unit must have red and green traffic light to indicate when arm is opened or closed;
Arm must be painted safety yellow with red and white reflective tape stripes;
Unit must be capable of at least 120 complete up/down cycles per hour;
The barrier motion shall be instantly reversible in either direction;
The barrier shall rise in approximately 3-8 seconds;
The barrier must be capable of operating in a temperature range of 32°F to 120°F;
Unit must operate of 208 – 240 VAC 60 HZ Single Phase;
Must be able to operate the unit from inside the units service panel for maintenance;
All unit access panels must be lockable to prevent unauthorized access; and
System must include a 24 hour battery backup.
Proposed equipment for upgrade will be approved by Government POC. This upgrade shall include the installation of required power feed, main power disconnect breaker and other required electrical hardware to power the unit.
This install will also include the installation of two (2) fixed K12 rated bollards on each side of the vehicle barrier arm to barricade the rest of the access road which is approximately 14 feet of space. These bollards will be spaced every 4 feet on center. Additionally, there needs to be one (1) fixed K12 bollard installed on the front and rear operational units on both sides of the barrier. There are a total of eight (8) bollards in all.
This installation will also include the ground preparation, installation of rebar and pouring of required rated concrete.
The Contractor shall install 20 new door readers, strikes, high security switches and control boards throughout
Hochmuth Hall and Swain Annex during the second option (2nd) year. The equipment must meet the following requirements:
Must be integrated and compatible with current access control system.
Must be able to read IC badges.
Lifecycle replacement of all high security paper/media shredders (all MCIA locations) will be split between two (2) years - half replaced on the third (3rd) year and the remainder replaced on the fourth (4 th
) year. Lifecycle replacement will have a schedule that will replace badge printers on the fourth (4 th
) option year.
5.1.2 - Preventive Maintenance Requirements
The Contractor shall provide the labor, equipment and supplies required to provide preventative maintenance including cleaning of all CCTV camera lenses every 6 months to include the removal of spider webs, adjustment and focusing of camera lens as needed, adjustment of door hardware and strikes, removal of dust from electronic components, testing of panel back up batteries, and changing and checking the oil level of the garage vehicle barrier arms every 6 months. Check garage barrier arm ground loop sensors every 6 months to ensure proper operation and repair or replace if required. The following tasks shall be performed independent of Government supervision, direction, or control:
The Contractor shall provide all necessary labor, equipment, supplies, upgrades, patches, etc. required to provide preventive maintenance support for all aspects of the Quintron AccessNsite security system. This includes additional procured licensing for expanded requirements.
Ensure all security related equipment is operating properly and ensure preventive maintenance is conducted in accordance with the components operating/user manual (provided upon request).
The Contractor shall provide bi-annual preventive maintenance inspections, to include cleaning all cameras and ensuring all security related equipment is operating properly. This includes 3, 6 and 9-month preventive maintenance on user manual specified components. The contractor shall immediately begin the preventive maintenance on all MCIA security equipment, software and components.
The Contractor shall provide all hardware and software version patches, fixes and updates that become available as changes occur routinely and/or updated annually to the Intrusion Detection System (IDS), access control system
(Quintron’s AcessNSite), and Closed Circuit Television (CCTV) system during the contracted support period. Once these updates are received by the contractor, they will have five (5) business days to notify the COR. Once the COR is notified, proper arrangements will be coordinated with the MCIA Information Systems Department to schedule the updates.
6. TASK 2
6.1 SERVICE CALLS AND REPORTING REQUIREMENTS
The Contractor shall establish a single management focal point to accomplish the administrative, managerial and financial aspects of this contract and this person shall serve as the primary interface with the COR.
The contractor shall respond within four (4) hours from the time the COR or designated government representative, initiates a request for maintenance or repair with the contractor.
The Contractor turnaround time to report back to the Government with a plan shall be within two (2) calendar days of the service call with an outlined resolution and price.
The Contractor’s employees shall check-in and check-out with the COR or designated government representative each and every time the Contractor is performing work at the job site. This is a mandatory requirement for SCIF accountability.
Upon completion of any on-site work and prior to the Contractor leaving the facility, the Contractor shall contact the
COR or designated representative for an oral incident summary so the work can be officially inspected and accepted by the Government as complete.
The Contractor shall provide a written incident summary for each incident) within 10 business days notification.
This should include any final costs, actions taken and lessons learned.
7. Task 3
7.1 The Contractor shall be prepared to provided additional expansion physical security equipment and components based upon threats and security posture increases. The Government will identify and approve all procurement of security equipment and components based upon evolving security issues. These expansion additions are to sustain a level of security in accordance with IC policy and directives. Upon receiving Government pre-authorization, provide replacement materials, parts, and items for expansion items identified.
8. DATA RIGHTS
8.1 No data, materials, information or other items (hereinafter singularly or collectively "Items") created or provided expressly for this PWS shall be used by the Contractor for any purpose other than those that are in support of, or for performance under, this PWS without the prior written permission of the Contracting Officer. The
Contractor is obligated to protect from unauthorized use or disclosure all Government confidential or classified material and/or Government-owned proprietary, and/or Personally Identifiable Information or Personal Privacy, Items obtained in the course of performance under the Government contract, as long as such Items remain proprietary, confidential, sensitive or classified. Any information obtained in the course of duties, or the performance of services, under this contract including, but not limited to, information that may be made available for use that relates to the technical data, trade secrets, processes, operations, style of work, or apparatus, or to the technical data, statistical data, amount or source of any income, profits, losses, or expenditures of any person, firm, partnership, corporation, or association is included in this clause (and with Items). Contract personnel shall not publish, divulge, disclose, or make known items in any manner, or to any extent not authorized by the Contracting
Officer. When the Contractor's need for such Items ends (including all database or GFI/GFE items), the items shall be returned within 10 business days to the appropriate Government program personnel. However, the obligation not to discuss, disclose, release, reproduce or otherwise provide or make available such Items, or any portion thereof, shall continue, even after completion of this contract. Any actual or suspected unauthorized use, disclosure, release, or reproduction of any items or violation of this agreement, of which the company or any employee is or may become aware, will be reported promptly (within one business day) to the Contractor's program manager, who will inform the Contracting Officer within 5 business days of receiving such report.
All items generated by the Contractor, including, but not limited to, software and database data/information/products, instructional products, schematics, diagrams and general or analytical reports and all associated intellectual property, in whatever form, created, generated, or produced under this requirement shall become the property of the U.S. Government/Marine Corps and not the Contractor, subcontractor, or individual author or researcher; therefore, the U.S. Government/Marine Corps shall have the irrevocable, royalty-free, worldwide right to use, modify, reproduce, perform, display, release, or disclose such Items, in whole or in part, in any manner and for any purpose whatsoever and to have or authorize others to do so. The contract will include all applicable DFARS clauses (including, but not limited to, DFARS 252.227-7015 and DFARS 252.227-7020). Items shall be sufficient, complete and relevant to support the Contractor's findings and be consistent with fact. Test and demonstration will be required as an additional task for models. Unless otherwise authorized by the Contracting
Officer, the Contractor shall not use the Contractor's or a Third-Party's proprietary data, information, software items and/or other materials or other items for any purpose without meeting the requirements of DFARS clause 252.227-
7020 and without the specific, written approval by the Contracting Officer, prior to start of any work.
All deliverables shall be prepared and delivered as specified under the contract and/or the PWS. Deliverable Items pertaining to specific work to be performed under the contract shall be identified. Although not normally priced separately, the resources to prepare and submit these deliverables should be included in the proposed price for said task. While the list below constitutes potential reporting requirements which apply to the basic contract, the
Government reserves the right to require additional documentation not specified herein depending on performance requirements. All deliverables shall be delivered FOB Destinations as specified in the related Deliverables Chart.
The Contractor shall furnish the COR with one copy of the transmittal letter and required data requirements. All developed databases, analyses, studies, applications, information and other items and all associated intellectual property, completed or in progress under the contract shall be solely and fully owned by the Government. The
Contractor shall turnover all Contract developed databases, analyses, studies, applications, information and other items and all associated intellectual property, completed or in progress, to the Government, if not already delivered, upon contract completion.
9. DELIVERABLE REQUIREMENTS
The Marine Corps shall have unrestricted access and use of all deliverables upon delivery. The Contractor shall provide all deliverables in a version, format and media used/useable and modifiable by the Marine Corps. Therefore, unless otherwise directed by the COR, the deliverable items identified in this PWS shall be delivered in a media and an electronic format compatible with resources currently being used by the Government.
Table 1. Deliverables Chart Task # Method Delivery Frequency
# DELIVERABLE TASK DELIVERY
METHOD
FREQUENCY
0001 Non-Disclosure
Agreements
4.1.4 Electronic Due to COR within five (5) business days
of contract award. Due within five (5) business days for New employees.
0002 After Action Report 4.1.6 Electronic Due to COR within ten (10) business days following each service call.
0003 Quality Control Plan
Initial
4.1.7 Electronic Due to COR within ten (10) business days
following contract award.
0004 Quality Control Plan
Updates
4.1.7 Electronic Contractor shall maintain and update their
QCP throughout the performance of the contract. The Contractor shall make appropriate modifications and submit to the COR within thirty (30) days of the changes.
0005 Quality Control Plan 4.1.7 Electronic Contractor shall re-evaluate and submit an updated QCP to the COR within six (6) months of contract award.
0006 Quality Control Plan 4.1.7 Electronic Corrective action report is due to COR within one (1) business day of completion of the action.
0007 Annual/Semi-Annual
Report
4.2.1 Electronic Due no later than five (5) business days
prior to the scheduled contract review.
0008 Monthly Project Status
Report
4.2.2 Electronic Due to the COR by the tenth (10
th
) day of each Month.
# DELIVERABLE TASK DELIVERY
METHOD
FREQUENCY
0009 Transition Out Plan 4.5 Electronic Due to COR NLT ninety (90) calendar days prior to expiration of this contract.
Not required if current wins contract.
0010 Lessons Learned 4.5 Electronic and
Orally
Due to the COR no less than ninety (90) calendar days before end of award. Not required if current wins contract.
0011 Resolution and Pricing
Plan
6.0 Electronic Due to COR within two (2) calendar days
of service call.
10. WORKING ON A GOVERNMENT INSTALLATION
The Contractor shall provide each employee with an identification badge, which identifies, by photograph, the individual as an employee of the Contractor. These badges shall be worn at all times and presented for examination on request from the Contracting Officer, COR, QA Personnel, Military Police, or any other Government Official with a need to see the badge. All Contractor personnel attending meetings, answering Government telephones, working on site, where their Contractor status is not known to third parties, must identify themselves as Contractors, to include wearing ID badges which identifies them as Contractor personnel.
The Contractor and his employee shall be subject to all traffic, security and registration regulations for personnel and vehicles, to include Marine Corps Base Order 5530.2 "Contractor Screening Policy".
Contractor personnel shall also ensure that when logged onto Government equipment that their profile shows them as Contractor personnel. Unless otherwise directed by the COR, all documents produced or revised by Contractors or developed through Contractor participation must be marked as "Contractor generated documents" or otherwise identified in a manner that discloses the Contractor's participation.
11. PERFORMANCE REQUIREMENTS SUMMARY (PRS)
11.1 Performance Requirement Summary
The PRS is a listing of the tasks that will be monitored during the Contract term. The PRS Chart also lists examples of the types of documents that will be used during monitoring, as well as the standards of performance, the
Acceptable Quality Level (AQL) of performance and remedies for non-compliance that are available if the
Contractor fails to perform at the AQL. All listings of required services or standards used in this Performance
Requirements Summary Chart are intended to be completely consistent with the terms and conditions of the
Performance Work Statement (PWS). This PRS also provides the minimum standard of acceptable performance as well as the minimum acceptable Quality level of this standard. Failure to meet these minimum in any of the tasks listed will result in an assessment of unsuccessful performance for the task(s).
Performance Requirements Summary (PRS)
PERFORMANCE CHARACTERISTIC TARGET STANDARD MEASUREMENT
Quality of Work Performed
Use of resources to provide acceptable or better results through the following:
˗ Technical accuracy
˗ Thoroughness of analysis / findings
˗ Appropriateness of resources (people, computers, money and time) applied to achieve results.
˗ < 5% rejection rate of all formal deliverables submitted under the performance provisions of the contract
˗ <10% rejection rate of draft and first time submissions.
Reconciliation
˗ Reconciled weekly by Division
Leads.
˗ Reconciled monthly by COR /
CPM and tracked as a 3-mos.
moving average.
Consequence of Non-compliance
˗ Not exercise Options
˗ Negative CPARs entry
˗ Contractor Consideration
PERFORMANCE CHARACTERISTIC TARGET STANDARD MEASUREMENT
Responsiveness
Effective use of prime and subcontractor resources to meet ongoing (conventional) and discrete work requirements emerging at the Division levels, including:
˗ Providing effective responses to requirements / reallocations of labor within the WBS.
˗ Effective balancing of resources to accomplish work requirements without sacrificing priorities, or creating unstable performance.
˗ Using suitable benchmarking to establish staff allocations and work packages within the WBS.
Response provided to
COR within 24-hrs.
Strategy provided to
COR <48-hrs. from notification, including:
˗ WBS review
˗ Approach agreement
˗ Deliverables
˗ Availability of staff.
Assessment
Periodic assessment by the COR, as to the thoroughness of the response.
Reconciliation
Reconciled monthly by COR / CPM and tracked as a 3-mos. moving average.
Consequence of Non-compliance
˗ Not exercise Options
˗ Negative CPARs entry
˗ Contractor Consideration
Staffing
Includes selection of qualified staff to meet requirements:
˗ Adequacy of skills, experience of staff to meet program requirements
˗ Use of team members, Subcontract staff to ensure most qualified capabilities are applied
˗ Responsiveness and use of staff as required with the contracted PWS
˗ Staff stability maintained at 90% of proposed levels
˗ New hires within 30-days of notification of vacancy
˗ Subcontractor staffing pulls <10-days from notification of vacancy
˗ <14-days backfill for unscheduled staff departures
Assessment
Assessment by the COR
Reconciliation
Reconciled monthly by COR / CPM and tracked as a 3-mos. moving average
Consequence of Non-compliance
Extended periods of vacancy for staff, or consequential impacts to performance may warrant financial consideration / Negative CPARS entry / Termination
Management and Administration
Includes the following measures of performance and compliance:
˗ Deliverables shall be complete, accurate and prepared to a professional standard
˗ Quality of the Contractor's overall technical management strategy
˗ Ability to identify and preclude problems, or resolve issues
˗ Effectiveness of their use corporate quality practices, resolution of invoice anomalies and effectiveness of their overall subcontract management.
Aggregation of subordinated areas assessed using progressively more objective criteria - ratings considered:
˗ Excellent – Exceeded performance expectations and abated, or immediately mitigated know problems
˗ Acceptable - Met performance expectations and generally responded to problems in a satisfactory manner
˗ Unacceptable - Areas of inconsistent performance, prolific problems remain unresolved and two or more performance areas are impacted
Assessment
Assessment by the COR, Performance evaluation at TBD milestones;
Reconciliation
Reconciled monthly by COR / CPM and tracked as a 3-mos. moving average.
Consequence of Non-compliance
Irresponsible management with consequential impacts to performance may warrant financial consideration / Negative CPARS entry / Termination
12. Government-Furnished Property, Material, Equipment, or Information (GFP, GFM, GFE, or GFI)
The Government currently possesses the following list of materials/components. The Contractor must be able to replace any of the items integral to the proper operation of the security system, but is not limited to the list provided below. The parts shall be acquired on an as needed cost reimbursable basis under the
Other Direct Cost (ODC) Contract Line Item Number (CLIN).
GOVERNMENT LIST OF CRITICAL MATERIALS AND COMPONENTS
MODEL QTY DESCRIPTION
ALTV2416 5 Power Supplies for Cameras, 16 Outputs, 24VAC, 8 A
AL300ULXPD16CB 5 Power Supply for Motion Detectors, 16 Outputs,12VDC, 2.5 A, PTC
Protection
BT1212 50 12VDC, 12Ah Battery
FDX60M2 4 IFS Fiber Converter to RS485
CCH-01U 4 1U Fiber Patch Panel in Wall-Mount Rack
CCH-CP06-56 4 Closet Connector Housing, 6 Fiber, Multimode, 62.5um
DTK-PVP27B 23 Surge Protection for Fixed Cameras
DTK-DP4P 22 Surge Protection for PTZ Cameras
EX4300-32F 2 32 Port Switch
WCH-04P 1 Fiber Panel
CNGE2MC 2 Media Convertor
VJM-4016-US 1 16 Channel Encoder
CCH-04U 1 Fiber Panel
IMP-100A-M-T 19 POE Media Converter
NPD-6001A 18 Media Convertor
VG4-SFPSCKT 18 Ethernet to SFP Interface
VG4-A-TSKIRT 18 PTZ Trim Skirt
NIN-733-V03IPS 19 Fixed Dome Camera Color
VG4-A-PA0 18 PTZ 24 VAC Power Supply
VG5-7130-EPC4 18 PTZ Indoor/Outdoor Digital IP Color
WV-SW504 6 Color Indoor Fixed Camera
POH1000HB 7 Enclosure with Heater and Blower
PLZ275DN 7 Camera Lens 2.7-13.5m
WV-CW484S 7 Camera Outdoor Color CCTV w/PTZ
POD9cta 22 Camera Housing Enviro
PWM20g 22 Outdoor Wall-Mount
WV-CU650 2 System Controller for Cameras
WJHD716/2000T2 2 Camera DVR Analog
HM507384N10040 1 Network Video Recorder, Server I7 CPU 8x4TB HDD
PF089680 2 Badge Printer, with Laminator and Internal Reader enroller.
Val-8500-630 2 USB Deluxe Camera W/Flash
T71-083-075-2 6 Large Enclosure with Power Supply, One ADC, Two DRI and RS485
T71-083-075-6 8 Large Enclosure with No Power Supply, Three DRI Sub Controllers
T71-083-075-1 4 Large Enclosure with power supply, Can Mount, Three IPP Boards
C111005 6 IPP-16-PCB Input Processor
C111003 3 KRI Alarm Control Pad
C204068 50 Multiclass RPK40 Keypad Reader
FDX60M2 4 IFS Fiber Converter to RS485
JMS-4AED 2 7" touchscreen handset
RY-3DL 4 selective door release adapter
JMS-4AEDV 2 handset/hands free
JM-4HD 2 7" touchscreen sub master
KC-DAR 2 Intercom with cam
AP-10M 1 Multi Zone Intercom Switch
LE-SS/A 3 Intercom
H-959 1 Poly Strapping Machine
E5031-XSWL62641 110 Eplex 5000 Electronic Lock
PMD2 EZPLUS-0033 1 Walk-through Magnetometer
HS-1010 21 High Security Shredder
0201 OMD 4 Media Destroyer Shredder
CDX-10 10 High Sec Door Lock
7110-01-029-0389 5 5 Drawer Multi-lock File Safe
7110-00-919-9193 25 5 Drawer File Safe
7110-00-920-9343 4 4 Drawer File Safe
7110-00-920-9342 78 2 Drawer File Safe
7110-00-476-2954 1 Vault
52R-N5-40WH 60 Security Rotating Beacons
Datastroyer 240/X2 Evac 1 Disintegrator with X2 Evac System/55 gallon Steel Drum Collection Bins
DCS 100 1 Disintegrator and Evac System
1601 4 Barrier Gate
MST-T 1 Tandem Maximum Security Turnstile
D938Z 155 PIR 360 Motion Detector
DS150i 6 Request to exit detectors
AP669 62 Motion Detectors
1006 Series 30 Heavy Duty Strikes
1570 1 Electromagnetic Gate Lock
HSS-L2D 40 High Security Switch
MSS-330C 20 Recessed Contact
3000 Series 20 Electric Strike
CX98/99 Series 20 Controlled Exit Device
C50EMC 2 Encoder
S60DMC 2 Decoder
PMD2 2 Walk Through Metal Detector
EMIS 1 Mail Scanner
XIS-1080D 1 X-Ray Machine
PL-260A 1 PA Multi-zone Amplifier
XTS-5000 16 Radio
SPS-30 3 White Noise
13. KEY PERSONNEL
13.1 PROGRAM MANAGER (PM)
Minimum Experience:
Five years of related experience, including five years managing a staff of four or more as Project Manager of projects involving CCTV install and maintenance, CCTV design, access control and IDS installation, access control and IDS maintenance and troubleshooting, government high security contracts, ability to offer suggestions to new problems and requirements.
Minimum Education:
Bachelor's degree in Information Systems, Program Management, Engineering or comparable discipline. Advanced professional education and training in management principles and practices are desirable.
Functional Responsibilities:
Manages the overall program and contractual effort. The position serves as the contractor's authorized interface with the Government Contracting Officer, the Contracting Officer's Technical Representative (COTR), government personnel, and customer agency representatives. Responsible for formulating and enforcing work standards, assigning contractor work schedules, and reviewing work discrepancies. Supervises contractor personnel and communicate policies, purposes and goals of the organization to subordinates. Responsible for the management of the entire project and the assigned staff. Responsible for coordinating all project administrative matters with the
Contracting Officer's Representative.
13.2 SENIOR TECHNICAL CONSULTANT (KEY PERSONNEL).
Minimum Experience:
Five years of on the job experience in the design, installation and troubleshooting of security hardware, to include:
Access control, CCTV, Intrusion Detection Systems (IDS), and Quintron’s AccessNsite software.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .