M60_Tank_Installation.pdf
PDF 22 MB Posted
- Attached to
- DESIGN, FABRICATION, & INSTALLATION MUSEUM EXHIBIT Federal contract opportunity
- Solicitation number
- M00264-15-R-1081
- Issued by
- United States Marine Corps
About this file
M60 TANK INSTALLATION
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFP _M00264-15-R-1081-0002.pdf | ||
| SBD_Installation.pdf | ||
| RFP _M00264-15-R-1081-0001.pdf | ||
| Vietnam_Tableau_Exhibt_Drawing_Package.pdf | ||
| RFP _M00264-15-R-1081.doc.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AREA OF WORK
Facility Wall of poured concrete. Height of wall: 23’-0”
Scope of Work- -Scope includes the installation of the M-60 tank at the location shown. All of the other exhibit elements shown are for reference only and are not in scope.
-Design and fabricate steel mount to support tank. Mount to be securely bolted to concrete deck at location shown. NMMC to con�rm height and angle of tank in �nal position but will not exceed 8’-0” high from the deck to the bottom of tank. Tank weight: 55 tons.
-Tank to be lowered onto mount with crane prior to the construction of building roof (by others). Contractor will have a window of time during construction of building perform this work. At the time of tank installation the exterior wall shown will be completed. Installation of tank will necessitate locating crane on the opposite side of the wall.
-Once on mount, tank will be secured to prevent movement.
-Mount to be constructed in such a way as to be encapsulated by themed ground form (by others) and be invisible to the visitor when theming is complete.
-After tank installation is complete it will be covered with tarps and plywood so as not to damage surface and protect it from damage by facility construction workers.
Note: Scope only includes installation of tank and mount, all other elements shown to be installed at a later date and are for information only.
Note: Scope only includes installation of tank and mount, all other elements shown to be installed at a later date and are for information only.
| 150206_G13_3D |
| iX00-01 |
| iX00-02 |
| iX00-03 |
| iX00-04 |
| iX00-05 |
| iX00-06 |
| iX00-07 |
| iX00-09 |
| iX13-01 |
| iX13-02 |
| iX13-03 |
| iX13-04 |
| iX13-05 |
| iX13-06 |
| iX13-07 |
| iX13-08 |
| iX13-09 |
| iX13-10 |
| iX13-11 |
| iX13-12 |
| iX13-13 |
| iX13-14 |
| iX13-15 |
| iX13-16 |
| iX13-17 |
| iX13-18 |
| iX13-19 |
| iX13-20 |
| iX13-21 |
| iX13-23 |
| iX13-24 |
| iX13-25 |
| iX13-26 |
| iX13-27 |
| iX13-28 |
| iX13-29 |
| iX13-30 |
| iX13-31 |
150206_G13_2D
File details come from the government source that posted it. Updated .