Response to Questions from prospective offeror's and to extend the offer due date to 29 Jun 15.

View the file

Other files for this federal contract opportunity

Other files attached to WTBN Doctrinal Support, newest first.
File Type Posted
M00264-15-R-1023-0001.doc DOC document
QASP.doc DOC document
Revised_Solicitation_M00264-15-R-1023.doc DOC document
PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

QUESTIONS AND ANSWERS

QUESTIONS FROM PROSPECTIVE OFFERORS AND ANSWERS FROM GOVERNMENT SOLICITATION (M00264-15-R-1023)

Weapons Training Battalion (WTBN) Doctrinal Revision

Question 1: SF 1449 Continuation Sheet, Item Number 0001 provides a 4 month period of performance, Items 0002AA-0002AD show 2 month review periods. Does this constitute a 12 month total Period of Performance, or could some of the review processes occur sooner?

Answer 1: Yes, some of the review processes could occur sooner.

Question 2: Given that a brand new program is referenced in Section 1.0, will the M9 service pistol be the only sidearm included in the updated manual?

Answer 2: Yes, only the M9 service pistol will be included for this requirement.

Question 3: Will the photo requirement be in black and white as in the current publication, or in color?

Answer 3: Black and white

Question 4: Does the government intend to delete or add to the 149 pictorials in the current manual?

Answer 4: The number of pictures in the new manual may be more or less, the intent is to ensure that through pictures, techniques are understood.

Question 5: Given that a brand new program is referenced in Section

1.0 is the new manual anticipated to be larger? If so, what is the anticipated size?

Answer 5: The new manual is anticipated to be around the same number of pages with a

10% variance.

Question 6: Will the Government provide Personal Protective Equipment (PPE) to the contractor to support training?

Answer 6: YES.

Question 7: If no access to secure or classified data is required (PWS

6.2) are employees supporting this effort that will NOT go aboard Quantico required to have a NACI investigation completed IAW PWS 6.1? For example, the technical writer or photo editor?

Answer 7: NO

Question 8: Will the Government provide dedicated workspace to contractor personnel?

Answer 8: If required, space is available. But computer assets will not be provided.

Question 9: Please clarify the meaning of ‘redacted’ in the context of submission of technical and business proposals on page 39 of the RFP.

Answer 9: Paragraph L-3.1 will be revised to remove the word “redacted”.

Question 10: Page 13, 5.2, table: Explain page 13, table Final drafts and final versions to designated activities in PWS 4.5 states after 3 months, 6 months, 9 months, and 12 months. Dates don’t coincide with pages 3-8, CLIN items 0001 (4 months), 0002AA (2 months), 0002AB (2 months), 0002AC (2 months), and 0002AD (2 months).

Answer 10: The table on page 13, 5.2 in the PWS is being revised.

Question 11: Page 13, 6.1: Does the photographer need to have a current NACI investigation considering page 14 states there will be no access to any secure or classified data systems or materials in support of the contract?

Answer 11: YES.

Question 12: Will the government add 6 months of the 12 month POP price as the cost for

CLIN 0003 or can the offeror list a separate cost for the 6 month option?

Answer 12: List a separate cost for 6-month option.

Question 13: In the interest of cost savings to the government, would the government consider the granting of “military necessity’ for contractor use of Quantico Bachelor

Housing for all or a portion of contract duration? (See: USMC, MCB Quantico, MARINE CORPS BASE ORDER P11101.4A, BACHELOR HOUSING

MANUAL)?

Answer 13: NO

Question 14: Reference 4.4.: Will the Government require in-person attendance for all weekly meetings? Are meetings via Skype or Go to Meeting acceptable alternatives to onsite weekly meetings?

Answer 14: YES

Question 15: Realizing that the majority of effort will take place during the Doctrinal Revision

Support CLIN, and in the interest of minimizing cost to the Government, can the

Government provide an estimate of the level of effort required during the

Doctrinal Review CLINs?

Answer 15: This should be limited to editing and formatting of the document, no field or firing time is anticipated, but may be required if Training, Techniques, and

Procedures (TTPs) required validation.

Question 16: If deemed beneficial to time and cost savings, would the Government consider utilization of the contractor’s range facility for the taking of photos and/or doctrinal discussions?

Answer 16: NO, photography must be conducted under the supervision of WTBn personnel.

Question 17: Is the Government satisfied with the existing Combat Pistol Program (CPP) and only seeking to incorporate the CPP into reference, or are there areas of the CPP that will require further analysis, design, and development? If there are areas requiring further analysis, design, and development what are the major areas?

Answer 17: There is currently no anticipated further analysis, design, and development

(ADD) requires. However, on order of General Officer review, the vendor would be required to assist in validation of TTPs.

Question 18: Ref Sec 3.7. Contractor must be versed in taking professional photos of Marine shooters staged in the correct shooting position. These pictorial training aids will be used within the MCRP 3-01B to assist with the learning process and will reflect unambiguous shooting positions. Will the WTBN provide access to suitable Marines who can demonstrate/model correct shooting techniques or does the contractor provides that model? Would the government consider utilizing a contractor provided range for the photo shoots?

Answer 18: WTBn will provide the Marine to model all poses. The government will not consider a contractor provided range for photo shoots.

Question 19: Page 9 of 50, CLIN 0003, states the POP is 6 months; Page 19 of 50, Inspection and Acceptance, Delivery Information, CLIN 0003, states, "POP

02-JUL-2016 TO 01-DEC-2016." The dates listed are actually 5 months in duration, however, we interpreted the period of performance to end on 1 Dec 2016.

Please confirm that we have interpreted this correctly.

Answer 19: The correct period of performance (POP) for CLIN 0003 is 6 months. The actual months will be revised to reflect six (6) months.

Question 20: Page 39 of 50, Section L-4.1, states "Text and graphics portions of the electronic copies shall be in a format readable by MS Word 2003 or later.

Data submitted in spreadsheet format shall be readable by MS Excel

2003 or later." We have assumed that the Government's current MS software is

Version 2003, which would mean the Government would not be able to read our proposal if it were submitted in a software version later than 2003.

Please confirm that we have correctly interpreted this requirement to mean our proposal should not be submitted in any Microsoft Word or Excel version that is not readable by version 2003.

Answer 20: The Government’s current MS Office version is 2010.

Question 21: Page 13, 5.2, table: Comment adjudication references 4.6. There isn't a paragraph

4.6 in specific services on page 11.

Answer 21: Comment adjudication references is being changed to reflect 4.5.

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 25-Jun-2015 10:00 AM to 29-Jun-2015 10:00 AM.

DELIVERIES AND PERFORMANCE

The following Delivery Schedule item for CLIN 0003 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC

POP 02-JUL-2016 TO

01-DEC-2016

N/A
M30903

WEAPONS TRAINING BATTALION

27211 GARAND RD MCCA

QUANTICO VA 22134

SUNG NONTONG

703-784-5250

FOB: Destination M30903

To:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC

POP 02-JUL-2016 TO

01-JAN-2017

N/A
M30903

WEAPONS TRAINING BATTALION

27211 GARAND RD MCCA

QUANTICO VA 22134

SUNG NONTONG

703-784-5250

FOB: Destination M30903

The following have been modified:

INSTRUCTIONS TO OFFERORS

INSTRUCTIONS TO OFFERORS COMMERCIAL ITEMS: Addendum to FAR 52.212-1

L-1. GENERAL

L-1.1 The Government intends to award a single Firm Fixed Price (FFP) contract for a base year as a result of this solicitation.

L-1.2 Each Offeror shall submit a proposal that clearly and concisely describes their response to the requirements of this solicitation. Use of general or vague statements such as “standard procedures will be used” will not satisfy this requirement. Unnecessary elaboration or presentations beyond that sufficient to present a complete and effective proposals are not desired and may be construed as an indication of the Offeror’s lack of understanding. Elaborate artwork and expensive visual or other presentation aids are discouraged. Data previously submitted, or presumed to be known, i.e. descriptions of previous projects performed for the Government cannot be considered as a part of the quote unless physically incorporated in the proposal.

L-1.3 All reports, Records, materials (including, but not limited to, photography, graphics, and artistic or creative Works), information, and items, and all associated intellectual property, in whatever form, created, generated, or produced under this contract shall become the property of the Marine Corps; therefore, the Marine Corps shall have the irrevocable, worldwide, royalty-free, right to use, modify, reproduce, perform, display, release, or disclose such reports, Records, materials, information and items, in whole or in part, in any manner, and for any purpose whatsoever, and to have or authorize others to do so. Furthermore, the Contract shall include DFARS clause 252.227-7020. Moreover, the Contractor shall not use the Contractor's or a Third-Party's proprietary items and/or other materials for any purpose without meeting the requirements of DFARS clause 252.227-7020 or without the specific, written approval by the Contracting Officer prior to start of any work.

Government Data/Materials/Information/Items. No data, materials, information or other items (or any associated intellectual property) created or provided expressly for this effort shall be used by the Contractor for any purpose other than those purposes that are in support of and performance under this effort without the prior written permission of the Contracting Officer. The Contractor is obligated to protect from unauthorized use or disclosure any government confidential or classified material(s) and government owned proprietary data obtained in the course of performance of services under any government task order/contract as long as such data remains proprietary, confidential, or classified. Any information obtained in the course of duties or the performance of services under this effort including, but not limited to, information that may be made available for use which relates to the technical data, trade secrets, processes, operations, style of work, or apparatus, or to the technical data, statistical data, amount of source of any income, profits, losses, or expenditures of any person, firm, partnership, corporation, or association is included in this clause. Contractor personnel (including any subcontractor personnel) shall not publish, divulge, disclose, or make known Data/Materials/Information/Items in any manner or to any extent not authorized by the Contracting Officer.

L-1.4 Proposals must be prepared in accordance with these instructions. Failure to do so may result in the Offeror’s submission being determined to be unacceptable and ineligible for award. Each Offeror’s submission shall be screened by the Contracting Officer or a designee upon receipt to ensure completeness and compliance with the instructions contained in the RFP.

L-1.5 It is an offeror's responsibility to ensure and verify its proposal has been received by the proper person at the proper place at the proper time. It is the offeror's responsibility to confirm proper delivery to, and timely receipt by, the RCO, Darrell Williamson, Contract Specialist.

L-1.6 The purpose of this procurement is to obtain dotrinal revision services. The contract award shall be made in accordance with the following information contained in Sections L and M. Each Offeror must submit a proposal including information pertaining to Technical Capability; Performance Execution and Management; Past Performance; and Price.

L-2 Questions: Offerors may submit questions requesting clarification of solicitation requirements. All questions must be received by 29 May 2015, NLT 4:00 PM Eastern Time. All questions submitted for this solicitation must be electronically sent to the following email address: darrell.williamson@usmc.mil. No questions will be responded to after the closing date/time. For proposal purposes the estimated date of contract award is anticipated with a period of performance start date of 02 July 2015.

Note: Due to the firewall at Quantico, please be advised that it is the Offeror’s responsibility to ensure all electronic submittals of questions are received by the Contracting Office in the timeframe given above.

L-3 INSTRUCTIONS FOR SUBMISSION OF PROPOSALS

L-3.1 Electronic proposals are not authorized for this solicitation and will not be considered for evaluation. Proposals must be submitted no later than 10:00 AM Eastern Time, 29 June 2015. The Offeror’s proposal shall consist of two (2) separate volumes with one (1) original and three (3) copies of each volume. The Volumes are I - Technical and II - Business. In addition to the paper copies identified above, the Offeror shall submit all proposal information in electronic format on a CD. In order to maximize efficiency and minimize the effort involved in the proposal evaluation process, all Offerors must comply with the following instructions for proposal format and content. Proposals that do not comply may be considered non-responsive and may render the offer ineligible for award. Proposals shall be sent via Federal Express, private courier, or hand delivered, to the following address and must be received prior to the cutoff date/time to:

Regional Contracting Officer, NCR

Room 224

Attention: Darrell L. Williamson 2010 Henderson road

MCB, Quantico, VA 22134

L-4 PROPOSAL FORMAT

L-4.1 Text and graphics portions of the electronic copies shall be in a format readable by MS Word 2003 or later. Data submitted in spreadsheet format shall be readable by MS Excel 2003 or later.

The electronic version on CD shall be prepared so that if an evaluator prints the proposal it meets the following format requirements:

· 8.5x11 inch paper

· 8.5x14 inch for foldouts, matrixes, WBS;

· Single-spaced typed lines

· 1 inch margins on all sides

· 11 point Arial font

· Headers/Footers – ensure the company name and RFP number are included on each page

· Graphs and drawings must be clear / legible and may use a smaller font

· No photographs or hyperlinks are permitted

L-5 PROPOSAL CONTENT

Each proposal shall contain the following volumes/sections:

· Technical Volume (I)–NTE 30-pages, including a Letter of Introduction, Table of Contents, Compliance Matrix, Technical Capability, Performance Execution and Management, and Past Performance.

· Business Volume (II)–NTE 15 pages, including a Formal Offer Letter, SF1449 and Section B Price Proposal.

If a proposal volume exceeds the above page limitations, all pages in excess of the limitation for each volume will not be considered in order that all proposals are treated equally.

Volume (I) – Technical Volume

L-5.1 The Offeror shall demonstrate the ability, resources and experience required to perform the requirements in the PWS, including the detailed procedures and methods to be used. All information must be presented in sufficient depth for the government to make a comprehensive evaluation of the Offeror's understanding of the PWS and the Offeror's capability for successful performance. Pricing Information shall not appear anywhere in the Technical Volume (I), which shall address only the technical capability, performance execution and management, and past performance requirements.

L-5.2 A Letter of Introduction, limited to one (1) page, with the solicitation number, corporate principal submitting the offer, key points of contact within the company (e.g., contracts, pricing, technical), and a summary of the material content. This letter is not included in the page count.

L-5.3 A compliance matrix should be included, along with a Table of Contents (TOC) pertinent to the proposal’s material organization. Neither the compliance matrix, nor the TOC are included in the page count.

L-6 Evaluation Factors

L-6.1 Factor 1 - Technical Capability.

The proposal should clearly address the Offeror’s understanding of the technical and programmatic requirements outlined in the Performance Work Statement (PWS); ensuring their discussion articulates their capability so as to provide continuous quality support. The discussion must demonstrate the Offeror’s capacity to support the identified demonstrated mission areas, understands the priorities and emerging issues within those areas, and can execute a comprehensive approach that ensures quality Performance and use of staff resources to meet objectives. The proposal should clearly demonstrate the Offeror’s ability to adequately identify a suitable level of technical understanding of the issues. This includes, at a minimum, describing contract level performance objectives that can be accomplished by their technical approach; describe the benefits and advantages of that approach; and effectively illustrate the roles of staff and team resources to execute the intended strategy.

L-6.2 Factor 2 - Performance Execution and Management.

The proposal shall clearly demonstrate the Offeror’s management approach suitable to respond to the types of requirements delineated in the PWS, consistent with their technical approach. The discussion must provide a comprehensive approach to managing task orders, performance-based work requirements; assurance of consistent quality of performance; capacity for handling matters of staffing and resource balancing; and ensuring complementary roles between the contractor’s managers and government staff. The evaluation will be based on the Offeror's understanding of the critical support areas, emerging issues, and risks associated with the support goals set forth in the PWS, and have the management techniques, controls, subcontractor management processes, and quality provisions necessary to execute their approach.

The offeror shall demonstrate their ability to adequately define an effective management approach complementary to the proposed technical solution set forth in response to the criteria in the PWS. At a minimum, this includes identifying responsibilities and roles of team members in attaining performance objectives; describing the processes and quality measures associated with executing the strategy; and illustrating the roles of staff and team resources relevant to the approach so as to ensure suitable oversight and control of performance execution. Collectively, the integrated approach must demonstrate to the evaluator that the Offeror possesses the capabilities and resources to establish and operate an efficient organization that is both responsive and flexible to meet the requirements. Roles of management and other key staff are annotated and provisions for independent, objective quality assurance (e.g., customer surveys, etc.) are incorporated. Measures for immediate action and remediation are noted in the discussion so as to ensure the quality of contract deliverables and timeliness of service delivery. Key considerations include process maturity, roles of responsible staff, degree of WBS integration, and controls at both the corporate and contract level under performance-based operating parameters.

L-6.3 Factor 3. Past Performance.

The proposal shall address the quality of an Offeror’s relevant past performance based on the input received from the Offeror, its references and other reliable sources contacted by the government. Offeror’s that have no record of past performance (i.e. new businesses) must submit a signed and dated statement to that effect. If an Offeror submits a certification statement and the Government has no information available regarding the Offeror’s past performance, that Offeror will receive an Unknown Confidence (Neutral) rating (i.e. the Offeror is evaluated neither favorably nor unfavorably) for past performance. Offerors are advised that any contract reference submission that is not relevant will receive a neutral rating for that contract reference in Past Performance. The Offeror will provide (3) references demonstrating relevant past performance involving the quality of performing the same or similar scope and magnitude of effort and complexities within the last three (3) years . Include the following fields:

· Customer

· Contract/Task Order Number

· Program name

· Period of performance

· Contract type

· Total contract value

· Identification of any Key Staff involved who will be assigned to this contract

· Names/Telephone numbers/e-mail for the PCO and COR/TOM.

In addition, Offerors should provide the enclosed Past Performance Questionnaire (Attachment 02) to the same three (3) previous references. The references should email the form directly to the RCO-NCR at the email address provided on the form on or before 12 June 2015.

The Government may request additional past performance information from others using the Past Performance Questionnaire. The Government may also use other information such as CPARS/PPIRS/FAPIIS data available from Government sources to evaluate the Offeror’s past performance. The Government reserves the right to limit or expand the number of references it decides to contact and to contact references other than those provided by the Offeror.

Volume II - Business Volume

The Offerors shall address, at a minimum, all facets of the non-technical aspects of the offer, including a Formal Offer letter, to include the total contract dollar value. Provide prices corresponding to the CLINs in Section B of the solicitation, to include Labor categories and labor rates (material documentation) for your firm fixed pricing. There is a 15 page limit for Business volume II.

L-6.4 Factor 4. Price.

L-6.5 The Offeror shall complete the Section B CLIN’s and include supporting documentation.

L-6.6 Offerors should note that FAR 52.217-8, Option to Extend Services clause is included in this Solicitation. The Government will evaluate this potential option to extend services by adding six (6) months of the Offeror’s final option period price to the Offeror’s total evaluated price. Offerors are notified that the Government may choose to use the Option to Extend Services clause at the completion of any performance period. The price for the exercise of any portion of the available six months will be derived from the prices in effect at the end of the current performance period. Offeror’s pricing should reflect the potential exercise of the Extension of Services option at FAR 52.217-8, Option to Extend Services, keeping in mind that this solicitation is competitive and should reflect the Offeror’s most competitive price and terms.

L-6.7 The Government intends to evaluate the base and option period to determine best value based on the total price proposed.

L-6.8 Completeness. The Offeror must sign the solicitation, acknowledge all amendments, and include a compliance matrix and Table of Contents corresponding to their price submission. At a minimum, the following areas must be addressed:

· Offer is valid for 90-days from (Date of Submission);

· No exception to any Terms and Conditions has been taken, or if so, clearly cited;

· Acknowledge any Amendments to the RFQ;

· CCR validated / NAICS 611430 compliant;

· Signed Offer of $XXXXXXX for BY;

· CLIN pricing and supporting documentation is provided;

· Staff positions based upon contingency hires must include a signed letter of offer/acceptance in the Business Volume; and

· Additional supporting information is provided as required by the complexity of the offer.

PWS

PERFORMANCE WORK STATEMENT

Performance Work Statement for

Doctrinal Revision Of The Marine Corps Reference Publication (mcrp) 3-01b Pistol

1. Scope. Marksmanship Program Marksmanship Section (MPMS), Weapons Training Battalion (WTBn), Quantico VA has a primary responsibility to research, develop, and implement new marksmanship training, techniques, and procedures (TTPs). As TTPs are updated and created, they are captured and promulgated across the Marine Corps through various official Marine Corps correspondence and orders. Marine Corps Reference Publication (MCRP) 3-01B, Pistol Marksmanship was last updated in November, 2003. Since that time, the Marine Corps has shifted from the Entry Level Pistol (ELP) to a brand new training program for pistol instruction and qualification, the Combat Pistol Program (CPP). The doctrine and theory within MCRP 3-01B, is no longer relevant and cannot serve as the doctrinal reference for all Marine Corps Pistol Procedures. As a result, the 114 page MCRP 3-01B, with pictorial training aids, must be updated in order to provide a current reference for Marine Corps Marksmanship Training Units and Pistol Coaches to cite and reference when instructing.

2. Background. As the Marine Corps proponent for all facets related to marksmanship, Weapons Training Battalion is constantly evaluating, testing, and improving marksmanship to ensure that the best training and equipment is available to all Marines. As the facilitator and steward of the annual Marine Corps Marksmanship Symposium, WTBn is responsible for the monitoring of and progress of Marine Corps marksmanship shortfalls that were identified at the symposium. The lack of an updated MCRP 3-01B was a clearly identified training shortfall across the Marine Corps Forces and as such, WTBn has the sole responsibility to ensure that an updated MCRP 3-01B is signed by the Commanding General of Marine Corps Combat Development Center (MCCDC).

3. General Requirements.

3.1. Work Locations. Work efforts in support of this task, to include writing and editing of MCRP 3-01B along with the staging of models/taking of photographs, will be accomplished using their own equipment and software- no support equipment will be provided by WTBn. Contractor has the option to conduct tasks at off-site locations other than WTBn, except for all coordination meetings, photography, and progress reviews will be conducted aboard WTBn.

3.2. Government Responsibilities and Interface. The contractor is required to work directly for, provide updates to, and ask questions of the Marksmanship Program Management Section (MPMS), WTBn. As such, all governmental guidance, review, and feedback will be directly provided by MPMS.

3.3. Technical Performance Quality. The contractor shall possess the ability to learn the techniques and principles of the CPP- to the extent of participating in CPP training- in order to effectively communicate those nuances through updated written doctrine and photographs to Marines of all shooting levels.

3.4. The work will require the contractor to be skilled in writing, proficient at posing Marines/taking pictures of Marines in the correct shooting positions, and possess a strong understanding of Marine Corps terminology and Naval Letter formatting.

3.5. Performance Requirements. Performance will be evaluated via command review of the MCRP 3-01B, provided by three Commanding General’s offices. If the revised MCRP does not meet Naval Letter Format standards and/or fails to outline the necessary instruction for CPP, the MCRP will be sent back to the contractor with corrections for follow-up action.

3.6. Contractor shall ensure 100% grammatical and formatting accuracy of the revised MCRP 3-01B.

3.7. Contractor must be versed in taking professional photos of Marine shooters staged in the correct shooting position. These pictorial training aids will be used within the MCRP 3-01B to assist with the learning process and will reflect unambiguous shooting positions.

3.8. Contractor Qualifications: The contractor must provide - workers that have a strong background and experience in the development of marksmanship doctrine. It is not enough that the contractor is a competent marksman or trainer. Contractor employees must be skillful writers able to communicate accurately and succinctly and not be verbose writers. They must be trained and proficient in the use of Microsoft Word, PowerPoint, photography, and editing using the Microsoft Office programs. The contractor must have a strong familiarity with Marine Corps writing under the guidelines of the official Marine Corps Naval Correspondence Manual.

3.9. Contractor must have a familiarity with marksmanship, have the mental capacity to understand the TTPs of CPP, and convey those TTPs through text and pictorials.

4. Specific Services to be Provided.

4.1. Performance Standards. The contractor is required to revise all text and training pictorials of every page of the MCRP 3-01B to accurately present and instruct the new TTPs of the CPP.

4.2. Training Participation. The contractor will be required to walk and/or drive to pistol ranges aboard the Calvin A. Lloyd Range Complex, Marine Corps Base Quantico and observe/participate in CPP training. Must be physically capable of safely shooting a pistol.

4.3. Plan of Action and and Milestones (POA&M). Contractor will develop and submit a POA&M to MPMS for approval. This POA&M submittal and approval will take into consideration the timelines required for four levels of command review.

4.4. Attendance of performance meetings. The contractor must attend weekly update meetings at WTBn and brief a weekly report that monitors the progress of chapters updated within the MCRP 3-01B.

4.5. Revision to command review requirements. Performance metrics will be validated as the updated MCRP 3-01B is reviewed by four levels of command- Commanding Officer of WTBn, Commanding General of Training Command, Commanding General of Training and Education Command, and Commanding General of Marine Corps Combat Development Center. As such, the contractor will be responsible to complete/update/research and make changes as needed in response to all comments provided via command review to satisfy the requirement of an approved MCRP 3-01B.

5. Deliverables

5.1. Contractor will provide an updated MCRP 3-01B that reflects the current TTPs of the CPP. A complete updated and revised MCRP 3-01B will obtain the signature of the Commanding General of Marine Corps Combat Development Command ( MCCDC).

5.2. A Weekly Status Report (WSR) shall be provided to the COR in person via weekly update meetings, to assist the Government’s ability to monitor performance. The WSR shall include, at a minimum: (1) work accomplished for the week and its relation to the Performance Work Statement (PWS), (2) concerns or issues that may impact performance, schedules, or functionality, etc., and discuss proposed resolutions, (3) include any additional reporting as defined in the PWS. (Note that providing notification of a potential impact to the contract on the WSR does not alleviate the requirement to formally notify the contracting officer of possible contract issues).

Deliverable Content Due Date

POA&M
Document milestones, goals, and objectives
Contractor POA&M with COR within 14 days after date of award
Weekly Summary Report
Provide an update in person to COR at WTBn with regards to progress made.
Due to the COR NLT the Friday of the following week for the training accomplished from the previous week

Briefs, information papers and other products

Briefs, information papers and other products as identified by TECOM, the COR, or others designated by the COR

Due to COR for review NLT than 7 days after assignment of task

Comment adjudication 4.5.

Consolidation of all staffing comments and actions
Due to COR Training Command/TECOM/MCCDC for review NLT than 14 days after staffing suspense date
Final drafts and final versions to designated activities in PWS 4.5
As directed by COR
As required: After award of contract: – Six months after , to first activity.

Eight months after; to second activity.

Ten months after; to third activity.

Twelve months after; fourth activity for signature.

5.3. Contractor Responsibilities and Compliance: The contractor shall coordinate with the Contracting Officer’s Representative (COR) on a weekly basis to receive guidance and tasks. The contractor shall coordinate priority of effort with the COR. Core working hours are Monday through Friday, between 8:00 am and 4:30 pm EST., excluding normal Federal holidays. Time spent on a government shooting range must be under the supervision of Marine Corps certified range safety officers. All data entry work may be checked for accuracy and approved by the COR.

6. Security. Access to Government buildings will be granted for contractor employees and network accounts established. All contractor staff shall abide by the rules of conduct for the installation and the organization that they are supporting. This includes adherence to personal security (e.g., badges, Common Access Card (CAC)), information security policies, and work area access.

6.1. All contractors must have a current NACI investigation completed that will be valid through the course of this contract. The government will not initiate any investigation on the contractor’s behalf.

6.2. The contractor will not require access to any secure or classified data systems or materials in support of this contract.

7. Handling and Use of Data/Materials/Information and Intellectual Property Rights. The contractor shall provide deliverables management as defined in the PWS.

7.1. Government Data/Materials/Information. No data, materials, information or other items (hereinafter singularly or collectively “Items”) created or provided expressly for this PWS shall be used by the contractor for any purpose other than those that are in support of, or for performance under, this PWS without the prior written permission of the contracting Officer. The contractor is obligated to protect from unauthorized use or disclosure all Government confidential or classified material, and/or Government-owned proprietary, and/or Personally Identifiable Information or Personal Privacy, Items obtained in the course of performance under the Government contract, as long as such Items remains proprietary, confidential, sensitive or classified. Any information obtained in the course of duties, or the performance of services, under this contract including, but not limited to, information that may be made available for use that relates to the technical data, trade secrets, processes, operations, style of work, or apparatus, or to the technical data, statistical data, amount or source of any income, profits, losses, or expenditures of any person, firm, partnership, corporation, or association is included in this clause (and with “Items”). Contractor personnel shall not publish, divulge, disclose, or make known Items in any manner, or to any extent not authorized by the Contracting Officer. When the contractor’s need for such Items ends, the Items shall be returned promptly (within ten (10) business days) to the appropriate government program personnel. However, the obligation not to discuss, disclose, release, reproduce or otherwise provide or make available such Items, or any portion thereof, shall continue, even after completion of this contract/order. Any actual or suspected unauthorized use, disclosure, release, or reproduction of any Items or violation of this agreement, of which the company or any employee is or may become aware, will be reported promptly (within one business day) to the contractor’s program manager, who will inform the Contracting Officer within five (5) business days of receiving such report.

If proprietary items are incorporated into the deliverables including, but not limited to copyrighted materials, photographs, and/or use of individual’s images, the contractor shall obtain an irrevocable, worldwide, royalty-free license (or image release) of sufficient scope to allow the Department of Defense unrestricted use of such proprietary items. Moreover, the contractor will provide the original of all licenses and image releases along with a spreadsheet and/or other Intellectual Property Rights Audit Sheet listing all such signed licenses and image releases to the Contracting Officer upon request or at the time of delivery of the finished products.

For the MCRP deliverables, besides complying with DFARS clause 252.227-7020 in its entirety, the contractor will note section (c)(2), which reads: “When a work is first produced, created, or generated under this contract, and such work is required to be delivered under this contract, the contractor shall assign copyright in those works to the Government. The contractor, unless directed to the contrary by the Contracting Officer, shall place the following notice on such works: ‘<Copyright> (Year date of delivery) United States Government, as represented by the Secretary of the Navy. All rights reserved.’ ”The contractor will submit a draft of the aforementioned image release and assignment documents to the Contracting Officer for review and concurrence of the sufficiency of such documents. The contracting Officer will provide templates if requested by the contractor.

7.2. Reference DFARS clause 252.227-7020 Rights in Special Works.

8. Quality Assurance

8.1. The Government shall monitor contractor performance in accordance with the Quality Assurance Plan (QASP).

9. Travel and ODC Management

9.1. No travel outside of the local area is anticipated in support of this requirement.

10. Meetings

10.1. Weekly progress meetings involving the Government and the contractor are necessary to facilitate documentation and analytical support efforts. Date, time, and location for these meetings will be determined by mutual agreement between the contractor and the COR.

10.2. Post Award Kick-off Meeting. The contractor shall schedule and conduct a post award kickoff meeting within seven (7) days after date of the task order award. The purpose of this meeting is to ensure the contractor and the government, understands their roles and responsibilities, validate understanding of the requirement, including external influences, and mission, and establish a schedule for updates and communications.

10.3. Quarterly Contract Performance Review. The contractor, in conjunction with guidance provided by the COR, shall schedule and conduct a quarterly Program Review within fifteen (15) calendar days of the final day of the month for the period of performance (e.g., October-December – before Jan 16th). The agenda for the review shall be developed between the contractor’s Program Manager and the COR. The agenda items shall include the elements of the monthly Progress Report, performance metrics, as well as any additional items deemed important by the parties. The Government reserves the right to change the timing (E.G., semi-annually vice quarterly), content and format, as required.

11. Government Furnished Materials, Equipment, Property and Services

11.1. The Government will provide facilities access aboard MCB, Quantico and technical information, as required, for the performance of this requirement. As appropriate, the Government will provide for Navy-Marine Corps Internet (NMCI) connections for non-secure Internet Protocol Router Network (NIPRNET). Government will provide weapons and ammunition to partake in the CPP training.

12. Contractor Furnished Equipment, Materials and Supplies

12.1. Contractor will provide their own equipment to take professional quality photos of Marine subjects that will be posing in the correct shooting positions. Additionally, contractor must provide its own personal computer to revise the MCRP and provide their own related stationary equipment and tools.

13. Enterprise-wide Contractor Manpower Reporting Application (ECMRA)

“The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the solicitation M00264-15-R-1023 via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address https://doncmra.nmci.navy.mil.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported anytime during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help deck, linked at https://doncmra.nmci.navy.mil.

(End of Summary of Changes)